50\60 Station Road, Cambridge . A New City Quarter?

Page 1

50 \ 60 STATION ROAD

CAMBRIDGE

[ A NEW CITY QUARTER? ]

BUILDING MATTERS 2017 UNIVERSITY OF EAST LONDON

Michael Eve

Olivia Paine

Michael On

Azlan Mohamad Bin Johar

Hatim Muhammad Mohd Amin

Hanis Nadzirah Fairuz

Bahira Nur Abdul Rahman

Pawel Olak

Troy Stennett

Stephanie Intsiful

Report Submission Date: 07/03/2017

BUILDING MATTERS GROUP 5 1

\ GRIMSHAW

50 \ 60

STATION ROAD

STAGE 0 - 1 \ CONNECTING HISTORY

BUILDING MATTERS GROUP 5

01
02 GRIMSHAW [ CAMBRIDGE THE HISTORICAL CITY ] 1600 1800 1900 1950
03 BUILDING MATTERS GROUP 5 50 \ 60 STATION ROAD CAMBRIDGE 1847 2000
04 GRIMSHAW
[ HISTORY ]
Historical photographs of Cambridge
05 BUILDING MATTERS GROUP 5 50 \ 60 STATION ROAD CAMBRIDGE
Various images of Cambridge today

50 \ 60

STATION ROAD

STAGE 0 - 1 \ PLANNING A BRIEF

BUILDING MATTERS GROUP 5

07
08 GRIMSHAW 01 04 [ CB1 MASTERPLAN ]
09 BUILDING MATTERS GROUP 5 50 \ 60 STATION ROAD CAMBRIDGE 02 05 03 06

ROAD ] BROOKGATE BRIEF

LANDMARK FEATURE

ON ARRIVAL FROM THE STATION WHICH DIRECTS VISITORS TOWARDS THE CITY CENTRE

MAXIMUM LETTABLE AREA

PROVIDING POTENTIAL FUTURE TENNANTS

WITH FLEXIBLE OFFICE SPACE WHICH COULD BE ADAPTED TO ANY RANGE OF NEEDS. THIS REQUIRES THE DESIGN OF ONE, CONNECTED PROPOSAL.

10 GRIMSHAW
[
50 \ 60 STATION

FOCAL AVENUE

CENTRED AROUND THE DEVELOPMENT

WHICH EXTENDS THE PUBLIC REALM ADJACENT TO THE STATION AND FORMS THE HEART OF THE NEW PUBLIC QUARTER

VISIBLE CONNECTIONS

WHICH ALLOW BOTH THOSE WITHIN THE DEVELOPMENT AND THOSE WITHOUT TO FEEL A RELATIONSHIP TO THE HISTORICAL CITY CENTRE WHICH IT REFERENCES.

11 BUILDING MATTERS GROUP 5 50 \ 60 STATION ROAD CAMBRIDGE

50 \ 60

STATION ROAD

STAGE 2 \ ADDRESSING CONCEPT

BUILDING MATTERS GROUP 5

13

REFUSED APPLICATIONS ]

14 GRIMSHAW
Refused Applications in 2012 & 2013
[

FOR REFUSAL

15 BUILDING MATTERS GROUP 5 50 \ 60 STATION ROAD CAMBRIDGE [
REASONS
]
16 GRIMSHAW
These drawing are the property of Grimshaw These drawing are the property of Grimshaw These drawing are the property of Grimshaw
[ POLICIES ]

CASE STUDY - 30 STATION ROAD ]

17 BUILDING MATTERS GROUP 5 50 \ 60 STATION ROAD CAMBRIDGE
[

50 \ 60

STATION ROAD

STAGE 3 \ ADDRESSING CONTEXT

BUILDING MATTERS GROUP 5

19

CONTEXT ]

Clear continuing theme and rhythm through

20 GRIMSHAW
[

“... The CB1 masterplan proposals will draw from existing precedent within the masterplan area and will set out to respond to historic and local material and colour palette of Cambridge. The balance between contemporary and traditional materials and contrast and homogeneity was explored...”

21 50 \ 60 STATION ROAD CAMBRIDGE dark
GRC/reconstituted
GRC/reconstituted
matte dark grey aluminium 1 2 8 9 5 6 7 3 4
grey matte metal panels matte mid grey anodised aluminium frame and glass curtain walling system
stone vertical fin in ground level glass curtain walling precast concrete clad columns clear glass revolving door
stone
Cambridge station brickwork facade Sainsbury’s Laboratory Cambridge O’callaghan Hotel opposite the site Pembroke College

50 \ 60

STATION ROAD

STAGE 4 \ A DETAILED FACADE

BUILDING MATTERS GROUP 5

23

[ CLADDING FINISH ]

Legend

Areas of interest

Finished ground level

Model based on section E-E of supplied drawings

Legend for perspective section diagram (above)

Approved building line by planning application

Increased area of lettable floor space (total of 15% increase)

24 GRIMSHAW
F.G.L
25 BUILDING MATTERS GROUP 5 50 \ 60 STATION ROAD CAMBRIDGE
1. Fixing of Horizontal support bracket to Metsec 2. Construction of GRC system 3. Fixing GRC component to support bracket 1. Fixing of vertical support U bracket to Metsec VERTICAL GRC PANEL FIXING HORIZONTAL GRC PANEL FIXING 2. Inner GRC panel hollow aluminium frame
[
]
3. Fixing GRC component to support bracket
STUDY OF COMPONENTS

[ DESIGN QUERY ]

Glazing GRC Cladding

Connection Issue -

Cellular beam not extended off the column to support the Metsec panel. The Metsec panel seems to rest on its own onto the column. This situation is not possible because the load from GRC panels and the wind load brace only by Metsec.

26 GRIMSHAW
Detail Section Detail Plan Floor to Column Construction Detail

SAINSBURY SUPERSTORE CAMDEN

SAINSBURY LABORATORY CMABRIDGE

27 BUILDING MATTERS GROUP 5 50 \ 60 STATION ROAD CAMBRIDGE
Portland Roach Stone Aluminium Tray Assembly Concrete Slab Cantilevered Steel Structure within Slab Mild Steel Column Section Base Plate Portland Stone Pier Tension Rod Cellular Beam Precast Concrete Unit Concrete Encased Steel Section Steel Frame Structure Amluminium Cladding Panel Limestone Paving FINSBURY SQUARE LONDON
[ CASE STUDY ]

50 \ 60

STATION ROAD

STAGE 5 \ CONSTRUCTION NOW

BUILDING MATTERS GROUP 5

29

[

SHEET PILING PROCESS ]

30 GRIMSHAW
Power Pack Piler Laser Hydraulic Hoses Saddle Mast Main Cylinders Clamps Reaction Piles
31 BUILDING MATTERS GROUP 5 50 \ 60 STATION ROAD CAMBRIDGE
Various process photographs of the sheet piling process

HOARDING STRATEGY

32 GRIMSHAW
SILENT PILING & NOISE BARRIER
[
]
STRATEGY
33 BUILDING MATTERS GROUP 5 50 \ 60 STATION ROAD CAMBRIDGE [ STRATEGY CONCLUSION ]

50 \ 60 STATION

ROAD

BUILDING MATTERS GROUP 5

35 \ CONCLUSION
36 GRIMSHAW
37 BUILDING MATTERS GROUP 5 50 \ 60 STATION ROAD CAMBRIDGE [ ? ]