LED DOWNLIGHT SERIES PL-DLS-10/11/13W INSTALLATION GUIDE
RoHS
// CLEARANCE INFORMATION // COMBUSTIBLE BUILDING ELEMENT Barrier required for loose fill insulation or loose combustible materials
Transformer 50mm
Combustible building structural member
A B
C
Thermal insulation
Location
Distance
Description
A
50mm (Minimum) 25mm (Minimum) 25mm (Minimum)
Clearance between the top of recessed luminaire and combustible materials.
B C
Recessed lumnaire
Clearance between structural member. Clearance between thermal insulation and luminaire.
Notice: 1. This downlight is only for indoor application. 2. Don’t look at the light directly when the downlight is on. 3. For any further information please contact PrimeLED.
// INSTALLATION DIAGRAM 1
2
LAMP CUT OUT
Cut Out Size PL-DLS-10/13W Ø90mm
1. Cut a hole in the ceiling.
2. Connect driver.
PL-DLS-11W Ø80mm
3
4
3.Place driver into the ceiling.
PrimeLED Australia Warehouse / Showroom
4. Install the downlight into the ceiling and adjust gimble to suit.
Unit 2, 99-101 Western Ave Westmeadows VIC 3049 1300 533 000 (1300 LED 000) info@primeled.com.au www.primeled.com.au