Construction Environmental Management Plan Plan

Acronym

Designation Purpose Condition #

Section of CEMP and Appendices

Construction Noise and Vibration Delivery Work Plan

CNV DWP

16.1, 16.2, 31, 33.2, 34, and 36 to 39

To provide for the development and implementation of identified best practicable options to avoid, remedy or mitigate adverse effects on receivers of noise and vibration resulting from construction effects

0 and Appendix L

Historic Character Delivery Work Plan (Built Heritage Section)

HC DWP (Built Heritage Section)

41 and 46

To outline the practices and processes to avoid, remedy or mitigate the potential adverse effects on built heritage that may result during construction.

5.10.1 and Appendix M

Historic Character Delivery Work Plan (Archaeology Section)

HC DWP (Archaeology Section)

42

To manage the adverse archaeological effects that may result during construction.

5.10.2 and Appendix N

Urban Design Delivery Work Plan

UD DWP

47

To enable the integration of the permanent works into the surrounding landscape and urban design context.

5.11 This plan is not relevant to the early works

Public Art Delivery Work Plan

PA DWP

56

To manage the adverse effects on public art located within or in close proximity to the construction footprint.

This plan is not relevant to the early works

Contamination Delivery Work Plan (also a Contaminated Soils Management Plan)

CDWP

57

To outline the practices and processes to manage the adverse effects of contaminated land arising from construction.

5.12 and Appendix O

Table 1-2: Plans attached to the CEMP to address the relevant A2N resource consent conditions

Plan and relevant assessment

Acronym

Resource Consent Condition #

Purpose

Section of CEMP

Communication and Consultation Plan

CCP

25 and 27

To outline the practices and processes to ensure appropriate communication and consultation is undertaken with the community, stakeholders and parties affected by construction activities.

5.3 and Appendix G

Erosion and Sediment Control Plan

ESCP

53 - 58, 65 73

To outline the methods for managing and controlling erosion and sediment discharges from the construction area.

5.4 and Appendix H

Air Quality Management Plan

AQ DWP

219 - 228

To outline the practices and processes to avoid, remedy or

5.5 and Appendix I