BOXRECESSED

1. ALL SHOW SET ELEMENTS TO HAVE CONDITIONS VERIFIED IN FIELD PRIOR TO INSTALLATION.

2. REFER TO SHOW SET ELEMENT LIST FOR FURTHER DETAILS, COORDINATION OF QUANTITIES.

3. ANY DEVIATIONS FROM THE DESIGNS SHOWN IN THIS DRAWING PACKAGE ARE TO BE APPROVED IN WRITING BY UNIVERSAL.

30. SCENIC VENDOR WILL BE RESPONSIBLE FOR ALL SHOW CONTROL ELEMENTS THAT MIGHT BE REQUIRED BY SCENIC ELEMENTS THEY FABRICATE. 31. SCENIC VENDORS SHALL VERIFY ALL DIMENSIONS PRIOR TO FABRICATION PROJECTION SCREEN PROJECTOR

ABBREVIATIONS

4. ALL SHOW AND THEMED LIGHTING TO BE DETERMINED. SEE LIGHTING DRAWINGS FOR COORDINATION.

5. ALL SIGNS AND GRAPHICS IN THIS DRAWING PACKAGE ARE FOR GENERAL SIZE, COORDINATION, AND CREATIVE INTENT ONLY. ALL GRAPHIC AND SIGN DETAILS, FABRICATION DRAWINGS, ETC. WILL REQUIRE WRITTEN APPROVAL BY UNIVERSAL PRIOR TO FABRICATION.

6. ARTIST ILLUSTRATIONS TO BE USED FOR OVERALL SCOPE, ART DIRECTION, AND GENERAL ATMOSPHERE ONLY.

7. SCENIC ELEMENTS TO HAVE CONCEALED MOUNTING HARDWARE ACCESSIBLE FOR MAINTENANCE.

8. TEST AND ADJUST WILL BE REQUIRED ON SITE BY FABRICATOR.

9. VERIFY SCENIC ELEMENT LOCATIONS WITH ARCHITECT'S DRAWINGS.

10. FABRICATOR IS RESPONSIBLE FOR ALL COORDINATION REQUIRED WITH FACILITY MECHANICAL, ELECTRICAL, PLUMBING AND LIFE SAFETY SYSTEMS.

11. ALL FINISHES TO MATCH ANY REQUIRED PHOTO REFERENCE AND/OR INTELLECTUAL PROPERTY REQUIREMENTS AND BE APPROVED IN WRITING BY UNIVERSAL.

12. PROVIDE CONCEALED, LOCKABLE MAINTENANCE ACCESS FOR ALL EFFECTS COMPONENTS.

13. FINAL FINISH APPEARANCE OF SCENIC ELEMENTS SUBJECT TO OWNER'S ART DIRECTOR APPROVAL AT EACH WORK PHASE.

14. THE DESIGN METHODS SHOWN IN THIS DRAWING ARE A SCHEMATIC REPRESENTATION OF ONE OF THE MANY POSSIBLE WAYS TO SOLVE FOR PERFORMANCE REQUIREMENTS INDICATED IN THE SPECIFICATIONS. OTHER MEANS DEVELOPED BY THE VENDOR, THAT PROVIDE HIGHER LEVELS OF PERFORMANCE, RELIABILITY, MAINTAINABILITY, LONG LIFE, AND LOWER COST SHALL BE CONSIDERED.

15. THESE DRAWINGS ARE TO DESCRIBE THE CREATIVE INTENT REQUIRED TO PRICE, FABRICATE, AND INSTALL ALL SHOW SET ELEMENTS BY QUALIFIED SUBCONTRACTORS.

16. BASE ALL WORK ON THESE DOCUMENTS BY EMPLOYING THE BEST INDUSTRY STANDARD CONSTRUCTION AND FABRICATION PRACTICES. NOTHING IN THESE DRAWINGS SHALL BE DEEMED TO CONTRADICT PROPER CONSTRUCTION, FABRICATION, OR ENGINEERING PRACTICES AND TECHNIQUES.

17. CLARIFICATION REGARDING ANY SHOW ELEMENT, SYMBOL, OR NOTE IN THESE DOCUMENTS SHALL BE REQUESTED FROM UNIVERSAL CREATIVE PRIOR TO SUBMITTING FINAL PRICING OR ENTERING INTO AN AGREEMENT OF WORK.

18. DO NOT SCALE DRAWINGS. RELY ON DIMENSIONS SHOWN ON DRAWINGS AND/OR MEASURED IN THE FIELD. NOTIFY UNIVERSAL CREATIVE IF DIMENSIONS ARE ABSENT, APPEAR INCORRECT, OR IF CONFLICTS OCCUR IN THE FIELD. FIELD VERIFY ALL FUTURE EXISTING FACILITY DIMENSIONS PRIOR TO FABRICATION.

19. ALL FRP ELEMENTS SHALL BE FIRE TREATED WITH A CLASS "A" FIRE RATING.

20. ALL FABRICATED OR INSTALLED ELEMENTS OF THE WORK DESCRIBED BY THESE DOCUMENTS SHALL COMPLY WITH ALL LOCAL CODES AND BUILDING SAFETY STANDARDS. VENDORS SHALL ATTACH ALL CERTIFICATES OF COMPLIANCE TO INSTALLED ELEMENTS AND PROVIDE COPIES OF ALL CERTIFICATES FOR INSPECTION BY LOCAL CODE AUTHORITIES. ART DIRECTOR TO BE INFORMED OF HOW THESE CODES WILL IMPACT SCENIC ELEMENTS.

21. REFER TO ARCHITECTURAL AND ENGINEERING DRAWINGS FOR ALL FACILITY REQUIREMENTS.

22. ALL FABRICATED OR INSTALLED SHOW ELEMENTS AS DESCRIBED WITHIN THESE DOCUMENTS SHALL MEET OR EXCEED ALL UNIVERSAL GENERAL PERFORMANCE SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO ALL OVERHEAD SPECIFICATIONS AND HIGH ABUSE SPECIFICATIONS.

23. PHOTO REFERENCE IS PROVIDED FOR THEMATIC CHARACTER. ACTUAL SHOW SET DETAILS PER INTELLECTUAL PROPERTY PROVIDED PHOTO REFERENCE TO BE DUPLICATED.

24. CHARACTER LIGHTING PLACEMENT AND INTEGRATION WILL BE REQUIRED AND IS NOT SHOWN HEREIN.

25. SPEAKER PLACEMENT AND INTEGRATION WILL BE REQUIRED AND IS NOT SHOWN HEREIN.

26. ALL SHOW SET DESIGN DETAILS, FABRICATION DRAWINGS, ETC. WILL REQUIRE OWNER ART DIRECTION APPROVAL PRIOR TO FABRICATION.

27. VENDORS SHALL BE RESPONSIBLE TO MATCH ALL PAINTS TO THE PANTONE COLOR MATCHING SYSTEM.

28. IF CONFLICTING INFORMATION IS INDICATED IN DRAWINGS OR NOTES, UNIVERSAL CREATIVE SPECIFICATION DOCUMENTS PREVAIL.

29. ALL SHOW ELEMENTS ON ROOF OR FACILITY WALLS WILL BE MOUNTED ON SECONDARY STEEL PROVIDED BY THE GENERAL CONTRACTOR. SCENIC VENDOR TO COORDINATE WITH FUTURE EXISTING STEEL TABS FOR MOUNTING ATTACHMENTS. SCENIC VENDOR IS NOT TO PENETRATE THE EXTERIOR WATERPROOFING FOR ANY ATTACHMENT DETAILS.