6 minute read
Permitting
from Test 3
Could I move my building in the future if necessary?
In short, yes. Due to the fact we deliver the building materials on a trailer, it is possible to disassemble and reassemble. If you are making a move to another climate; however, it is advised to check on the local snow and wind loads to ensure that your building will stand up in the new environment. Can I further customize my building after installation?
Due to the versatility of metal buildings, it is a very easy process to further customize your building. Many customers choose to leave their building pretty bare, but many have also added things such as drywall, cabnitery, bathrooms, etc. Take a look at our YouTube page for videos of what previous customers have done.
Will my building arrive before the installers?
The way we are able to do these building at such a cost effective price is by going on runs with our buildings. We load up about 3-5 buildings on a trailer and drive to your area to install multiple buildings at a time. The installers of the building will be the ones driving the delivery truck, so once your building is on site, so are the installers. What happens if I need to cancel the building?
If you need to cancel the building order, please reach out to our Building Success Team. You can read through the “Cancellation Policy” section for more information.
If you have any questions, you can feel free to reach out to the Building Success Team at (813) 692-7320, and a representative will be happy to help
My buidling is up and already full. I wish I would’ve gone bigger, but my permit department was pretty strict with the square footage maximums. I don’t know why I didn’t order one sooner. I thought it was going to be a pretty major process, but besides the permit office, it was smooth sailing. Love the new buidling!!
Steve’s 42x45x15/11 in Tennessee
I didn’t WANT a building, I NEEDED a building. I had cars, tractors, and boats all sitting outside. I wanted two large doors to fit everything in easily and they made it work without a problem. I haven’t started moving everything in yet, but by this weekend, everything will be in the building!! Thanks guys! Alex’s 22x35x10 in Arizona

After buying our new property, my wife and I both knew we’d be needing a building. She found Big Buildings Direct online and I gave ‘em a call. I told them what I had to store and they designed a building that worked well. I am thrilled to pull my motorhome in the center and have both sides still.

Rob’s 24x40x11 in Illinois
Permitting


Do I Need a Permit?
Determining if you need a permit is a major step in the process.* Some local governments may have different rules depending on what the property is zoned as. It’s very important to give them as much detail about your use and property as you have. Every city and county has different requirements; however, your permit office can give you some preliminary information to determine if you need a permit.
What should I ask my permit office?
• Is a permit required for a prefabricated metal building? • What is the required ground snow load for my address? • What is the required wind load for my address? • Are there any square footage constraints due to my parcel size? • Are there any zoning issues that determine where I can put the building? • How far from my property line can I build? • Will __________ drawings work for my permitting needs? • Are there any utility lines that could cause issues with placement of the building?
*Permitting is the customer’s responsibility and Big Buildings Direct does not handle building permits.
How to Prepare a Site Plan
• A site plan will be the customer’s responsibility.
A lot of permitting offices will accept an aerial view of your property with an area marked for the building. A lot of customers have successfully completed their site plan by using Google Earth to take a picture of their property.

• If the building department requires a more detailed site map, a surveyor may have to get involved to complete this step. The permitting office will be able to tell you what is required.
“After a quick phone call with my permit office, I had quite a few questions answered. They told me the size and placement limits, so I know that there won’t be issues down the line. After talking with them, the permit process seems pretty straight foward.”
What to Bring to Get a Permit?
Property information (address, property tax #, parcel #, etc.) The order form stating the exact size and cost of your building Structural plans stamped for your state Renderings of your building Site map Time and Patience



“I walked into the permit office with everything I could think of that would help. I walked out with a permit about an hour later.”

How to Pull a Permit?
1. The first step is to make sure you have asked your permit office the correct questions. a. See the “questions to ask” section for more information. 2. The second step is to make sure you have all the necessary paperwork.* a. See “What to Bring?” for specific examples. 3. Some building departments will require you to submit everything online, while others will allow you to come in. It is ideal to schedule an appointment with the building department, so you can ask questions or answer questions easier. 4. Before you submit your permit, most local governments will require that you pay a fee. Make sure to have this done when appropriate, so as to not cause delays for the process. 5. Once you have submitted your paperwork, it is a waiting game until they give you an update. Some permit offices can take a while to give you an update. This varies depending on multiple factors. 6. Success, you’re approved! a. If you are not approved, see “common permitting issues” for more help.
Common Permitting Issues
• Drawings ◊ There are a few main types of engineered drawings. Some permit offices require less common types of drawings, so be sure to talk with the Building Success Team if you have any questions or concerns. • Easements ◊ Every county and city will have different requirements on how far away from the property line you need to build. To find these out, it is usually best to give the permit office a call. The requirements can also vary depending on the size of your property. Be sure to let the building department know your address, so they can give you more specific information regarding easements. Sometimes you can also file for a variance, but that can be a lengthy process. If necessary, we can also change the size of the building to accommodate easements.