Architecture Portfolio
ARIANE CORRINE REYES
Selected Works (2019 - 2022)
Bachelor of Arts and Master of Architecture
University of San Francisco and Arizona State University
PROLOGUE
Architecture projects an interpersonal approach in our built and natural environment.
Saipan, where I grew up, has a deep and forgotten history even within a remote radius. While growing up, I learned the value of cherishing and respecting existing communities and environments.
Throughout my academia in San Francisco, Arizona, and experience in the field, I believe that constant learning in this evolving world not only guarantees a successful design but a successful designer as well.
As designers, it is important to honor the many perspectives we get to work with. With this philosophy, I believe architecture will advance by staying true to the human experience and the world we live in.
Grad: May 2024 MASTER OF ARCHITECTURE
Arizona State University
Current GPA: 3.67
Grad: May 2021 BACHELOR OF ARTS
EDUCATION EXPERIENCE
University of San Francisco
Overall GPA: 3.69
Minor in Architectural Engineering
07/2022 - Present GRADUATE WRITING TUTOR
Arizona State University, Tempe
- Reviews writing for ASU graduate students at any stage of the writing process through oneon-one online writing tutoring sessions.
06/2021 - 07/2022 ARCHITECTURAL INTERN
Taniguchi Ruth Makio Architects, Saipan
- Involved in preparing and organizing construction documents in Revit for commercial projects in Guam and the Commonwealth of the Northern Mariana Islands. Inspected as-built surveys of the project site and transferred in Revit. Supported Project Manager and Principal Architect in ensuring projects are up to code, standards, and technical and clerical work.
02/2021 - 05/2021 ARCHITECTURE STUDENT EMPLOYEE
University of San Francisco, San Francisco
- Produced SketchUp models and Lumion renderings of University of San Francisco’s (USF) Thacher Gallery and the Kalmanovitz Hall
Sculpture Terrace in preparation for a 3d virtual gallery space.
08/2020 - 03/2021 STUDIO MONITOR
University of San Francisco, San Francisco
- Instructor’s assistant in semester-long fabrication lab course. Provided assistance to students in basic use of standard lab equipment and machines.
07/2016 - 07/2016 SALES PROMOTER
DFS T-Galleria, Saipan
- Distributed fragrance and beauty samples while building product knowledge. Followed up with customers and provided guidance on product selection. Engaged in meaningful interactions and built good rapport with local and international customers.
SOFTWARE SKILLS
Revit
Adobe Photoshop
Adobe Illustrator
Adobe InDesign SketchUp
Lumion
Autodesk Sketchbook ProCreate Blender
Microsoft Word Microsoft Powerpoint
PAVE THE WAY SCHOLARSHIP RECIPIENT
Women Architects Festival 2022
- Women Architects Festival (WomenAF) 2022 is a two-day virtual conference creating a safe space for women in architecture and design. I was chosen as a recipient of the Pave the Way Scholarship, an opportunity for students with financial need to participate in this event.
ASSOCIATE MEMBER
AIA National, Micronesia, and Guam
- The American Institute of Architects (AIA) National is a notable architectural resource for licensed and emerging professionals through the power of design.
- AIA Marianas Scholarship Recipient for School Year 2022 - 2023
PRESENTER
11th Annual Creative Activity & Research Day
- The 11th Annual Creative Activity & Research Day (CARD) is a showcase for scholarly research done by USF’s undergraduate and graduate community. My research is titled, “Testing Grounds: Analysis of the Military Planning of the American Territory of Tinian” sparks a conversation about the existing and potential military footprint on the island of Tinian.
(480) 823-0522
ari.cor.reyes@gmail.com
www.linkedin.com/in/arianereyes
PROFESSIONAL DEVELOPMENT CONTACT
CONTENTS
EXPANSION: OLD BOTANICAL GARDEN AT PLANTEN UN BLOMEN
Instructor: Felipe Mesa
Academic Work 2022 Advanced Architecture Studio I Arizona State University
CTI GARDEN COURT RENOVATION
Work 2022 Taniguchi Ruth Makio Architects
GUAM COMMUNITY COLLEGE BLDG. 2000 RENOVATION
Work 2022 Taniguchi Ruth Makio Architects
SAN FRANCISCO MUSEUM OF FILM AND DIGITAL ENTERTAINMENT
Instructor: Nathaniel Eck
Academic Work 2019 5th Year Studio University of San Francisco
GUAM LIBERATION DAY FLOAT DESIGN
Work 2022 Taniguchi Ruth Makio Architects
OTHERS
SKETCHES
4 5
EXPANSION: OLD BOTANICAL GARDEN AT PLANTEN UN BLOMEN
STUDIO: ARCHITECTURE OF LIVE COLLECTIONS
Located in Planten un Blomen, the Old Botanical Garden covers 116 acres of land as a point of research and horticultural exhibition for the city of Hamburg.
The greenhouses is composed of an exoskeleton of steel girders arranged in a parallelogram geometry. The existing collections include the Tropic House, Cycad House, Subtropic House, Fern House, and Desert House.
The greenhouse sits into a hillside and mimics the curvature of the Mediterranean terraces, leading to the historical moat from old city fortications.
7
In a group of four, the intention of our expansion and adaptation was to provide a new botanical collection and program to give the existing project new life with current sustainable and bioclimactic approaches. We analyzed the strengths and weaknesses of the project and provided a new expansion design. I was in charge of all drawings (unless stated otherwise). (Photo of new urban plan with expansion above.)
EXTERIOR ROOF STRUCTURE
Structural roof elements aligned on a geometric grid
EXTERIOR COLUMN STRUCTURE
Structural columns supporting main structural load-bearing elements
ROOF GLAZING SYSTEM
Roof glazing is supported by hanging from exterior structural elements and allows warm air to escape through ceiling vents
WALL GLAZING SYSTEM
Wall glazing allows lights to enter while creating airflow to help regulate temperatures in the different collections
SITE AND INTERIOR
The interior is connected to the site through a system of terraces
Exploded axonometric diagram of new expansion by groupmate, David Wood
8 9 URBAN PLAN Planten un Blomen, Hamburg, Germany GRAPHIC SCALE 1:500 N GRAPHIC SCALE: 1:800 0 16 32 24 40 80
BUCERIUSLAWSCHOOL MARSEILLERPROMENADE BUCERIUSLAWSCHOOL
ST.PETERSBURGSTREET
B.DENKIRCHÖFEN
HELMUTSCHMIDT AUDITORIUM JAPANESEGARDEN
JUNGIUSSTRAßE
OLD BOTANICAL GARDEN AT PLANTEN UN BLOMEN ADVANCED ARCHITECTURE STUDIO I PROFESSOR: FELIPE MESA
GARDEN AT PLANTEN UN BLOMEN
10 11 53 16 8 8 5 4 8 4 52 A B C D E F G H 1 2 3 4 6 7 9 10 11 12 13 14 15 16 17 YA YB YC YD YE YF YG YH YI YJ YK YL YM YN YO YP YQ 8 5 N 0 1 10 20 30 GRAPHIC SCALE 1:300 2 3 4 5 6 7 8 9 5 4 3 2 1 6 7 8 OLD BOTANICAL
ADVANCED ARCHITECTURE STUDIO I PROFESSOR: FELIPE MESA 1 ENTRANCE 2 DESERT HOUSE 3 FERN HOUSE 4 SUBTROPIC HOUSE 5 CYCAD HOUSE 6 NEW EXPANSION 7 TROPIC HOUSE 8 AQUATIC POND
OLD BOTANICAL GARDEN AT PLANTEN UN BLOMEN
12 13 18 2 2 2 2 6 3 1 1 10 20 30 GRAPHIC SCALE 1:300 2 3 4 5 6 7 8 9 0 Water Level -14.00m -12.00m Terrace 3 -10.00m Terrace 4 -8.00m Entry Level -6.00m Restroom Clg. 0.00m Expansion Floor +3.00m +4.00m Education Garden H G F E D A Terrace 2 53 17 5 16 8 8 0 1 10 20 30 GRAPHIC SCALE 1:300 2 3 4 5 6 7 8 9 0 1 10 20 30 GRAPHIC SCALE 1:300 2 3 4 5 6 7 8 9 Expansion Floor Restroom Clg. Education Garden 0.00m +3.00m +4.00m 4 3 1
ADVANCED ARCHITECTURE STUDIO I PROFESSOR: FELIPE MESA
DEMOLITION - OVERALL SITE PLAN
Taniguchi
1. ALL WORK SHALL BE IN COMPLIANCE WITH APPLICABLE FEDERAL AND LOCAL CODES AND REGULATIONS PERTAINING TO LIFE SAFETY, PROPERTY PROTECTION, AND ENVIRONMENTAL PROTECTION.
2. PROVIDE AND MAINTAIN HOARDING/BARRICADES, LIGHTING AND GUARDRAILS AS REQUIRED BY APPLICABLE CODES AND REGULATIONS TO PROTECT OCCUPANTS OF BUILDINGS AND WORKERS.
3. KEEP EXITS, EXIT ACCESSES, EXIT DISCHARGES, AND CLEAR AT ALL TIMES.
4. VERIFY LOCATION AND EXTENT OF DEMOLITION WORK FOR ALL TRADES NECESSARY FOR THE WORK WHETHER INDICATED OR NOT.
5. PROVIDE AND MAINTAIN PARTITIONS/BARRIERS AS REQUIRED TO PREVENT SPREAD OF DUST, FUMES, SMOKE, ETC. TO OTHER PARTS OF THE BUILDING. UPON COMPLETION, REMOVE PARTITIONS AND REPAIR DAMAGED SURFACES TO MATCH ADJACENT SURFACES.
6. PROTECT ADJACENT AREAS AND EXISTING BUILDING ELEMENTS / COMPONENTS TO REMAIN FROM POTENTIAL DAMAGES RESULTING FROM DEMOLITION WORK.
7. REPAIR DAMAGES TO ADJACENT SURFACES, ETC. WHERE AFFECTED BY DEMOLITION WORK.
8. IF DEMOLITION IS PERFORMED BEYOND THAT IS REQUIRED, RESTORE AFFECTED AREAS AT NO COST TO THE OWNER.
9. NOTIFY OWNER BEFORE DEMOLITION WORK BEGINS IN OCCUPIED AREAS.
10. KEEP AREAS CLEAN AND HAZARD DURATION OF DEMOLITION WORK. LEAVE AREAS BROOM CLEAN READY FOR NEW WORK.
11. REMOVE [FROM SITE DAILY] AND LEGALLY DISPOSE OF DEBRIS, RUBBISH, AND OTHER MATERIALS RESULTING DEMOLITION WORK.
12. NO EXISTING WORK BY OWNER SHALL BE REMOVED UNLESS SUCH REMOVAL IS APPROVED IN WRITING BY OWNER.
13. NOTIFY OWNER OF UTILITIES, PIPES, CONDUIT, AND OTHER ELEMENTS FOUND WITHIN DEMOLITION
LOCATION MAP
INDEX OF DRAWINGS
VICINITY PLAN
CTI GARDEN COURT RENOVATION
HOTEL RENOVATION BASED IN GUAM
Drafted demolition series for renovation of an existing hotel in Tumon, Guam. This project consists of two mirrored buildings connected by a covered hallway. The center point includes utility rooms and elevators facing a courtyard that will contain a swimming pool for tenants to access. This demolition was decided to provide better ADA compliant fixtures and changes.
15 EX ST NG BU LD NG A EX ST NG BU LD NG B EXISTING SUNROUTE HOTEL EXISTING SWIMMING POOL AREA EXST. PROPERTY LINE, TYP. ELECTRICAL MANHOLE AND GUARDPOST, SEE ELECTRICAL SHEETS EXST. RETAINING WALL PARK NG 7 6 5 4 3 2 1 25 26 27 28 29 30 31 32 33 34 35 36 37 17 18 19 20 21 22 23 24 11 10 9 8 14 15 16 REMOVE EXISTING WATER FOUNTAIN AND REPLACE WITH CENTRAL POOL D1.2 PARK NG 7 STAL LS PR OV I D ED S44°37'18°E S 76 19 50 E (149 25) (40.00') S 0 7 1 0 1 0 W ( 3 00 0 ) N 82° 49 35 W (471 15 ) N 0 7 35 1 1 E ( 2 08 55 ) N 180277.0230 E 184726.7421 S = 82° 43' 29" E (10.00') BUILDING B IS A MIRROR OF BUILDING A D1.1 EX ST NG BU LD NG C 3 STALLS PR OV I DED 4 STAL LS PR OV I D ED NOT N SCOPE 3 STALLS PROV DED 8 STALLS PROV DED
AREA THAT ARE NOT SHOWN ON THE DRAWINGS. 14. CONTRACTOR TO OBTAIN AND PAY FOR PERMIT FEES. 15. REFER TO CIVIL DRAWINGS FOR SCARIFYING AND GRADING OF SITE. 16. EXTENT OF CONSTRUCTION SHALL BE COORDINATED WITH CIVIL AND LANDSCAPING WORKS. Project Title Project Date: Scale: Supv: Checked Drawn Designed: File Sheet No. of IF SHEET IS LESS THAN 24" X 36" REDUCED PRINT - USE GRAPHIC SCALES Drawing As indicated CTI TRMA AR DLG MWM 05/11/22 No. OVERALL SITE DEMO PLAN GARDEN COURT RENOVATION Project Status
NORTH 0' 15' 30' 60' SCALE: 1" = 30'-0" 1
D1.0
DEMOLITION NOTES No.DescriptionDate 1" = 30'-0"
COURT
TUMON,
PROJECT LOCATION STA. ASAN YONA AGANA S E A H L N E P A C C YIGO ANDERSEN D4.4BUILDING D5.1BUILDING D5.2BUILDING D5.3COURTYARD D5.4BUILDING D5.5BUILDING D5.6BUILDING ARCHITECTURAL A1.0OVERALL SITE A1.1SITE PLAN A1.2POOL PLAN A2.1FIRST FLOOR A2.2SECOND FLOOR A2.3THIRD FLOOR A2.4BUILDING A2.5BUILDING A2.6BUILDING A2.7ENLARGED A2.8ENLARGED A2.9ENLARGED A3.1ENLARGED A3.2ENLARGED A3.3ENLARGED A3.4ENLARGED A3.5BUILDING A4.1OVERALL ROOF A4.2BUILDING A4.3BUILDING A4.4BUILDING A5.1BUILDING TITLE T1.1TITLE SHEET, LOCATION PLAN, VICINITY PLAN T1.2ZONING & CODE ANALYSIS T1.3SYMBOLS, ABBREVIATIONS AND INDEX OF DRAWINGS CIVIL C1.0GENERAL
DEMOLITION D1.0OVERALL SITE DEMO PLAN D1.1SITE DEMO PLAN D1.2FOUNTAIN DEMO PLAN D2.1FIRST FLOOR PLAN D2.2SECOND FLOOR PLAN D2.3THIRD FLOOR PLAN D2.4BUILDING A D2.5BUILDING B D2.6BUILDING C D2.7ENLARGED DEMO PLANS D2.8ENLARGED DEMO PLANS D2.9ENLARGED
PLANS D3.1ENLARGED
D3.2ENLARGED
D3.3ENLARGED
D3.4ENLARGED
D3.5BUILDING
D4.1OVERALL
PLAN D4.2BUILDING
PLAN D4.3BUILDING
PLAN
NOTES
DEMO
RCP
RCP
RCP
RCP
C RCP
ROOF
A ROOF
B ROOF
LOCATION
ARCHITECTURAL SITE
16 17 1 2 3 4 5 6 A B C D E 1 D5.5 D5.5 D5.4 84' 0" 62'0" 28'0" 6'0" 10'6" 17' 6" 14' 0" 14' - 0" 14' 0" 14' 0" 14' 0" UN T 10 A UN T 0 B UN T 102A UN T 102B UN T 03A UN T 106A N T 106B UN T 07A UN T 107B UN T 08A FLUID-APPLIED ELASTOMERIC COATING SYS. FLUID-APPLIED ELASTOMERIC COATING SYS. FLUID-APPLIED ELASTOMERIC COATING SYS. FLUID-APPLIED ELASTOMERIC COATING SYS. CLO. SAFETY BOX STAIRCASE #2 BT BT BT BT BT BT BT BT BT BT LAV LAV LAV LAV LAV ELEC. CLOSET WC WC WC WC WC WC WC WC WC WC 3'0" 3'0" 6'0" 12 18" ACCESS PANEL 12 18" ACCESS PANEL 12 x 18" ACCESS PANEL 12 x 18" ACCESS PANEL CONC. WALL CORRIDOR GD GD GD GD GD GD 4" EXST. DOWNSPOUT, TYP. RG RG RG RG RG RG RG RG RG RG ROOF LINE ABOVE ROOF LINE ABOVE 2'0" DOUBLE WALL WITH PAINT FINISH, TYP. CEILING LINE ABOVE FD FD FD FD FD FD FD FD FD FD POURED-IN-PLACE CONC. WALL WITH PAINT FINISH, TYP. 3' - 0" 5 1/4" 4' 4" 4' 4" 4' 4" 4' 4" 4' 4" 4' 4" 4' 4" 4' - 4" 4' 4" 4' 4" 4' 4" 3'0" 3'0" 3'0" 3'0" 3'0" 3'0" 3'0" 3'0" 4' 11 3/4" 4' 11 3/4" 5 1/4" 3' 0" 3' 0" 5 1/4" 4' 11 3/4" 4' 11 3/4" 5 1/4" 3' 0" 3' 0" 5 1/4" 4' 11 3/4" 3' - 0" 5 1/4" 4' 11 3/4" 4' 11 3/4" 3' 0" 5 1/4" GLASS BLOCK, TYP. 3' 0" 5 1/4" 4' 11 3/4" 4' 11 3/4" 5 1/4" 3' 0" 3' 0" 5 1/4" 4' 11 3/4" 2 2 3 3 3 3 4 4 4 4 4 4 4 4 5 5 5 5 6 7 7 7 7 7 7 8 8 8 8 8 8 9 9 10 10 10 11 11 11 11 11 11 11 11 11 11 CERAMIC TILE 12 x 12", TYP. SLIDING POCKET DOOR, TYP. LAV LAV LAV LAV LAV CLO. SAFETY BOX CLO. SAFETY BOX CLO. SAFETY BOX CLO. SAFETY BOX CLO. SAFETY BOX CLO. SAFETY BOX CLO. SAFETY BOX CLO. SAFETY BOX CLO. SAFETY BOX CEILING LINE ABOVE ALL WORK SHALL BE IN COMPLIANCE WITH APPLICABLE FEDERAL AND LOCAL CODES AND REGULATIONS PERTAINING TO LIFE SAFETY, PROPERTY PROTECTION, AND ENVIRONMENTAL PROVIDE AND MAINTAIN HOARDING/BARRICADES, LIGHTING AND GUARDRAILS AS REQUIRED BY APPLICABLE CODES AND REGULATIONS TO PROTECT OCCUPANTS OF BUILDINGS KEEP EXITS, EXIT ACCESSES, EXIT PUBLIC WAYS VERIFY LOCATION AND EXTENT OF DEMOLITION WORK FOR ALL TRADES NECESSARY FOR THE WORK WHETHER INDICATED OR NOT. PROVIDE AND MAINTAIN PARTITIONS/BARRIERS AS REQUIRED TO PREVENT SPREAD OF DUST, FUMES, SMOKE, ETC. TO OTHER PARTS OF THE BUILDING. UPON COMPLETION, REMOVE PARTITIONS AND REPAIR DAMAGED SURFACES TO MATCH ADJACENT PROTECT ADJACENT AREAS AND EXISTING BUILDING ELEMENTS / COMPONENTS TO REMAIN FROM POTENTIAL DAMAGES RESULTING REPAIR DAMAGES TO ADJACENT SURFACES, ETC. WHERE AFFECTED BY IF DEMOLITION IS PERFORMED BEYOND THAT IS REQUIRED, RESTORE AFFECTED AREAS AT NO COST TO THE OWNER. NOTIFY OWNER BEFORE DEMOLITION WORK BEGINS IN OCCUPIED AREAS. KEEP AREAS CLEAN AND HAZARD THROUGHOUT DURATION OF DEMOLITION WORK. LEAVE AREAS BROOM CLEAN READY FOR NEW WORK. REMOVE [FROM SITE DAILY] AND LEGALLY DISPOSE OF DEBRIS, RUBBISH, AND OTHER MATERIALS RESULTING DEMOLITION WORK. NO EXISTING WORK BY OWNER SHALL BE REMOVED UNLESS SUCH REMOVAL IS APPROVED IN WRITING BY OWNER. NOTIFY OWNER OF UTILITIES, PIPES, CONDUIT, AND OTHER ELEMENTS FOUND WITHIN DEMOLITION AREA THAT ARE NOT SHOWN ON THE DRAWINGS. CONTRACTOR TO OBTAIN AND PAY FOR REFER TO CIVIL DRAWINGS FOR SCARIFYING AND GRADING OF SITE. EXTENT OF CONSTRUCTION SHALL BE COORDINATED WITH CIVIL AND LANDSCAPING WORKS. DEMO STAIRCASE RAILING DEMO EXISTING ROOF DRAINS DEMO EXISTING BALCONY DEMO BALCONY DOORS DEMO EXISTING POCKET DOOR DEMO CONCRETE WALL. SEE STRUCTURAL DWGS. DEMO EXISTING DOORS. DEMO CHASE DOORS. DEMO SINK; WATER LINE TO BE DEMO TILE, TUB, AND WC DEMO EXISTING TILE IF SHEET IS LESS THAN 24" X 36" REDUCED PRINT - USE GRAPHIC SCALES SCALE: 1/4" 1'-0" 1 DEMOLITION - BLDG. AENLARGED PLAN A 4'8' DEMOLITION NOTES DEMOLITION KEYNOTES O E B LD NG B S A M RROR MAG OF B D NG ROOF 27' - 0" A B C D E D5.5 D5.5 A.1 B.1 C.1 D.1 E.1 F.1 G.1 G F 208' 0" 28' 0" 6' 0"10' 6" 17' 6" 22' 8" 14' 11" 8' 10" 14' 11" 22' 8" 17' 6" 10' 6"6' 0" 28' 0" 9'0" 9'0" 9' 0" B D G C CERAMIC ROOF TILES, TYP. 2" THK SPRAYED-ON POLYURETHANE INSULATION WITH WATERPROOFING SYSTEM, TYP. ELEC. CLOSET 168' 4" 14' 0" 14' 0" REMOVE EXST. DOWNSPOUT, TYP. IF SHEET IS LESS THAN 24" X 36" REDUCED PRINT - USE GRAPHIC SCALES No.DescriptionDate DEMOLITION - OVERALL WEST ELEVATION DEMOLITION - OVERALL SOUTH ELEVATION LEVEL 1 0" LEVEL 2 9' - 0" LEVEL 3 18' - 0" ROOF 27' - 0" A B C D E D5.5 D5.5 A.1 B.1 C.1 D.1 E.1 F.1 G.1 G F 208' 0" 28' 0" 6' 0"10' 6" 17' 6" 22' 8" 14' 11" 10" 14' 11" 22' 8" 17' 6" 10' 6"6' 0" 28' 0" STAIRCASE #2 STAIRCASE #2 B D G A B NG C B D B CERAMIC ROOF TILES, TYP. 2" THK SPRAYED-ON POLYURETHANE INSULATION WITH WATERPROOFING SYSTEM, TYP. ELEC. CLOSET ELEC. CLOSET LEVEL 1 0" LEVEL 2 9' - 0" LEVEL 3 18' - 0" ROOF 27' - 0" 1 2 3 4 5 6 7 8 9 10 11 12 D5.4 D5.4 13 168' 4" 21' 4" 7' 0" 14' 0" 14' 0" 14' 0" 14' - 0" 14' 0" 14' 0" 14' 0" 14' 0" 14' 0" 14' 0" 27'0" 9'0" 9'0" 9'0" REMOVE EXST. DOWNSPOUT, TYP. 2" THK SPRAYED-ON POLYURETHANE INSULATION WITH WATERPROOFING SYSTEM, TYP. CERAMIC ROOF TILES BUILDING D5.6 Project Title Project Date: Scale: Supv: Checked Drawn Designed: Sheet No. IF SHEET IS LESS THAN 24" 36" REDUCED PRINT - USE GRAPHIC SCALES Drawing No. ELEVATIONS GARDEN D5.2 No.DescriptionDate 4'8' 16' SCALE: 1/8" 1'-0" 1 DEMOLITION - OVERALL WEST ELEVATION SCALE: 1/8" 1'-0" 2 DEMOLITION - OVERALL SOUTH ELEVATION CTI GARDEN COURT RENOVATION TANIGUCHI RUTH MAKIO ARCHITECTS
LOCATION MAP
INDEX OF DRAWINGS
TITLE
T1.1TITLE SHEET, LOCATION PLAN, VICINITY PLAN
T1.2ZONING & CODE ANALYSIS
T1.3SYMBOLS, ABBREVIATIONS AND INDEX OF DRAWINGS
DEMOLITION
D1.1SITE DEMOLITION PLAN
D2.1PARTIAL DEMOLITION PLANS
D2.2DEMOLITION PLANS RESTROOM
ARCHITECTURAL
A1.1SITE PLAN
A2.1PARTIAL PLANS
A2.2PLANS RESTROOM
A3.1DETAIL PLANS AND INT. ELEVATIONS
A4.1DOOR/ROOM/FINISH SCHEDULE AND MISC. DETAILS
VICINITY PLAN
STRUCTURAL
S0.1STRUCTURAL, DESIGN CRITERIA AND GENERAL NOTES AND TYP. DETAIL
GUAM COMMUNITY COLLEGE BLDG. 2000 RENOVATION
COLLEGE RENOVATION BASED IN GUAM
MECHANICAL
M1.0NOTES, LEGENDS, ABBREVIATIONS AND SCHEDULE
M1.1DEMOLITION/NEW MECHANICAL PLAN
PLUMBING
P1.0NOTES, LEGENDS, ABBREVIATIONS AND SCHEDULE
Drafted set of drawings to reflect the changes in the restrooms for both East and West wings. This building was first intended to provide a dormitory for Guam Community College’s students to reside in. Much of the restrooms contain shower fixtures that are then demolished to provide a more ADA compliant commercial restrooms, both in the ground and second floor.
ARCHITECTURAL
18 19 UP UP UP A2.1 1 SIM. A2.1 2 SIM. WEST W NG EAST W NG CE FICA TI TE GUAMREGISTERED ARCHITECT R EXP.4/30/23 No. 246 MAKIO W MICHAEL DATE: BY ME OR UNDER MY DIRECT SUPERVISION HEREBY CERTIFY THAT THIS PLAN WAS PREPARED Project: Title: Project No. Date: Scale: Supv: Checked: Drawn: Designed: File Drawing No. 1/16" = 1'-0" GUAM COMMUNITY COLLEGE TRMA RP, AR MWM/TP MWM 06/17/22 2122 SITE PLAN BLDG. 2000 RESTROOM RENOVATION BID SET A1.1 NORTH 8' 16' 0 32' SITE PLAN No.DescriptionDate
SITE LOCATION
MANGILAO
MANGILAO TAMUNING BARRIGADA TUMON TALOFOFO CHALAN S E A H P P N E O C A N P C F C YIGO E
RESTROOM
NA L PROFESSIO ENGNEER DATE: BY ME OR UNDER MY DIRECT SUPERVISION HEREBY CERTIFY THAT THIS PLAN WAS PREPARED 04/30/2023 R MARIANO ABNE V (ELECTRICAL No.125 CATE F CERT GUAM EXP
Taniguchi PROJECT LOCATION
20 21 UP UP UP A2.2 2 A2.1 MATCHLINE 4 3 2 1 A B C D E F G H J 126' 0" 13' 4" 13' 4" 13' 4" 13' 4" 19' 4" 13' 4" 13' 4" 13' 4" 13' 4" A2.2 SIM. 1/A21MATCHLNE XA XB XC XD XE XF XG XH XI XJ 126' 0" 13' 4" 13' 4" 13' 4" 13' 4" 19' 4" 13' 4" 13' 4" 13' 4" 13' 4" X1 X2 X3 X4 43'6" C F M G REG STEREDEXP.4/30/23ARCHITEC No. 246 MAKIO W MCHAE ME OR UNDER MY DIRECT SUPERVISION Project: Title: Project No. Date: Scale: Supv: Checked: Drawn: Designed: File Sheet No. of REVISIONS IF SHEET IS LESS THAN 24" X 36" REDUCED PRINT - USE GRAPHIC SCALES Drawing No. As indicated GUAM COMMUNITY COLLEGE TRMA RP, AR MWM MWM 06/17/22 2122 PARTIAL PLANS BLDG. 2000 RESTROOM RENOVATION BID SET A2.1 No.DescriptionDate SCALE: 1/8" 1'-0" 1 PARTIAL PLAN - FIRST AND SECOND FLOOR, TYP. - WEST WING SCALE: 1/8" 1'-0" 2 PARTIAL PLAN - FIRST AND SECOND FLOOR, TYP. - EAST WING NORTH KEY PLAN LEVEL NORTH KEY PLAN LEVEL WEST WING EASTWING WEST WING EASTWING 29' 0" 6" 6' 4" 10' 8" 6' 4" 3' - 0" 3' 4" 6" 3' 4" 4" 1' 6" 2' 0" 1' 6" 4" 2' 0" 6' 9" ø5 -0 5'0" 4 3 E F FTFTVCTFTFT- WO E E ROO 110 A O L S 110B M R OO 109 3' - 0" 5' ø -0 D110A D110 D109 5' 0" 0 1/2" 5' 0" 3' 0" 6' 0 1/2" 13' 9" 15' 3" 6" 29' 0" 17' 10" 6" 10' 8" 4 3 E F A.F.F. 5/8" GYP. on Mtl. Stud 8' 0" A.F.F. 5/8" GYP. on Mtl. Stud 0" A.F.F. 5/8" GYP. on Mtl. Stud 0" 1' x 4' - 6" LIGHT FIXTURE, TYP. FLAT ROUND LIGHT FIXTURE, TYP. WOM R T OOM 110 A.F.F. 5/8" GYP. on Mtl. Stud 8' 0" A.F.F. 5/8" GYP. on Mtl. Stud 0" E E RO M 109 A O L S 110B 13' 9" 15' 3" 6' 4" 6" 6" 11' 0" 10' 8" 4 3 E F 18'10" 8' 8" 8'8" 6" 29' 0" 13' 9" 15' 6" 1' x 4' - 6" LIGHT FIXTURE, TYP. FLAT ROUND LIGHT FIXTURE, TYP. 17' 10" 6" 10' 8" A.F.F. 5/8" GYP. on Mtl. Stud 8' 0" A.F.F. 5/8" GYP. on Mtl. Stud 8' 0" A.F.F. 5/8" GYP. on Mtl. Stud 8' 0" A.F.F. 5/8" GYP. on Mtl. Stud 0" A O L S 209B WO E E ROO 209 E E RO M 208 A.F.F. 5/8" GYP. on Mtl. Stud 8' 0" 4 3 E F 18'10" 13' 9" 15' 6" D209 D209A D208 29' 0" ø5 -0 ø5 -0 ø5 -0 OR C O T 209B M N S R S R OM 208 FTFTVCTFTFT8' 8" 8'8" 6" 6' 4" 6" 5' 0" 6' 0" 10' 8" OM R T OOM 209 IF SHEET IS LESS THAN 24" 36" REDUCED PRINT - USE GRAPHIC SCALES 16' NORTH KEY PLAN LEVEL NORTH KEY PLAN LEVEL WEST WING EASTWNG WEST WING EASTWNG SCALE: 1/4" = 1'-0" 1 RR PLAN FIRST FLOOR WESTWING (EASTWING SIM.) SCALE: 1/4" = 1'-0" 2 RR RCP PLAN FIRST FLOORWESTWING (EASTWING SIM.) SCALE: 1/4" = 1'-0" 4 RR RCP PLAN SECOND FLOORWESTWING (EASTWING SIM.) SCALE: 1/4" 1'-0" 3 RR PLAN SECOND FLOORWESTWING (EASTWING SIM.) A B C D INT. ELEV. KEY NORTH 29' 0" 18'10" 6" 6' 4" 10' 8" 6' 4" 6" 8' 8" 3' 0" 3' 4" 6" 3' 4" 5' 4" 6" 2' 0" 6" 5' 4" 2' 0" 6' 9" 5 -0 ø5'0" 4 3 E F FTFTVCTFTFT- OM R OOM 110 J OR C O E 110B M N R S R OM 109 8'8" 3' 0" 5' 1" 5 -0 D110A D110 D109 5' 0" 3' 0 1/2" 5' 0" 3' 0" 6' 0 1/2" 13' 9" 15' 3" 6" 29' 0" 18'10" 8' 8" 6" 8'8" 17' - 10" 6" 10' 8" 4 3 E F A.F.F. 5/8" GYP. on Mtl. Stud 8' 0" A.F.F. 5/8" GYP. on Mtl. Stud 8' 0" A.F.F. 5/8" GYP. on Mtl. Stud 8' 0" 4' - 6" LIGHT FIXTURE, TYP. FLAT ROUND LIGHT FIXTURE, TYP. M N R S R OM 110 A.F.F. 5/8" GYP. on Mtl. Stud 8' 0" A.F.F. 5/8" GYP. on Mtl. Stud 8' 0" M R T OOM 109 OR C O T 110B 13' 9" 15' 3" 6' 4" 6" 6" 11' 0" 10' 8" 4 3 E F 18'10" 8' 8" 8'8" 6" 29' 0" 13' 9" 15' 6" 4' - 6" LIGHT FIXTURE, TYP. FLAT ROUND LIGHT FIXTURE, TYP. 17' - 10" 6" 10' 8" A.F.F. 5/8" GYP. on Mtl. Stud 8' 0" A.F.F. 5/8" GYP. on Mtl. Stud 8' 0" A.F.F. 5/8" GYP. on Mtl. Stud 0" A.F.F. 5/8" GYP. on Mtl. Stud 8' 0" J OR C O E 209B OM R T OOM 209 M R T OOM 208 A.F.F. 5/8" GYP. on Mtl. Stud 8' 0" 4 3 E F 13' 9" 15' 6" D209 D209A D208 29' 0" 5 -0 ø5 -0 5N R S O 209B E E RO M 208 FTFTVCTFTFT6' 4" 6" 5' 0" 6' 0" 10' 8" W M N S R S R M 209 CE TE M G EGISTERED ARCH TECT EXP.4/30/23 No. 246 O MAK W MICHAEL DATE: HEREBY CERTIFY THAT THIS PLAN WAS Project: Title: Project No. Date: Scale: Supv: Checked: Drawn: Designed: File Sheet No. of REVISIONS IF SHEET IS LESS THAN 24" 36" REDUCED PRINT - USE GRAPHIC SCALES Drawing No. As indicated GUAM COMMUNITY COLLEGE TRMA RP, AR MWM/TP MWM 06/17/22 2122 PLANS RESTROOM BLDG. 2000 RESTROOM RENOVATION BID SET A2.2 0' 4' 8' 16' No.DescriptionDate NORTH KEY PLAN LEVEL NORTH KEY PLAN LEVEL WEST WING EASTWING WEST WING EASTWING SCALE: 1/4" 1'-0" 1 RR PLAN FIRST FLOOR - WESTWING (EASTWING SIM.) SCALE: 1/4" 1'-0" 2 RR RCP PLAN FIRST FLOORWESTWING (EASTWING SIM.) SCALE: 1/4" 1'-0" 4 RR RCP PLAN SECOND FLOORWESTWING (EASTWING SIM.) SCALE: 1/4" = 1'-0" 3 RR PLAN SECOND FLOORWESTWING (EASTWING SIM.) A B C D INT. ELEV. KEY NORTH 8' 0" TYP. WTPTDWR OPEN TPH 6' 10" 2" WTWC WC WC ADA GRAB BAR TPH TPH SCD SCD WTVENT SCD MIR SD SD LAV WTWC ADA GRAB BAR TPH UR SCD SCD WC WC SCD UR WT- VENT MIR LAV SD SD TPH 6" WTTPH WT- PTDWR TPH OPEN PTDWR WTPT-2 PT-2 PT- PTProject: BLDG. SCALE: 1/4" 1'-0" 1 WOMEN'S RESTROOM INT. ELEVATIONS SCALE: 1/4" 1'-0" 2 JANITOR'S CLOSET INT. ELEVATIONS F.F.L. D A C B F.F.L. D A C B F.F.L. No.DescriptionDate 8'0" TYP. WTPTDWR OPEN TPH 6'10" 1' 2" WTWC WC WC ADA GRAB BAR TPH TPH SCD SCD WTVENT SCD MIR SD SD LAV WTWC ADA GRAB BAR TPH UR SCD SCD WC WC SCD UR WT- VENT MIR LAV SD SD TPH 1' 6" WTTPH WT8' 0" TYP. PTDWR TPH OPEN PTDWR WTPT- PT- PT-2 PTCE E M REG STER AR H TEC R EXP.4/30/23 No. 246 O MAK E MCH DATE: Project: Title: Project No. Date: Scale: Supv: Checked: Drawn: Designed: File REVISIONS Drawing No. 1/4" 1'-0" GUAM COMMUNITY COLLEGE TRMA RP, AR MWM/TP MWM 06/17/22 2122 DETAIL PLANS AND INT. ELEVATIONS BLDG. 2000 RESTROOM RENOVATION BID SET A3.1 A D INT. ELEV. KEY 0' 2' SCALE: 1/4" 1'-0" 1 WOMEN'S RESTROOM - INT. ELEVATIONS SCALE: 1/4" 1'-0" 3 MEN'S RESTROOM - INT. ELEVATIONS D A C B SCALE: 1/4" 1'-0" 2 JANITOR'S CLOSET INT. ELEVATIONS NORTH F.F.L. D A C B F.F.L. D A C B F.F.L. No.DescriptionDate GUAM COMMUNITY COLLEGE BLDG. 2000 RENOVATION TANIGUCHI RUTH MAKIO ARCHITECTS
PIER 70 URBAN DESIGN
SAN FRANCISCO MUSEUM OF FILM AND DIGITAL ENTERTAINMENT
LIBRARY, ARCHIVE, AND MUSEUM
San Francisco’s urban fabric comprises both vintage and modern movie theaters. Celebrating this rich culture is the San Francisco Museum of Film and Digital Entertainment.
Encompassing the culture in 20th-century film and the use of modern technology showcases it through different spaces within the site. With resources in its library, archive, and museum, it merges for the valuable experience of education and awareness about the revolution of digital entertainment.
SAN FRANCISCO MUSEUM OF FILM AND DIGITAL ENTERTAINMENT
San Francisco’s urban fabric comprises of both vintage and modern movie theaters. Celebrating this rich culture is the San Francisco Museum of Film and Digital Entertainment. Encompassing the culture in 20th century film and the use of modern technology, showcases it through different spaces within the site. With resources in its library, archive, and museum, it merges for the for the value experience of education and awareness about the revolution of digital entertainment.
DIAGONALS HISTORICAL SIGNIFICANCE ACCESS TO TRANSIT LINES
3 2 1 G 20TH CENTURY MOCK MOVIE SETS COMPUTER LABS VIRTUAL REALITY ROOM ADMINISTRATIVE OFFICES OUTDOOR READING AREA LIBRARY SPACE SMALL MOVIE THEATERS TEMPORARY GALLERY SPACE RESTROOMS CONFERENCE ROOMS LOBBY SPACE CAFE KIOSK ARCHIVE RESTROOMS PROJECTOR ROOM ARCHIVE RETRIEVAL SYSTEM LARGE AUDITORIUM ROOM 5TH YEAR STUDIO PROFESSOR: NATHANIEL ECK
GUAM LIBERATION DAY FLOAT DESIGN 2021
Taniguchi Ruth Makio Architects was assigned to fabricate a float design for the University of Guam and Guam Community College that empowers higher education on the island of Guam.
In a three-person team, I created and rendered four design options on Revit and Adobe Photoshop within a month’s span. Weekly meetings with school presidents and committees were conducted to fine-tune and arrange specific details prior to construction.
TANIGUCHI RUTH MAKIO ARCHITECTS
Intern, Design by Cort (2021)Remote stage production assistant in creation of packets and 3d models
Architecture Student Employee, Thacher Gallery (2021)Gallery space in preparation for online exhibitions
Blender Animations - Ongoing self-taught hobby in 3d modeling and creating abstract animations on Blender
TESSELLATION OTHERS
Augmented Reality Assignment, Arizona State University (2022)Advanced Architecture Representation I course exploring augmented reality placed in a campus setting through Adobe Aero
28 SKETCHES
Sketches from University of San Francisco first and second year studios and travels
THANK YOU! (480) 823-0522 ari.cor.reyes@gmail.com www.linkedin.com/in/arianereyes