Boston Archtiectural College_Studio 3_Blue Residence_Yang (Caroline) Cai

Page 1


Blue Residence

An Affordable Housing Project in Boston

Boston Architectural College

Studio 3

SP25

Table of Content Site Analysis

Project Manifesto

Basis of Design

Schematic Design

Structure Inspiration

Hydrology

Circulation

Materials

Flood Mitigation

Visualization

One hundred and fifteen thousand years ago, Boston was covered under the largest ice sheet - Laurentide Ice Sheet.

The melting of the Laurentide Ice Sheet significantly contributed to the geological landscape of the City of Boston as we know today.

When further examining the history of Dorchester Bay, the heart-wrenching history of the prisoners of World War I & II, tell the story of virtue of resilience and hope.

To which, I think architecture is merely a quiet statue, if without life in it. But what kind of life might that be, in such a time when spaces are created by the lifeless materiality that we all consume? After all, it is us humans, who infuse meanings into memories and turn stories into realities.

Blue Residence is an affordable housing project for the low income artist community in Boston’s Dorchester Bay area, which explores the historical elements of geology and wars, to spark a future opportunity that embodies resilience and hope.

Site Analysis Abiotic Environment

Laurentide Ice Sheet Melting Process During the Last Ice Age

City of Boston

Site Tectonics

Pelitic Bedrock, Tectonic Plate

Floodplain Alluvium

Sand and Gravel

Till or Bedrock

Fine Grained Deposit

Project Site

Dorcheseter Bay
Charles River

Hydraulic Conductivity & Corrosion of Concrete

0-6 Average Feet per Day, Moderate Corrosion of Concrete

0-6 Average Feet per Day, High Corrosion of Concrete

7-35 Average Feet per Day, Little to No Corrosion of Concrete

146-214 Average Feet per Day, Little to No Corrosion of Concrete

Project Site

Dorchester Bay
Charles River
Ice Sheet Retrieval Path Glacier River and Lakes

Site Analysis Biotic Environment

Illustration of Dorchester Bay Biotic Environment

Cranberry Bog Tidal Flats Forest Land & Wetlands

Marsh/Bog Open Water

Wooded Marsh Reservoir

Salt Marsh Beach/Dune

Pirme 1 Forest Land

Pirme 2 Forest Land

Pirme 3 Forest Land

Statewide Importance

Local Importance

Project Site

Dorcheseter Bay
Charles River
Tidal Flats
Beach/Dune

Sea Scallop Shellfish Suitable Areas

Quahog

Razor Clam

Soft-Shelled Clam

Surf Clam

American Oyster

Bay Scallop

Blue Mussel

European Oyster

Ocean Quahog

Project Site

Dorchester Bay
Charles River
NeponsetRiver 15min
Soft-Shelled Clam & Razor Clam
Soft-Shelled Clam

Site Analysis Social & Cultural

Local Reported Assault Activities

ASSAULT REPORTED IN 2024

ASSAULT REPORTED IN 2023

SITE

Transportation

Census 2020 TIGER Major Roads

Commuter Rail Stations

Airports

MBTA Bus Routes

Commuter Rail Lines

Ferry Routes

Ferry Route

Project Site

Dorcheseter
Charles River

DORCHESTER

Non-acute Care Hospitals

Farmers Markets

Infrastructure

Non-acute Care Hospitals

Acute Care Hospitals Emergency Department Status

Non-acute Care Hospital

Libraries Buildings

x 2 x 2 x 14 x 6

Acute Care Hospitals Emergency Department Status

Licensed Child Care Programs Police Stations

Library

Licensed Childcare

Local Police Station

State Police Station

Project Site

Dorchester Bay
Charles River
NeponsetRiver 15min

Site Analysis Sea Level Rise & Flooding

Boston Climate Ready Sea Level Rise Scenarios

Flood Vulnerable Neighborhood

Flood Impacted Neighborhood

Project Site

Dorcheseter

(2050s-2100s) SLR Induced Flooding

36” Sea Level

Rise High Tide

36” Sea Level Rise

10pct Annual Flood

36” Sea Level Rise 1pct Annual Flood

50% Likelihood Later-Term (2070s +) SLR Induced Flooding

2.5 inches of local land subsidence) by 2070. This does not represent the worst case scenario.

Environmental Justic Populations

Minority

Income

English Isolation

Minority and Income

Minority and English Isolation

Income and English Isolation

Minority, Income and English Isolation

Project Site

Dorchester Bay
Charles River

Proposed Project Characters Project Manifesto

When looking into the project site’s history, I was overwhelmed by its richness and many stories of the war prisoners at Camp McKay.

To which, I think architecture is merely a quiet statue if without life in it. But what kind of life might that be, in such a time when spaces are created by the lifeless materiality that we all consumed? After all, it’s us humans who infuse meanings into memories and turn stories into realities.

Project Blue Residence is inspired by the life story of a fictional character, Luigi Ferrari, who was a Prison of War during the World War I & II. He battled with mental health issues due to dramatic life changes and found his way back into the society after a prolonged period as a war prisoner. Luigi’s struggle and strength are shared by many people today. Project Blue Residence is home to refugees, the struggling artists, and the low income families. It is a community for healing and growth through the form of art.

Left: one of Luigi’s letters to his loving wife, after he was transferred to Camp McKay.

Basis of Design

Problem Identification & Design Solution

1 4 2 5 Programming Adjacency Matrix Neighborhood Key Plan Activity Grouping Neighbors & Connectivity

3 6 People Grouping Safety Strategy

The basis of design responds to the previous identifies issue. The programming includes affordable housing for the low income artist community, particular who are newcomers. The public spaces are divided into three major functions, a Memorial Gallery to remember the history and celebrate the present; a Employment and training center to provide skills and support for emerging artists. The last is an open park that welcomes everyone to learn about the climate topics and rising sea level.

Massing Models Schematic Design

Preliminary Massing

Schematic Section

Raised Platform

Schematic Lower Level

Schematic Upper Level

Artificial Hill with Accessible Cave
Built on Raised Rafters

Structure Inspirations

Self Watering Planter & Back Flow Preventer

The structure system was inspired by “self watering planter” and “back flow prevention valve”.

A thickened sea slab is supported by a forest of pile foundations that are around 76’. A raised secondary slab is typical 8” concrete slab.

Space between the two slabs is a water basin to collect flood water.

The arch opening on the seawalls are equipped with mechanical water hatches that allows water collected in the park level to drain into the water basin.

5 Pack Self Watering Planters-6 inch. (n.d.). Jofamy. https://jofamy.com/products/5-pack-self-watering-planters-6-inch

Proposed Structure
Domed Arch
Seawalls
Slabs
Pile Foundation

Square One Insurance Services. (2024, July 23). Getting to know backwater valves. Affordable Home and Car Insurance. https://www.squareone.ca/resource-centres/getting-to-know-your-home/backwater-valve

High Tide Flood

Hydrology Plan Upper Level

Proposed Contour

Water Flow Direction

Water Flow on Dome Structure

Roof Drain

Scupper Drain

Catch Basin

Roof Trench Drain

Trench Drain at Grade

Scale1” =120’

1 Road & Side Walk

Parking & Accessible Curb Dome

Paths of Circulation

Primary Vehicle Access

Access to Parking

Pedestrian Access

1

Scale1” =120’

1 2 3 4

Skateboarding Park
2 Water Retention Pond
Retention Pond

Paths of Circulation

Primary Vehicle Access

Access to Parking

Pedestrian Access

Healing Space

Scale1” =120’

2 Residential Block
Residential Unit

Materials Lower Level

Illustration of Materials

Concrete

Underwater

Durability

Versatility

Strength

Sustainability

ADA Friendly

Scale1” =120’

Porous

Concrete

Drainage

Filtration

Versatility

Sustainability

ADA Friendly

Eelgrass

Salt Tolerant

Submerged

Marine Habitat

Native Species

Purslane

Salt Tolerant

Native Species

Adaptability

Edible

3 4

Interlocking

Pavement

Permeability

Low Maintenance

ADA Friendly

Sustainability

Ease of Repair

Aesthetics

5

Granite

Built-in Planter

Durability

Versatility

Strength

Sustainability

Longevity

Materials Upper Level

Illustration of Materials

Concrete

Sustainability

ADA Friendly

Terracotta Shingles

Sustainability

Energy

Succulent

Salt Tolerant

Native Species

Adaptability

Low Maintenance Variety

Aesthetics

Toxin Removal

Drought Resistant

3

Succulent

Salt Tolerant

Native Species

Adaptability

Low Maintenance

Variety

Aesthetics

Toxin Removal

Drought Resistant

4

Interlocking Pavement

Permeability

Low Maintenance

ADA Friendly

Sustainability

Ease of Repair

Aesthetics

5

Granite

Built-in Planter

Durability

Versatility

Strength

Sustainability

Longevity

Block I Block II

ontario.ca. “Sustainable Growth: Ontario’s Forest Sector Strategy,” n.d. https://www.ontario.ca/page/ sustainable-growth-ontarios-forest-sector-strategy.

Fiber Cement Siding

- 1/2” Gypsum Board - Vapor Barrier

- 2”x6” Lumber Framing @ 16” O.C., c/w

Fiber Glass Insulation - 1/2” Sheathing Board - Air Barrier

- 2” Rigid Insulation

- 1-1/2” Metal Furring Channel

- 1/2” Fiber Cement Board w Patterns

Block III
Block IV
Block V

Commercial Units

1

2 Camp McKay Memorial Museum & Community Art Gallery

- Permanent display of Camp McKay historical images

- Open space for community events and temporary art exhibition

Refugee Welcome Center & Community Employment Service

- Resources center for newcomers

- Skills training services

1 2

Section North-Shouth

Illustration of Flood Mitigation

In a heavy rain fall condition, water will run off from the dome structure and be collected in the water pond at the lower level.

Then the water will continue to overflow into the water basin, where eelgrass farm is located.

When water in the water basin is full, it will rise up through the openings in the skateboarding park, to provide visual cue for people to exit the area and move the higher ground.

In a severe flooding scenario, the sea water will first flood into the water basin, and continue to rise through the skateboarding parking openings providing early warning cues.

Scale1” =96’

Water Pond
Water Basin
Eelgrass Farm
Water Pond 2

Section West-East

Illustration of Flood Mitigation

In a heavy rain fall condition, water will run off from the dome structure and be collected in the water pond at the lower level.

Then the water will continue to overflow into the water basin, where eelgrass farm is located.

When water in the water basin is full, it will rise up through the openings in the skateboarding park, to provide visual cue for people to exit the area and move the higher ground.

In a severe flooding scenario, the sea water will first flood into the water basin, and continue to rise through the skateboarding parking openings providing early warning cues.

Water Pond
Flood Early Warning
Eelgrass Farm
Water Pond

Sea Level Rise Scenarios Sections

Expected Near Term (2030s-2050s) 9” SLR

9”

Expected Mid Term (2050s-2100s) 21” SLR

50% Likelihood Later Term (2070s +) 40” SLR

40” SLR High Tide

40” SLR Base Flood Elevation

Sea Level Rise - (2070s+) Extreme Scenario

40” SLR Mean Sea Level Top of Residential FF

Top of Sea Wall Mean Sea Level NAVD88

of Sea Slab

*BPDA Recommendation

Sea Level Rise Scenario

SLR Mean Sea Level

SLR High Tide

SLR Base Flood Elevation

SLR Mean Sea Level

SLR High Tide

SLR Base Flood Elevation 40” SLR Base Flood Elevation

SLR Mean Sea Level

SLR High Tide

SLR Mean Sea Level

SLR High Tide

SLR Base Flood Elevation

Sea Level Rise Scenarios Plans

Sea Level Rise Scenarios Legend

High Tide Flood

10pct Annual Flood

1pct Annual Flood

ADA Standards

Rendering Seating & Arches

Rendering Children’s Playground

Rendering Skateboarding Park

Rendering View from Parking

Rendering View From Water 2100s