insertion of overall building mass
ms to bring in the quality of mmunities connected dition into a typical village pe
is done by different means of y well-known for lakes rapped around the building, ousing complex resize and width andofare proxt – through a series
separation of overall building mass to two slabs facing eachother
ecting units differdifferent usesfor and inhabitation.
The investigation on noise le different directions.
tween. Different from e to the standardised size of irs system as circulacan be done scustomisations a vertical landscape,
public – the All of ngfrom to users’ preference.
yards and to private – ther an opened, lively and enrstitial spaces provide bourhood for people to live in. events and activities.
fic site na (all drawings done individually) done individually) ter One l Year Project)
an (yangao@hku.hk) @hku.hk)
-EAVE TETRIS
implementation of housing units wrapped by exterior streets
The sectional concrete model is casted separately then stacked onthe topvillage housings in Lijiang are located on a mountain Many of Start-up Constraints: of eachother afterslope, where individual households are scattered around; in this case, - 6x2 grid slab wards. This allows - 7 units the horizontal circulation is rather difficult as villagers have to walk all outcome of the - street with three turning points to showcase the populated system the way from one point to their own house; therefore, the idea is to cut transition of openthe housing fabric in patches and stack them up, creating a continuness (visual weight of circulation, openness ous vertical landscape that connects village houses together, not only and privacy ofThe eachstart up constraints (as listed) are made to allow central open bring people and households closer to eachother but also provide a space at each floor, attracting dwellers to move and gather towards floor...etc) in four the center of the building. clearer circulation within the building. different layers.
YAU YUET SUN, CHERRY selected works 2011-17