Sandeep Shikre Associates, Pune Feb 2018 – Feb 2019

Senior Project Architect

Spearheaded the management of a high-rise project in Mumbai. Produced the concept, created drawings on BIM and collaborated with all trades on BIM. Interacted with clients to gather and clarify requirements. Held site meetings to implement ideas and conduct site supervisions and inspection for quality control.

 Streamlined the project to build Retail + Residential high-rise towers (303.40mt high) at Mazgaon, Mumbai. (192577sqmt).

Dar Al-Handasah Consultants (Shair and Partners), Pune Jun 2016 – Jan 2018 Architect

Internal team lead, MEP Coordination on BIM, Done IFC submission.

 Khalifa Football stadium, Qatar. 40000 pax

 Makkah Clock Royal Tower (Abraj Al Bait), KSA

 Al Bayt Football stadium, Qatar.

Masterplan Services Pvt Ltd, Pune, Leeyana LLC, Muscat. Jan 2012 – Jan 2016

Design Architect (Jan 2012 – Dec 2012). Senior Architect - Design Lead (Dec 2012 – Feb 2018)

Led a team of six architects. Provided guidance to devise conceptual designs, shop drawings, ROI and construction monitoring services. Routinely updated clients on the detailing and design of the construction materials and organised meetings with decision makers to recognise and administer requirements. Prepared specifications of materials and communicated with construction management and vendors to accomplish the ideas. Solicited bids and negotiated vendor offers. Researched building codes and acquired permits.

 Succeeded in designing and developing commercial + residential development for Arkan majan at Baushar, Muscat (87615sqmt)

 Executed the project of HCLIT Park at Hinjewadi phase-1, Pune (5769sqmt)

 Navigated all the phases of project implementation to build New MAN turbo – OHI workshop at Rusayl Industrial Estate, Muscat (2491 sqmt)

 Commercial development for Toucan united co. At al-ghubrah, Muscat (46904sqmt)

 Proposed Head office for Oman Chamber of commerce and Industry (OCCI) at plot no. 1817, Boushar, Muscat. (31885 sqm)

 Farmhouse for Amer Al-suleimani at Al Fuleij, Muscat (1733sqmt)

Studio Arch, Pune May 2010 – Dec 2011

Architect

Developed plans and designs for local Pune projects. Investigated projects to check compliance with local bye-laws and Municipal scrutiny (PreDcr). Collaborated with different trades, vendors and clients to boost smooth completion of projects.

Additional Experience

Junior Architect, Siddhant Pvt Ltd., Pune

MARINAVIEW,Residential+retaildevelopment for EMAAR Group Dubai At Rashid Yachts and Marina Dubai. B/Up Area=112615.45 sqmt 01

RESIDENTIALDEVELOPMENT AT DUBAI CREEK HARBOUR BRIDGE DISTRICT, PLOT B-009, DUBAI B/Up Area=18702 sqmt

APARTMETNANDRESORTATPALMJUMERAHA

Residential high risetowers(303.40mthigh)+retaildevelopment At Mazgaon, Mumbai. B/Up area=192577 sqmt

MakkahClockRoyalTower(AbrajAlBait),KSA&KhalifaFootballStadium,Qatar Commandcentreandpolicestationat NEOM,KSA

Commercial+residentialdevelopmentforArkanMajanAt plot no 161. Al-Khuwair, Muscat. B/Up area=87156 sqmt

NewMANturbo-OHIworkshop. Atplotno55.Al-RusaylIndustrialEstate,Muscat.B/Uparea=2491sqmt

Proposedcommercial+residentialdevelopmentforToucanUnited At Al-Ghubrahl, Muscat. B/Up area=46904 sqmt

ProposedcommercialdevelopmentforOasisDevelopmentCO.S.A.O.C At Sohar,Oman. B/Up area=26025 sqmt

ProposedcommercialdevelopmentforAl-Shallinternation,FirasCenter At Sohar,Oman. B/Up area=12138 sqmt

ProposedFarmhouseofAmerAl-Suleimani

At Al-fuleij, Barka, Oman B/Up area=1733 sqmt

6 7 08 NA 1.3 18 1.7 23 28 32

NORTH ELEVATION-OVERALL
EAST ELEVATION-OVERALL
WEST ELEVATION-OVERALL
MATERIAL KEYNOTES

RESIDENTIAL DEVELOPMENT

AT DUBAI CREEK HARBOUR BRIDGE DISTRICT, PLOT B-009, DUBAI

FACTS AND FIGURES

PLOT AREA- 18702 SQM

TOTAL GFA- 21885.87 SQM

TOTAL B/UP- 5715.70 SQM

ROLES AND RESPOSIBILITY:

AS AN SENIOR ARCHITECT OF THE PROJECT, STARTED PROJECT FROM CONCEPTUAL LEVEL WITH GOOD AESTHETICAL FLAIR AND CODE COMPLIANCES, HANDLED AND COORDINATED WITH EXTERNAL CONSULTANS, VENDORS, AND OTHER DIESCIPLINES SMOOTHLY BY LEADING INTERNAL AND EXTERNAL TEAMS EVENTUALLY ACT AS A SINGLE POINT CONTACT FOR ALL INVOLVED DISCIPLINES. CURRENTLY PROJECT HAS BEEN FINISHED IFC STAGE.

ODIUM FLOOR
FIRST FLOOR

RESORT & CABANAS AT PALM JUMERAH, DUBAI

LocatedintheprestigiousandexclusivetownshipofPalmjumerah, Apartmentsandcabanasaremeanttobeapartoftheexclusive ownervillasandresidencesbuiltonthelake.

WithaccesstoalltheamenitiesthePalmJumerahoffers,the units wereaskedtobedesignedtobetranquil,privateandalmostcutoff fromtherestofthedevelopment.Bycarryingthemontothelake,and positioningthemsothatnoresidentcanseetheotherfromitsdeck, whileutilizingtheareamosteffectivelywasthemainchallengeofthis design.

TOWER PLAN(LEVEL 1 TO 7)

TOWER PLAN(TYPICAL REFUGE FLOOR)
TOWER PLAN(LEVEL 8 TO 68 FLOOR)
TOWER PLAN(LEVEL DUPLEX FLOOR)
RETAIL BLOCK VIEW
RETAIL BLOCK VIEW

TOWER PLAN(LEVEL 8 TO 68 FLOOR)

P

1 TO 7) TOWER PLAN( DUPLEX LOWER FLOOR)

REFUGE FLOOR)

STACKING PLAN
APARTMENT DIAGRAM
Proposed Strip Mall: Pedestrian Walkways and Plazas

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.