Service Training

Foreword

In 2004 the tandem vibratory rollers of product range BW 100 AD/AC4 and BW 120 AD/AC4 were launched in the market for the first time. They are a further development of the old BW 100/120AD/AC of generation 3, which already were a great sales success. The contents of this training shall enable the service engineer to perform adjustments and trouble shooting as well as all necessary repair work in a professional manner. The owner of the machine should recognize that the service engineer is fully familiar with the machine. He should realize that the service engineer applies the correct measures to detect a possible fault on a machine and that all repair measures are performed with skill and knowledge.

Persons participating on this training course should be confident when having to work on this machine.

Documentation

For the BOMAG machines described in this training manual the following documentation is additionally available:

Attention!

The currently valid part numbers for the documents can be taken from the Doclist or the Customer Service page in the BOMAG Intranet or Extranet (BOMAG Secured Area) in accordance with the serial number of the machine.

1. Operating and maintenance instructions

2. Spare parts catalogue

3. Wiring diagram*

4. Hydraulic diagram*

5. Repair instructions

6. Service Information

* The document versions valid at the date of printing are part of this training manual.

Service Training

General

Machines of product range BW 100/120 AD/AC-4 are tandem vibratory rollers or combination rollers for compaction work in road construction. They are most suitable for the compaction of bituminous materials as well as light compaction tasks in earthwork. Compaction is achieved by the vibration of both drums or the vibration of the drum and the static load of the rubber tires. The power output from the water cooled Kubota diesel engine is transferred to drums or wheels (travel and vibration systems) and to the steering via the hydrostatic drive systems of the machine. This type of power transmission ensures lowest possible efficiency losses.

Both drums of the BW 100/120 AD-4 are fitted with both travel motors as well as vibration motors. The motors for the respective drive systems are always arranged on one side of the machine. Since it is beneficial for many applications (e.g. when laying asphalt layers) to work with one vibrating and one static drum, the machine is equipped with a vibration shut-off valve for the rear drum.

On machines of type BW 100/120 AC-4 the wheel set is driven by two travel motors. This roller combines the high compaction power of a vibration drum with the excellent surface sealing effect of rubber tires in one machine. This machine obviously achieves considerable savings in costs when compared with a pure vibratory or pneumatic tired roller.

The standard equipment of the machine includes a gravity sprinkler system. A pressure sprinkler system is optionally available on request. In connection with the scrapers the water sprinkler system avoids picking up of material by the drums.

On the AC-machines a pressure sprinkler system prevents sticking of dirt and bitumen to the rubber tires. For this purpose the tires are sprayed with emulsion.

Front and rear frames of the machine are joined by an oscillating articulated joint. The amply dimensioned oscillation angle makes sure that the drums always have ground contact over the entire width.

Both travel motors are fitted with integrated brakes working as parking brakes. Depending on the position of the brake solenoid valve these brakes are released by charge pressure when starting the engine and applied when shutting the engine down.

Service Training

Maintenance

The tandem/combination rollers of series BW 100/120 AD/AC-4 are high performance machines for the extremely difficult use in asphalt compaction and earth work. To be able to meet these demands the machine must always be ready to be loaded up to its limits. Apart from that, all safety installations must always be fully functional when working under the partly very dangerous conditions on a construction site.

Thorough maintenance of the machine is therefore mandatory. This not only guarantees a remarkably higher functional safety, but also prolongs the lifetime of the machine and of important components.

The time required for thorough maintenance is only minor when being compared with the malfunctions and faults that may occur if these instructions are not observed.

The maintenance intervals are given in operating hours. It is quite obvious that with each maintenance interval all the work for shorter preceding intervals must also be performed. During the 2000 hour interval you must also perform the maintenance work for the 500 and 1000 hour intervals.

It should also be clear, that with the 2500 hours interval only the work for the 10 and 500 hour intervals must be performed.

For maintenance work you must only use the fuels and lubricants mentioned in the table of fuels and lubricants (oils, fuels, grease etc.).

List of components

Service Training

BW 100/120 AD/AC-4

Engine ManufacturerKubota

TypeD 1703 MDI

CoolingWater

Working cycles4

Number of cylinders3

Power DIN 6271 IFN/SAE at 2700 rpmkW25,2

Fixed engine speed rpm2250 Stage 1

Fixed engine speedrpm2700 Stage 2

Valve clearance I/Emm0,20/0,20

Travel pump

ManufacturerHydromatik

TypeA10 VG 28

SystemAxial piston

Displacementcm³/rev.28

High pressure limitationbar380

Charge pressurebar24

Speedrpm2700

Max. flow capacity l/min73

Service Training

BW 100/120 AD/AC-4

Travel motor (drums)

ManufacturerPoclain

TypeMK 04

Number2

SystemRadial piston motor

Displacementcm³/rev.408

Brakeyes

BW 100/120 AC-4

Travel motor (wheels)

ManufacturerPoclain

TypeMSE 02

Number2

SystemRadial piston motor

Displacementcm³/rev.255

Brakeyes

BW 100/120 AD/AC-4

Vibration pump

ManufacturerBosch

TypeHYZ 11

SystemGear

Displacementcm³/rev.11

Starting pressurebar210

Operating pressurebar 100 +/-60 bar (soil dependent)

Service Training

Vibration motor

ManufacturerBosch

Type HYZ 8

SystemGear

Displacementcm³/rev.8

Frequency stage 1Hz55

Frequency stage 2Hz70

Amplitudemm0.5

Steering pump

ManufacturerBosch

Type HYZ 8

SystemGear

Displacementcm³/rev.8

max. steering pressurebar140 +/-30 bar

Steering valve

ManufacturerDanfoss

TypeOSPC 80 ON

SystemRotary valve

Kubota diesel engine 1703 MDI

The tandem vibratory rollers of series BW 100/120 AD/AC-4 are powered by a water cooled 3-cylinder Kubota diesel engine type 1703 MDI.

The engine is an upright water-cooled four-stroke diesel engine.

Cross-section of diesel engine

Service Training

of engine:

Pos. 1 Engine temperature switch

Pos. 2 Connection glow plug

Pos. 3 Oil dipstick

Pos. 4 Injection nozzles

View

Pump installation on diesel engine

Service Training

Pos. 1 Charge pump Pos. 2 Vibration pump

3 Oil pressure switch

View of diesel engine, flywheel side

Service Training

3

Pos. 1 Travel pump

Pos. 2 Pressure test port A high pressure forward

Pos. 3 Pressure test port B high pressure reverse

Pos. 4 High pressure relief valves 380 bar

Service Training

Tests and adjustments

Measuring the compression

Fig. 5:

Compression pressure:

1. Run the engine warm and shut it down. Disassemble the nozzle holders.

2. Install the diesel engine compression tester to the nozzle holder opening.

3. Make sure that the throttle lever is in top position (no injection) and start the engine with the starter motor.

4. Read the max. pressure. Repeat the measurement at least two times.

5. If the measurement is below the permissible limit value check cylinder, piston, valve and cylinder head.

Adjustment values:

Compression pressure

Factory settings 29.4 -32.4 bar

Permissible limit value min. 23.5 bar

Checking the valve clearance

Service Training

IMPORTANT:

The valve clearance must only be checked and adjusted when the engine is cold.

The cylinders are counted from the flywheel end, i.e. cylinder 1 is on the flywheel side.

1. Remove the cylinder head cover.

2. Align the mark „1TC“ on the flywheel and the notched part (1) on the plate so that piston no. 1 is in compression stroke or overlaps top dead centre (TDC).

3. Measure the valve clearance marked "1" with a feeler gauge.

4. Correct the clearance by the setscrew if it is not within the limits of the specified factory data.

Valve clearance (cold) Factory settings 0,20 mm

(The values apply for intake and exhaust valves)

Service Training

Please note that the TC-mark is only valid for cylinder 1. There is no mark for the other cylinder.

Cylinder 1 is in compression stroke when the TC-mark is visible in the window (2) Now turn the flywheel further, until the other valves overlap top dead centre and adjust the valve clearance accordingly.

Note:

• The "TC"-mark on the flywheel applies only for cylinder no. 1. The other cylinder has no "TC"-mark.

• When the „TC“-mark is aligned with the punched mark on the rear disc, piston no. 1 is in top dead centre position. Now turn the flywheel bz 15° clockwise or anticlockwise to check whether the pistons are in TDC-position (compression position).

(The piston is in TDC when intake and exhaust valves do not move. When both valves are moving, the piston is in overlapping position.)

• Finally turn the flywheel by 360 ° to ensure that „TC“-mark and punched mark match exactly. All valve clearances must be set to the nominal value.

• Turn the flywheel two to three times in anti-clockwise direction to check the valve clearance.

• After adjusting the valve clearance retighten the locking nut of the setscrew.

Service Training

Engine solenoid:

The machine is equipped with a solenoid which works according to the principle „ENERGIZED TO RUN“. This solenoid has the benefit that the engine will be immediately shut down in case of a fault in the electric system. A disadvantage is the quite costly design of the solenoid with two coils.

Nominal currents of windings:

Pickup winding (PW)51 A

Holding winding (HW)0.7 A

Function of the engine solenoid:

The pickup winding (PW) is directly triggered via potential 30. Once the engine has started and oil pressure is available the voltage to the pickup winding is interrupted and voltage is only applied to the holding winding.

Fig. 14:
Solenoid

Service Training

Travel system:

On the machines described in this training manual the travel system consists of a closed hydraulic circuit. It mainly consists of the travel pump with the integrated safety elements, two travel motors, the hydraulic oil filter and the hydraulic oil cooler.

Charge pressure from brake valve

Charge pressure from brake valve

High pressure test ports MA and MB

Charge pressure after hydraulic filter

The installation of a hydraulic pump with variable displacement into a closed hydraulic circuit is a perfect solution for a hydrostatic travel system, because with this design the travel direction can be reversed without any problems.

The travel pump is flanged to the flywheel side of the diesel engine. It is directly driven by the engine with constant speed.

The tandem gear pump driven by the auxiliary output of the diesel engine consists of a steering/charge pump and a vibration pump. The return flow from the steering valve is fed through the charge oil port into the travel pump.

Leak oil port to tank

Service Training

Besides its function of supplying the closed circuit with cool and filtered oil as replacement for leakage and flushing losses, the oil from the charge circuit is also used to release the travel motor integrated brakes:

All safety and control elements needed for the operation in a closed hydraulic circuit are integrated in the travel pump. These are:

High pressure relief valves (380 bar) with integrated boost check valves

Charge pressure relief valve (24 bar)

Servo control

The travel motors (on AD-machines) are hydraulically connected parallel to each other. On AC-machines all three motors are arranged parallel to each other.

Hello

dear  friend!  Thank  you  very much  for reading.  Enter  the link  into  your browser.  The  full manual is available

DOWNLOAD

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.