SITE DIARY | CAMBRIDGE HOUSE HOTEL
A report on a retrofit and new build hotel in Picadilly London by PDP architects. Following and analysing the relationships between architects, contractors and client, from the design phase through the project realisation. Site visits took place at multiple different construction stages, attending design meetings and shadowing site managers on the progress. A construction sequence exploring technical details and process was made in relation to an aspect of the project.

Advertisement



INSTALLING ENVELOPE STEEL FRAME SYSTEM [SFS]
INSTALLING ENVELOPE SOUNDBLOC & HABITO BOARDING
INSTALLING ENVELOPE BRICK FACADE | INTERNAL BLOCKWORK
INSTALLING INTERNAL [SFS]
SOUNDLOC BOARDING ONE SIDE & PARTIALLY ON THE OTHER
POURING SCREED ABOVE CONCRETE FLOOR SLAB
FITTING FLOOR WOODEN BOARDING AND W/C TILES ABOVE SCREED
FIX CEILING SUPPORTS