3 - Lilama 69-3 DSE Tekla at Dong Yang project

Page 1

Tekla Structures for Steel detailing and fabrication: DongYang project Tekla User‘s Day – Hanoi, April 2013 Mr. Nguyen Vu Truong, Director of LILAMA69-3 DESIGN INDUSTRIAL & SYSTEMS ENGINEERING JOINT STOCK COMPANY


Content: • Introduction of Lilama 69-3 DSE • Tekla Structures at Lilama 69-3 DSE – The milestones • Tekla Structures for Dong Yang project • Conclusions and Suggestion


Introduction:







Mile stones with Tekla Structures: • 04.2011: Model 35 buildings of Cong Thanh cement plant project – subcontracted for Polysius Vietnam • 2012: Signed the contract with DongYang P&F (Korea) to Design and Fabricate 3500 tons of Steel Structures for HSGP and SSSP project in AbudHabi – UAE


Cong Thanh Cement Plant





Vincom Mega Mall project: Movies


DongYang project: • • • • •

6 Conveyors; 5 Transfer towers Finish the design work in December, 2012 Plan to finish fabrication work in April, 2013 20 experienced Tekla users Using 3 main software: - Tekla Structures for structural Modeling and Detailing - 3D Max for Architectural - Autodesk Inventor for Mechanical work


CV-1100/1200: Granule Collecting Conveyors


CV-1100/1200: Movies


CV-1100/1200: Granule Collecting Conveyors


CV-1100/1200: Granule Collecting Conveyors


CV-1300: Reclaimed Transfer Conveyor


CV-2100/2200: Stacker & Reclaimed Conveyor


TT-1: Transfer Tower No.1


TT-1: Transfer Tower No.1


TT-2: Transfer Tower No.2


TT-2: Transfer Tower No.2


TT-3: Railcar Loading Building


TT-3: Railcar Loading Building


Engineering schedule for HSGP+SSSP project: Step 1: Create General Arrangement drawings by CAD system for Structural and ME,EL, PP,‌


Engineering schedule for HSGP+SSSP project: Stage 1: Create General Arrangement drawings by CAD system for Structural and ME,EL, PP,‌


Step 2: Structural Analysis and Design - Build structural model base on GA drawings, add loads, load combinations -

Standard:

ANSI/AISC 360 - 05 Specifications for Structural Steel Buildings, ASCE/SEI 7-10 Minimum design loads for buildings and other

structures, International Building Code 2006/2009 (IBC 2006/2009, ‌.).


Step 3: Create Sketch drawings for structural


Step 4: Build 3D Tekla model Step 5: Create Engineering drawings: Check dimensions, profiles


Step 6: Clash check with Mechnical model on Tekla via Reference model


Step 7: Connection design and detailing in Tekla Step 8: Create Erection drawings and check.


Step 9: Create workshop drawing We use 2 ways: - Create Assembly that includes single part drawings as traditional way in AutoCAD

* Non professional way and not easy for fabrication.


- Create both Assembly drawings and Single part drawings

• Easy for fabrication • Easy to manage


Suggestion: Need help from HSD VIETNAM for Advanced functions in Tekla: - Firm and project settings, - Collaborations,… To optimize Tekla’ potential + Check the clashing between weld and structural members ? + Suitable price for Tekla software Our trend: + In the next few year we will try to intergrate Tekla software to CNC fabrication, create and manage schedule, erection simulation… + Use Tekla software as early as possible. + We will invest at least one Tekla license each year.


Q&A ?


Thank you!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.