EFFECTIVE RISK BASED INSPECTION 19th – 21st October 2015
Cologne, Germany RBI stands for Risk Based Inspection and is a methodology applied in the Hydrocarbon and Chemical Processing Industry as part of their Process Safety Management. This is done in order to operate and manage assets and Equipment which is exposed to hazardous chemicals and pressure in a safe manner. The approach is one of many methodologies used to maintain assets are in a safe and reliable condition to keep the chemicals/fluids/gases inside of the pressure boundaries as per the original design criteria. In most countries around the globe, the surveillance of these pressure vessels or pipelines containing hazardous chemicals are regulated with rigid inspection programs.
YOUR FACILITATOR – DR MICHAEL RENNER Dr Michael Renner holds an Engineering degree and a Ph.D. from Teesside University, UK in Mechanical Engineering/Metallurgy and is a certified European Engineer (EUR ING). He has worked in several different industries such as the Steel, Hot Dip Galvanizing, Non-Ferrous Metal and has over 26 years in the Chemical Process Industry at Bayer and their clients. He has in total 35 years working experience, the first half of which is centred on Corrosion Prevention Strategies, Materials Optimization & Development and Root Cause Failure Analysis. Dr M Renner has worked in the metallurgical engineering and inspection management in Germany and in the US he extended his working area into the field of Mechanical Integrity (MI) including Material Engineering and strategic QA in major investment projects. Dr Renner has now centred his focus on working in the field of Asset Life Cycle Management, Risk Management (to include Risk Based Maintenance & Risk Based Inspection) and Corrosion Management in Europe, Middle East and the USA via his consultancy Asset & Corrosion Management in Germany.
ü
WHY YOU SHOULDN’T MISS IT?- BENEFITS
• To improve risk management results. • To provide an independent approach for managing risks. • To apply a strategy of doing what is needed for safeguarding Integrity and improving reliability and availability of the asset by planning and executing those inspections that are needed. • To reduce inspections required and shutdowns needed and provide longer run length without compromising safety or reliability. • To safeguard integrity and mitigate the risk of failures. • To increase plant availability and reduce unplanned Shutdown. • To provide a flexible technique to be able to continuously improve and adopt to changing risk. • To ensure inspection techniques and methods are in line consider potential failure modes. • A more cost-effective alternative to traditional inspections by means of non -destructive testing. • More reliable equipment and plant operation. • Identification of the operational risks associated with equipment via material degradation. • Adherence to codes of compliance resulting in increased Safety.
IN CO-OPERATION WITH
• 5H+ of Networking session with other industry peers and sharing best practices. • Case study from the trainer’s experience.
LONDON | HONG KONG | INDIA | MALAYSIA | SHANGHAI | SINGAPORE www.enigma-cg.com
CGOG 01
EFFECTIVE RISK BASED INSPECTION 19th – 21st October 2015
Cologne, Germany
WHO SHOULD ATTEND? • • • • • •
Inspection & Maintenance personnel Materials & Corrosion engineers Plant Reliability engineers Non-destructive testing engineers
•
Plant inspectors responsible for managing the integrity of ageing process equipment, pipelines, boilers and storage tanks
• •
Production and other plant engineers
Materials and corrosion engineers Unit & Maintenance superintendents/supervisors
Technicians responsible for the safe on -going operation of pressure containing equipment in oil and gas facilities and HSE personnel
TRAINER’S PROFILE Dr Michael Renner holds an Engineering degree and a Ph.D. from Teesside University, UK in Mechanical Engineering/Metallurgy and is a certified European Engineer (EUR ING). He has worked in several different industries such as the Steel, Hot Dip Galvanizing, Non-Ferrous Metal and has over 26 years in the Chemical Process Industry at Bayer and their clients. He has in total 35 years working experience, the first half of which is centred on Corrosion Prevention Strategies, Materials Optimization & Development and Root Cause Failure Analysis. Dr M Renner has worked in the metallurgical engineering and inspection management in Germany and in the US he extended his working area into the field of Mechanical Integrity (MI) including Material Engineering and strategic QA in major investment projects. Dr Renner has now centred his focus on working in the field of Asset Life Cycle Management, Risk Management (to include Risk Based Maintenance & Risk Based Inspection) and Corrosion Management in Europe, Middle East and the USA via his consultancy Asset & Corrosion Management During his established career he has written more than 80 papers which have been published in international magazines and conferences. He served twice as chairman for The Stainless Steel World Conference 2001 in Maastricht/NL and the Asset Integrity Conference in Doha/Qatar in 2009. He has been invited numerous times to be a keynote speaker for conferences in the USA and Malaysia and at times moderated conference sessions. He also provides Corrosion Management seminars to the Oil & Gas, Refinery and Chemical Industry and is an RBI Courses lecturer for a International Master's degree program called European Risk Management from The Steinbeis University in Berlin. Dr Michael Renner is a fellow of NACE International and Stainless Steel World. To add to his accomplishments he is also a co-author of a RBI book called- “Risk-Based Inspection and Maintenance Procedures for European Industry”, published in 2008.
Partial list of companies that have benefitted from Mr. Renner ’s expertise:
Ø Thai Oil Public Limited Ø PTTEP
Ø Shell
Ø Conoco Phillips
Ø Total
Ø BP
Ø Petronas
Ø ExxonMobil
LONDON | HONG KONG | INDIA | MALAYSIA | SHANGHAI | SINGAPORE www.enigma-cg.com
CGOG 01
EFFECTIVE RISK BASED INSPECTION 19th – 21st October 2015
Cologne, Germany
Introduction Risk Management & RiskInspection Based Inspection (RBI) Introduction to RisktoManagement & Risk Based (RBI) ü Overview of the RBI Key Elements of the RBI Technology based upon API 580 & 581 such as :-
• • • • • • • • • • •
Data Collection for RBI Risk Analysis Consequence of Failure Likelihood of Failure How Inspection Affects Risk Assessing Inspection Effectiveness RBI Inspection Planning RBI Inspection and Task Management Benefit & Limitations of RBI Case Studies Example of major chemical accidents/incidents with inspection or materials & corrosion shortcomings as cause of the incidents
ü
DAY ONE 19 TH – OCTOBER 2015 - 9:30am to 5:00pm
ASSET INTEGRITY MANAGEMENT (AIM) IN THE HYDROCARBON & CHEMICAL PROCESSING INDUSTRY q q q q q q q
Discussion: Audience perception of AIM Asset Integrity Management (AIM) – A holistic approach Asset Integrity Risk Management process Process Safety Management & Asset Integrity Management Role of Risk Based Inspection within AIM RBI benefits & limitations RBI as an Integrated Management or Continuous Improvement
RISK ASSESSMENT CONCEPTS q q q q q
Discussion: Audience perception of risk assessments What is risk? Risk management & risk reduction Inspection optimization Case Study: Case history of an AIM related refinery
PLANNING RBI ASSESSMENTS q q q q
DATA & INFORMATION COLLECTION FOR RBI ASSESSMENT q q q
q q q q q
q
Key elements of an RBI Program Consequence & probability for RBI Types of RBI assessments Understanding how RBI can help to manage operating risks Relationship between RBI and other Risk -Based and safety initiatives Jurisdictional requirements
Data needs & quality Sources of site specific data & information Codes & Standards – National & International
DAMAGE MECHANISMS AND FAILURE MODES q q q
q
INTRODUCTION TO RISK -BASED INSPECTION
Establishing objectives & goals of a RBI assessment Initial screening Establishing operating boundaries Selecting type of RBI assessment
q
Identification of damage mechanisms Overview damage mechanisms Introduction of Failure Modes and the relevance for POF/COF Accumulated damage Tabulating results Case Study: Case Histories of major industrial incidents Group Discussion: Cases of damage mechanisms & failure mode
LONDON | HONG KONG | INDIA | MALAYSIA | SHANGHAI | SINGAPORE www.enigma-cg.com
CGOG 01
EFFECTIVE RISK BASED INSPECTION 19th – 21st October 2015
Cologne, Germany
DAY TWO – 20 TH OCTOBER 2015 - 9:30am to 5:00pm ASSESSING PROBABILITY OF FAILURES (POF
• Introduction to probability analysis • Types of probability analysis RISK MANAGEMENT WITH INSPECTION ACTIVITIES & OTHER RISK MITIGATION ACTIVITIES ASSESSING CONSEQUENCE OF FAILURES (COF )
• • • • • • • •
Intro to consequence analysis Units of measure Level 1 & 2 consequence analysis considerations Determination of COF Group Discussion: Assessing COF examples Corrosion management strategies Preparation of corrosion loops Establishment of Integrity Operating Window
NETWORKING SESSION
DAY THREE – 21ST OCTOBER 2015 - 9:30am to 5:00pm INSPECTION PLANNING BASED UPON RISK ANALYSIS
• • • • •
Risk target Inspection effectiveness Pressure vessels & piping Heat exchanger tube bundles Inspection planning
INSPECTION TECHNOLOGY/METHODOLOGY Discussion: INSPECTION TECHNIQUES & NDT TECHNOLOGY
• Intrusive and non-intrusive methods • Classic & advanced NDT technology • Examples regarding important damage mechanisms
REASSESSMENT & UPDATING RBI ASSESSMENTS (EVERGREENING )
• Inspection data management & RBI documentation and • • • •
recordkeeping Case Study: Relationship between RBI & a FFS assessment Examples of RBI Pitfalls Example of an Industrial RBI assessment case Q&A session NETWORKING SESSION
IN CO-OPERATION WITH
LONDON | HONG KONG | INDIA | MALAYSIA | SHANGHAI | SINGAPORE www.enigma-cg.com
CGOG 01
EFFECTIVE RISK BASED INSPECTION 19th – 21st October 2015
Cologne, Germany
REGISTRATION FORM PARTICIPANT DETAILS 1) Name(Mr/Mrs/Ms):____________________________________________ Position: ______________________ Department: _____________________ Direct Telephone:___________________ Mobile: _____________________ Email :________________________________________________________
CANCELLATION TERMS & CONDITIONS CANCELLATION must be received in writing at least 30 days before the event. All bookings carry a 50% cancellation fee immediately after a signed contract has been received by ENIGMACG. Cancellation within 7 days notice from the event date will not be able to obtain a full credit for any future events. NO Refund will be made available. Upon the completion and receipt of the registration form, payment is required within 5 working days of the issuance of the invoice. Indemnity
2) Name(Mr/Mrs/Ms):____________________________________________ Position: ______________________ Department: _____________________ Direct Telephone:___________________ Mobile: _____________________ Email :________________________________________________________
3) Name(Mr/Mrs/Ms):____________________________________________ Position: ______________________ Department: _____________________ Direct Telephone:___________________ Mobile: _____________________ Email :________________________________________________________
COMPANY Company: ____________________________________________________ Address: ________________________________________________________
VAT Number :_____________________________________________
AUTHORISATION Signature:_______________________________________________________ Name: __________________________________________________________ Position:_______________________________________________________ Email :________________________________________________________ Direct Telephone:___________________ Mobile: _____________________
PAYMENT METHOD Payment can be made via : q BANK /TELEGRAPHIC TRANSFER (Overseas delegates may pay by Telegraphic Transfer
Should for an reason outside the control of ENIGMA CG training & Consultancy, the venue or trainer ‘s change, or the event being cancelled due to an act of terrorism, extreme weather conditions or industrial actions, ENIGMA CG shall endeavour to reschedule but client hereby indemnifies and holds ENIGMA CG harmless from and against any and all cost, damages and expenses, including attorney fees which are incurred by the client. The construction, validity and performance of this contract shall be governed in all respects by the laws of Malaysia to the exclusive jurisdiction of whose courts the Parties hereby submit TERMS & CONDITIONS FEES are inclusive of refreshments & course materials. Walk-in delegates with payment will only be admitted on the basis of space availability at the event and with immediate full payment. Full payment prior to the event is mandatory for attendance.In the event that ENIGMACG permanently cancels the event for any reason whatsoever, (including, but not limited to any force majeure occurrence) and provided that the event is not postponed to a later date nor is merged with another event, the Client shall receive a credit voucher for the amount that the Client has paid to such permanently cancelled event, valid for up to one year to be used at another ENIGMACG event. No refunds, part refunds or alternative offers shall be made. ENIGMA CG reserve the rights to make any amendments and/or changes to the courses, venue, trainer and/or topics if warranted by circumstances beyond its control. ENIGMA CG reserve the rights to postpone or reschedule any events prior a week before the date of the event. By signing this contract, client agrees that in case of dispute or cancellation of this contract ENIGMACG will not be able to mitigate losses for any less than 50% of the total contract value. If, for any reason, ENIGMACG decides to cancel or postpone this event, ENIGMACG is not responsible for covering airfare, hotel, or other travel cost incurred by clients. This event will not be refunded, but can be credited to a future event. DATA PROTECTION: Client confirms that it has requested and consented to ENIGMACG database to used by ENIGMACG and passed to selected third parties, to assist in communicating which may be of interest to the client. COPYRIGHTS etc: All intellectual property rights in all materials produce or distributed by ENIGMA CG is expressively reserved and any unauthorised duplications, publications or distributions is prohibited Upon receiving the signed registration form, the client hereby consent to ENIGMA CG to keep your details for the use of future marketing activities carried out by ENIGMA CG and third party & organisation partners. CLIENT hereby agree that this contract is valid, binding & enforceable; and client has no basis to claim any payment under this contract at anytime are improper, disputed or unauthorised in anyway.
q CHEQUE (Cheque to be crossed and made payable to ENIGMA CONSULTING GROUP LIMITED
(All payment must be made within 5 working days from the invoice date)
FIRST ROUND REGISTRATION FEE (VALID TILL 15TH JULY)
1796
To Register Contact Bilina Patt Tel: +44 203 769 7910 Fax: +44 207 183 0083 Email: bilina@enigma-cg.com
LONDON | HONG KONG | INDIA | MALAYSIA | SHANGHAI | SINGAPORE www.enigma-cg.com
CGOG 01