Biomass boiler case study E.ON district heating plant Knislinge The Professionalツエs choice since 1935 Location
Village of Knislinge, Sweden
Date delivered
March 2008
Fuel used
Briquettes or wood chips (seasonal)
Output delivered
8GWh/year
CO2 saving
2,200 tonnes/year
Scope of supply
Biomass boiler PB2, 2MW with all associated sensors & switches and control system. Flue gas equipment consisting of multi cyclone and flue gas fan.
2011-11-18. All rights reserved. Information subject to change without notice.
Ash container. Description
1x Biomass boiler PB2 delivering 2MW of hot water for district heating of the village. The boilers are fed through a system of containers linked by an fuel auger. Depending on the season briquettes or dry wood chips are used.
Operation
The boiler is delivering hot water for the village. Automatic ash handling transports the ash from the boiler out to an ash bin. The flue gases are cleaned with an multi cyclone assuring that local emission protocoll is met.
+46 479 177 00窶ェax +46 479 177 25 sales@osbyparca.se www.osbyparca.se Box 93, 283 22 Osby