Construction Environmental Management Plan Plan
Acronym
Designation Purpose Condition #
Section of CEMP and Appendices
Construction Noise and Vibration Delivery Work Plan
CNV DWP
16.1, 16.2, 31, 33.2, 34, and 36 to 39
To provide for the development and implementation of identified best practicable options to avoid, remedy or mitigate adverse effects on receivers of noise and vibration resulting from construction effects
0 and Appendix L
Historic Character Delivery Work Plan (Built Heritage Section)
HC DWP (Built Heritage Section)
41 and 46
To outline the practices and processes to avoid, remedy or mitigate the potential adverse effects on built heritage that may result during construction.
5.10.1 and Appendix M
Historic Character Delivery Work Plan (Archaeology Section)
HC DWP (Archaeology Section)
42
To manage the adverse archaeological effects that may result during construction.
5.10.2 and Appendix N
Urban Design Delivery Work Plan
UD DWP
47
To enable the integration of the permanent works into the surrounding landscape and urban design context.
5.11 This plan is not relevant to the early works
Public Art Delivery Work Plan
PA DWP
56
To manage the adverse effects on public art located within or in close proximity to the construction footprint.
This plan is not relevant to the early works
Contamination Delivery Work Plan (also a Contaminated Soils Management Plan)
CDWP
57
To outline the practices and processes to manage the adverse effects of contaminated land arising from construction.
5.12 and Appendix O
Table 1-2: Plans attached to the CEMP to address the relevant A2N resource consent conditions
Plan and relevant assessment
Acronym
Resource Consent Condition #
Purpose
Section of CEMP
Communication and Consultation Plan
CCP
25 and 27
To outline the practices and processes to ensure appropriate communication and consultation is undertaken with the community, stakeholders and parties affected by construction activities.
5.3 and Appendix G
Erosion and Sediment Control Plan
ESCP
53 - 58, 65 73
To outline the methods for managing and controlling erosion and sediment discharges from the construction area.
5.4 and Appendix H
Air Quality Management Plan
AQ DWP
219 - 228
To outline the practices and processes to avoid, remedy or
5.5 and Appendix I
Page 13
| Karangahape Station Early Works