ICE CUBE

Page 99

99 SITE ANALYSIS PROGRAM DEVELOPMENT PRECEDENTS DESIGN PROCESS TECHNOLOGIES

The existing ruin that is located in the center of the newly formed quad between DEC and the existing townhouses acts as blockade to anyone that wishes to easily walk from one side of the quad to the other. The new landscape utilizes the ruin while eliminating the blockade. The wall that separates the quad is demolished and replaced with a stair case so that the quad opens up and flows with the landscape. The demolished stone work is then incorporated into the bearing walls of the terracing that are located throughout the landscape.

FINAL

View from Top of Terrace


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.