GOAL 4: Greenway Trail
GOAL 4: Greenway Trail: Development
Key Issues
Link to Sun Trail Goals Options Funding Route through Downtown FEC Land Acquisition (Small Parcel 1. Complete Highwaymen Trail Gap
Design 2. Solidify Historic Downtown route 3. CONFERENCE AGENDA: Presentation and
Direction 10/22
10/22 11/22
4. DECISION: Historic Downtown Route 12/22 Responsibility: City Engineer
September 2022 Update Highwaymen Trail Segment
• Final review of plans underway by City and FDOT • Engineering cost estimate indicates significant increase in cost. Request for increase funding being prepared for FDOT review.
Historic Downtown Route
• Design currently on hold. Final route to take in consideration Downtown Master Plan as well as Indian River Drive reconstruction plans and Moore’s Creek Bridge replacement.