PUBLIC LIBRARY

New Construction

PROJECT TYPE: Commercial

LOCATION: Los Angeles, California

ARCHITECT: CWAAIA

Role: Project Manager

02

FOREST LAWN CREMATORIUM

New Construction

PROJECT TYPE: Commercial LOCATION: Cypress, California

ARCHITECT: John Cataldo Architects

ROLE: Project Manager

CONCRETE TILT-UP WAREHOUSE

03

New Construction

PROJECT Type: Industrial LOCATION: Brawley, California

ARCHITECT: AC Martin

ROLE: Project Coordinator |||

04

PUBLIC LIBRARY

Tenant Improvement

PROJECT: Commercial LOCATION: Rolling Hills Estates, California

ARCHITECT: John Cataldo Architects.

ROLE: Project Manager

WHOLESALE FOOD STORE

05

Tenant Improvement

PROJECT: Commercial

LOCATION: City Of Industry, California

ARCHITECT: John Cataldo Architects

ROLE: Project Manager

06

CONCRETE TILT-UP WAREHOUSE

New Construction|Schematic Design

PROJECT: Industrial

LOCATION: Commerce, California

ARCHITECT: John Cataldo Architects

ROLE: Project Manager

07

LOMA VISTA

New Construction

PROJECT TYPE: High End Residential

LOCATION: Beverly Hills, California

ARCHITECT: HMDG, INC.

Role: Designer, Model Maker

08

RESIDENTIAL VILLAGE

New Construction | Schematic Design

PROJECT TYPE: Residential LOCATION: Los Angeles, California

ARCHITECT: CWAAIA

Role: Project Manager

PUBLIC LIBRARY

New Construction

PROJECT TYPE: COMMERCIAL

LOCATION: California

ARCHITECT: CWAAIA

Role: Project Manager

RENDERING: CWAAIA

PROGRAM USED: Revit, AutoCAD

STATUS: In Construction

Upon assuming the role of project manager at CWAAIA, I inherited this project which was in the midst of the Design Development (DD) phase. Through strategic planning and execution, I successfully advanced the project to the Construction Document (CD) phase, resulting in obtaining approvals from fifteen different agencies and ultimately securing the final building permit in less than eight months. The client celebrated this progress with a groundbreaking ceremony in January 2025, marking the imminent commencement of construction.

FOREST LAWN CREMATORIUM

New Construction

PROJECT TYPE: Commercial

LOCATION: Cypress, California

ARCHITECT: John Cataldo Architects

ROLE: Project Manager

PROGRAM USED: AutoCAD

The project was a brand-new crematorium. The scope of work included: the partial demolition of an existing carport and design of a brand new crematorium. As the Project Manager:

• I Managed all phases of the project.

• Produced a comprehensive set of construction documents that was approved by the planning and building departments, with no corrections.

• Developed design and technical solutions throughout the project life cycle.

• Interfaced with clients, contractors, review agencies, engineering, and specialty consultants.

• Organized client meetings and served as the primary point of contact.

• Managed workflow and production of deliverables.

• Reviewed designs for compliance with applicable codes.

• Coordinated building systems to ensure compatibility with the design intent.

CONCRETE TILT-UP WAREHOUSE

New Construction

PROJECT Type: Industrial

LOCATION: Brawley, California

ARCHITECT: AC Martin

ROLE: Project Coordinator |||

PROGRAM USED: Revit

TEAM: Dale Furman|Ema Shahinian|Alan Tomasi

STATUS: Built

The project was a brand-new concrete tilt-up warehouse, approximately 40 feet in height. Positioned on a 9.78–acre lot, it provides 103,000 square feet of warehouse/manufacturing area and 5000 square feet of office. As a Project Coordinator |||:

• I worked on the Construction Documents.

• Developed construction details.

• Reviewed and responded to RFIs and submittals.

PUBLIC LIBRARY

Tenant Improvement

PROJECT: Commercial

LOCATION: Rolling Hills Estates, California

ARCHITECT: John Cataldo Architects.

ROLE: Project Manager

PROGRAM USED: AutoCAD, Adove Photoshop

RENDERINGS: Butch Lara

STATUS: Built

The project was a tenant improvement in an existing public library. The scope of work included: dividing the existing floor area using interior partitions to create a new study area, two restrooms, a storage and an entry with ADA compliance ramp. As the project manager:

• I produced a comprehensive set of construction documents.

• Interfaced with clients, contractors, review agencies, engineering, and specialty consultants.

• Reviewed designs for compliance with applicable codes.

• Led all communication aspects with the client/contractor and governing agencies.

• Organized client and consultant meetings and served as the primary point of contact for the project.

• Developed design and technical solutions through all phases of the project.

WHOLESALE FOOD STORE

Tenant Improvement

PROJECT: Commercial

LOCATION: City Of Industry, California

ARCHITECT: John Cataldo Architects

RENDERING: Butch Lara

ROLE: Project Manager

PROGRAM USED: AutoCAD

The project was an existing warehouse to be turned into a wholesale food distribution center. The scope of work included: the demolition of previously done interior improvements, the addition of three walk-in coolers, three walk-in freezers, two new restrooms, an office, and a new loading dock. As the project manager:

• I produced a comprehensive set of construction documents.

• Interfaced with clients, contractors, review agencies, engineering, and specialty consultants.

• Reviewed designs for compliance with applicable codes.

• Led all communication aspects with the client/contractor and governing agencies.

• Organized client and consultant meetings and served as the primary point of contact for the project.

• Developed design and technical solutions through all phases of the project.

CONCRETE TILT-UP WAREHOUSE

New Construction|Schematic Design

PROJECT: Industrial

LOCATION: COMMERCE, CALIFORNIA

ARCHITECT: John Cataldo Architect

RENDERINGS: Butch Lara

ROLE: Project Manager

PROGRAM USED: AutoCAD

The project was a brand new, 71,006 square feet, warehouse which included 3,678 square feet of office on the first floor and 3,328 square feet of office on the mezzanine. As the project manager:

• I produced a comprehensive set of construction documents for the planning department.

• Analyzed site incorporating survey and contextual conditions.

• Reviewed designs for compliance with applicable codes.

• Led all communication aspects with the client/contractor and governing agencies.

• Organized client meetings and was the primary point of contact for the project.

LOMA VISTA

New Construction

PROJECT TYPE: High End Residential

LOCATION: Beverly Hills, California

ARCHITECT: HMDG, INC.

Role: Designer, Model Maker

ORIGINAL ARCHITECT: LeanArch, Inc.

PHOTOS: Tyler Hogan, Marzieh Karimi

PROGRAM USED: AutoCAD, Rhinoceros 3D

STATUS: Built

The project was a 7,343 square feet of high-end private home. • I worked on the Construction Documents, and built the physical model.

RESIDENTIAL VILLAGE

Schematic Design

PROJECT: Residential Village

LOCATION: Los Angeles, California

ARCHITECT: CWAAIA

I currently Manage the development and production of design documents, presentations, and deliverables for this eight-unit residential development that is currently in the Schematic Design (SD) phase. This project is situated on a subdivided parcel that accommodates eight single-family dwellings, each with a detached Accessory Dwelling Unit (ADU).

Thank you.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.