FEL Process Front End Loading (FEL) is staged-gate process where we develop a definition of scope and cost of a capital project to meet your business objectives. The final products of this process are typically a design basis package that is used to support the production of detailed design documents and an accurate cost estimate to gain project authorization. •• Cost estimate accuracy, cumulative engineering hours spent, and the contingency assigned to the cost estimate are important aspects of each phase of FEL. •• The engineering cost and percentages vary widely between large and small projects. •• This is certainly also true for those projects where new or emerging technology is being applied than previously commercially demonstrated. Projects such as these may require additional engineering to achieve the desired estimate accuracy and project contingency desired.

Project Authorization

FEL 1

FEL 2

FEL 3

FEL 4

Start-Up

Conceptual Design

Preliminary Design

Detail Design

Expense

Pre-Spend Capital

Basi c or Definition Design

Closeout Qualification Validation

+/- 40 - 50% (order of magnitude)

+/- 30%

Pre-Spend Capital Budget & Contingency +/- 10%

www.bsiengr.com

BSI Engineering

Procurem ent Construction Capital & Expense

Capital & Expense

Budget & Contingency

300 E-Business Way #300 Cincinnati OH 45241

513-201-3100

info@bsiengr.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
FEL Process by bsiengr - Issuu