Proposed design
The design maintains the initial home condition and adds a room (bedroom) on the 2nd oor. There are several design proposals to adjust the need for air circulation, natural lighting and aesthetics: 1 Dismantling some parts of the stairs wall and replaced it with roster (air circulation & natural lighting); 2 Replacing the roof of the stairs to a transparent roof, with 20% transparency level (lighting); 3 The addition of the roster at the top of the 2nd oor (aesthetics);
4 Cabinet under the stairs (storage/warehouse).
Advertisement
Meanwhile, if the 2nd oor structure is declared to be less strong by the contractor, required structural reinforcement in the form of addition of foundations, columns, and beams on the 1st oor.