Business Development Group SRL 16, Vasile Alecsandri St, 010639 Bucharest, Romania Tel/Fax: 0040-21-3179870 0040-21-3179871
Dutch Water Technology Road Show Romania 2012 Draft Proposal
1. UPDATES FROM THE ROMANIAN WATER SECTOR 2012 1.1 Identified problems and lessons in Sector Operational Program Environment POS1(20072013). Extension to POS2 ( EU funding programme 2012-2020) By POS1 we understand the Sectorial Operational Program ( Romanian SOP) under development since 2007 and with good premises to end by 2015. POS1 in water sector is the most performant EU funded project in Romania. More than 74% of allocated funds were approved and more than 70% were already spend in different stages of water projects. We identified also problems and lessons to be learned in this period of planning and execution of POS1 that can be summarized as follows: Project Planning Phase: 1.1.1. The planning of projects has been done without the correct evaluation of Masterplans in the regions. Because of this item, the whole process has not been correlated with the local funding available and the non -imbursable EU financial instruments . Lesson: For the next POS2 funding program, the actualization of current Masterplans should be realized this year 2012 and sent to the Ministry of Environment in last month of 2012. Project preparation Phase: 1.1.2 . The “guessed� design parameters gives unrealistic design work, in some regions.(were not known few important technical parameters like specific consumption, inflows, etc). 1.1.3.Sludge management has not been treated in this POS 1 phase in a correct matter because lack of technical solutions or fear to tackle the problem. 1.1.4.Lack of commercial abilities and skills in water companies created in some steps, pressures on the cash flows of local water companies. Improving the tariffs structures needed to be realized. Lesson: Better open and creative cooperation between final client ( water company) and consultants teams in identifying problems and adopting (new) solutions related to new technologies/equipment to be adopted . Creation and implementation of management courses for water operating companies management teams. 1.1.5. Lack of related information when the project design starts( geological data, topographical measurements, hydrological data). These data are to be prefered by related bodies, like Town Halls or other regional specialized companies . Lesson: For the next POS2, the start of achieving related project data should start early, in order for next preparation phases to use the data already achieved. Registration Address: 80 Plantelor St. Sector 2, Bucharest; Postal Address: P.O. Box 34-13, 021412 Sector 2 Bucharest, Reg. Number: J40/1012/1992; VAT number: RO 4824749; Bank ING Bank Bucharest www. bdgroup.ro E-mail: office@bdgind.ro