GOAL 4: Greenway Trail

GOAL 4: Greenway Trail: Development

Key Issues

 Link to Sun Trail  Goals  Options  Funding  Route through Downtown  FEC Land Acquisition (Small Parcel 1. Complete Highwaymen Trail Gap

Design 2. Solidify Historic Downtown route 3. CONFERENCE AGENDA: Presentation and

Direction 10/22

10/22 11/22

4. DECISION: Historic Downtown Route 12/22 Responsibility: City Engineer

September 2022 Update Highwaymen Trail Segment

• Final review of plans underway by City and FDOT • Engineering cost estimate indicates significant increase in cost. Request for increase funding being prepared for FDOT review.

Historic Downtown Route

• Design currently on hold. Final route to take in consideration Downtown Master Plan as well as Indian River Drive reconstruction plans and Moore’s Creek Bridge replacement.