Unit 16 MCKI Assignment-Btechnd Programme BTEC Higher National Diploma in Business Unit Number and Title Unit 16 Managing Communication, Knowledge and Information (MCKI) QFC Level Level 4 & 5
Introduction The report has been prepared for London’s Heathrow airport for the decision making for increasing the capacity of the airport. Various aspects related to communication knowledge and information have been covered in the report. Based on the study conducted for the London’s Heathrow and other aspects the following aspects have been covered in the report
Assess information and knowledge needs
Create strategies to increase personal networking to widen involvement in the decisionmaking process
Develop communication processes
Improve systems relating to information and knowledge
All these aspects have been discussed in the report. The conclusion provides a summary of all the aspects mentioned above.
Task 1: Assessing knowledge needs
information
and
Discuss the range of decisions to be taken by the Heathrow Authorities and Management Based on the information that has been provided, the decision that has to be taken is whether to build a new airport or increase the capacity of the existing airport by building the 3rd runway and a sixth terminal. Both the options will have to be analysed based on the feasibility. However there might be other options that the airport might consider. This may be associated with the operations management. In other words, looking at the strategic location Heathrow its connectivity with domestic airports may be planned wherein more number of passengers can be handled within the same infrastructure. For the decision taken based on the various options that are available, various other decisions may have to be taken by the authorities and the management. These decisions will have an