2 Flower Street (MediaWorks) SSCNVMP C1.1 Introduction This Site Specific Construction Noise and Vibration Management Plan (SSCNVMP) is for the MediaWorks Building at 3 Flower Street. It is required to satisfy CRL designation conditions 35, 39 and 40. As Appendix C1 of the Mt Eden Main Works Construction Noise and Vibration Delivery Work Plan (CNV DWP), this SSCNVMP is a supplementary document that builds on the CNV DWP, and therefore, directly references relevant sections of the CNV DWP to avoid repetition. Together, the CNV DWP and MediaWorks SSCNVMP are consistent with the draft MediaWorks SSCNVMP1. It will be implemented for works within 100m and blasting activities within 200m of the MediaWorks Building. The objective of this SSCNVMP is to detail the best practicable option(s) (BPO) to avoid, remedy or mitigate the identified adverse effects on MediaWorks. It contains, or references: •
Details of those responsible for implementing this SSCNVMP (CNV DWP Section 3)
•
MediaWorks noise and vibration sensitive spaces (Section C1.3)
•
The relevant standards (the general requirements in CNV DWP Section 4 and the MediaWorks specific requirements for Studio 1 are summarised in Section C1.2)
•
Predicted construction noise and vibration levels and transfer functions (Section C1.4)
•
Mitigation and management measures (CNV DWP Section 9)
•
Communication protocol (CNV DWP Section 10)
•
Monitoring (CNV DWP Section 11 and Section C1.5 specifically for Studio 1)
•
Contingency measures (CNV DWP Section 12.3 and Section C1.6 specifically for Studio 1).
•
SSCNVMP review process (CNV DWP Section 1.6 and CRL designation condition 40.13)
This SSCNVMP has been prepared by Marshall Day Acoustics and forms part of the Construction Environmental Management Plan (CEMP) for the Mt Eden Main Works. It builds on the SSCNVMP previously prepared and implemented for the Mt Eden Enabling Works.
1
Project Agreement in respect of the City Rail Link between Auckland Transport (AT) and MediaWorks Holdings Limited (Mediaworks), reference item 6 and Appendix 1. Page 8 | Mt Eden Main Works CNV DWP – Appendix C SSCNVMPs