CONSTRUCTION UPDATEÂŚ KB BioEnergy, City of Akron Engineer/Builder
Project Complete BIOFerm Energy Systems and Schmack Biogas GmbH
Substrate(s)
Biosolids
Digester type
Two complete mix, two horizontal plug flow
Gas cleaning technology
Gas cooling/drying, siloxane and hydrogen sulfide removal prior to CHP
Biogas production capacity
600 cfm
Biogas end use
CHP
Power capacity
1.2 MW
Groundbreaking date
May 2012
Start-up date
January 2014
Location
Akron, Ohio
KB BioEnergy, City of Akron
The project is complete.
PHOTO: BIOFERM ENERGY
FCPC Renewable Generation LLC, Waste-to-Energy Facility
Sacramento Biodigester, CleanWorld Partners
Location
Milwaukee, Wis.
Location
Sacramento, Calif.
Engineer/Builder
Symbiont Inc., Miron Constr., Biothane
Engineer/Builder
Peabody Engineering, Otto Construction
Substrate(s)
Food processing waste
Substrate(s)
Pre- and post-consumer food waste
Digester type
Anaerobic membrane bioreactor
Digester type
Three-stage, high-solids liquid digester
Gas cleaning technology
H2S media treatment system
Gas cleaning technology
BioCNG
Biogas production capacity
500 scfm
Biogas production capacity
350 scfm
Biogas end use
CHP
Biogas end use
Electricity and vehicle fuel
Power capacity
2 MW
Power capacity
190 kW
Groundbreaking date
October 2012
Groundbreaking date
June 2013
Start-up date
Q1 2014
Start-up date
April 2014
Construction is substantially complete and clear water testing is complete. Tanks are being filled in preparation for start up.
SCHADE Stockyard Equipment for Wood Pellets
Total EX-Proof protection including third party certiďŹ cation (DEKRA EXAM) Leading storage capacities for wood pellets Minimum contract to start-up period Optimum economic machine-type for wood pellet handling SCHADE Lagertechnik GmbH P +49 2325 58740 F +49 2325 58 74 74 sales@schade-lagertechnik.com www.schade-lagertechnik.com
Construction is continuing on schedule. Once complete, the digester will produce electricity and 700,000-gallon-per-year equivalent of renewable transportation fuel.