Case study Knislinge

Page 1

Biomass boiler case study E.ON district heating plant Knislinge The Professionalツエs choice since 1935 Location

Village of Knislinge, Sweden

Date delivered

March 2008

Fuel used

Briquettes or wood chips (seasonal)

Output delivered

8GWh/year

CO2 saving

2,200 tonnes/year

Scope of supply

Biomass boiler PB2, 2MW with all associated sensors & switches and control system. Flue gas equipment consisting of multi cyclone and flue gas fan.

2011-11-18. All rights reserved. Information subject to change without notice.

Ash container. Description

1x Biomass boiler PB2 delivering 2MW of hot water for district heating of the village. The boilers are fed through a system of containers linked by an fuel auger. Depending on the season briquettes or dry wood chips are used.

Operation

The boiler is delivering hot water for the village. Automatic ash handling transports the ash from the boiler out to an ash bin. The flue gases are cleaned with an multi cyclone assuring that local emission protocoll is met.

+46 479 177 00窶ェax +46 479 177 25 sales@osbyparca.se www.osbyparca.se Box 93, 283 22 Osby


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.