November 20, 2013 board packet

Page 1

Regular Meeting of the Capitol Region Watershed District (CRWD) Board Of Managers, for Wednesday, November 20, 2013 6:00 p.m. at the office of the CRWD, 1410 Energy Park Drive, Suite 4, St. Paul, Minnesota. REGULAR MEETING AGENDA Materials Enclosed I.

Call to Order of Regular Meeting (President Joe Collins) A) Attendance B) Review, Amendments and Approval of the Agenda

II.

Public Comment – For Items not on the Agenda (Please observe a limit of three minutes per person.)

III.

Permit Applications and Program Updates (Permit Process: 1) Staff Review/Recommendation, 2) Applicant Response, 3) Public Comment, and 4) Board Discussion and Action.) A) Permit # 13-027 Vintage on Selby – 60 Day Review Extension Request (Kelley) B) Permit # 13-034 TCC Signage - Variance Request (Kelley) C) Permit # 13-035 Agropur - Erosion Control (Kelley) D) Permit # 13-036 Apex Auto (Kelley) E) Permit Program/Rules Update (Kelley)

IV.

Special Reports – Victoria Park Master Plan, Alice Messer, City of St. Paul

V.

Action Items A) AR: Approve Minutes of the November 6, 2013 Regular Meeting (Sylvander) B) AR: Approve Accounts Payable/Receivables for October 2013 (Sylvander)

VI.

Unfinished Business A. FI: Special Grant Program Update (Zwonitzer) B. FI: Trout Brook Interceptor Realignment Project (Eleria) C. FI: CAC Revitalization Update (Reider) D. FI: Lake McCarrons Aquatic Plant Management Plan (Thienes and Doneux)

VII.

General Information A) Administrator’s Report

VIII. Next Meeting A) Wednesday, December 4, 2013 Meeting Agenda Review IX.

Adjournment

W:\04 Board of Managers\Agendas\2013\November 20, 2013 Agenda Regular Mtg.docx

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District


November 20, 2013 Regular Board Meeting III. Permits A) 13-027 Vintage on

Selby Review Extension Request DATE: TO: FROM: RE:

November 14, 2013 CRWD Board of Managers Forrest Kelley, Regulatory and Construction Program Manager 13-027 Vintage on Selby Extension Request

Background Permit 13-027 Vintage on Selby was tabled with 12 conditions on October 2, 2013. Issues The 60-day Review Period for this permit expires November 25, 2013. The Board must act on the permit at the November 20, 2013 meeting or the permit will be deemed approved. The applicant has submitted a request to extend the permit review period in order to finalize plan changes before resubmitting to the District. Requested Action Approve the requested 60-day extension

Enc:

Extension request email from Dan Elenbaas, Ryan Companies

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.


forrest From: Sent: To: Cc: Subject:

Dan Elenbaas <Dan.Elenbaas@RyanCompanies.com> Tuesday, November 12, 2013 10:57 AM forrest Thomas Rehwaldt RE: 13-027 Vintage on Selby

Forrest, Yes please accept our request for extension. The hard copy plans that I dropped off with the check were to cover the 9 items on your last report and showed the revised number of Stormtech chambers down to 100. Let us know if we missed anything and we’ll look forward to the next meeting. Thanks, Dan Elenbaas, PE, LEED AP BD+C Ryan A+E, Inc. 612-492-4666 tel | 612-597-4837 cell | 612-492-3666 fax dan.elenbaas@ryancompanies.com

From: forrest [mailto:forrest@capitolregionwd.org] Sent: Tuesday, November 12, 2013 10:46 AM To: Dan Elenbaas Cc: Thomas Rehwaldt Subject: RE: 13-027 Vintage on Selby

Hi Dan, We are coming up against the 60‐day review period deadline. Would you like to request an extension? Forrest J. Kelley, PE Regulatory and Construction Program Manager Capitol Region Watershed District 1410 Energy Park Drive, Suite 4 St. Paul, MN 55108 Office (651)-644-8888 Fax (651) 644-8894 capitolregionwd.org

1


Capitol Region Watershed District Applicant:

Permit Application 13-034 Trout Brook Circle Signage

Tom Becken Applicant Contact: TCC Materials 2025 Centre Pointe Blvd. Suite 300 Mendota Heights, MN 55120

Alex Olin TCC Materials 2025 Centre Point Blvd. Suite 300 Mendota Heights, MN 55120

Description: Sign Installation Stormwater Management: None District Rule: E—Wetland Management Disturbed Area: 0 Acres Impervious Area: 0 Acres PERMIT FINDINGS: Applicant proposes to install a sign at the corner of Arlington and Trout Brook Circle. The sign posts are to be installed within a wetland. Wetland Management Rule E requires all wetland losses to be replaced at a ratio of 2:1, and the de minimis is zero. The sign posts will have a combined foot print of approximately 8 square inches. The wetland habitat functions and value will not be negatively impacted by the proposed sign posts. There will be no wetland improvement by requiring 16 square inches of replacement wetland and it is not technically feasible to accurately delineate wetland boundaries at this level of detail. The applicant requests a variance from the wetland replacement requirements of Wetland Management Rule E. STAFF RECOMMENDATION: Approve requested variance to allow installation of a new sign and 8 square inches of wetland fill

Trout Brook Cr.

Arlington Ave.

Permit Location Permit Report 13-034

Aerial Photo November 20, 2013 Board Meeting



Capitol Region Watershed District

Applicant:

Dick Behling Agropur 2080 Rice Street Maplewood, MN 55113

Permit Application 13-035 Agropur

Consultant:

Benton Ford Rehder & Associates 3440 Federal Drive, #110 Eagan, MN 55122

Description: Building Addition Stormwater Management: None, erosion control only District Rule: F—Erosion and Sediment Control Disturbed Area: 0.125 Acres Impervious Area: 0.125Acres

STAFF RECOMMENDATION: Approve with 3 Conditions

Rice St.

1. Receipt of $500 surety check 2. Replace the following language in Note 2 “Sweep paved public streets” with “Sweep all paved surfaces” 3. Provide final signed plans.

Permit Location Permit Report 13-035

Aerial Photo November 20, 2013 Board Meeting


Capitol Region Watershed District Permit Report CRWD Permit #:

13-035

Review date:

November 14, 2013

Project Name:

AgroPur Building Expansion

Applicant:

Dick Behling AgroPur 2080 Rice Street Maplewood, MN 55113

Purpose:

New building addition

Location:

South side of existing facility at 2080 Rice Street

Applicable Rules:

F

Recommendation:

Approve with 3 Conditions

EXHIBITS: 1. Project erosion control plan sheet by Rehder & Associates, dated and recd 10/30/13 HISTORY & CONSIDERATIONS: None. RULE F: EROSION AND SEDIMENT CONTROL Standards ďƒ˜ A plan shall demonstrate that appropriate erosion and sediment control measures protect downstream water bodies from the effects of a landdisturbing activity. ďƒ˜ Erosion Control Plans must adhere to the MPCA Protecting Water Quality in Urban Areas Manual. Findings 1. Erosion and sediment control measures are consistent with best management practices, as demonstrated in the MPCA manual Protecting Water Quality in Urban Areas. 2. Adjacent properties are protected from sediment transport/deposition.

W:\07 Programs\Permitting\2013\13-035 Agropur\13-035 Permit_Review2.doc

Page 1 of 2


3. Wetlands, waterbodies and water conveyance systems are protected from erosion/sediment transport/deposition. 4. Project site is less than 1 acre; an NPDES permit is not required. RULE E: WETLAND MANAGEMENT Standard  Wetlands shall not be drained, filled (wholly or in part), excavated, or have sustaining hydrology impacted such that there will be a decrease in the inherent (existing) functions and values of the wetland.  A minimum buffer of 25 feet of permanent nonimpacted vegetative ground cover abutting and surrounding a wetland is required. Findings 1. There is a wetland on the property. 2. No impacts are proposed, and a wetland delineation report is not required. 3. An existing buffer greater than 25 feet exists and will not be disturbed.

RECOMMENDATION: Approve with 3 Conditions Conditions: 1. Receipt of $500 surety check 2. Replace the following language in Note 2 “Sweep paved public streets” with “Sweep all paved surfaces” 3. Provide final signed plans.

W:\07 Programs\Permitting\2013\13-035 Agropur\13-035 Permit_Review2.doc

Page 2 of 2



Capitol Region Watershed District Applicant:

Vincent Reiter Apex Auto 198 East Minnehaha Street Saint Paul, MN 55130

Permit Application 13-036 Apex Auto Salvage Consultant:

PJ Disch Westwood 7699 Anagram Drive Eden Prairie, MN 55344

Description: Improvements to existing auto salvage yard at Pennsylvania and 35E Stormwater Management: Underground filtration/infiltration District Rule: C, D, and F Disturbed Area: 1.5 Acres Impervious Area: 1.4 Acres STAFF RECOMMENDATION: Table with 11 Conditions Receipt of $7,000 surety and documentation of recorded maintenance agreement. Submit a copy of the NPDES permit. Provide additional documentation on the site soil conditions and potential for existing contamination. Relocate perforated draintile to the bottom of the filtration media to prevent infiltration, and provide a minimum of 15 inches of clearance between the retention media and the filter outlet. 5. Provide documentation from MPCA on determination if an impermeable liner is required to eliminate potential for mi gration of existing or future contaminants. 6. Stormwater runoff from the gravel areas has the potential to prematurely clog the sand filter. Provide pre-treatment sys tem sufficient to reduce fine particles prior to discharge to the filtration system, or pave areas currently proposed to be gravel. 7. Remove the filter fabric between the rock and sand in the design plans to reduce clogging. 8. Revise filtration rate in HydroCAD model to 1.0 in/hr and route it to the primary outlet. There should be no “exfiltration,� and the filtration rate likely limits the flow rate in the pipe outlet, not the perforated draintile. 9. Extend silt fence to cover gaps in property border, and show location of rock construction entrance in design plans. 10. Specify that limestone shall not be used in rock surrounding the pipe storage. 11. Provide building low floor elevations and low opening elevations to confirm compliance with freeboard requirements.

35 E

1. 2. 3. 4.

vania Pennsyl

Permit Location Permit Report 13-036

Ave.

Aerial Photo November 20, 2013 Board Meeting


Capitol Region Watershed District Permit Report CRWD Permit #:

13-036

Review date:

November 11, 2013

Project Name:

Apex Auto

Applicant:

Vincent Reiter 198 East Minnehaha Avenue St. Paul, MN 55130

Purpose:

Redevelopment of west side parking lot and storage area.

Location:

Southeast corner of Minnehaha Avenue East and L’Orient Street North

Applicable Rules:

C, D, and F

Recommendation:

Table with 11 Conditions

EXHIBITS: 1. Apex Auto – Soil Infiltration Site Assessment Memo, by Westwood, dated 10/30/2013, Recd. 10/31/2013. 2. Project summary memo (includes narrative, HydroCAD modeling, and Volume Control Worksheet), by Westwood, dated 09/27/2013, Recd. 10/31/2013. 3. Schematic Design Plans (sheets C1-C4), by Westwood, dated 10/25/2013, Recd. 10/31/2013. HISTORY & CONSIDERATIONS: At this time, Apex Auto is only redeveloping the west portion of the site which is less than 1.0 acres. However, the design also allows for further development of the east portion of the property in the future which constitutes a “common plan of development” and would exceed 1.0 acres of land disturbance. RULE C: STORMWATER MANAGEMENT Standards  Proposed discharge rates for the 2-, 10-, and 100-year events shall not exceed existing rates.  Developments and redevelopments must reduce runoff volumes in the amount equivalent to an inch of runoff from the impervious areas of the site.

W:\07 Programs\Permitting\2013\13-036 Apex Auto\13-036 Permit_Review_01.doc

Page 1 of 4


 Stormwater must be pretreated before discharging to infiltration areas to maintain the long-term viability of the infiltration area.  Developments and redevelopments must incorporate effective non-point source pollution reduction BMPs to achieve 90% total suspended solid removal. Findings 1. A hydrograph method based on sound hydrologic theory is used to analyze runoff for the design or analysis of flows and water levels. 2. Runoff rates for the proposed activity do not exceed existing runoff rates for the 2-, 10-, and 100-year critical storm events. Stormwater leaving the project area is discharged into a well-defined receiving channel or pipe and routed to a public drainage system. 3. Stormwater runoff volume retention is not achieved onsite in the amount equivalent to the runoff generated from one inch of rainfall over the impervious surfaces of the development. a. The amount of proposed impervious onsite is 61,045 square feet. b. Volume retention: Volume Retention Required (cu. ft.) Volume Retention Provided (cu. ft.) 4,574 cf None, filtration is proposed. c. Filtration is proposed due to poor soils and potential historic site contamination: Volume Retention Required (cu. ft.) Volume Retention Provided (cu. ft.) 5,945 cf Underground filter 11,681 cf d. Banking of excess volume retention is not proposed. e. Filtration volume and facility size has not been calculated using the appropriate hydrological soil group classification and design filtration rate. f. The filtration area is capable of filtrating the required volume within 48 hours. g. Stormwater runoff is not adequately pretreated to remove solids before discharging to infiltration areas, additional detail is required. 4. Best management practices achieve 90% total suspended solids removal on an annual basis. 5. A recordable executed maintenance agreement has not been submitted. RULE D: FLOOD CONTROL Standards  Compensatory storage shall be provided for fill placed within the 100-year floodplain.  All habitable buildings, roads, and parking structures on or adjacent to a project site shall comply with District freeboard requirements.

W:\07 Programs\Permitting\2013\13-036 Apex Auto\13-036 Permit_Review_01.doc

Page 2 of 4


Findings 1. There is no floodplain on the property according to FEMA. 2. It is unknown if all habitable buildings, roads, and parking structures on or adjacent to the project site comply with CRWD freeboard requirements. RULE E: WETLAND MANAGEMENT Standard  Wetlands shall not be drained, filled (wholly or in part), excavated, or have sustaining hydrology impacted such that there will be a decrease in the inherent (existing) functions and values of the wetland.  A minimum buffer of 25 feet of permanent nonimpacted vegetative ground cover abutting and surrounding a wetland is required. Findings 1. There are no known wetlands located on the property. RULE F: EROSION AND SEDIMENT CONTROL Standards  A plan shall demonstrate that appropriate erosion and sediment control measures protect downstream water bodies from the effects of a landdisturbing activity.  Erosion Control Plans must adhere to the MPCA Protecting Water Quality in Urban Areas Manual. Findings 1. Erosion and sediment control measures are not consistent with best management practices, as demonstrated in the MPCA manual Protecting Water Quality in Urban Areas. 2. Adjacent properties are protected from sediment transport/deposition. 3. Wetlands, waterbodies and water conveyance systems are protected from erosion/sediment transport/deposition. 4. Project site is greater than 1 acre; an NPDES permit is required. RULE G: ILLICIT DISCHARGE AND CONNECTION Standard  Stormwater management and utility plans shall indicate all existing and proposed connections from developed and undeveloped lands for all water that drains to the District MS4. Findings 1. New direct connections or replacement of existing connections are not proposed. 2. Prohibited discharges are not proposed.

RECOMMENDATION: Table with 11 Conditions

W:\07 Programs\Permitting\2013\13-036 Apex Auto\13-036 Permit_Review_01.doc

Page 3 of 4


Conditions: 1. Receipt of $7,000 surety and documentation of recorded maintenance agreement. 2. Submit a copy of the NPDES permit. 3. Provide additional documentation on the site soil conditions and potential for existing contamination. 4. Relocate perforated draintile to the bottom of the filtration media to prevent infiltration, and provide a minimum of 15 inches of clearance between the retention media and the filter outlet. 5. Provide documentation from MPCA on determination if an impermeable liner is required to eliminate potential for migration of existing or future contaminants. 6. Stormwater runoff from the gravel areas has the potential to prematurely clog the sand filter. Provide pre-treatment system sufficient to reduce fine particles prior to discharge to the filtration system, or pave areas currently proposed to be gravel. 7. Remove the filter fabric between the rock and sand in the design plans to reduce clogging. 8. Revise filtration rate in HydroCAD model to 1.0 in/hr and route it to the primary outlet. There should be no “exfiltration,� and the filtration rate likely limits the flow rate in the pipe outlet, not the perforated draintile. 9. Extend silt fence to cover gaps in property border, and show location of rock construction entrance in design plans. 10. Specify that limestone shall not be used in rock surrounding the pipe storage. 11. Provide building low floor elevations and low opening elevations to confirm compliance with freeboard requirements.

W:\07 Programs\Permitting\2013\13-036 Apex Auto\13-036 Permit_Review_01.doc

Page 4 of 4


7699 Anagram Drive Eden Prairie, MN 55344 PHONE 952-937-5150 FAX 952-937-5822 TOLL FREE 1-888-937-5150


November 20, 2013 Board Meeting IV. Special Reports –Victoria Park Master Plan

DATE: TO: FROM: RE:

November 14, 2013 CRWD Board of Managers Bob Fossum, Water Resource Project Manager Victoria Park Hydrology Study

Background The City of St. Paul plans to develop the new Victoria Park over the next several years. Victoria Park will be on the site of the former Koch-Mobile Tank Farm. The District has previously been involved in this project by issuing stormwater, erosion control and wetland permits to allow filling of the site. At the August 3, 2011 Board Meeting, the Managers approved a planning grant for the Victoria Park Hydrology Study for an amount not to exceed $50,000. This initiative falls under the District goal of “Bringing Water Back”. The District has engaged EOR, Inc. to complete a hydrology study of the site and on November 19, 2012 draft Water Feature Concepts were reviewed with the Managers.. Issues The City of Saint Paul has created and convened a Victoria Park Advisory Group. The charge of the group is to develop a Master Plan for Victoria Park based on input from the community. The first meeting was held on September 17, 2012 and the ninth and final meeting will be December 3, 2013. Alice Messer with City of St. Paul Parks and Recreation will review the draft Master Plan with the Managers. Staff will discuss next steps and how the District most effectively offers comment on this draft Master Plan. Requested Actions None, information only enc:

Victoria Park Master Plan, DRAFT, dated October 29, 2013 North Picnic Area, Victoria Park Master Plan, DRAFT, dated October 29, 2013 South Picnic Area, Victoria Park Master Plan, DRAFT, dated October 29, 2013

cc:

Alice Messer, City of St. Paul, Parks and Recreation, w/o enc.

W:\06 Projects\Victoria Park\Brd Memo, Victoria Park Special Report, 11-14-2013.docx

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.


DOWNTOWN ACCESS ENTRY SIGNS OVERLOOK WITH SEATING 60 CAR PARKING LOT SLEDDING BOWL RAVINE BRIDGE OVERLOOK NOVA CLASSICAL ACADEMY

CANOE/KAYAK STORAGE SOUTH PICNIC AREA t t t t

WATER PLAZA/PARK ENTRANCE RECIRCULATING WATER TREATMENT COMMUNITY GARDENS

MOWED TURF OPEN SPACE

t RESTROOMS t SHELTER t PLAY AREA/SPLASH PAD

PARK ENTRANCE

GRP CANOE AND KAYAK DOCK MISSISSIPPI RIVER ACCESS TRAIL COMBINED BIKE/PED TRAIL WITH HISTORIC/INTERPRETIVE ELEMENTS

NORTH PICNIC AREA

40 CAR PARKING LOT

RESTROOMS SHELTER PLAY AREA CANOE/KAYAK STORAGE

MULTI-USE ATHLETIC FIELD

RIVER SIDE GATHERING AREA NATIVE PRAIRIE PLANTING MOWED TURF OPEN SPACE

AMPHITHEATER OPEN WATER WETLAND PARK ENTRANCE HISTORIC QUARRY INTERPRETIVE OPPORTUNITY SHRUB CARR WETLAND EXISTING WETLAND

RESTING AREA FUTURE SHEPARD ROAD TUNNEL SAM MORGAN REGIONAL TRAIL WATER CHANNEL DOWN BLUFF

BIRD HABITAT/MOIST SOIL CELLS

RECENT CROSBY REGIONAL PARK ACQUISITION AREA-TRAIL CONNECTION

HIGHLAND PARK ACCESS TRAIL

EXISTING TUNNEL UNDER SHEPARD RD. RIVER OVERLOOK CROSBY REGIONAL PARK TRAIL ACCESS

Project Manager: Don Ganje / Alice Messer Contact: 651-266- 6425 / 651-266-6412 Email: Don.Ganje@ci.stpaul.mn.us / Alice.Messer@ci.stpaul.mn.us

VICTORIA PARK

design advisory committee

october 29, 2013- MEETING #8


ENTRY PLAZA WITH RECIRCULATING WATER / SPRAY FEATURES SOFT-SURFACE WATER EDGE TRAIL COMMUNITY GARDEN RAISED BEDS NATIVE SEDGE PLANTING CHILDRENS PLAY AREA

RECIRCULATING WATER TREATMENT POND

RESTROOMS

NATIVE PRAIRIE PLANTING

BREAD OVEN

WEIR

PICNIC SHELTER (6-8 TABLES)

EXISTING RAILROAD TRACK PICNIC TABLE WITH BARBEQUE GRILL BRIDGE LOCATION

MULTI-USE ATHLETIC FIELD t t t t

SOCCER LACROSSE FOOTBALL HIGH SCHOOL BASEBALL

EXPOSED LIMESTONE RR EMBANKMENT COMBINED BIKE/PED ASPHALT TRAIL EXISTING RAILROAD BRIDGE AMPHITHEATER/OUTDOOR CLASSROOM

OPEN WATER WETLAND (WINTER ICE SKATING) HISTORIC QUARRY/INTERPRETIVE OPPORTUNITY

SHRUB CARR WETLAND BOARDWALK SEATING AREA

SOFT SURFACE TRAIL/ BOARDWALK BIRD BLIND EXISTING WETLAND MOIST SOIL CELLS

NORTH PICNIC AREA Project Manager: Don Ganje / Alice Messer Contact: 651-266- 6425 / 651-266-6412 Email: Don.Ganje@ci.stpaul.mn.us / Alice.Messer@ci.stpaul.mn.us

VICTORIA PARK

design advisory committee

october 29, 2013- MEETING #8


OVERLOOK WITH SEATING NATIVE PRAIRIE PLANTING

BENCH WITH ROOF RAINGARDEN

SLEDDING BOWL

PARKING (60 STALLS) WATER CHANNEL DOWN BLUFF

EXISTING RAILROAD TRACK

RAINGARDEN

FOOT BRIDGE OVER RAVINE

6’ PATH

LOCKABLE CANOE KAYAK STORAGE

PUBLIC RESTROOM NATURE BASED PLAY AREA

GRP BOARDWALK BETWEEN EXISTING BOOMS (FLINT HILLS PROPERTY)

PICNIC SHELTER 6-8 TABLES

INTERACTIVE PUBLIC ART EXISTING EXPOSED SAND STONE BLUFF

MOWED TURF OPEN SPACE

12’ PAVED MULTI-USE TRAIL

EXISTING BLUFF

PICNIC TABLE

FISHING PIER/CANOE/ KAYAK DOCK

SOUTH PICNIC AREA Project Manager: Don Ganje / Alice Messer Contact: 651-266- 6425 / 651-266-6412 Email: Don.Ganje@ci.stpaul.mn.us / Alice.Messer@ci.stpaul.mn.us

VICTORIA PARK

design advisory committee

october 29, 2013- MEETING #8


November 20, 2013 Board Meeting V. Action Item A) Approve Minutes of November 6, 2013 DRAFT Regular Board Meeting (Sylvander)

Regular Meeting of the Capitol Region Watershed District (CRWD) Board of Managers, for Wednesday, November 6, 2013 6:03 p.m. at the office of the CRWD, 1410 Energy Park Drive, Suite 4, St. Paul, Minnesota. REGULAR MEETING I.

Call to Order of Regular Meeting (President Joe Collins) A) Attendance Joe Collins Mike Thienes Shirley Reider Seitu Jones Mary Texer

B)

Others Present Mark Doneux, CRWD Michelle Sylvander, CRWD Forrest Kelley, CRWD Anna Eleria, CRWD Bob Fossum, CRWD Britta Suppes, CRWD Gustavo Castro, CRWD

Public Attendees Todd Shoemaker, Wenck Dr. Ben Janke, U of M Dr. Jacques Finlay, U of M Joe Bischoff, Wenck

Review, Amendments and Approval of the Agenda

President Collins asked for additions or changes to the agenda. Manager Mary Texer requested the addition of Action item F, MAWD Resolution. Motion 13-197: Approve the November 6, 2013 Agenda with the addition of Action Item F, MAWD Resolution. Reider/Texer Unanimously approved II.

Public Comments – For Items not on the Agenda There were no public comments.

III.

Permit Applications and Program Updates A)

Permit # 13-019 Hamline Station (Kelley)

Mr. Kelley, reviewed Permit #13-019 Hamline Station. The applicant is PPL, Inc.. The permit is for Redevelopment of the former Midway Chevrolet. The applicable rules are Stormwater Management (Rule C), Flood Control (Rule D), Erosion and Sediment Control (Rule F). The disturbed area of this project is 2.0 Acres and 1.84 Acres impervious surface. Motion 13-198: To approve Hamline Station Permit #13-019 with 5 conditions: 1. 2.

Receipt of $9,200 surety and documentation of recorded maintenance agreement. Submit a copy of NPDES permit. Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District


3. 4. 5.

Remove geotextile fabric from bottom of infiltration system detail on Sheet C6. Geotextile shall be placed on top and sides only. Specify non-limestone rock for the clean washed angular4 aggregate surrounding the Storm Tech System. Revise detail GRD-13 on Sheet C6. The metal posts installed 36” deep at the paver interface have potential to puncture the impermeable liner beneath the structural soil, and dislodge pavers. Provide alternative tree protection fence anchoring device such as sand bags on cross members or other alternative approved by City of St. Paul and CRWD.

Texer/Jones Unanimously approved B)

Permit # 13-028 Loomis Armored Transport (Kelley)

Mr. Kelley, reviewed Permit #13-028 Loomis Armored Transport. The applicant is Ironton Managment. The permit is for the construction of a new building and parking lot within the Beacon Bluff redevelopment. The applicable rules are Stormwater Management (Rule C), Flood Control (Rule D), Erosion and Sediment Control (Rule F). This project has 3.2 Acres of disturbed area and 3.52 Acres of impervious surface. Motion 13-199: To approve Loomis Armored Transport Permit 13-028 with three conditions: 1. 2. 3.

Receipt of $17,600 surety and documentation of recorded maintenance agreement. Provide a copy of the NPDES permit. Revise pond outlet #4 in the HydroCAD model. Currently, the filtration draintile is modeled as a 6-inch irifice which results in a flow rate of 1.73 cfs during the 100-year event. Assuming a 1.0 in/hr filtration rate, however, results in a peak “filter flow” of 0.1 cfrs based on a filter area of 4.546 square feet. Adjust high water and overflow elevations as necessary.

Reider/Texer Unanimously approved C)

Permit #13-030 Western U Plaza (Kelley)

Mr. Kelley reviewed permit #13-030 Western U Plaza. The applicant is St. Paul Old Home Plaza. The permit is for redevelopment and reuse of former Old Home property at Western and University. The applicable rules are Stormwater Management (Rule C), Flood Control (Rule D), Erosion and Sediment Control (Rule F). This project has 1.6 Acres of disturbed area and 1.03 Acres of impervious surface. Motion 13-200: To approve Western U Plaza Permit 13-030 with 5 Conditions: 1. Provide documentation that the maintenance agreement has been recorded with Ramsey County. 2. Remove geotextile fabric from bottom of infiltration system detail on Sheets C6 and C7. Geotextile shall be placed on top and sides only. 3. Specify non-limestone rock for the clean washed angular aggregate surrounding the Storm Tech system. 4. Revgise HydroCAD model to include the portion of Area 4 (new building) that is draining to the intersection of University Ave and Virginia Street. 5. Remove the 6” drain tile from the underground infiltration system. Thienes/Texer Unanimously approved Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District


Motion 13-201: Approve creation of a volume bank for the Sand Companies and deposit of 4,844 cubic feet of volume reduction credits. Thienes/Texer Manager Jones abstained from voting due to possible conflict of interests. D)

Permit #13-031 US Bank Demolition (Kelley)

Mr. Kelley reviewed permit #13-031 US Bank Demolition. The applicant is Shepard Development, LLC. The permit is for the demolition of the US Bank building at 2751 Shepard Road. The applicable rule is Erosion and Sediment Control (Rule F). This project has 8.73 Acres of disturbed area and no impervious surface. Motion 13-202: To approve US Bank Demolition Permit 13-031 with 3 Conditions: 1. 2. 3.

Receipt of $17,460 surety. Provide a copy of the NPDES permit. Identify locations of material stockpiles and required perimeter controls to contain stockpiled materials.

E)

Permit Program/Rules Update (Kelley)

A TAC meeting is scheduled for November 7, 2013 from 9:00 – 11:00 am. There will be six permit applications at the November 20th meeting. IV.

Special Reports A) Summary and Analysis of Water Quality Data from the Capitol Region Watershed District’s Stormwater Monitoring Program, 2005-2012, Benjamin D.Janke, Ph.D, University of Minnesota (Suppes)

Mr. Fossum introduced Dr. Jacques Finlay and Dr. Ben Janke from the University of Minnesota. Since 2005, CRWD has been collecting and analyzing water quality data through the District Monitoring Program. CRWD determined that additional analysis of the robust data set was needed to identify long-term trends. In January 2013, CRWD contracted with Dr. Finlay and Dr. Janke at the University of Minnesota to perform additional analyses of CRWD monitoring data. The final deliverable by Dr. Janke is a comprehensive report titled “Summary and Analysis of Water Quality Data from CRWD’s Stormwater Monitoring Program, 2005-2012”. The objectives of the analyses and report were to: (1) Investigate spatial and seasonal patterns in water yields and concentrations of nutrient and metals (2) Understand the impact of storm even characteristics (e.g. rainfall depth, antecedent dry days or rainfall) on loading of water and nutrients (3) Investigate the impact on water and nutrient loading of differences in land cover and drainage characteristics among monitored sub-watersheds (4) Determine exceedence probabilities of water yields and nutrient loads (5) Quantify probabilities and seasonality of metal toxicity exceedences

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District


The primary goals of these analyses were to better understand water and nutrient loading patterns in the watershed, inform the design of future stormwater BMPs, and aid in the development of TMDLs or water quality goals for the CRWD’s lakes and streams. The analyses provide methods that may be used to compare future monitoring seasons to data from the summary period (2005-2012). A summary has also been compiled of major patterns in spatial and seasonal variability among monitored sub-watersheds, which may help identify seasons and/or specific sub-watersheds or BMPs that may be crucial for managing water quality in the CRWD. Dr. Janke reported that the data confirms that the majority of phosphorus and sediment loading is the result of storm flow in CRWD. Surprisingly, the majority of nitrogen loading can be attributed to baseflow. Statistical analysis of cumulative frequency distribution indicated BMPs in the watershed are performing as designed and are reducing runoff volumes. Data analyzed from CRWD indicates about 80-85% of the rainfall events are 1 inch or less and 60-65% of the runoff volume is contained in storms 1 inch or less. Dr. Janke pointed out that CRWD’s monitoring data set is very extensive and is being noted by other researchers across the nation. B) Statistical Analysis of Lake Data in the Capitol Region Watershed District, Joe Bischoff, Wenck Associates, Inc. (Eleria) Ms. Eleria introduced Joe Bischoff with Wenck Assocaites, Inc. In early January 2013, CRWD hired Wenck Associates, Inc. to conduct a more in-depth analysis of the four CRWD lakes water quality data collected by Ramsey County to better understand temporal, seasonal and climatic trends and the factors driving these trends. Specifically, CRWD sought answers to several questions for each of the lakes including: 1) Is the lake water quality data generally getting better or worse; 2) What are the trends; and 3) What factors are driving these trends. Mr. Bischoff reviewed statistical and graphical analysis of CRWD lake water quality data, trend analysis of selected water quality parameters, and a qualitative assessment of potential trend drivers. The Board reviewed and commented on the draft technical memorandum summarizing the results and recommendations for further analysis and monitoring. V.

Action Items A) AR: Approve Minutes of the October 16, 2013 Regular Meeting (Sylvander)

Motion 13-203: Approve Minutes of the October 16, 2013 Regular Meeting. Jones/Reider Unanimously approved B) AR: Approve Contract Amendment #4 with Wench Associates Inc. for the Highland Ravine Project (Eleria) Ms. Eleria reviewed in early November 2012, CRWD’s Board of Managers approved Wenck Associates as the engineer for the Highland Ravine Stabilization Project for an original contract amount of $45,476. To date, CRWD has approved three contract amendments for additional engineering work at cost of $8,110 for a total engineering budget of $53,586. The additional work included stabilization designs for ravines discovered during field work, addressing another round of comments, and covering other design changes that were outside the original scope of work. Due to the expanding scope of the project and the complexities of working with private property owners, Wenck has exceeded the engineering budget and seeks additional funds to cover portion of the unpaid expenses to date and the remaining tasks including finalizing the stabilization plans for all ravines, completing the Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District


contract documents, assisting CRWD with easements/agreements, and bidding. Wenck is requesting $7,634 to complete the engineering work. Currently, the Wenck contract deadline is December 31, 2013, which needs to be extended through 2014. CRWD staff anticipates all plans will be completed and easements/agreements secured in February 2014. The project will go out for bid in March 2014 and construction will commence in summer 2014. Motion 13-204: Approve Contract Amendment #4 for Wenck Associates, In.c for the Highland Ravine Stabilization Project in an amount not to exceed $7,634.00 for a total budget not to exceed $61,220 and a contract deadline of December 31, 2014. Thienes/Texer Unanimously approved C)

AR: Establish the Monitoring, Research and Maintenance Division (Doneux)

Administrator Doneux reviewed Minnesota Statue 103D.325, Subdivision 1 provides the District with employment authority and states that the CRWD Board of Managers may employ a chief engineer, professional assistants, and other employees, and provide for their qualifications, duties, and compensation. The District recognizes the need to regularly evaluate and assess staff size, skills and structure. Since the District first started hiring employees with the Administrator position in 2003, the staff organizational structure has been flat. All employees report directly to the Administrator. Over time staff organized around the monitoring and BMP maintenance has grown in numbers with 5.5 FTE working in this area currently. Because of this growth and need to provide more direct supervision for these staff, Administrator Doneux feels there is benefit in establishing functional Divisions as an organizational tool to provide enhanced and more direct staff supervision, training and mentoring. In addition to the District benefit, staff desires the opportunity to grow and gain management experience at CRWD. Establishing functional units (Division) within the District’s staff structure recognizes the benefit for both staff and the District to provide professional advancement for staff to strengthen the organization, reduce turnover and maintain high employee satisfaction. Administrator Doneux emphasized that staff structure beyond establishing the Monitoring, Research and Maintenance Division is not known and the organizational structure is something that will need to be regularly reviewed and evolve overtime with District programs, projects and staffing requirements. This plan has been reviewed with the Personnel Committee and the Board of Managers. Administrator Doneux recommend the Board of Managers create and establishes the Division of Monitoring, Research and Maintenance. He also recommended that the Board of Managers regularly evaluate the District’s staff structure to ensure an efficient and effective structure that harnesses staff skills, abilities and professional development goals. Motion 13-205: Adopt Resolution Creating and Establishing the Monitoring, Research and Maintenance Division. Reider/Texer Unanimously approved D)

AR: Approve Program Manager III Position (Doneux)

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District


Currently the District does not have a Program Manger III position. Administrator Doneux drafted a position description and has reviewed it with the Personnel Committee. The Primary Objective of this position is to manage the Monitoring, Research and Maintenance Division. In addition, this position will perform skilled to highly skilled duties providing water resource management, protection and planning as it relates to the implementation of District’s Watershed Management Plan and annual work plan. The Program Manager coordinates the implementation of their Division’s area of responsibility within the District’s Watershed Management Plan. Major areas of accountability and essential job functions include: program and project Management, Fiscal management and employee supervision. In addition to creating the Program Manager III position, Adminstrator Doneux is requesting Board approval to promote Bob Fossum into this position. Bob Fossum has been with the District since 2004 and has been instrumental in implementing many major projects and programs with the District including, Rules, the 2010 Watershed Management Plan and the Arlington Pascal project. Most recently Bob Fossum has brought his leadership and management skills to help stabilize the Monitoring and BMP Maintenance programs of the District after significant staff turnover. In accordance with the District Salary Administration Policy, the Personnel Committee must approve any change in Grade for an existing employee. The Personnel Committee has met and supports this promotion and is seeking Board Approval of this action. Motion 13-206: Approve Program Manager III Position and Position Description Reider/Jones Unanimously approved Motion 13-207: Approve Promotion of Bob Fossum to Grade 11 and to fill Program Manager III Position Reider/Jones Unanimously approved E)

AR: Approve 2014 Employee Health Insurance Program (Doneux)

Administrator Doneux reviewed that since 2003, Bearence (formally TC Fields) has provided insurance to the District. During late 2011 the District looked at other options for benefits for employees. Staff worked with Bearence to review and determine a new benefits package with the goal of attempting to meet the following objectives: 1. Realize a cost savings for the District and District employees. 2. Obtain similar benefit coverage’s to those currently available to District employees through Ramsey County. The District has purchased health benefit package from Health Partners through Bearance for 2012 and 2013. The District purchased dental and other ancillary coverage’s (Life, Short Term and Long Term Disability) from Ramsey County. The District is now ready to take the next step and obtain all benefit coverage through Bearance. Staff has obtained benefit quotes from Bearance for health, dental and ancillary coverage’s. Bearance obtains quotes from at least three vendors when soliciting benefit quotes. Staff has reviewed potential changes to the benefits with the Employee Committee (Managers Texer and Collins). Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District


Motion 13-208: Approve the 2014 Employee Benefit Program as follows: 1) 2) 3) 4)

5)

Effective January 1, 2014, the District move all employee benefit programs from Ramsey County to those offered through the District’s Insurance Company, the Bearence Management Group. The District requires a monthly employee contribution of $40.00 for single, $80.00 for Single Plus One and $120.00 for Family health insurance, effective December 1, 2013. The District requires a monthly employee contribution of $10.00 for single, $20.00 for Single Plus One and $40.00 for Family dental insurance, effective January 1, 2013. The District will continue to provide ancillary employee benefits including life, short term disability and long term disability insurance. These programs and the employee/District contributions will be consistent to those offered by Ramsey County. The District will continue to provide Life Insurance and Long Term Disability coverage consistent with the Ramsey County Program and allow employees to purchase additional coverage at their cost. The District provide payroll deductions and employee contributions to Health Care Flexible Spending Accounts and Dependent Care Spending Accounts.

Reider/Texer Unanimously approved F)

AR: Approve MAWD Resolution (Doneux)

Administrator Doneux and Board Members shared interest in improving the planning and communication from Minnesota Association of Watershed District’s (MAWD) that helps support MAWD’s lobbyist. A resolution has been drafted by Mary Texer for the MAWD Board to adopt. Manager Texer reviewed the draft resolution the Minnesota Association of Watershed Districts (MAWD) has a vested public interest in the activities of the laws and rules of the Minnesota State Legislature and Administration. MAWD had engaged the lobbying services of Ray Bohn to advance the Association’s legislative agenda. Individual Watershed Districts can fully support the Association’s legislative agenda only if they are fully informed about the ongoing legislative process. Social media has become a powerful tool that can include both individuals and organizations from around the state to keep them immediately informed of legislative activities. A resolution was proposed that the MAWD Board adopt and communicate to the membership no later than the third Tuesday in January each year a well articulated legislative agenda and lobbying activities and processes that include the following: A structured inclusive approach to legislative lobbying that promotes active participation by the Watershed Districts, their staff and boards; Key talking points for the Watershed Districts, their staff and boards that engage legislators and advance the legislative agenda; A comprehensive social media strategy that informs and calls people to action in support of the legislative agenda. Motion 13-209: Adopt MAWD resolution. Texer/Reider Unanimously approved VI.

Unfinished Business A.

Inspiring Communities Program Update (Eleria and Castro)

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District


Ms. Eleria reviewed the partnership CRWD has partnered with the City of Saint Paul’s Planning and Economic Development (PED) Department since August 2011 on creating water-friendly landscapes at single-family residential properties that the City is acquiring and redeveloping through its Neighborhood Stabilization Program (NSP). For each NSP property, CRWD has prepared a landscape plan that includes stormwater BMP(s) (i.e., rain gardens, swales, etc.) to provide proper drainage away from the property, minimize stormwater runoff from the property, enhance the property’s aesthetics and improve water quality of the Mississippi River. The Neighborhood Stabilization Program, now called Inspiring Communities Program has been undergoing some changes. Up to now, CRWD has been working directly with the City of St. Paul, and they have been implementing many of the rehabilitation of vacant single family buildings over the last couple of years. Moving forward, the program is shifting to a developer driven model that allocates property and subsidy through an open bid process to developers. To that end, the City released and RFP in early October with around 77 properties, which includes a mix of owner occupied and rental, as well as vacant building rehabs and new construction. In this new format, the developer is ultimately responsible for initiating work with CRWD. The enhancement of the RFP properties to achieve water quality benefits is still a requirement of the program, however, developers are not required to work with CRWD. Nevertheless, CRWD will continue to offer a free landscape design and rebates, generally ranging from $500 - $1,000, for the installation of rain gardens. In cases where CRWD identifies a unique opportunity for the installation of other management practice, higher rebates could be considered. VII.

General Information A.

Administrator’s Report

Administrator Approved or Executed Agreements Stewardship Grant Agreement with Great River Greening for a fall intern. - $1,500. Board Approved or Executed Agreements TBI Work Order No. 5 Amendment No. 2 with Barr Engineering for additional rail monitoring program. Not to exceed $56,500 for a total work order amount of $992,865 General updates including recent and upcoming meetings and events 1)

Upcoming events and meetings a) Next CAC Meeting is Wednesday November 13, 2013 from 7:00-9:00 pm. b) Next Board Meeting is Wednesday, November 20, 2013 at 6:00 pm. c) MAWD Annual Meeting and Trade Show, December 5-7, 2013, Arrowwood Resort, Alexandria. The Villa Park Wetland Restoration Project is one of the featured presentations at this conference. The deadline to register for lodging is November 15, 2013. The deadline to register for the Annual Conference is November 20, 2013.

2)

Project Updates a) Villa Park Wetland Restoration Project Dredging at Villa Park is complete and all dried sediment has been removed. Frattalone is now completing the final site restoration phase. Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District


b) TBI – Cayuga Relocation Project The TBI Realignment Project at 35E/Cayuga is completed. The new TBI alignment has been fully constructed and is on-line. The old TBI alignment is now abandoned. VIII. Next Meeting A) Wednesday, November 20, 2013 Meeting Agenda Review IX.

Adjournment

Motion 13-210: Adjournment of the November 6, 2013 regular Board Meeting at 8:34 p.m. Jones/Texer Unanimously Approved Respectfully submitted, Michelle Sylvander

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District


November 20, 2013 Board Meeting V. Action Items – B) Accounts Payable & Budget Update (Sylvander)

DATE: November 14, 2013 TO: CRWD Board of Managers FROM: Michelle Sylvander, Office Manager RE: October 2013 Accounts Payable/Receivable and Administrative/Program Budget Report _________________________________________________________________________________

Background Enclosed are the Accounts Payable/Receivable and the Administrative/Program Budget Reports for the Month of October 2013. Issues Summary of Accounts Payable/Receivable Report: Accounts Payable Accounts Receivable

$ 540,232.17 $ 221,951.71

Summary of Preliminary Budget Report:

$ 31,796.47 $ 110,668.54 $ 23,673.14 $ 374,094.02 $ 540,232.17

Administrative Budget Program Budget Project Budget Capital Improvement Budget TOTAL

Request Action Approve October 2013 Accounts Payable/Receivable and August Budget Report and direct Treasurer and Board President to endorse and disperse checks for these payments. enc:

October 2013 Accounts Payable/Receivable October 2013 Preliminary Budget Report

W:\02 Budget and Finance\Board Memos\Board Memos 2013\BD Memo AP Budget Report 11.20.2013.docx

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.


ACCOUNTS PAYABLE/RECEIVABLE Date

Vendor Name

Vendor Address

Michael Thienes

284 S McCarrons Blvd Roseville MN 55113

10/14/13

Al's Coffee

820 Decatur Ave. North Golden Valley, MN 55427

11/01/13

Al's Coffee

820 Decatur Ave. North Golden Valley, MN 55427

09/30/13

11/20/13

Report Date Invoice #

Description

Amount

Manager Per Diem/Expense

$725.85

112578

Coffee

$197.50

30960

Oasis Filter Cooler

3rd Quarter

Check #

G/L Code

$725.85

15583

101-13970-4010 $675.00 101-13970-4020 $ 50.85

---

101-13970-4210

Office Supplies

$208.26

15584

101-13970-4210

Office Supplies

Total

---

$10.76

G/L Description Manager Per Diem/Expense

10/25/13

Barr Engineering

4700 West 77th Street Minneapolis MN 55435-4803

23621128.00-3

Hamline TOD Green Infrastructure Feasibility Study

$992.86

---

---

330-13621-4490

Scientific Analysis/Research

10/25/13

Barr Engineering

4700 West 77th Street Minneapolis MN 55435-4803

23620944.05-35

TBI Work Order #1 of Nov. 11,2009 Agreement

$408.00

---

---

315-13550-4470

Engineering

10/25/13

Barr Engineering

4700 West 77th Street Minneapolis MN 55435-4803

23620944.11-3

Farrington Drainage

$1,637.00

---

10/25/13

Barr Engineering

4700 West 77th Street Minneapolis MN 55435-4803

23620944.09-22

Trout Brook Realignment from I-35E to Cayuga

10/28/13

Richard Beckstrom

289 Jansa Drive Shoreivew, MN 55126

10/23/13

Ben Meadows

P.O. Box 5275 Janesville, WI 53547-5275

1019810328

10/24/13

Ben Meadows

P.O. Box 5275 Janesville, WI 53547-5275

1019811573

10/15/13

Benefit Extras, Inc.

P.O. Box 1815 Burnsville, MN 55337

10/11/13

BNSF Railway Company

3115 Solutions Center Chicago, IL 60677-3001

90084045

10/15/13

Brooks Office Interiors

2222 Elm Street SE Minneapolis, MN 55414

112280

Shelves for Plotter area

10/03/13

City of St. Paul

Department of Public Works 15 W. Kellogg Blvd. St. Paul, MN 55102

129202

10/31/13

c/o Cassidy Turley Midwest Inc

1400-1410 Energy Pk Dr Holdings LLC 4678 World Parkway Circle St. Louis MO 63134

10/16/13

District 10 Como Community Council

1224 N. Lexington Parkway St. Paul, MN 55103

10/09/13

EOR

10/21/13

EOR

10/10/13

Environmental Initiative

10/30/13

ESRI

10/28/13

Exenvironmental

10/25/13

Frattalone Companies, Inc.

10/08/13

Fresh Color Press

10/19/13

651 Hale Avenue North Oakdale, MN 55128 651 Hale Avenue North Oakdale, MN 55128 211 North First Street, Suite 250 Minneapolis, MN 55401 File 54630 Los Angeles, CA 90074-4630 648 Commerce Drive P.O. Box 222 Hudson, WI 54-16 3205 Spruce Street Little Canada, MN 55117

Well Sealing Program

52624

December Rent

217 44-0051-9 44-0053-9 130177 92726364 13-655

Sealing of 2 wells Supplies Knee boots, Rescue Helmet, Headlamp

$56,090.11 $865.00 $41.97

---

415-13818-4470

Engineering

$59,127.97

15585

415-12815-4470

Engineering

$865.00

15586

201-13130-4510

Construction Expense

---

211-13200-4210

Office Supplies

---

$365.13

$407.10

15587

240-13399-4210

Office Supplies

$30.00

$30.00

15588

101-13970-4040

Employee Benefits

$1,563.13

$1,563.13

15589

415-12815-4510

Construction Expense

$367.44

$367.44

15590

101-13970-4210

Office Supplies

Vehicle Rental

$6,286.60

$6,286.60

15591

208-13000-4630 $1571.65 211-13200-4630 $1571.65 305-13421-4630 $1571.65 315-13550-4630 $1571.65

Office Rent - December

Monthly Flex TBI Storm Sewer Relocation

Vehicle Expense/Maintenance

$5,500.00

$5,500.00

15592

101-13970-4220

Como Curb Cleanup Direct Mail Project

$762.75

$762.75

15593

220-13280-4300

Postage

Como Park Pond Improvement

$703.50

---

305-12432-4530

Maintenance Expense

Victoria Park - Modeling & Design

$437.50

$1,141.00

15594

325-12601-4500

Planning Expense

Environmental Initiative Organizational Membership

$600.00

$600.00

15595

101-13970-4260

Dues & Publications

$2,998.46

$2,998.46

15596

230-13370-4620

Equipment Maintenance

$175.00

$175.00

15597

240-13390-4280

Training & Education

$277,093.91

$277,093.91

15598

410-12750-4510

Construction Expense

$770.60

$770.60

15599

220-13280-4210

Office Supplies

$4,705.00

$4,705.00

15600

305-13421-4530

Maintenance Expense

$934.19

$934.19

15601

220-13250-4210

Office Supplies

---

330-13624-4530 $1250.00 210-13143-4530 $1250.00

Maintenance Expense

15602

330-13624-4530 $2000.00 210-13143-4530 $2000.00

Maintenance Expense

ArcGIS Confined Entry Training - Custavo Castro

---

Rent-December

4839

Villa Park Wetland Restoration

7625 Golden Triangle Drive, Suite C Eden Prairie, MN 55344-3700

28839

Como Flyer

Goliath Hydro-Vac Inc.

24491 Dakota Ave. Lakeville, MN 55044

17602

Vac. Manholes, catch basins

10/16/13

Good Printer

3769 Dunlap Street North St. Paul, MN 55112

14962

2012 Annual Report Books

09/30/13

Great River Greening

35 West Water Street, Suite 201 St. Paul, MN 55107

2131

Rain Garden Watering Events

$2,500.00

09/30/13

Great River Greening

35 West Water Street, Suite 201 St. Paul, MN 55107

2132

Rain Garden Water Events

$4,000.00

10/10/13

HDR Engineering, Inc.

701 Xenia Avenue Sourth Minneapolis, MN 55416

400792-H

Villia Park Wetland Restoration

$5,495.65

---

---

410-12750-4460

Surveying, Mapping, GIS

09/03/13

HDR Engineering, Inc.

701 Xenia Avenue Sourth Minneapolis, MN 55416

399040-H

Villia Park Wetland Restoration

$13,125.89

---

---

410-12750-4460

Surveying, Mapping, GIS

--$6,500.00


ACCOUNTS PAYABLE/RECEIVABLE Date

Vendor Name

Vendor Address

11/20/13

Report Date Invoice #

Description

Amount

Total

Check #

G/L Code

---

---

220-13250-4430

Consultants

G/L Description

09/03/13

HDR Engineering, Inc.

701 Xenia Avenue Sourth Minneapolis, MN 55416

10/07/13

HDR Engineering, Inc.

701 Xenia Avenue Sourth Minneapolis, MN 55416

11/01/13

Health Partners

NW 3600 PO BOX 1450 Minneapolis, MN 55485-3600

10/09/13

Houston Engineering Inc.

1401 21st Avenue North Fargo, ND 58102

17276

Curtiss Pond Design & Construction Project

10/31/13

Impressive Print Inc.

1995 Oakcrest Ave. Roseville, MN 55113

60831

Fall Newsletter

$175.44

10/11/13

Integra Telecom

P.O. Box 2966 Milwaukee, WI 53201-2966

11370391

Monthly Phone service

$554.85

10/31/13

Forrest Kelley

1259 Avon Street North St. Paul, MN 55117

10/31/13

Oct. Office Cleaning

$480.00

10/31/13

Forrest Kelley

1259 Avon Street North St. Paul, MN 55117

10/31/13

Oct. Expense Report

$618.45

$1,098.45

15608

208-13000-4330

Staff Expense

C Lanphear Design

3715 45th Avenue South Minneapolis, MN 55406

1013-01

Design work

$1,021.38

1,021.38

15609

220-13250-4210

Office Supplies

10/31/13

Marco

Konica Minolta Premier Finance P.O. Box 790448 St. Louis, MO 63179-0448

$75.00

15610

101-13970-4610

Equipment Pruchase/Rental/Lease

10/18/13

Marco

NW 7128 P.O. Box 1450 Minneapolis, MN 55485-8554

INV1642406

HP Printer Contract

$480.69

---

101-13970-4610

Equipment Pruchase/Rental/Lease

10/23/13

Marco

NW 7128 P.O. Box 1450 Minneapolis, MN 55485-8554

INV1648477

Sharp Copier Contract

$677.99

15611

101-13970-4210

Office Supplies

10/31/13

MAWD

540 Diffley Road St. Paul, MN 55123

Training & Education

10/17/13

MECA

10/29/13

10/24/13

Menards

10/04/13

Minnesota Native Landscapes

10/10/13

The Monitor

10/08/13

MSC

10/22/13

MSC

10/21/13

MSC

10/30/13

Manely Olson

10/13/13

Pitney Bowes

11/01/13

Pitney Bowes

11/01/13

Ramsey County - RISK

Attn: Ruth Kraemer 600 4th Street North Cold Spring, MN 56302 Capitol One Commercial P.O. Box 5219 Carol Stream, IL 60197-5219 8740 77th Street NE Otsego, MN 55362 1885 University Avenue, Suite 110 St. Paul, MN 55104 75 Maxess Road Melville, NY 11747-0000 75 Maxess Road Melville, NY 11747-0000 75 Maxess Road Melville, NY 11747-0000 1974 Summer Street Falcon Heights, MN 55113 P.O. Box 371874 Pittsburgh, PA 15250-7874 P.O. Box 223648 Pittsburgh, PA 15250-2648 90 Plato Blvd. W P.O. Box 64097 St. Paul, MN 55164-0097

399042-H

Education & Outreach Program

$1,950.02

400247-H

Education & Outreach Program

$1,506.43

$22,077.99

15603

220-13250-4430

Consultants

Benefits for December 2013

$6,540.00

$6,540.00

15604

Various/benefits

Employee Benefits

$4,207.07

$4,207.07

15605

305-12425-4470

Engineering

$175.44

15606

220-13250-4210

Office Supplies

$554.85

15607

101-13970-4610

Equipment Pruchase/Rental/Lease

---

101-13970-4320

Utilities

December Benefits

240226084

2013

CP Erosion Control Oct.

Knoica Minolta Copier Contract

Annual Meeting & Trade Show

---

$75.00

---

$1,158.68

$2,405.00

$2,405.00

15612

101-13970-4280 $555.00 208-13000-4280 $185.00 210-13140-4280 $185.00 211-13200-4280 $555.00 230-13250-4280 $370.00 230-13370-4280 $185.00 410-13750-4280 $185.00 415-13810-4280 $185.00

$45.00

$45.00

15613

208-13000-4280

Training & Education

Office Supplies

Erosion & Control Field Seminar Monitoring Supplies

$22.49

$22.49

15614

211-13200-4210

$427.39

$427.39

15615

210-13143-4520

Materials

Monitor Insert

$300.00

$300.00

15616

220-13280-4210

Office Supplies

60145693

Respirators & Batteries

$191.35

---

---

240-13399-4210

Office Supplies

64015423

Batteries

$62.41

---

---

240-13399-4210

Office Supplies

46696333

9835 61891

Herbaceous Plants for RSVP

Respirators - returned

($26.98)

$226.78

15617

240-13399-4210

Office Supplies

Well Sealing

Well Sealing

$500.00

$500.00

15618

201-13130-4510

Construction Expense

38926275

Postage Refill

$53.92

$53.92

15619

101-13970-4300

Postage

38926275

Postage Reserve Account

$500.00

$500.00

15620

101-13970-4300

Postage

$1,195.17

$1,195.17

15621

Various/benefits

Employee Benefits

RISK-001629

Risk Management November


ACCOUNTS PAYABLE/RECEIVABLE Date

Vendor Name

10/14/13

Ramsey County - Attorney

10/10/13

Ramsey Conservation District

10/09/13

Ramsey Conservation District

Vendor Address 90 Plato Blvd. W P.O. Box 64097 St. Paul, MN 55164-0097 1425 Paul Kirkwold Drive Arden Hills, MN 55112 1425 Paul Kirkwold Drive Arden Hills, MN 55112 90 Plato Blvd. W P.O. Box 64097 St. Paul, MN 55164-0097 P.O. Box 44154 Eden Prairie, MN 55344

Atty-004454

Description Attorney Services - September 2013

$12,520.00

Stewardship Grant Program

$12,677.50

Scientific Analysis/Research

211-13205-4490

Scientific Analysis/Research

$1,522.97

$1,522.97

15624

305-13432-4520

$1,126.50

15625

101-13970-4210 $400.10 220-13275-4210 $726.40

45412

Surveying

$898.50

$898.50

15626

417-13801-4460

Surveying, Mapping, GIS

$29.38

$29.38

15627

101-13970-4330

Staff Expense

$134.01

$134.01

15268

211-13200-4210

Office Supplies

$300.00

$300.00

15629

101-13970-4440

Accounting Expense

$1,094.70

$1,094.70

15630

211-13200-4210

Office Supplies

$3,000.00

$3,000.00

15631

210-13143-4710

Grants/Cost-Share/Partner Funding

$64.54

$64.54

15632

101-13970-4250

Telecommunications

10/31/13

Michelle Sylvander

6593 Albert Ct. Lino Lakes, MN 55038

10/15/13

Tech Sales

311 West 44th Street Minneapolis, MN 55409

318149

Activated Clay

09/30/13

Techware

17850 Kewood Trail, Suite 216 Lakeville, MN 55044

84946

Sage Software Consulting

6021A

Sensor

Trans Alarm

211-13205-4490

15623

$1,126.50

9001 East Bloomington Freeway, Suite 118 Bloomington, MN 55420-3435

10/15/13

--$25,197.50

G/L Description Legal Fees

Embroidered Apparel

Sunde

P.O. Box 121175, Dept. 1175 Dallas, TX 75312-1175 2801 21st Avenue So. Suite 100 Minneapolis, MN 55407 500 East Travelers Trail, Suite 600 Burnsville, MN 55337-7503

101-13970-4420

Plants

10/09/13

Teledyne

G/L Code

15622

10998

Ramsey County Communit Corrections Royal Textile Manufacturing

The Alliance for Sustainability

$650.25

Lake Survey - Loeb, McCarrons, Crosby & Como

COR-00254

Check # $650.25

Total

10913CRWD

10/30/13

11/05/13

Amount

101013CRWD

10/16/13

08/30/13

11/20/13

Report Date Invoice #

Expense Report

Oct. Expense Report

Partner Grant

Partner Grant Reimbursement

Materials Office Supplies

RMR892058

Alarm Monitoring

Y348W8403

Shipping

$28.77

---

---

101-13970-4300

Postage

10/05/13

UPS

Lockbox 577 Carol Stream, IL 60132-0577

09/14/13

UPS

Lockbox 577 Carol Stream, IL 60132-0577

Y348W8373

Shipping

$30.43

---

---

101-13970-4300

Postage

10/12/13

UPS

Lockbox 577 Carol Stream, IL 60132-0577

Y348W8413

Shipping

$8.79

---

---

101-13970-4300

Postage

10/19/13

UPS

Lockbox 577 Carol Stream, IL 60132-0577

Y348W8423

Shipping

$10.52

---

---

101-13970-4300

Postage

11/02/13

UPS

Lockbox 577 Carol Stream, IL 60132-0577

Y348W8443

Shipping

$1.73

$80.24

15633

101-13970-4300

Postage

10/18/13

Urban Roots MN

731 East 7th Street St. Paul, MN 55106

$5,000.00

15634

210-13143-4710

Grants/Cost-Share/Partner Funding

10/29/13

US Bank

P.O. Box 790408 St. Louis, MO 63179-0408

Oct. 1811

Intermedia.net $328.27, U of M $190.00, South Look Club $43.00, Exc

---

101-13970-4280 $640.62 101-13970-4250 $328.27

10/29/13

US Bank

P.O. Box 790408 St. Louis, MO 63179-0408

Oct. 9994

Rainbow $37.68, Target $5.35, Roseville Bakery $14.35

$57.38

Walters

P.O. Box 67 Circle Pines, MN 55014

Trash/Recycling - October

$52.15

10/23/13

Wenck

1800 Pioneer Creek Center P.O. Box 249 Maple Plain, MN 55359-0249

1304736

Permit Program

$5,707.30

10/23/13

Wenck

1800 Pioneer Creek Center P.O. Box 249 Maple Plain, MN 55359-0249

1304734

Permit Program

$4,984.90

10/10/13

Stewardship Grant

535720

Grant for Urban Roots Interns

$5,000.00

$968.89

---

Training & Education

15635

101-13970-4210

Office Supplies

15636

101-13970-4320

Utilities

---

---

208-10032-4470 $622.91 208-11022-4470 $348.70 208-13102-4470 $611.55 208-12010-4470 $598.05 208-12014-4470 $30.00 208-12017-4470 $1626.80 208-12026-4470 $440.03 208-13004-4470 $538.05 208-13012-4470 $891.21

Engineering

---

---

208-13102-4470 $675.00 208-13025-4470 $549.30 208-13026-4470 $1159.60 208-13027-4470 $999.30 208-13028-4470 $443.90 208-13029-4470 $578.90 208-13030-4470 $578.90

Engineering

$1,026.27

$52.15


ACCOUNTS PAYABLE/RECEIVABLE Date

Vendor Name

08/21/13

Wenck

10/23/13

Wenck

08/21/13

Wenck

10/28/13

10/21/13

10/31/13

Vendor Address

1800 Pioneer Creek Center P.O. Box 249 Maple Plain, MN 55359-0249

1800 Pioneer Creek Center P.O. Box 249 Maple Plain, MN 55359-0249 1800 Pioneer Creek Center P.O. Box 249 Maple Plain, MN 55359-0249

Xcel Energy

P.O. Box 9477 Minneapolis, MN 55484-9477

Xylem

OI Corporation P.O. Box 9010 College Station, TX 77842-9010

Nate Zwonitzer

1410 Energy Park Dr St. Paul MN 55108

11/20/13

Report Date Invoice #

Description

1303559

Permit Program

1304735

Lake Statistical Analysis

1303556

Highland Ravine Stabilization

Oct. 2013

Amount

Total

Check #

G/L Code

Engineering

Engineering

$5,841.87

---

---

208-10032-4470 $772.96 208-11022-4470 $149.09 208-12010-4470 $727.96 208-12013-4470 $202.09 208-12017-4470 $1764.77 208-12026-4470 $232.09 208-13004-4470 $419.18 208-13009-4470 $419.18 208-13012-4470 $1154.55

$978.00

---

---

211-13205-4470

G/L Description

$7,355.20

$24,867.27

15637

417-12801-4470

Oct. 2013 Service

$398.00

$398.00

15638

101-13970-4320

Utilities

158839

Water Logger Repair

$436.19

$436.19

15639

211-13200-4210

Office Supplies

Expense Report

Oct. Expense Report

$62.00

$62.00

15640

210-13140-4330

Staff Expense

$540,232.17

$540,232.17

Approved for Payment: __________________________11/20/2013 Michael Thienes, Treasurer

Date

RECEIPTS Date 10/16/13 10/28/13

Vendor Name Jaeger Construction State of Minnesota

06/25/13

E X Environmental

Description US Bank Demolition MN Dot Utility Agreement TOTAL

Vendor Address

Check Amount $500.00 $221,451.71 $221,951.71

$500.00 $221,451.71 $221,951.71

Check # 7285 53178611

G/L Code 13-031 415-12815

G/L Description Permit Fees Grant Income

OUTSTANDING INVOICES/CREDITS

08/27/13

Pitney Bowes

08/31/13

Northern Battery

10/12/13

Staples

11/04/13

Techware

13-630 5600073353 1326007 8027309552 85007

Duplicate Invoice, already Pd invoice #13-623, Ck#15358 Returned unused ribbon from old postage meter

$175.00

$175.00

($28.81)

($28.81)

Credit RM363478

($20.00)

($20.00)

Returned headphone - needed additional adaptor Consulting for Sage Software

($58.97)

($58.97)

$1,425.00

$1,425.00

sent email 10/2/2013 - phone # not in service

Hold till more progress is made with software


CAPITOL REGION WATERSHED DISTRICT

Project/Program:

2013 BUDGET REPORT

2013 Budget

OPERATIONS ADMINISTRATION

Administrative Budget

378,900.00

378,900.00

79,626.00

79,626.00

201-Groundwater

19,900.00

19,900.00

PROGRAMS

31,796.47

457,923.79

1,376.39

Balance of Budget Remaining

YTD Expenditures

-

(79,023.79)

% of Budget Expended 120.86%

79,626.00

0.00%

4,717.24

15,182.76

23.70%

41,850.00

41,850.00

83.86

1,006.03

40,843.97

2.40%

194,190.00

194,190.00

26,462.11

150,152.36

44,037.64

77.32%

210-Stewardship Grants

233,750.00

233,750.00

19,292.47

166,275.75

67,474.25

71.13%

211-Monitoring and Data Collection

417,060.00

417,060.00

44,087.28

479,965.49

(62,905.49)

115.08%

220-Education/Outreach

13,594.90

152,570.00

152,570.00

110,256.29

42,313.71

72.27%

225-Technical Resources & Information Sharing

47,590.00

47,590.00

-

42,368.98

5,221.02

0.00%

228-Future Trends: Research & Positioning

44,380.00

44,380.00

-

1,562.20

42,817.80

0.00%

230-Geogrpahic Information Systems (GIS)

65,650.00

65,650.00

61,137.05

4,512.95

93.13%

22,050.00

PROGRAM TOTAL

1,318,616.00

0.00

4,766.30

22,050.00

1,005.23

9,389.49

12,660.51

42.58%

1,318,616.00

110,668.54

1,026,830.88

291,785.12

77.87%

300-Administration

38,374.00

38,374.00

0.00

0.00

38,374.00

0.00%

301-Shoreline & Streambank Maintenance

19,220.00

19,220.00

0.00

8,310.55

10,909.45

43.24%

185,360.00

185,360.00

13,179.85

89,377.56

95,982.44

48.22%

0.00

0.00

-

13.75

6,250.00

6,250.00

-

-

315-Trout Brook Subwatershed

184,990.00

184,990.00

317-Crosby Lake Subwatershed

13,150.00

13,150.00

325-Wetland, Stream and Ecosystem Restoration-Planning

54,600.00

54,600.00

122,900.00

122,900.00

5,881.96

305-Como Lake Subwatershed PROJECTS

Current Month Expenditures

208-Permitting

240-Safety Program

310-Lake McCarron's Subwatershed 313-Loeb Lake Subwatershed

330-Mississippi River Subwatershed PROJECTS TOTAL TOTAL OPERATIONS BUDGET Capital Improvement Project

401-Shoreline Restoration Fund CAPITAL IMPROVEMENT

2013 Amended Budget

200-Administration

207-Rulemaking/Rule Revisions

(13.75)

0.00%

6,250.00

0.00%

55,908.08

129,081.92

30.22%

0.00

404.80

12,745.20

3.08%

1,394.68

13,203.04

41,396.96

0.00%

60,790.99

62,109.01

49.46%

3,216.65

624,844.00

0.00

624,844.00

23,673.14

228,008.77

396,835.23

36.49%

$2,322,360.00

$0.00

$2,322,360.00

$166,138.15

$1,712,763.44

$609,596.56

73.75%

2013 Budget

2013 Budget Transfers/ Amendments

2012 Amended Budget

Current Month Expenditures

YTD Expenditures

Balance of Budget Remaining

% of Budget Expended

16,220.00

16,220.00

0.00

7,961.40

8,258.60

49.08%

164,200.00

164,200.00

239.30

140,954.06

23,245.94

85.84%

410- Lake McCarron's BMP Fund

1,945,940.00

1,945,940.00

301,482.23

1,256,352.91

689,587.09

64.56%

415-Trout Brook BMP's

2,161,510.00

2,161,510.00

61,778.85

292,634.77

1,868,875.23

13.54%

417-Crosby Lake BMP

171,350.00

171,350.00

9,604.12

44,635.23

126,714.77

0.00%

425-Wetland, Stream and Ecosystem Restoration - Implementation

259,200.00

259,200.00

-

2,375.35

256,824.65

0.00%

430-Mississippi River Subwatersheds BMP's

150,000.00

150,000.00

635.41

(24,019.59)

174,019.59

0.00%

440-Special Projects and Grants

338,210.00

338,210.00

354.11

80,782.91

257,427.09

23.89%

405-Como BMP Fund

490-Debt Services

172,622.00

TOTAL CAPITAL IMPROVEMENT PROGRAM

FUND BALANCES

2013 Budget Transfers/ Amendments

REPORT DATE: 11/13/2013

Fund Balances

$5,379,252.00

Fund Balance @ 12/31/12

172,622.00 $0.00

2013 Fund Balance Transfers

$5,379,252.00

Fund Balance @ 12/31/12

$374,094.02

2013 YTD Revenue

116,775.01

55,846.99

67.65%

$1,918,452.05

$3,460,799.95

35.66%

Current Month Expenditures

YTD Expenditures

Fund Balance @ 10/31/13

Operations

1,674,927.00

-

1,674,926.44

1,172,062.76

166,138.15

1,712,763.44

Capital Improvement

1,727,405.00

-

1,727,405.00

3,782,241.57

374,094.02

1,918,452.05

1,134,225.76 3,591,194.52

TOTAL FUND BALANCE:

$3,402,332.00

$0.00

$3,402,331.44

$4,954,304.33

$540,232.17

$3,631,215.49

$4,725,420.28


November 20th, 2013 VI. Unfinished Business A) Special Grant Program Update (Zwonitzer)

DATE: TO: FROM: RE:

November 13th, 2013 CRWD Board of Managers Nate Zwonitzer, Urban BMP Specialist 2014 Special Grant Program Update

Background In September 2013 the Board of Managers awarded $510,000 in Special Grant funds. An additional $50,000 was left unallocated to use as contingency funds. To provided needed match funds for a CWF grant application for Central High School, $30,000 of those contingency funds were allocated to that project leaving $20,000 in contingency funds. Issues There are two Special Grant projects requiring an update, and a new project (Dellwood Gardens) that may be a good candidate for grant funds. 1. Episcopal Homes: In early November, CRWD was notified by Episcopal Homes that they were withdrawing their grant request of $60,000 due to an expedited construction schedule. These funds were added to the contingency funds. Changes are reflected in the attached table. 2. Lowertown Ballpark: St. Paul is in discussions with Metropolitan Council regarding directing roof runoff from the Green Line Operation and Maintenance Facility (OMF) to the ballpark for reuse. OMF is adjacent to the ballpark site and approximately 2 acres of the 4 acre roof could be redirected to the ballpark. This could result in considerable reductions to runoff and potable water use, but will likely carry considerable cost due to the increased need for storage. The ballpark design process is in high gear so quick decisions may be needed in order to take advantage of opportunities as they are identified. 3. Dellwood Gardens: Dellwood Gardens approached Capitol Region Watershed District about collaborating on a stormwater re-use system utilizing roof runoff for irrigation and potentially flushing toilets. The building is currently being renovated as an assisted living facility that will serve low-income, urban populations. The building owner’s goal is to reduce potable water use for irrigation and toilets so funds can be redirected to providing services for residents. To support the effort and help with planning, CRWD has requested assistance from several consulting firms with experience in the area of stormwater reuse systems to explore and analyze reuse options. Action Requested None. Enclosures: Updated 2014 Special Grant Funding Summary Table \\CRWDC01\Company\06 Projects\Special Grants\2014\Bd Memo 2014 Special Grants Update 11-13-2013.docx

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.


2014 Special Grant Funding Summary Applicant

Model Cities

St. Paul

Project

Central Exchange & BROWNstone

Lowertown Ballpark

Central High School Stormwater Retrofits

Great River School Episcopal Homes Total

Stormwater Retrofits Treatment beyond permit requirement

Amt. Requested

Amt. Eligible

$432,469

$338,169

Total Award

Funded Elements Central Exchange: Permeable pavers & native plantings BROWNstone: Native vegetation & infiltration swales, some $65,000 engineering funds for both sites

$300,000

$300,000

$222,000

$222,000

Signage, 2 Cisterns, underground $225,000 filtration, surface filtration (tree trench) $80k for CWF grant match, $50k for design finalization if CWF grant $80,000 unsuccessful

$502,000

$273,500

Stormwater reuse system, stabilization/plantings, permeable $110,000 hardscapes, parking lot rain garden

$229,241 $1,685,710

$226,001 $1,359,670

Contingency

Other Funds

2

$0 Withdrawn ($60k previously awarded) $480,000 Episcopal Homes funds ($60k), Engineer review, funds for additional discovered $80,000 projects etc. Not currently allocated to Special Grants CCLRT Redevelopment BMPs - $20k, $35,000 SSGI planning - $15k


November 20, 2013 Board Meeting VI. Unfinished Business – B) TBI Realignment Project (Eleria)

DATE: TO: FROM: RE:

November 14, 2013 CRWD Board of Managers Anna Eleria, Water Resource Project Manager TBI Realignment Project Recap

Background The first phase of the TBI Realignment Project at Station 53+08.5 to Station 60+48.6 was completed in Fall 2012. Phase I activities included installation of 162 feet of 12’x9’ box culvert beneath BNSF railroad tracks within 30-hour work window, installation of an additional 400 feet of box culvert outside of BNSF ROW, construction of City sanitary sewer line and manholes, dewatering of construction area and pumping groundwater to TBI, and removal and disposal of contaminated soil. Issues The second phase of the project commenced in August 2013 after MnDOT removed the existing Mississippi Street bridge and was completed in early November 2013. Phase II activities included dewatering the construction area, diverting baseflows and stormwater flows from the TBI section upstream of construction area to TBI section downstream of that area, installing the remaining 236 feet of new box culvert, constructing transition sections between the existing and new TBI, and abandoning the old TBI alignment. CRWD and Barr Engineering staff will provide a summary of the completed project including an updated budget at the Board meeting. Action Requested None, for your information.

W:\06 Projects\Trout Brook Interceptor\MN DOT\TBI Realignment - 35E and Cayuga\Board\BM_TBIRealignmentProject_PhaseIIRecap_11-20-13.docx

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.


DATE: TO: FROM: RE:

November 14, 2013 CRWD Board of Managers and Staff Mark Doneux, Administrator November 20, 2013 Administrator’s Report

Administrator Approved or Executed Agreements Stewardship Grant Agreement for a green roof and rain gardens at 1282 Englewood Ave. - $820.00 Stewardship Grant Agreement for two rain gardens at 1847 Laurel Ave. - $3,319.12 Board Approved or Executed Agreements Amendment No. 1 to Consultant Service Agreement with Wenck Associates for Lakes Statistical Analysis for additional scope of work costs of $762.32 – total cost not to exceed $15,122.32. General updates including recent and upcoming meetings and events On Thursday, November 7, 2013 Mark Doneux and Anna Eleria attended ‘Preparing Minnesota for Climate Change: A Conference on Climate Adaptation’ at the Science Museum of Minnesota. On Thursday, November 7, 2013 Staff organized and hosted a meeting for the Lake McCarrons homeowners to discuss concerns and develop next steps for an Aquatic Plant Management Plan. Steve Woods, Assistant Director at BWSR is leaving the Agency to become the Executive Director of the Fresh Water Society. Steve starts at the Fresh Water Society on December 2nd. 1)

Upcoming events and meetings a) The office will be closed on Thursday, November 28th and 29th for the Thanksgiving Holiday. b) Next Water Resources Working Group Meeting is Tuesday December 3, 2013 at 1:30 pm. c) Next Board Meeting is Wednesday, December 4, 2013 at 6:00 pm. d) MAWD Annual Meeting and Trade Show, December 5-7, 2013, Arrowwood Resort, Alexandria. The Villa Park Wetland Restoration Project is one of the featured presentations at this conference. e) Next CAC Meeting is Wednesday December 11, 2013 from 7:00-9:00 pm.

2)

Project Updates a) Villa Park Wetland Restoration Project Dredging at Villa Park is complete and all dried sediment has been removed. Frattalone is now completing the final site restoration phase. b) TBI – Cayuga Relocation Project The TBI Realignment Project at 35E/Cayuga is completed. The new TBI alignment has been fully constructed and is on-line. The old TBI alignment is now abandoned. W:\04 Board of Managers\Correspondence\Administrator's Report 2013\Administrator's Report 11-20-13.docx

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.