Great devices project

Page 1

Great Devices Project 1.    

mpp The latest date that the project manager should contact the regulatory authorities to book in regulatory approval tests: 31-10-2016 The latest date that the project manager should contact the production manager to book the facilities for the first prototype build: 31-08-2016 The latest date that the project manager should contact the production manager to book the facilities for the second prototype build: 19-10-2016 The last dates for booking the facilities:

Book Regulatory Approval Test Contact booking for First Prototype Build Contact booking for Second Prototype Build 2. MEMO To:Ms. Thurlings From: Project Manager Subject: Information about the Project Date: 06-05-2016 Ma’am, This is to inform you that after conducting a technical feasibility study to investigate if it is possible to modify one of the company’s standard products to create a product variant to satisfy the needs of veterinarians it is found that the project is feasible and the project will require 166 days to complete. The start date of the project is 23-05-2016 and the end date of the project will be 18-01-2017. The cost of the project is determined in the table below:

Resource Name Electronics Engineer Software Engineer Mechanical Engineer Test Engineer Production Engineer Technical Writer Total Direct Labour Costs


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.