The project focuses on creating engaging public spaces and thoughtful event layouts to foster interaction, entertainment, and a sense of belonging for all participants. The design integrates vibrant street elements, temporary installations, and efficient traffic flow management, ensuring a seamless experience for attendees while enhancing the neighborhood’s lively atmosphere.
Toronto, Canada - 2024
Toronto, ON, Canada
Event Planning and Design Overview VillageFest 2024 Project Area The BIA District, Church-Wellesley Village
Project Type Event Planning and Design
PROJECT OVERVIEW
In 2024, I had the opportunity to work on the site plan for the highly anticipated Church-Wellesley Village Street Festival, proudly celebrating Indigenous and 2SLGBTQ+ arts. My role involved comprehensive planning and design to ensure a safe, inclusive, and vibrant community event that honored diversity and culture.
MY ROLE
Site Analysis and Surveys, Layout Design, Stakeholder Coordination, Safety Planning, Vendor Coordination, Crowd Management, Accessibility and Inclusivity, Sustainability Initiatives, and Technical Implementation.
TOOLS
AutoCAD, Adobe Illustrator, Adobe Photoshop
The Village is a comfor table and suppor tive communit y that of fers the connectedness of a small town, in the hear t of the Cit y The Village is an urban destination, connected to transit with businesses and events that are at the forefront of Cit y building and urban life.
On Dut y Police
On Patrol Officers
Water Station
Existing Garbage Bins Fire Hydrant Medical, Securit y and Police Hub
Site Plan Considerations for Emergency and Safety Access During Road Closures
Traffic Barricades and Emergency Lanes
The positioning of traffic barricades and the delineation of emergency lanes should comply with accessibilit y provisions in the OBC, specifically ensuring unobstructed routes for emergency vehicles, as outlined in Subsection 3.2.5, which mandates clear paths for emergency ser vices. An emergency lane width of no less than 6-9 meters is generally recommended for fire depar tment access. This ensures the necessar y clearance and visibilit y for emergency operations.
Fire Lanes
Fire lanes must be maintained with adequate clearance for fire depar tment vehicles, with hydrants located strategically. According to Section 3.10.3.4, access routes for fire vehicles must be at least 9 meters wide, with visibilit y markings and easy access to hydrants positioned within 45 meters of the building entrances or fire connections. This ensures compliance with fire safet y standards and rapid response capabilities.
Clearances and Access
The clearance of 3.5 meters in the center of each side street, as you mentioned, aligns with OBC provisions for ensuring unobstructed emergency vehicle access. The fire access route should allow for easy maneuverabilit y of vehicles in emergency situations.
The stage is SL-75 model measuring 20' x 16' and will be strategically placed to accommodate event activities and ensure optimal audience engagement.
Location:
South of Monteith Street, facing an angle towards Dundonald Street.
Additional Structures:
The stage will have a generator located behind it. The stage will have a tent for stage staff and a tent changeroom for performers.
STAGE-2
The stage is SL-75 model measuring 20' x 16' and will be strategically placed to accommodate event activities and ensure optimal audience engagement.
Location Northwest corner of Maitland Street, facing an angle towards the southeast corner.Dundonald Street.
Additional Structures
The stage will have a generator located behind it. The stage will have a tent for stage staff and a tent changeroom for performers.
Duration
Present on both days of the event.
Configuration
Features a catwalk extending from the middle of the stage, avoiding intersection with the emergency lane.
2SLGBTQ Artist Vendor Booths
The vendor booths, each measuring 3.00 m x 3.00 m, were thoughtfully arranged in the curb lanes in front of 519 / Barbara Hall Park and 572 Church Street.
This deliberate placement not only maximizes visibility for the vendors but also enhances the overall aesthetic appeal of the event space.
Ten vendors were placed on the curb lane in front of 519 Church Street and Barbara Hall Park, while five vendors were placed on the curb lane in front of 572 Church Street.
Each vendor is spaced 2.4 meters apart. This decision is supported by:
• Ontario Building Code (OBC): Section 3.3.1.9 requires a minimum corridor width of 1.1 meters.
• Ontario Fire Code: Ensures clear egress routes for emergency access.
• Accessibility for Ontarians with Disabilities Act (AODA): Requires a minimum clear width of 1.1 meters for accessible routes. Therefore, the 2.4-meter gap is sufficient and compliant with all relevant codes and standards.
Notably, the vendor area is situated adjacent to, but does not intersect with, the emergency lane, ensuring a clear space for unobstructed access.
INDIGENOUS VENDORS MARKET
The Indigenous vendors market is designated between Alexander Street and Wood Street on both lanes of Church Street.
This area accommodates a total of 20 vendors, including 19 Indigenous vendors and 1 non-Indigenous vendor, Lost Rivers Toronto (vendor number 10), with 10 vendors on each side of the street Each table is spaced 3 meters apart. This decision is supported by:
• Ontario Building Code (OBC): Section 3.3.1.9 requires a minimum corridor width of 1.1 meters.
• Ontario Fire Code: Ensures clear egress routes for emergency access.
• Accessibility for Ontarians with Disabilities Act (AODA): Requires a minimum clear width of 1.1 meters for accessible routes.
Therefore, the 3 meter gap is sufficient and compliant with all relevant codes and standards.
.
1.52m 0.76m 0.71m Foldable Tables 60*30 inches.
Notably, the vendor area is situated adjacent to, but does not intersect with, the emergency lane, ensuring a clear space of no less than 2.5 meters for unobstructed access.
2nd Project School of Management
Academic Project
A compilation of academic architectural projects completed in 2023, exploring sustainable design and innovative construction solutions in Canada.
Toronto, Canada - 2023
M A N AG E M EN T S CH O O L
2023 - CANADA
PROJECT OVERVIEW
As a par t of IPLAN program, we requested a comprehensive analysis of the Management School building bringing togather the 3 dif ferent courses at TMU:
Materials and Methods of Construction, Ontario Building Code and Revit modelling
The project was developed by a group of 5 people
Academic Project
MY ROLE
Facade’ Design, Visualization TOOLS
BIM 360, google ear th, CADmapper, Revit, Illustrator, Photoshop
Building Area: 970 m
Building Height: 7-Storeys
Building Type: Institutional 2
Plot Dimensions :34.27 x 36.50m
Site Area :251m2
The site forms an integral par t of th T onto Met opolitan Unive si e goal of this Matser Plan is g owth and intensification with a co public ealm, accessibil varie y suppo
p
T e combination of t wo under developed pa at d St east/Coope R & 111 Gerrard St East/ Graduate Studies
Mutual Street
Project location
SPACES
An interconnected space through the first and second floor ser ving the third floor is provided with a featured stair. Bet ween the first and second floors, there is no limit to the size of the opening in a Group A-2 occupancy, if the building is sprinklered according to Sentance 3.2.8.2.(6).
Opening for the stair way bet ween second and third floor must be protected with a fire separation complying with requirements of the floor assembly and does not exceed 20m2 in compliance with the Cit y Of Tornoto By -laws
Section in main entrance
APPLICATION
Nor th and East facade
PROPERTIES
KEY FEATURES AND BENEFITS
Material Composition, Low Maintenance, Non-Combustible Properties and Sustainability.
Aesthetic Low maintenance, Ecological Advantage, Noncombustible frame is added beyond the cur tain walls to at tach the panles.
Section and Facade in The Main Entrance
3rd Project
Grand Bazaar Restoration
Restoration & Preservation
A comprehensive restoration project aimed at preserving the Grand Bazaar’s historical architectural integrity while incorporating modern sustainability techniques. This real-world project addressed critical issues such as humidity and water damage, applying innovative solutions to protect and extend the life of one of Turkey’s most iconic landmarks.
Istanbul, Turkey, 2019 - 2020
GRAND BAZAAR
KAPALIÇARŞI
GRAND BAZAAR ROOFTOP RENOVATION 2020 - ISTANBUL TURKEY
RAND BAZAAR ROOFTOP RENOVATION
Project area : 30,700 m2
Project height : Up to 2 storeys
Project t ype : Urban Renovation
MY ROLE
Surveying, Taking Measurements, Drafting, Data Management, Analysis/Reporting
TOOLS
AutoCAD, Illustrator
PROJECT TEAM OVERVIEW
Architects: 4
Engineers: 1
Restoration Specialists: 2
Laborers: 35+
Consultants: 1
Restoration of the 558-year-old Grand Bazaar in Istanbul, including removing improper rooftop additions, repairing damage from the "Skyfall" movie, and replacing 800,000 tiles over 40,000 square meters. This meticulous two-year effort ensured structural integrity and enhanced the historic landmark's appearance.
The Grand Bazaar, also known as Kapalı Çarşı, is a sprawling historical marketplace that covers over 61 streets and houses more than 4,000 shops. It is divided into several sections, each with its own specialty, including textiles, jewelry, carpets, leather goods, ceramics, and spices.
STREETS
The bazaar consists of 61 covered streets, many of which are dedicated to specific trades. For example, some streets are known for goldsmiths, others for carpets or antiques.
SHOPS
With over 4,000 shops, it offers a wide variety of goods, making it a prime destination for tourists and locals alike. It is estimated that 250,000 to 400,000 visitors pass through the bazaar daily.
The bazaar also features two historical bedestens (domed market halls), where valuable items like antique jewelry and carpets are often sold. These are the Sandal Bedesten and the Cevahir Bedesten.
SECTIONS DEPARTMENTS
The Grand Bazaar is divided into different areas or departments specializing in various products. Some notable areas include:
Jewelry & Gold (The Kuyumcular Street)
Leather Goods
Textiles and Silk
Carpets & Kilims
The Historical Cevahir Bedesten (domed market halls)
Construction Drawings With Process Flow
Press Strip Application Plan
Purpose: This drawing shows how the press strip system is applied to secure layers during roofing. The press strip ensures the attachment of waterproofing membranes or insulation to prevent shifting and leakage.
Key Notes: The press strip system aids in achieving tight sealing for insulation and other roof layers, preventing water ingress.
Process Flow:
Surface Preparation
Marking and Placement
Fixing the Press Strips
Final Inspection
Organic Bitumen Membrane Plan
Purpose: TThis plan highlights the placement of the organic bitumen membrane, which provides a durable and flexible waterproof layer in roofing systems, protecting against moisture and weather-related damages.
Key Notes: The organic bitumen membrane offers excellent durability and flexibility, ideal for structures like the Grand Bazaar roof that need to resist variable weather conditions
Process Flow:
Cleaning the Surface
Membrane Placement
Adhesion
Edge Sealing Inspection and Testing
Tile Application (Gutter Insulation Rises by 18 cm)
Purpose: This plan focuses on the tile application process, particularly in areas where the gutter insulation rises by 18 cm to enhance drainage and prevent water buildup.
Key Notes: The 18 cm rise in insulation is crucial for promoting proper drainage and avoiding water damage to the roof structure.
Gutter
GRAND BAZAAR
FACADE SURVEY AND WATER DAMAGE DOCUMENTATION
These drawings illustrate the architectural facades of the Grand Bazaar as surveyed during the restoration project. The detailed drawings highlight the structure's original features, while additional imagery documents areas affected by water damage. These issues, primarily caused by prolonged exposure to moisture, have impacted key structural elements, which were carefully identified during the survey to guide the restoration process.
ROOF RESTORATION at THE GRAND BAZAAR (Kapalıçarşı)
The Grand Bazaar, one of Istanbul’s most iconic landmarks, underwent a major roof restoration beginning in 2016. Decades of neglect had caused extensive damage to the roof, particularly from water leakage, unregulated air conditioning units, and external installations like antennas. These issues led to the deterioration of the building’s structural integrity and threatened the historical significance of the marketplace.
This restoration is part of a larger effort to modernize the Grand Bazaar, including plans for central heating and cooling systems, while respecting its cultural and architectural heritage.
BEFORE RESTORATION
In the 'before' images, the roof shows signs of wear, with mismatched tiles, cracks, and invasive modifications. These conditions posed a risk to the shops below and compromised the Bazaar’s overall charm.
AFTER RESTORATION
The 'after' photos illustrate the remarkable transformation of the roof. The new red tiles, specially chosen to match the original design, restore the historical aesthetic of the Bazaar. The roof is now designed to prevent water damage, ensuring the building’s longevity and protecting the stores from potential flooding. These changes preserve the historical essence of the Bazaar while enhancing its safety and functionality, ensuring the structure endures for another century.
Before Restoration
Before Restoration
After Restoration
Site Plan Progress Shots
4th Project
Residential Compound
Residential Type Project
This project showcases the design and execution of a residential compound centered around community, functionality, and environmental sustainability. The design aims to create a seamless connection between urban convenience and eco-conscious living, offering residents both comfort and a reduced environmental footprint.
Istanbul, Turkey - 2019
RESIDENTIAL COMPLEX
ISTANBUL
BUILDING TYPE ResidentialBuilding BUILDING HRIGHT 9 Storeys
Adobe Illustrator, Adobe Photoshop.
TOOLS
AutoCAD,
BALANCING CLASSIC MODERN AND
The Kayashir Residential Complex in Istanbul is a harmonious blend of classical charm and modern sophistication.
This expansive project spans over 5,000 square meters with a built-up area exceeding 30,000 square meters, housing 200 luxurious apartments.
The complex seamlessly integrates classical elegance with contemporary style. Its architectural facades feature intricate details and expansive windows, flooding interiors with natural light.
The project offers spaces for children, lush green landscapes, and serene water features, providing a variety of recreational opportunities.
Site Plan
PROFESSIONAL MANAGEMENT
The complex is designed with resident convenience in mind.
MULTIPLE ELEVATORS
Strategically placed elevators minimize wait times and ensure quick access to apartments.
SMART CONTROL SYSTEM
Residents can manage lighting, climate, and security systems remotely via smartphones.
Residents enjoy a range of comforts, including indoor and outdoor pools, state-of-the-art fitness facilities, gourmet dining, and a retail area. A smart system enables remote control of home environments.
5th Project
Villa Tranquila
Custom Home Design
The villa’s design focuses on maximizing natural light, incorporating openplan layouts, and integrating sustainable materials. Attention to detail was key, ensuring that both aesthetic beauty and environmental responsibility were at the forefront. The result is a serene, modern living space that offers both luxury and comfort, perfectly harmonized with its natural surroundings.
Turkey - 2018
Yalova,
Villa Tranquila
Presenting a contemporary embodiment of minimalist architecture, this villa stands as a testament to refined design and spatial elegance. The street-facing facade, characterized by a single level, is a striking introduction to the seamless blend of form and function that defines this architectural marvel. This project epitomizes modern luxury living at its finest, poised to leave an indelible mark in the realm of architectural excellence.
RESPONSI Bl LITI ES Drafting, Design Devlopment, Modelling, Site Visiting.