Fee Description
Year 20/21 Fee incl. GST
Year 21/22 Fee excl.
GST
Fee incl.
Pricing Code
$1,920.00
$1,800.00
$180.00
$1,980.00
FC
$2,100.00
$1,963.64
$196.36
$2,160.00
FC
$2,520.00
$2,363.64
$236.36
$2,600.00
FC
$2,820.00
$2,636.36
$263.64
$2,900.00
FC
$2,820.00
$2,636.36
$263.64
$2,900.00
FC
$5,950.00
$5,590.91
$559.09
$6,150.00
FC
Stormwater Drainage [continued] Lintel only – 0.9m to 1.2m This fee is calculated per lintel (each) Lintel only – 1.8m This fee is calculated per lintel (each). Lintel only – 2.4m This fee is calculated per lintel (each). Lintel only – 3.0m This fee is calculated per lintel (each). Lintel only – 3.6m This fee is calculated for lintel (each). Small stormwater drainage pit works
This item includes work to modify/reconstruct/construct a stormwater drainage pit. Stormwater drainage pits are constructed or modified to comply with Council's Engineering Specification. This fee applies to drainage pits where the maximum dimension (H, W, D) does not exceed 1.5m. This fee is charged per drainage pit modification / reconstruction or construction. Large stormwater drainage pit works
At cost + 15% Estimate available prior to commencement.
FC
This item includes work to modify/reconstruct/construct as a stormwater drainage pit. Stormwater drainage pits are constructed or modified to comply with Council's Engineering Specification. This fee applies to drainage pits where the maximum dimension (H, W, D) exceeds 1.5m. This fee is charged per drainage pit modification/reconstruction or construction on a cost-plus. basis
Miscellaneous Works Business hours are from 7am to 4pm excluding weekend and public holidays. Miscellaneous project – labour costs
Full cost + 25% Estimate available prior to commencement
FC
This fee will be applied where Council elects to undertake work on behalf of another person or organisation involving the Council's assets, that is not included in other fees or charges in this document. Such work may include the coordination of public utility adjustments, project management/coordination or work on unique assets. This fee will not apply to grants from Government agencies. This fee will include all labour costs associated with the works. This will be tracked by timesheet and will include all day-labour, professional and management staff involved in the work. This fee is calculated on an actual cost-plus basis. Miscellaneous project – material, plant, contract and professional service costs
Full cost + 15% Estimate available prior to commencement
FC
This fee will be applied where Council elects to undertake work on behalf of another person or organisation involving the Council's assets, that is not included in other fees or charges in this document. Such work may include the coordination of public utility adjustments, project management/coordination or work on unique assets. This fee will not apply to grants from Government agencies. This fee will include all costs associated with materials, plant, contract and professional services used for the works. This fee is calculated on an actual cost-plus basis. Removal of dumped waste – including collection from site and disposal
At cost + 20%
FC
Asbestos removal – using Council coordinated accredited contractor
At cost + 50%
FC
Removal and disposal of damaged asbestos stormwater outlet pipes identified during restoration construction works by Council
At cost + 20%
FC
continued on next page ...
Page 79 of 90