City Rail Link – C1-C2 Community Liaison Group Meeting MINUTES AND ACTION POINTS Rā: Wā: Wāhi:
26 November 2020 5pm – 6pm Chief Post Office
CRL CRL staff & contractors
ATTENDEES CLG Members P McLuckie N Playle R Boswell J Mantell
Maria Hernandez-Curry (MHC)
Stakeholder Communications Manager – CRL Ltd
Nicole Lawton (NL)
Communications and Engagement Advisor – CRL Ltd
Andrew Swan (AS)
C1 Construction Manager – CRL Ltd
Jhon Aragon (JA)
C1 Delivery Manager – CRL Ltd
Brandy Smith (BS)
Downer Stakeholder Engagement Manager
ITEM
UPDATE/ACTIONS
1
Welcome and introductions – Maria Hernandez-Curry
• MHC welcomed everyone then introduced the meeting agenda. • Noted the meeting would be recorded for minute-taking purposes.
2
C1 Britomart/Lower Queen Street update – Andrew Swan and Jhon Aragon
• AS provided construction update (speaking to pictures in slide 3 of the presentation): - Construction is progressing well within the Chief Post Office (CPO) building - Minor Covid-19 related delays means the public opening of CPO pushed out until likely the end of March 2021 - Stainless steel canopies have been replaced in the front of the building by Te Komititanga, as well as the historic light columns and rebuilding the heritage canopy that had to be demolished before construction began - Rebuild of the column on the corner of the building complete •
CLG member asked if DSB would repair cracks on the back of the CPO building. AS said CRL will repair the base of the building where construction activity has caused chips and damage. In January 2021 Auckland Transport will scaffold the building for façade works – which includes a “deep clean”, crack repair and fixing up the windows. AS said the building will be shrink wrapped for about the first six months of 2021 for these façade works. He noted the cracks in the building’s façade were “legacy cracks” and had not appeared during CRL construction.
• AS continued his construction update (speaking to pictures in slides 4 & 5 of the presentation):
Page | 1
CRLL – CLG