Construction Drawings, Designing details Landscape elements for Lodha’s PALAVA, Dombivali Lodha’s Supremus Powai Lodha’s World one, Lower parel MCGM Linear Park, Lower parel
Designed: Mass Housing Residential for CIDCO’s TOD development of Navi Mumbai: Along with Bus Terminal, Bus Depot, Truck Terminal, Railway Station Forecourt, Commercial Buildings, Multi level Car parks.
Municipal Drawings for Submission for 9.0 Lac Sq.ft Tender Drawings, Environmental Drawings, Fire & Transport Approval Drawings for more than 35 0 Lac Sq ft (One of the Package out of 04 Packages –07 Sites out of 25 Sites)
Construction Drawings (GFC) Site Coordination with PMC, Contractors & Stakeholders; Resolving BOQs, Variation segment, RFIs, Sample flats, Finishing's for 14500 Units out of 85000 Units.
Checking & Approving: Aluminium form work drawings approvals Shop drawings BIM model from 200 to 350 federated model, clash detection
Conceptualization to Execution: Benchmarking, Fee Proposals, Concept Designing, Schematic Design, Approval Drawings, Tender Drawings, Construction drawings, BOQ, Billings, and Site Coordination and Finishing's and All required. Selected Projects:
(About to
(Launched,
Design development
A abandoned beach with a scenic view of Bandra worli sealink structure, it is an academic project of semester 06 for Landscape section. Brief was to design the beachfront for public recreational activities. As there are limited developed beach front in Mumbai for public.
View from site location towards Bandra Worli Sea link.
As per functionality, privacy hierarchy and view vantage points, keeping proposed structure sunken.
Existing site condition
Proposed structure sunken in sand without hurting nature.
HTLINE
Re ima g ining Mumb a i C ity
, M u m b a i. Semester 10 –2016-17
HowMumbaikars will rejuvenate?
SHIFT
Due to less of quality and approachable open spaces People opting to spend theirmajor recreational time on Alternative Amenities (Multiplexes, discotheques, pubs, junk food restaurants, OTTplatforms.)
Reasoning to this Public open spaces are getting encroached (Slum dwellers,developers)
Due to thisMumbai issuffering with lack of Public open spaces (Currently itis1.24 Sq.m/person; as per UN’s Sustainable Development Goals
ECOLOGY
The Relationsof organismto one another and to theirphysical surroundings Ecology stands on 4principles
Governmentwantsto revive ZOO
Reviving zoo will result into harming animals again
Instead of zoo. Ithas tobe a human interaction space, think tank
Open spaces encroachment
Encroachment of Open spacesare mostly because of their dying state
Listof dying open spaces
Jijamata udyan isone of prominent open space can be revive to set an example for government and citizens
Peopleparticipation stages
blocks
around wetland pond, gardens, amphitheater, bridges, pathways, bicycle track and existing trees.
View of MumbaiZoo
Entrance Arena
Visitorsblock
Ecological institute
Souvenirsblock
WETLAND PARK
NURSERIES
RAIN GARDEN
PEDESTRIAN ENTRY / EXIT
ENTRANCE ARENA
USER :Citizens, Tourists, Thinkers, Policy makers.
ACTIVITY :Museum & Park entry/exit, Ticket house, Seating.
PEOPLE :40 –100ppl.
AREA :2000Sq.m
VISITORSBLOCK
USER :Citizens,Tourists.
ACTIVITY :Information and Enquiry area. PEOPLE :20-30ppl. AREA :500Sq.m
EXPO BLOCK
USER :Citizens, Tourists, Learners.
ACTIVITY :Experimental program show arena.
PEOPLE :10-15ppl.(per block) AREA :330Sq.m
50M SPAN COLUMN FREE SUSPENSION BRIDGE STAGE AREA BACK STAGE AREA
MOUNDS FOR SEATING
PEDESTRIAN PARAPLEGIC BRIDGE
AMPHITHEATERARENA
USER :Celebrity, Fan people, Public gathering & Staff.
USER :Citizens, Tourists, Thinkers, Policy makers, Learners.
ACTIVITY :Learning center, ITroom, Library.
PEOPLE :40 –80ppl. AREA :4500Sq.m
Government will be required to initiate competition :Public Participation program
Where people must visit Jijamata udyan (Site); the proposed site above to study the possibility, method to maintain and to earn money from Open spaces. Principal idea of this program is to get back all encroached and defunct open spaces of Mumbai city withpublic participation.
A competition isfor all listed encroached open spaces,residual defunctopen paces in particular wards and neighborhood.
Competition demands and idea for the setup of 10- 20open spaces annually
10-20 ideas
Best 5 –10 ideaswillget selectby jury and scrutinize by design, planner and all req. official.
After go ahead from bodies & Governmentwill fund the project and assign contractorteam to develop the same
Idea is to build neighborhood community and take care of the particular open space to sustain it longer. Thismay improvise mental, physical and social health.
Hence, Architecture setup requirement;for the upcoming body (Who’s going to teach the methods as well as take care of all the norms and regulations for this program)
Simultaneously going to run this institute which resides; (Bio domes, Botanical expo block, Ecology center, Visitor center, Souvenir arena, Amphitheatre, Filtration pond and garden) (Jijamata udyan) –As a centralized prototype (incubation) for Citizens and tourists.
Ecology body isan upcoming dedicated body for Mumbai open spaces, which will run under M.C.G.M (Municipal body of theCity Mumbai)
Basalt quarry
“ Its really about allowing nature to re-establish itself ”
A completely barren basalt quarry restoration landscape design is done by M/S.Prabhakhar P Bhagwat Associate, a landscape firm, over a period of eight yearsfrom 1977 to 1985.
Google earth image of Restored area. 2015
PrabhakarBhagwat(PBB),Ahmedabad
There are close to 3000 mines in India that produce various minerals. Close to Vadodara sits a former basalt quarry that speaks to the resilience of nature; a site that forces one to question the various manners in which we interact with nature.
Task:
while I was interning at PBB, got the opportunity to do research and make presentation on this pre-eminent project, and it taught me, how to create a self-sustaining ecosystem. Guided and inspired me, to work more on thisagenda.
The top soil waslayered on the rock;thistop soil became mulch and created the microenvironments necessary for the growth of grasses, native shrubs, and trees.
Natural mother earth Mined for mineralsextraction
Mining process stopped and restoration begins
Quarry isnow protected forest.
“What was once a barren quarry is now a protected forest.”
A nearby seasonal streams was diverted to fill the quarry basin.
In the making for close to 8 years - the site is a result of in-depth knowledge and a curated process that ultimately led to the rejuvenation of land and the creation of multiple microecosystems.
It has allowed for interactions between the variousforms of flora and also fauna.
The site is a rejection of the conventionally accepted hierarchy between man and nature.
The outcome was clear – to create a selfsustaining ecosystem.
“The idea of designing this space by not only just for recreation, but also spaces that have begun to lend a sense of identity to the city. They have been a response to the existent plant material, and to the relationship with the water bodies that surround it.”
Task:
• Designdevelopment process diagram of Phase - I
• Siteanalysis diagram
• Masterlayout rendering
• Physical hand model for study.
The wetlands that have been incorporated into the design of this park sit adjacent to a public lake. The development of the lake required working with various NGOs invested within thisarea.
Ihave worked with design team during my Internship (2015) and continued as Junior Architect for execution in 2017-2018.
View 01(V01)
View 02(V02)
PrabhakarBhagwat(PBB),Ahmedabad
Analysisof Khoni Soil&Vegetation
Design development process:
Physical model ideation
Typical section
Seresof activity areasarranged axally
Landform: Flat top conical mounds
Walkway :Curvlinearperipheralwalkway
Typical section
Large open spacesconta ned
Landform:Crescent shaped mounds
Walkway :Curviinearperpheralwalkway
Typ cal secton
Lnearpattern
Landform:Fat top pyramids(raised)
Wa kway :Meandering wa kways
Typical section
Organ c arrangement
Landform: Sliced ovals ( raise/sunken)
Walkway :Meandering walkways
Master layout Schematic sketch
Khoni wetland
Walking stone trail
Fencing detail Bamboo urban plaza
Linear park
Axisleading to central courtyard
Linear Park, spread over 6000 odd sq.mts, sits in the shadow of one of the tallest residential buildings - World One. It is a zigzag strip of land between a towering residential building and an extremely busy road and is divided into four zones; each zone comprising symbolic representationsof places in the city.
Prabhakar Bhagwat (PBB),Ahmedabad
Task:
• Sketches for Conceptual development stage
• Siteanalysis
• Masterplan layout sketch
• Siteexecution I have worked with design team during my Internship (2015) and continued as Junior Architect for execution in 2017-18.
“Gardens can be considered to be counterparts to the urban built fabric; opposite and compatible simultaneously. ”
An intensive exercise in spacemaking; a design that supports the idea of living that is intertwined with the existing landscape within the space. It celebrates that which was, and imagines an extension of a life that is already expressing itself. The planning of the space in question was about building connections; and then about preservation.
The overall space is an experimentation with materiality; and continuously transgressing boundaries between the built and the natural – becoming a backdrop for a long-established method of living.
Ihave been the part of very intense Site analysis process and developing conceptual ideas forthe landscape design of thisvery large sitefull of orchards.
Ihave worked with design team during my Internship (2015).
Existing trees analysis
Drainage plan
FRUITNG:
PHOENIXSYLVESTRIS(KHAJOOR)
PSIDIUMGUAJAVA (GUAVA)
WHEATFEILDS LITTERING:
MANILKARA ZAPOTA (CHICKOO)
MORUSALBA (SHEHTOOT)
MANGIFERA INDICA (MANGO)
MAJORSIGHTLINES
MINORSIGHTLINES
VIEWPOINTS
Sightlines
SWWINDDIRECTION
MOSTSIGNIFICANT
MODERATELYSIGNIFICANT
LESSSIGNIFICANT
WINDVELOCITY:5m/s
Shadowmap (June 8:00AM)
FRESH
FRUITYSMELLCHIKOO
CATTLEUTTER
map - Summer
CATTLE(COWS&BUFFALO)
PEIGON&COLLAREDDOVE
BLACKIBIS&WHITEIBIS
REDWATTLEDLAPWING
PONDHIERON
GARDEN SOIL
RAMMED EARTH WETSOIL DAMP SOIL HARDSOIL
LOOSESOIL
mapping
estate –Completed work images and Initial conceptual Option sketch
Initial conceptualdesign Option sketch
Women’s house
Design process -Parti diagram showing site selection & design evolution
Rosewood Truss White board clerestory Terracotta porousha fpot
Rosewood Beam
Rosewood Trellis
CIDCO Social housing
Project aims to develop affordable houses for low income group people at req. transit points like bus depot , terminals, railways stations for Navi Mumbai people.
ArchitectHafeez Contractor,Mumbai
Task:
• Tender drawings
• Municipal drawings
• Fire NOC, EC Approval drawings
• Construction drawings
• Site coordination
Housing
At 6M height only below the required residential. This fulfills parking and leaves 60% of site open to air.
Openground/green
This portion is to be either left open to sky or be used as playground . It is about 50 to 60 % of the site.
Podium
Creation of new ground by placing podium
Bus /truck
TRANSIT
Services and activities be it a depot or terminus for a bus or truck happens on the ground level. Entry to both is segregated. The Ingress and egress is segregated
Ihave been part of thisproject since 2019fromTender stage.
Ihave worked with Design, Approval, Construction drawings, Site coordination team and lead them.
IDEA OF THEPROJECT
Project distributed in 4 packages for 26 plots for client CIDCO. This is an affordable housing for lower income group people. Sites selected considering transit oriented development (TOD). So, selected sites are existing Bus depots, terminals, terminals, stations Truck railways without removing the exiting functionality of the place.
Design idea is to provide the housing with commercial for people travelling from Navi Mumbai to Mumbai for their jobs on daily basis and creating simultaneously great amenities like open spaces, club houses, rainwater harvesting, solar panels,MLCPs.
Podium open spaces and open parking
Station forecourt development Fitnesscenter and ample amountof RG areas
Separate entry/exit for residential and transit points MLCP buildingsforhigher density areas
L&T’s GREEN RESERVE , NOIDA.
Project aims to develop Luxury Apartments with large green spaces with abundant amount of amenities, The challenge was to create golf course views for all the apartments with higher FSI of 6.1 with lot of constraints. Achieved and Construction is ongoing
ArchitectHafeez Contractor,Mumbai
Task:
• Unit designing.
• Concept designing.
• Views (Sketchup, Lumion and Photoshop)
• Construction drawings.
Location Noida, Uttar Pradesh
I am project architect and started from scratch to construction drawings within 11 months.
FAR/FLOOR : 6835 SQ.FT_ 78.32%
CARPET AREA/FLOOR : 7212 SQ.FT_ 82.64%
CONST. AREA/FLOOR : 8727 SQ.FT_ 100%
2628 SQ.FT
3074 SQ.FT
Typical floor plan Tower-01
L&T’s Gateway
, SEWRI-MUMBAI.
Task:
• Unit designing.
• Concept designing.
• Views (Sketchup, Lumion and Photoshop)
Project aims to develop larger ticket size Apartments in Mumbai east coast with luxurious amenities. Creating an iconic building for another postcard stamp. Construction is ongoing Location Sewri, Mumbai.
• Construction drawings.
Integrating social, recreational and panoramic views the L&T Sewri aims to be an epitome of residential design.
The building is well-connected to different parts of the city, thus offers a seamless transition and a vibrant living experience for the residents.
The building encourages social interaction and provide residents with a retreat to relax and unwind while enjoying breathtaking views.
An iconic tower that stands out in the urban fabric of the city, acts a gateway to Mumbai and creates a landmark not only for its users but passerby's as well
Recreational space
Social interactive space
The building provides multiple levels recreational spaces with different kind of landscape and activities for to rejuvenate.
I am the project architect now and started from elevation designing to construction drawings.