#20 The Lancaster PROPERTY DESCRIPTION ADDRE INTERIOR DESIGNER: Keeley Green Interior Design BUILDER: Harrison Constructions PROJECT AREA: 210m² BRISBANE CITY COUNCIL
Sheet List Sheet Number 2000 1001 2005 2006 2007 2001 2002 2003 0 1002 1000 1006 2008 2011 2016 2017 2018 2019 2020 2021 2022 2023
Sheet Name KITCHEN - SHEET 1 GA FLOORPLAN PANTRY - SHEET 1 PANTRY - SHEET 2 LAUNDRY - SHEET 1 KITCHEN - SHEET 2 KITCHEN - SHEET 3 KITCHEN - SHEET 4 COVER SHEET & GENERAL NOTES FLOOR FINISHES PLAN DEMOLITION PLAN REFLECTED CEILING PLAN (RCP) WINE CABINET - SHEET 1 LOUNGE ROOM - SHEET 1 MASTER ENSUITE - SHEET 1 MASTER ENSUITE - SHEET 2 MASTER ENSUITE - SHEET 3 MASTER ENSUITE - SHEET 4 MASTER ENSUITE - SHEET 5 MAIN BATHROOM - SHEET 1 MAIN BATHROOM - SHEET 2 MAIN BATHROOM - SHEET 3
Current Revision E E E E E E E E E E E E E E E E E E E E E E
2024 2004 2028
LIBRARY/ OFFICE - SHEET 2 KITCHEN - SHEET 5 LAUNDRY - SHEET 2
E E E
GENERAL BUILDING CONSTRUCTION NOTES •
•
• •
• •
• • • • •
• •
• • • • • •
All design concepts, planning and documentation are the Copyright of Keeley Green Interior Design (KGID), using or copying information in part or full without written permission constitutes an infringement of copyright All dimensions to be verified on site with on site measure prior to start of construction, in the case of alterations to an existing dwelling confirm setout and critical dimensions during initial phase of construction and or when deemed appropriate by the builder. Report any discrepancies to KGID. Do not scale off drawings, use figured dimensions only Drawings to be read in conjunction with consultants drawings and specifications, including but not limited to structural engineer, building certifier, town planner and local government authority. All timber framing to be in accordance with AS1684 and structural engineers requirements All construction works to be in accordance with the Building Code of Australia and fit for intended use, no works shall be undertaken without written building approval by the nominated approving authority. All building works to comply with relevant parts of the Queensland Development Code. Builder to coordinate all required services, ensure plumbing and electrical setout is coordinated against other trades and is concealed in walls, ceilings and floors as required. Steps to be provided where falls exceed a threshold step of 190mm The Builder and Nominated Sub-Contractors are to carry out works in accordance with the signed contract drawings, specifications. Material schedules and the like shall be considered as supplementary information, all nominated materials and prime costs items to be installed in accordance with manufacturers drawings and specifications. All works on site to be carried out by licensed contractors, all contractors to have personal indenmity insurance and public liability insurance. All personal on site to be the sole responsibility of the nominated builder and or contractor and to have a thorough understanding of all work place health and safety requirements. Termite treatment to be in accordance with AS3660.1-2000 and Building Code of Australia Smoke Alarms to be in accordance with part 3.9.1 of the Building Code of Australia Builder to ensure property is cleaned and free of debris at completion of project. Builder to nominate extent of cleaning in contract. Builder to provide owner with all relevant manufacturers literature, as built drawings, specifications and certificates at completion of project. In the event of discrepencies between KGID drawings, schedules and specifications with consultants drawings notify KGID. Nominated builder to take full responsibility of construction coordination and building methodology.