Project Examples_McCormick

Page 1


REDEFINING THE TENANT EXPERIENCE

A Strategic Partnership with Savanna to Elevate Tenant Spaces and Strengthen Market Position

PROJECT TEAM

DESIGNING FOR PEOPLE & PURPOSE

At Vocon, design is about crafting spaces that connect people, purpose, and possibility. We combine bold ideas with deep insights to create environments that are functional, adaptable, and rooted in wellness and identity. Guided by collaboration, creativity, and a commitment to excellence, every decision reflects the project’s unique goals and inspires connections.

DESIGN DIRECTOR - SENIOR ASSOCIATE

VICE CHAIRMAN & MANAGING PRINCIPAL

THOMAS VECCHIONE

STRATEGY DIRECTOR - SENIOR ASSOCIATE

PRACTICE LEADER - SENIOR ASSOCIATE

DESIGN STRATEGIST

KHYATI SHAH
SARAH M c CANN

TRANSFORMING WORKPLACE EXPERIENCE

125 Broad Street presents an opportunity to transform a landmark property into a modern workplace destination. By enhancing underutilized spaces and prioritizing tenant-first design, we create environments that inspire connection, productivity, and appeal.

This vision goes beyond aesthetics—it redefines how tenants and guests interact with their environment, enhances daily functionality, fosters long-term value, aligns with evolving market expectations, and strengthens the presence and prominence in the Financial District.

COMPARATIVE ANALYSIS

01

2.3M SF

TOTAL BUILDING SIZE

1973 / 2019 YEAR BUILT / LAST RENOVATION

92%

CURRENT OCCUPANCY RATE

$65-$69 AVERAGE ASKING RENT ($/SF)

2.2% (50,000 SF) AMENITY ALLOCATION (% OF TOTAL SF)

*Data sourced

STREET
from CoStar & LoopNet
PRIMARY ENTRANCE & PLAZA

2.6M SF

TOTAL BUILDING SIZE

1970 / 2012 YEAR BUILT / LAST RENOVATION

88%

CURRENT OCCUPANCY RATE

$70-$74

AVERAGE ASKING RENT ($/SF)

1.7% (45,000 SF)

AMENITY ALLOCATION (% OF TOTAL SF)

PRIMARY ENTRANCE *Data sourced from

PLAZA

950K SF

TOTAL BUILDING SIZE

1913 / 2014 YEAR BUILT / LAST RENOVATION

75%

CURRENT OCCUPANCY RATE

$85-$89 AVERAGE ASKING RENT ($/SF)

4.2% (40,000 SF) AMENITY ALLOCATION (% OF TOTAL SF)

sourced

ENTRANCE

1.9M SF

TOTAL BUILDING SIZE

1915 / 2018 YEAR BUILT / LAST RENOVATION

89%

CURRENT OCCUPANCY RATE

$68-$72 AVERAGE ASKING RENT ($/SF)

2.9% (55,000 SF) AMENITY ALLOCATION (% OF TOTAL SF)

sourced

ENTRANCE

1.1M SF

TOTAL BUILDING SIZE

1984 / 2020 YEAR BUILT / LAST RENOVATION

85%

CURRENT OCCUPANCY RATE

$62-$66 AVERAGE ASKING RENT ($/SF)

3.8% (42,000 SF) AMENITY ALLOCATION (% OF TOTAL SF)

sourced

1.2M SF

TOTAL BUILDING SIZE

/ 2016 YEAR BUILT / LAST RENOVATION

83%

CURRENT OCCUPANCY RATE

$66-$70 AVERAGE ASKING RENT ($/SF)

4.2% (50,000 SF) AMENITY ALLOCATION (% OF TOTAL SF)

STOREFRONT

EXISTING SITE & BUILDING ASSESSMENT

02

SITE OVERVIEW

CONTEXT WITHIN LOWER MANHATTAN

125 Broad Street sits in a major commercial hub, surrounded by landmark office towers, financial institutions, and global headquarters. The building offers seamless access to subway lines, ferry terminals, and the FDR Drive, positioning it at the nexus of business, transit, and urban activity. Its streetscape blends corporate presence with public spaces, retail, and cultural landmarks.

Positioned in a dynamic commercial corridor, 125 Broad Street embodies the evolution of modern workplace design. Its waterfront views and prime location offer a compelling opportunity for thoughtful modernization, reinforcing its role in Lower Manhattan's ongoing transformation.

UNDERSTANDING THE BUILDING

Total Building Size & Floors

• 1,051,990 SF across 40 floors

• One of the largest office towers in Lower Manhattan Subterranean Space Allocation

• Cellar Levels 1, 2, & 3 total ~81,200 SF

• Includes existing fitness center & parking Plaza & Ground-Level Presence

• 21,000 SF elevated exterior plaza

• Primary & secondary entrances

Existing Retail & Activation Potential

• 25,000 SF of ground floor space

• Retail & lobby reprogramming opportunities

Island Ferry)

EXISTING PLAZA & GROUND FLOOR

EXISTING SUBCELLAR CONDITIONS | CELLAR 1

PROPOSED C1 AMENITY AREA OPPORTUNITY ± 28,000 SF

SOUTH STREET

EXISTING SUBCELLAR CONDITIONS | CELLAR 2

EXISTING SULLIVAN & CROMWELL FITNESS CENTER

± 9,200 SF

PROPOSED C2 AMENITY AREA OPPORTUNITY

± 24,500 SF

SOUTH STREET

EXISTING LEVEL C2

PARKING GARAGE (NOT IN SCOPE)

DESIGN VISION & OPPORTUNITIES

03

REDEVELOPING ARCHITECTURAL DESIGN

SEAMLESS CONNECTIVITY

Establish a fluid experience from street to plaza, plaza to lobby, and lobby to workspaces, ensuring a cohesive and intuitive journey throughout the building.

ENHANCED EXPERIENCE

Elevate the journey with refined materiality , dynamic lighting, thoughtful branding, and design creating a professional, and welcoming atmosphere.

REFINED IDENTITY

Strengthen the presence with a modernized architectural language that respects its history while aligning with evolving tenant and visitor expectations.

OPPORTUNITIES FOR TRANSFORMATION

HIGH-IMPACT AREAS

PHASE 1

• Primary Lobby Repositioning

Reconfigure the lobby with refined materials, lighting, and branding to elevate the first impression, improve circulation, and enhance tenant experience.

• Ground-Floor Activation

Transform underutilized spaces into dynamic tenant amenities, retail experiences, and collaborative environments that drive engagement and marketability.

• Maximizing Subcellar Potential

Unlock new tenant-driven spaces by optimizing subcellar levels for wellness, conferencing, and premium storage solutions that add long-term value.

PHASE 2

• Plaza Activation

• Workplace Enhancement

• Rooftop Transformation

PRIMARY LOBBY REPOSITIONING

EXISTING LOBBY CONDITIONS

The current lobby limits visibility, circulation flow, and flexible seating options, with security check-in positioned away from primary tenant access points.

PROPOSED LOBBY CONDITIONS

The repositioned lobby enhances circulation, adds flexible seating, and integrates branding, improving visibility, tenant access, and guest experience.

APPROACH FROM BROAD STREET

SECONDARY LOBBY

GROUND FLOOR ACTIVATION | OPT 1

AMENITY-FORWARD, WORK-ORIENTED CIRCULATION

• Centralized Co-Working Zone

Large open workspace and seating area adjacent to the secondary lobby promotes flexible work and collaboration.

• Retail & Café Activation Along Broad Street

Three retail/food & beverage zones animate the street edge with public-facing uses and clear tenant entry points.

• Defined Public and Tenant Corridors

Strong east–west public access path aligns with tenant entry and check-in zones, reinforcing intuitive movement.

• Balanced Privacy & Visibility

Amenities like public toilets and lounge areas are visible and accessible, while secure tenant zones are clearly delineated.

GROUND FLOOR ACTIVATION | OPT 2

SPLIT ACCESS WITH ENHANCED RETAIL EXPOSURE

• Retail-Paired Circulation Strategy

Large open workspace and seating area adjacent to the secondary lobby promotes flexible work and collaboration.

• Distributed Co-Working Nodes

A compact co-working zone sits in the core, while lounge/seating clusters are dispersed for flexible use throughout the floor.

• Secondary Lobby & Workspace Integration

Large open workspace connects directly to the secondary lobby, allowing for semi-private access while maintaining visual transparency.

• Zoned Public & Tenant Areas

More distinct separation of public retail and private tenant amenities allows clearer program definition.

GROUND FLOOR ACTIVATION | OPT 3

EXPERIENCE-DRIVEN, HOSPITALITY-LED

• Day-to-Night Speakeasy Concept

Work Lounge & Cocktail Bar near the secondary lobby offers flexible, hospitalitystyle programming that transitions from day to evening.

• Open Conference & Meeting Zone

Multi-use conferencing room near the secondary entrance becomes a flexible anchor for events or team functions.

• Refined Circulation Hierarchy

Central tenant corridor maintains clarity while public lounge and café areas remain fluid, welcoming, and inviting.

• Premium Restroom & Service Access

Public-accessible restrooms and seamless back-of-house integration improve overall building function.

MAXIMIZING SUBCELLAR POTENTIAL | CELLAR 1

BUILDING BRAND & IDENTITY REIMAGINED

REPOSITIONING BUILDING ENVIRONMENT

The evolution of 125 Broad Street is a strategic transformation that unifies spatial, digital, and brand experiences to support tenant-first design and modern market positioning. Thoughtful branding integrated into materiality, wayfinding, and storytelling ensures the building’s identity is felt from the street to the skyline. Presence. Precision. Prestige. Adaptability. Authenticity.

BRAND NARRATIVES

Narrative 1: Strength in Structure

Bold Geometry. Enduring Prestige.

This narrative draws from the physical structure of 125 Broad Street — verticality, rhythm, and monumentality. It speaks to legacy tenants who value structure, credibility, and long-term commitment. Inspired by architectural clarity and historical stature, the brand system communicates trust, presence, and quiet power.

Core Themes:

• Monumentality

• Tactility

• Sculptural Stillness

• Material Contrast

• Architectural Rhythm

• Foundational Geometry

• Integrity Of Craft

Material Palette:

• Charred Wood

• Darkened Brass

• Oxidized Steel

• Polished Stone

• Raw Textured Concrete

• Honed Basalt

• Cast Metal

Lighting:

• Low And Deliberate

• Wall Grazing

• Recessed Coves

• Focused Accents

• Controlled Shadows

• Glancing Light

• Ambient Washes

Narrative 2: Modern Legacy

Refined Evolution. Quiet Confidence.

This narrative builds on 125 Broad Street’s unique position in the Financial District — a landmark poised for thoughtful reinvention. It speaks to modern tenants who value heritage, adaptability, and a sense of curated experience. Inspired by subtle contrasts and elevated simplicity, the brand system communicates warmth, clarity, and lasting refinement.

Core Themes:

• Heritage Reframed

• Understated Elegance

• Lightplay And Atmosphere

• Historical Materiality

• Contemporary Silhouettes

• Historical Materiality

• Subtle Contrast

Material Palette:

• Mossy Greens

• Deep Navy

• Gold Leaf

• Hand-Glazed Tile

• Patinated Brass

• Honed Marble

• Smoked Oak Or Walnut

Lighting:

• Warm Shafts Of Daylight

• Golden Artificial Glow

• Material Reflections

• Moonlight-Inspired Touches

• Soft Uplighting

• Light As A Gradient

• Dimensional Layering

LOGO SYSTEM

A COHESIVE IDENTITY WITH ARCHITECTURAL PRECISION

The 125 Broad Street logo system is grounded in architectural rhythm and foundational geometry, echoing the building’s structural clarity and enduring stature. Designed for adaptability, it ensures cohesion across signage, print, and digital experiences while allowing room for narrative distinction.

WORDMARK

Wordmark: used across signage, print, and digital communications)
(Lettermark: compact signature for digital use, avatars, and signage anchors) (Icon/Symbol: abstracted mark for favicon, watermark, and system accents)
STACKED LOCKUP
HORIZONTAL LOCKUP
(Stacked lockup for vertical signage and architectural moments)
(Horizontal lockup for digital interfaces and directional signage)

THE VISUAL LANGUAGE | TYPOGRAPHY

TYPOGRAPHY SYSTEM

A refined typographic system strengthens legibility, consistency, and brand cohesion across all architectural and graphic applications.

Primary Typeface –Futura Now

A modern yet timeless typeface offering precision, clarity, and strong geometric structure. Its clean lines and balanced proportions make it an ideal choice for primary signage, building branding, and directories, ensuring a bold yet refined visual presence.

Secondary Typeface –Spectral

Designed for wayfinding, directional signage, and environmental graphics, Spectral brings elegance and readability to the built environment. Its sophisticated serif detailing complements Futura Now’s simplicity, enhancing legibility and navigation across branded spaces.

Tertiary Typeface –Neue Haas Grotesk

A subtle supporting typeface optimized for smaller-scale applications, ensuring clarity in room identification, elevator panels, and informational displays. Roboto’s modern, highly legible letterforms maintain consistency across functional typography while seamlessly integrating into the overall identity system.

THE VISUAL LANGUAGE | COLOR PALETTE

PRIMARY COLORS

• Anchors the identity with bold, enduring tones inspired by architectural rhythm, material richness, and timeless prestige. Used across signage, print, and digital.

SECONDARY COLORS

• Adds tonal depth drawn from stone, patina, and structural shadow. Supports primary tones in spatial applications, digital touchpoints, and refined accents.

TERTIARY COLORS

• Warm, expressive tones inspired by crafted finishes and hospitality details. Used sparingly to soften, highlight, or humanize the brand experience.

RIVER NAVY TEAL CURRENT GOLDEN REFLECTION
EAST GREEN SKYLINE BLUE STEEL GRAY GLASS WHITE CHARCOAL
TERRACOTTA WARMTH SANDY BEIGE
COPPER GLINT

Repositioning 125 Broad Street is more than a design exercise — it’s an opportunity to define a new era of experience, identity, and presence.

From lobby to skyline, the transformation unifies physical, digital, and emotional touchpoints, creating a workplace that reflects confidence, clarity, and connection. By elevating architecture, enhancing amenities, and embedding a thoughtful brand language, this strategy prepares 125

Broad to meet the needs of today’s tenants — and inspire the next generation of legacy.

THANK YOU

NOTE:

PLEASE NOTE THAT THE DRAWINGS, SKETCHES, AND DOCUMENTS PROVIDED BY VOCON ARE CONCEPTUAL SCHEMES AND MAY NOT BE COMPLETELY ACCURATE OR COMPLIANT WITH ALL REGULATIONS. IT IS THE USER'S SOLE RESPONSIBILITY AND LIABILITY TO USE THESE FILES, RECOGNIZING THAT THEY ARE INTENDED SOLELY FOR PROJECT DISCUSSIONS AND REFERENCE AND DO NOT SUPERSEDED THE VALIDITY OF CURRENT PRINT COPIES, OFFICIAL CONTRACT DOCUMENTS, OR FILED-VERIFIED CONDITIONS. OUR COMMITMENT TO PROVIDING CLEAR GUIDELINES EMPHASIZES OUR DEDICATION TO MINIMIZING ANY RISKS ASSOCIATED WITH USING THESE FILES.

APPENDIX

EXISTING SITE PHOTOS

SIXSIXTY FIFTH AVENUE

STRATEGIC RECOMMENDATIONS

STRATEGIC APPROACH

FLOOR 23 PLANNING & DESIGN

FLOOR 39 PLANNING & DESIGN

FLOOR 05 PLANNING & DESIGN

04 16 23 31

THE GOAL

Position 660 Fifth Avenue as the premier business destination in Midtown Manhattan, offering an unparalleled blend of modern amenities, cutting-edge design, and strategic location. Elevate the building's identity to attract top-tier tenants, fostering a vibrant community at the heart of New York City.

STRATEGIC APPROACH

AMENITY PROGRAMMING STRATEGY

CUSTOMER PROFILES

PEER OFFERINGS

BRAND INTENTION OPERATIONAL DETAILS PROGRAM MIX

FRAMING THE CONSUMER DEMAND

STUDY THE MARKET & COMPETITIVE SET

DEVELOP THE MOOD & VIBE NARRATIVE ALIGN WITH THE SERVICE MODEL

CURATING A DIVERSE OFFERING OF SPACES

TENANT PROFILES

FINANCIAL SERVICES & INVESTMENT FIRMS

• Family Office

• Wealth Management

• Venture Capital

• Private Equity

• Fintech

TECHNOLOGY

& CONSULTING

• Management Consulting • IT Services

Business Strategy Consulting • Digital Transformation

• Cybersecurity REAL ESTATE & PRIVATE EQUITY

• Real Estate Investment Trusts (REITs)

• Commercial Real Estate Development

• Private Equity Real Estate

• Property Management • Real Estate Consulting MEDIA & ENTERTAINMENT

• Broadcast Media • Publishing • Digital Media • Advertising • Entertainment Production

NEIGHBORHOOD

LEXINGTON

FUTURE OF FIFTH AVE

1. Public Space Upgrade:

• Expand sidewalks, bike lanes, and introduce new plazas to make Fifth Avenue more pedestrian-friendly and accessible.

2. Improved Accessibility:

• Enhance public transit integration and reduce traffic congestion to make commuting easier and support tourism.

3. Sustainability Focus:

• Implement green infrastructure and increase green spaces, aligning with environmental goals and improving urban aesthetics.

4. Economic & Cultural Boost:

• Revitalize the retail experience, attract tourists, and integrate cultural elements to drive economic growth and reinforce Fifth Avenue's significance.

NEW NY ACTION PLAN | Fifth

PEER ANALYSIS |

550 Madison Avenue - The Chippendale Building

PROJECT INFORMATION

TOTAL BUILDING SIZE: 1,870,000 SF

TOTAL AMENITY SIZE: 18,086 SF

Meet:

• Conference And Flexible Workspace Center

Cafe & Bar:

• Curated Food And Beverage Purveyors With Fresh Produce Options

Fitness:

• State-Of-The-Art Fitness Facility

Refresh:

• Showers On-Site Near Bike Storage And Fitness Center

Outdoor:

• 1⁄2 Acre Garden With Lush Vegetation, Direct Access To Nature

PEER ANALYSIS | 51 W 52ND Street - CBS Building

PROJECT INFORMATION

TOTAL BUILDING SIZE: 257,160 SF

TOTAL AMENITY SIZE: 15,000 SF

Meet:

• Conference rooms (multiple sizes), team lounge, business lounge, boardroom, and wellness studio

Cafe & Bar:

• In-building café

Dine:

• Atrium and café offering food and beverages

Fitness:

• Wellness studio

Outdoor:

• Dedicated terrace space (11th-floor terrace, etc.)

PEER ANALYSIS | 390 Park Avenue -

PROJECT INFORMATION

TOTAL BUILDING SIZE: 267,000 SF

TOTAL AMENITY SIZE: 28,567 SF

Meet:

• Conference rooms, boardroom, flexible workspace center, library, and lounge

Cafe & Bar:

• Bar within The Lever Club

Dine:

• Private dining at The Lever Club

Fitness:

• Opportunities for personal training and wellness

Refresh:

• On-site shower facilities

Grab & Go:

• Grab + Go café

Outdoor:

• Outdoor terraces (North and South), landscaped public plaza

PEER ANALYSIS | 9W57 -

PROJECT INFORMATION

TOTAL BUILDING SIZE: 1,543,665 SF

TOTAL AMENITY SIZE: 31,000 SF

Meet:

• Conference rooms, meeting spaces

Fitness:

• On-site gym with shower facilities

Refresh:

• Shower facilities in the gym

Outdoor:

• Building courtyard

PROJECT INFORMATION

TOTAL BUILDING SIZE: 1,637,363 SF

TOTAL AMENITY SIZE: 35,000 SF

Meet:

• Conference and meeting rooms available

Cafe & Bar:

• Full-service bar

Dine:

• Private dining options

PEER ANALYSIS | 767

PROJECT INFORMATION

TOTAL BUILDING SIZE: 1,637,363 SF

TOTAL AMENITY SIZE: 15,000 SF

Meet:

• Co-working spaces designed for meetings

Cafe & Bar:

• Includes a bar/lounge area

Dine:

• High-end dining options

PEER ANALYSIS | 1301 6th Avenue

PROJECT INFORMATION

TOTAL BUILDING SIZE: 1,770,988 SF

TOTAL AMENITY SIZE: 32,000 SF

Meet:

• Boardroom, conference rooms, business lounge, team lounge

Cafe & Bar:

• In-building cafe

Fitness:

• Wellness studio

Outdoor:

• Dedicated terrace

PEER ANALYSIS | Summary & Takeaways

SOCIAL AREAS

Key Takeaway: Most peer buildings prioritize multifunctional spaces such as conference rooms and lounges, fostering collaboration, business networking, and flexible work environments.

FITNESS CENTERS

Key Takeaway: Fitness facilities are prevalent in peer buildings, often combined with wellness studios and personal training options, reflecting the importance of health and wellness amenities for tenants.

DINING, BAR, GRAB & GO

Key Takeaway: Dining and beverage offerings range from high-end private dining to more casual Grab & Go options, catering to diverse tenant preferences and enhancing the convenience of in-building amenities.

AVAILABLE

LEASED

• OPTION 2: FLOOR 39

• 60% CONFERENCING/EVENT AMENITIES

• 40% PRE-BUILT SUITES

POTENTIAL AMENITY LOCATIONS

OPTION 1: FLOOR 39

• 40% CONFERENCING/EVENT AMENITIES

• 60% MEMBER'S CLUB LOUNGE

OPTION 2: FLOOR 23

• 60% CONFERENCING/EVENT AMENITIES

• 40% PRE-BUILT SUITES

OPTION 1: FLOOR 23

• 60% CONFERENCING/EVENT AMENITIES

• 40% PRE-BUILT SUITES

FLOOR 5: EXPANDED FITNESS CENTER

• LEVERAGE EXISTING INFRASTRUCTURE

MAIN BUILDING ENTRANCE

BASE FLOORS 4-9

• 66,000 - 79,000 SF

UNDERGROUND RETAIL CONCOURSE AND MTA CONNECTION

FLOOR 23

FLOOR 23 | Existing Conditions

DEMISING OPTION 01: NORTH / SOUTH

DEMISING OPTION 02: EAST / WEST

FLOOR 23 | Conferencing Amenity + Pre-Built

(24P)
(24P)

FLOOR 23 | Conferencing Amenity + Pre-Built

CONFERENCE CENTER 8,900 SF

FLOOR 23 | Conferencing Amenity + Pre-Built Look &

FLOOR 39

FLOOR 39 | Existing Conditions

DEMISING OPTION 01: NORTH / SOUTH
DEMISING OPTION 02: EAST / WEST

FLOOR 39 | Conferencing Amenity + Member's Club

FLOOR 39 | Conferencing Amenity + (2) Spec Builds

FLOOR 39 | Conferencing

FLOOR 39 | Conferencing Amenity Arrival

FLOOR 05

EXISTING CONFERENCE & FITNESS CENTER

6,900 SF

FLOOR 05 | Expanded Fitness Center Look & Feel

FLOOR 05 | Expanded Fitness Center

THANK YOU

225 PARK A V E NUESOUTH

People, Place, Purpose

225 Park Avenue South is the perfect home for monday.com's continued growth and presence in New York City. We share a common vision of bringing people together through shared purpose. Our continued relationship will build on the workplace we've already established together, one that aligns with monday.com's values, fostering collaboration and innovation in a place designed for connection and purpose-driven work .

A place in the hottest neighborhood

Union Squa r e Park

A place to make your mark...

Horizontal brand representation

The 19th-floor interior lighting and signage are designed to enhance the building's exterior brand visibility.

Vertical brand representation

Floors 11 to 18 use interior lighting and signage to enhance brand visibility from the exterior.

Private entrance dedicated signage

C6-4A Zoning: As-of-right signage with a maximum projection of 18 inches and a maximum surface area of 500 square feet.

R8B Zoning: Applied signage may project up to 10 inches beyond the street line if more than 10 feet above sidewalk.

...a chance to light up the sky

Backlit sign illuminated in monday. com's brand color, monday

E. 18th Street - Building Signage Opportunity

...with marquee signage opportunities

R8B ZONING:

Applied signage may project up to 10 inches beyond the street line if more than 10 feet above sidewalk.

SIGNAGE :

12 SF Max surface area, 12" tall max height, Two sign max

MARQUEE :

10' min. height above side walk, 3' max height of marquee fascia (approximately 13' max. projection here) and no closer than 2' to the curb

R8B ZONING:

Applied signage may project up to 10 inches beyond the street line if more than 10 feet above sidewalk.

...and a private entrance

MARQUEE :

10' min. height above side walk, 3' max height of marquee fascia (approximately 13' max. projection here) and no closer than 2' to the curb

Proposed

PASSENGER CARS 16-17:

-19th Floor

...and a private lobby

PASSENGER CARS 12-15:

MARQUEE :

10' min. height above side walk, 3' max height of marquee fascia (approximately 13' max. projection here) and no closer than 2' to the curb

VESTIBULE

...while ensuring overall brand alignment

Tel Aviv Office | Zoom Room
Tel Aviv Office | Office Shelving & Decor
Tel Aviv Office Conference Room
Tel Aviv Office | Banquette Seating
...and setting the tone for your day
...for welcoming your employees & guests

A place for business innovation...

...that reflects a cohesive brand identity
...to give employees inspiration

...enabling their best work

A place for business innovation

A great place to work

225 Park Avenue South is the ideal hub to support monday.com's continued business growth and innovation. With so many exciting projects underway, 225 provides an unmatched, dynamic environment to fuel collaboration and success for your employees.

A place of choice...

Second floor amenities

Repurposed retail

Curb appeal & lobby refresh

...to recharge and refresh

...to hangout with colleagues

...to enjoy work after work

Mezzanine floor plan - proposed layout
Ground floor plan - proposed lounge rendering
Reception

...with flexibility and style

Second floor plan - proposed conference rendering

...to stay fresh at work

Second floor plan - proposed wellness layout
Treatment Room
Treatment Room
Meditation Room
Yoga | Flex Room
Shower Suites
Shower Suites
Seating Lounge
Arrival

GENERAL NOTE FOR ALL PAGES:

These drawings are provided for reference purposes only and are schematic in nature. The information contained within is subject to further verification and does not override printed copies, official contract documents, or existing field conditions. Please note that the drawings have not been fully reviewed for feasibility or zoning code compliance and will require additional confirmation in collaboration with the design consultant

DESIGN CONCEPT PRESENTATION

130 FIFTH AVENUE

LOBBY STUDY & RECOMMENDATIONS

VICE CHAIRMAN | MANAGING PRINCIPAL

TOM VECCHIONE

DESIGN DIRECTOR

PRACTICE LEADER | SENIOR ASSOCIATE

DESIGN STRATEGIST

KHYATI SHAH
DERRICK MCCORMICK

PROJECT INTRO 01

RENEW & REFRESH

The architectural vision for the facade and lobby proposes a dynamic renaissance.

Through a modern, engaging facade and a reimagined, brightly lit lobby designed for community interaction, the renovation injects fresh vitality, turning the building into a vibrant hub of social connection.

DESIGN PARAMETERS

7.Replacement of existing doors that separate a conditioned space from the exterior shall not require the installation of a vestibule or revolving door, provided that an existing vestibule that separates a conditioned space from the exterior shall not be removed. *Exception does not apply to this case, the

130 5TH AVENUE | EXISTING CONDITIONS

130 5TH AVENUE | ADJACENT BUILDING LOBBIES

130 5TH AVENUE | RECENT VOCON PROJECTS

MICROSOFT
CLARION
540 MADISON

ENTRY STOREFRONT 02

LOBBY ENTRANCE REFRESH | EXISTING CONDITIONS

EXISTING EXTERIOR FINISHES EXISTING INTERIOR VESTIBULE

EXTERIOR BUILDING PAINTED CONCRETE

EXTERIOR STOREFRONT POLISHED STEEL

EXTERIOR BUILDING POLISHED BLACK GRANITE

EXTERIOR COLUMNS PAINTED CONCRETE

EXISTING CURVED PEDIMENT

EXISTING STOREFRONT SYSTEM

EXISTING BUILDING SIGNAGE

EXISTING DOORS (2) 3’-0” (W) X 7’-10” (H)

EXISTING FAUX COLUMNS

LOBBY ENTRANCE REFRESH | OPTION 1-A

EXTERIOR BUILDING PAINTED CONCRETE

EXTERIOR STOREFRONT OPT. 2: FINISH TO MATCH ADJACENT STOREFRONT

EXTERIOR COLUMNS PAINTED CONCRETE

EXISTING CURVED PEDIMENT TO REMAIN

EXISTING FAUX COLUMNS TO REMAIN

PROPOSED BUILDING SIGNAGE LOCATION

PROPOSED EXTERIOR FINISHES EXISTING INTERIOR VESTIBULE

EXTERIOR BUILDING POLISHED BLACK GRANITE EXISTING INTERIOR VESTIBULE

EXISTING INTERIOR VESTIBULE

LOBBY ENTRANCE REFRESH | OPTION 1-B

PROPOSED EXTERIOR FINISHES

EXTERIOR BUILDING PAINTED CONCRETE

EXTERIOR BUILDING POLISHED BLACK GRANITE

EXTERIOR STOREFRONT OPT. 2: FINISH TO MATCH ADJACENT STOREFRONT

EXTERIOR COLUMNS PAINTED CONCRETE

EXISTING PEDIMENT TO REMAIN

EXISTING FAUX COLUMNS TO REMAIN

PROPOSED BUILDING SIGNAGE LOCATION

NEW EXTERIOR FINISH (MATCH ADJACENT)

NEW INTERIOR VESTIBULE

NEW VINYL DISTRACTION MARKER PROPOSED INTERIOR VESTIBULE

LOBBY ENTRANCE REFRESH | OPTION 2

EXTERIOR BUILDING PAINTED CONCRETE

EXTERIOR BUILDING POLISHED BLACK GRANITE

EXTERIOR STOREFRONT OPT. 2: FINISH TO MATCH ADJACENT STOREFRONT

PROPOSED BUILDING SIGNAGE LOCATION

NEW EXTERIOR FINISH

PROPOSED TENANT SIGNAGE LOCATION

PROPOSED EXTERIOR FINISHES NEW PROPOSED INTERIOR VESTIBULE &

STOREFRONT SYSTEM

PROPOSED INTERIOR VESTIBULE & DOOR

LOBBY ENTRANCE REFRESH | SUMMARY

LOBBY REFRESH 03

LOBBY REFRESH | Option 1

OPTION 1 - LOOK & FEEL | Minimal Deeper Tones

LOBBY REFRESH | Option 2 Opportunities

OPTION 2 - LOOK & FEEL | Warm, Tailored, & Modern

ELEVATOR CAB REFRESH 04

ELEVATOR CAB REFRESH | Opportunities

99 PARK AVENUE

BUILDING ENHANCEMENT & AMENITIES

A NEW ARRIVAL EXPERIENCE

The Goal of this Conceptual Study is to evaluate design options that will make an impact on user experience as they enter 99 Park Avenue.

An active street presence that engages the second floor will draw a new energy to the building as Park Avenue continues to transform.

SETTING THE STAGE

25

3

BUILDINGS ANALYZED ACROSS ALL MAJOR

SUB-DISTRICTS, 4-5 SIMILAR TO 99 PARK AVE

76

% OF TOTAL BUILDING SF DEDICATED TO TENANT AMENITIES

92

% OF AMENITIES INCLUDE A LARGE 20-30 PERSON CONFERENCE ROOM

% OF AMENITIES INCLUDE CAFESTYLE SEATING AREAS IN LOUNGE

72

% OF BUILDINGS OFFER A GYM AREA

OPERATOR BENCHMARKS | AMENITY UTILIZATION & REVENUE

TRAINING ROOMS (75-150 PP)

#1 MOST REQUESTED

#1 REVENUE GENERATOR

#2 BOOKINGS

Flexible training rooms are highly requested by tenants, but only account for 35% of bookings and generate 33% of revenues.

BOARD ROOMS (20-30 PP)

#2 MOST REQUESTED

#2 REVENUE GENERATOR

#1 BOOKINGS

Board rooms account for 43% of bookings but only 29% of revenues.

EVENT/SOCIAL SPACE (200 PP)

#3 MOST REQUESTED

#3 REVENUE GENERATOR

#3 BOOKINGS

Events & Social spaces represent only 12% of bookings, but 27% of revenues because event spaces can charge more, particularly during peak periods throughout the year.

99 PARK AVENUE | HISTORY

HISTORICAL INFLUENCE

Built in the Art Deco style in 1953, the National Distillers Building pays homage to the iconic architectural style that emerged in the 1920s and 1930s, Characterized by sleek lines, geometric patterns, and a sense of glamour.

The revived Art Deco building seamlessly blend the elegance of the past with the demands of the present, accommodating modern amenities while preserving the timeless allure of the original era.

99 PARK AVENUE | HISTORY

OVER THE YEARS

Buildings in NYC dynamically respond to the needs and aspirations of the people who inhabit them. The need to swiftly respond to the current market and societal advancements, setting the pace for the world. Whether it’s re-imagining office spaces to accommodate remote work or creating mixed-use developments that foster vibrant communities.

TAKING THE JOURNEY

FACADE & STOREFRONT

FACADE & STOREFRONT | EXISTING CONDITIONS

GOALS & OBJECTIVES

• Reimagine the Facade & Storefront for a more grand experience that expresses the full height of the portal

• Showcase the activity generating on the interior lobby and second floor

• Emphasis the height of the entry portal with expressive finishes that will respect the existing geometries and materials

EXISTING FACADE & STOREFRONT ELEVATION
EXISTING FACADE & MARQUEE
FACADE & STOREFRONT PLAN
EXISTING FACADE PORTAL

FACADE & STOREFRONT | OPTION 1A

GALLERY

• Simplify and clean the entry to allow maximum opportunity for natural light and activity in the lobby and second floor.

• Granite planter acts as a podium holding a piece of artwork. You can look but you can’t touch.

• Natural movement and circulation from exterior to interior

FLAMED GRAY GRANITE PANELS

NON-REFLECTIVE STAINLESS STEEL MULLIONS

EXISTING RETAIL STOREFRONT & FACADE TO REMAIN ON BOTH SIDES

WHITE PAINTED METAL PANELS REMOVE STAINLESS STEEL BORDER AROUND SPANDREL

FLAMED GRAY GRANITE PANELS

NEW WATER CLEAR GLAZED STOREFRONT SYSTEM WITH 11’-4” REVOLVING AND SWING DOORS

NEW FLAMED GRAY GRANITE PLANTER

NATIONAL CONGRESS PALACE | OSCAR NIEMEYER
NATIONAL CONGRESS PALACE | OSCAR NIEMEYER

FACADE & STOREFRONT | OPTION

FACADE & STOREFRONT | OPTION 1B

FLUIDITY

• Softening the hard edges with a curved fluted metal or glass, giving a more fluid gesture to the entry.

• Emphasize the vertically of the grand open exterior into interior.

• Reflective materials allow for natural light to bounce of one another and illuminate the lobby and second floor.

EXISTING RETAIL STOREFRONT & FACADE TO REMAIN ON BOTH SIDES

REFLECTIVE STAINLESS STEEL PANELS REMOVE STAINLESS

BORDER AROUND SPANDREL

GLASS RODS OR FLUTED METAL PANEL

NEW WATER CLEAR GLAZED STOREFRONT SYSTEM WITH 11’-4” REVOLVING AND SWING DOORS

712 FIFTH AVENUE
FLUTED METAL FLUTED GLASS
COLUMN COVERS

FACADE & STOREFRONT | OPTION

FACADE & STOREFRONT | OPTION 2A

LIVING ROOM

• Pushing out the entry portal, adding 550 SF to the overall lobby.

• The double height space feels more grand and allows for more natural light penetration into the lobby and reception.

• The marquee gives a moment of relief before entering the building and adds a ceiling to the vestibule.

NON-REFLECTIVE STAINLESS STEEL MULLIONS

FLAMED GRAY GRANITE PANELS

EXISTING RETAIL STOREFRONT & FACADE TO REMAIN ON BOTH SIDES

GYPSUM CEILING (INT) WHITE PAINTED METAL PANELS (EXT) REMOVE STAINLESS STEEL BORDER AROUND SPANDREL

NEW MATTE STAINLESS STEEL MARQUEE/AWNING w/ INTEGRATED LIGHTING

NEW WATER CLEAR GLAZED STOREFRONT SYSTEM WITH 11’-4” SWING DOORS

FLAMED GRAY GRANITE PANELS

*ADDITIONAL

EXISTING STOREFRONT LOCATION

FACADE & STOREFRONT | OPTION 2A

*CONCEPT PURPOSES ONLY - MARQUEE TO BE VERIFIED WITH THE CODE REVIEWER

*CONCEPT PURPOSES ONLY

FACADE & STOREFRONT | OPTION 2B

LIVING ROOM

• Pushing out the entry portal, adding 550 SF to the overall lobby.

• The double height space feels more grand and allows for more natural light penetration into the lobby and reception.

• Pulling back the marquee to align with the structure of the building columns and still adds a ceiling to the vestibule.

FLAMED GRAY GRANITE PANELS

EXISTING RETAIL STOREFRONT & FACADE TO REMAIN ON BOTH SIDES

GYPSUM CEILING (INT) WHITE PAINTED METAL PANELS (EXT) REMOVE STAINLESS STEEL BORDER AROUND SPANDREL NEW WATER CLEAR GLAZED STOREFRONT SYSTEM WITH 11’-4” SWING DOORS

FLAMED GRAY GRANITE PANELS

STOREFRONT LOCATION

FACADE & STOREFRONT | OPTION 2B

*CONCEPT PURPOSES ONLY - MARQUEE TO BE VERIFIED WITH THE CODE REVIEWER

*CONCEPT PURPOSES ONLY

FACADE & STOREFRONT | BRANDING & IDENTITY

FACADE & STOREFRONT | SUMMARY

LOBBY

LOBBY | EXISTING CONDITIONS

INCOHESIVE SLATE

• There are many different architectural elements and styles that are clashing with one another.

• There is no clean line definition with all of the various ceiling heights.

• Recent renovation brings in curved elements with reception desk and lighting

• Various stained/grained materials

RECEPTION & ELEVATOR LOBBIES HAVE BEEN RECENTLY RENOVATED

COLUMNS TAKE UP A LOT OF USABLE AREA THAT CAN BE BETTER UTILIZED

VARIOUS CEILINGS AND LIGHTING FIXTURES THROUGHOUT LOBBY AND RECEPTION VERY REFLECTIVE FLOOR SHEEN AND POLISH

HEIGHT OF REVOLVING DOORS ARE VERY LOW COMPARED TO THE CEILING HEIGHTS

VARIOUS ARCHITECTURAL ELEMENTS

LOBBY | DESIGN INTERVENTIONS

CLEAN SLATE

• Clean up existing lobby and make sure we are giving the maximum opportunity for activation in the interior

• Peel back the many years of renovations to ensure we are respecting the history of the building by providing a forward generating space

• Activating a lobby that has multipurpose functions to cater to the many needs of the change environment

REPLACE EXISTING LIGHTING AND MATCH w/ NEW FOR COHESIVE DESIGN

REMOVE VARIOUS CEILINGS AND LIGHTING FIXTURES THROUGHOUT LOBBY AND RECEPTION

RELOCATE EXISTING MECHANICAL EQUIPMENT IN EACH ROOM

REMOVE EXISTING WALLS & DOORS. FLOOR TO RECEIVE NEW FINISH

PATCH AND REPAIR EXISTING WALL w/ NEW FINISH

REMOVE EXISTING FLOORING THROUGHOUT w/ NEW FINISH

REMOVE & RELOCATE EXISTING HVAC EQUIPMENT SYSTEMS IN CEILING

REMOVE COLUMN BUILDOUT AND ITS CONTENTS INCLUDING BASE, SHAFT AND CAPITAL

REMOVE EXISTING STOREFRONT REVOLVING DOORS.

REMOVE STRUCTURAL STEEL SPANDRELS ABOVE STOREFRONT REMOVE EXISTING GRANITE PLANTERS

REMOVE EXISTING MARQUEE, LIGHTING AND BUILDING SIGNAGE

COHESIVE SLATE

• Columns should stay the sameconnected to spandrels above

• Consider new materiality of the side walls;

• Discuss whether the columns should be re-clad with integrated lighting element

• Embrace the two columns and provide a more double-height experience

• Open up sight lines to the second floor experience

LIGHTING TO MATCH THROUGHOUT LOBBY, RECEPTION AND ELEVATOR LOBBY EXISTING RECEPTION DESK AND TURNSTILES TO REMAIN

LOUNGE SEATING IN VARIOUS AREAS THROUGHOUT LOBBY

NEW FEATURE STAIRCASE LEADING UP TO SECOND FLOOR CONFERENCING CENTER AND SUITES

DOTTED LINE OF SECOND FLOOR ABOVE, NEW FLOORING TO MATCH LINE OF FLOORING ABOVE

WRAP COLUMNS AS TIGHT AS POSSIBLE FOR MAXIMUM ALLOTTED SQUARE FOOTAGE

NEW FLOORING IN DOUBLE HEIGHT AREA

NEW WATER CLEAR GLAZED STOREFRONT SYSTEM

LOBBY | CONNECTION | STAIRCASE PRECEDENTS

LOBBY | VIEW FROM ENTRANCE

LOBBY | VIEW FROM CONCIERGE

SECOND FLOOR

SECOND FLOOR | TEST FIT

BUILDING AMENITY - 3,360 USF

CONFERENCING CENTER - 5,566 U SF

S UITE 1 - 3,450 USF

S UITE 2 - 3,100 USF

S UITE 3 - 3,536 USF

POSSIBLE TERRACE ACTIVATION (500 SF)

SECOND FLOOR | COMMUNITY |

SECOND FLOOR | COLLABORATIVE | CONFERENCE CENTER

APPENDIX

99 PARK AVENUE | DESIGN PARAMETERS

SIGNAGE REQUIREMENTS:

NYC 2022 BUILDING CODE

3202.2.1.8 Projecting signs. All permitted projecting signs may be constructed to project not more than 10 feet (3048 mm) beyond the street line, but not closer to the curb line than 2 feet (610 mm), when conforming to the requirements of this code and Section H112 of Appendix H, and provided that no part of the sign is less than 10 feet (3048 mm) above the ground or sidewalk level.

Exceptions:

Permanent projecting signs are prohibited on buildings in the areas indicated below: Borough of Manhattan.

SIGNAGE REQUIREMENTS:

NYC ZONING RESOLUTION

32-642 Non-Illuminated Signs: In the districts, as indicated, non-illuminated signs with total surface areas not exceeding three times the street frontage of the zoning lot (in feet), but in no event more than 200 sq. ft. for interior or through lots or 200 sq. ft. on each frontage for corner lots.

32-642 Additional regulations for projecting signs. In all districts, as indicated, permitted signs other than advertising signs may be displayed as follows:

(a) Non-illuminated signs may be displayed on awnings or canopies permitted by the Administrative Code, with a surface area not exceeding 12 square feet and with the height of letters not exceeding 12 inches. Any commercial copy on such signs shall be limited to identification of the name or address of the building or an establishment contained therein.

32-655 Height of Signs in all other Commercial Districts: In the districts as indicated, no permitted sign shall extend above curb level at a height greater than the following: Maximum Height - 25 Feet

1.1. Projecting signs. No permanent projecting sign shall be erected on any building on: 1.1.6. Park Avenue between 32nd Street and 40th Street

MARQUEE REQUIREMENTS :

NYC 2022 BUILDING CODE

3202.2.1.4 Marquees - Marquees may be constructed to project beyond the street line provided that they comply with Section 3106 and Sections 3202.2.1.4.1 through 3202.2.1.4.5.

3202.2.1.4.1 Height. Marquees shall receive structural support only from the building and shall be at least 10 feet (3048 mm) above the ground level or sidewalk.

3202.2.1.4.2 Projection. Marquees shall project no closer to the curb line than 2 feet (610 mm).

3202.2.1.4.3 Thickness. Marquees shall be no thicker nor shall the fascia be higher than 3 feet (914 mm) when measured vertically from its lowest to its highest point.

3202.2.1.4.4 Dimensions. Dimensions shall include all decoration but shall exclude any tension supports suspending the marquee from the wall

PARK AVENUE

99 PARK AVENUE | DESIGN PARAMETERS

FLOOR AREA RATIO (FAR):

FAR is the ratio of total building floor area to the area of its zoning lot. Each zoning district has an FAR which, when multiplied by the lot area of the zoning lot, produces the maximum amount of floor area allowable on that zoning lot. For example, on a 10,000 square foot zoning lot in a district with a maximum FAR of 1.0, the floor area on the zoning lot cannot exceed 10,000 square feet.

BUILDING ENHANCEMENT & AMENITIES

A NEW BUILDING EXPERIENCE

The Primary Objective of this Conceptual Study is to architecturally reimagine the building, infusing it with revived life and purpose, ultimately acting as a magnetic force to attract prospective tentants.

The intention is to elevate its status as a striking and captivating historic landmark within the urban fabric of SoHo, commanding attention along Broadway and Crosby Street.

AGENDA

HISTORY & BACKGROUND

HAVEMEYER BUILDING | HISTORY

HISTORICAL INFLUENCE

In 1897, amidst the dynamic urban landscape of New York City, George B. Post unveiled a 12-story, 174-foot Renaissance-eclectic office building. Adorning Broadway with eight bays, Prince Street with 11, and Crosby Street with six, the building’s façade showcased a striking blend of rusticated limestone, brick, and stone cornices.

The central section featured buff-colored brick, while the ninth floor boasted round-arched windows, Ionic columns, and a dentiled stone cornice. The building’s architectural finesse was further enhanced by decorative black iron spandrels and mullions.

Crowning the structure, a dentiled roof cornice with modillions around the western section epitomized the grandeur of the Gilded Age and George B. Post’s design prowess, leaving an enduring mark on New York’s skyline.

568 Broadway, ca. 1935. Source: Museum of the City of New York. 568 Broadway, ca. 1935. Source: Museum of the City of New York.

SOHO | CAST IRON HISTORIC DISTRICT

SoHo-Cast Iron Historic District | LP-00768

PERSERVATION

The SoHo-Cast Iron Historic District is home to around 500 buildings featuring distinctive cast-iron exteriors. In the latter half of the 19th century, the district transformed into a hub for business and entertainment, with most of its iconic cast-iron buildings constructed then. The use of cast iron allowed for intricate yet cost-effective facades compared to granite and marble.

SoHo was at risk due to the Lower Manhattan Expressway (LOMEX), a 10-lane elevated highway plan that could destroy much of SoHo and Little Italy. Local artists and preservation advocates tried to make SoHo a historic district, but their first attempt failed.

SoHo-Cast Iron Historic District | LP-00768 Borough of

Public Hearing: July 21, 1970 Designated: August 14, 1973

568-578

EXISTING CONDITIONS 02

THE PRINCE BUILDING

Formerly known as the Havemeyer Building, While it initially served as a manufacturing facility, this historic gem has undergone a remarkable transformation, evolving into a vibrant hub of loft-style offices and retail spaces.

Nestled in the heart of SoHo, within the bustling expanse south of Houston Street, the Prince Building has been reimagined to infuse life and activity into the vibrant tapestry of Midtown South. This section of Broadway teems with a myriad of shopping, dining, and entertainment options, creating a dynamic atmosphere that attracts a multitude of smallto mid-sized companies.

Here, the Prince Building serves as a catalyst, beckoning professionals and businesses to partake in the vibrant, bustling energy of this remarkable district, enhancing their endeavors and interactions within its rejuvenated walls.

BROADWAY & CROSBY FACADE

CROSBY - ENTRANCE
BROADWAY - ENTRANCE
BROADWAY - ENTRANCE
CROSBY - ENTRANCE
BROADWAY - ENTRANCE
CROSBY - ENTRANCE

GROUND FLOOR PLAN

ADJACENT BUILDING

PRINCE STREET
LOBBY
LOBBY
BROADWAY - ELEVATOR LOBBY
BROADWAY - ELEVATOR LOBBY
BROADWAY - LOBBY

AREAS OF OPPORTUNITY 03

AREAS OF OPPORTUNITY

CROSBY STREET | DEDICATED ENTRANCE

112 CROSBY

• New water clear storefront glazing, entry doors, and transom glass captured in an oil rubbed dark statuary bronze.

• New an oil rubbed dark statuary bronze clad awing, with water clear glass canopy

• New statuary bronze dedicated entrance signage.

• New exterior lighting integrated within the awning and wall scones to be studied further.

• New exterior building and tenant signage to be studied further.

CROSBY STREET | DEDICATED LOBBY PLAN

DEDICATED ENTRY

• New water clear storefront glazing, entry doors, and transom glass captured in an oil rubbed dark statuary bronze.

• Updated finishes throughout lobby, reception and elevator lobby, including paint, ceiling, lighting, flooring and furniture.

• New dedicated lounge in lobby for guests to wait and causal meetings.

• Dedicated reception for tenant, including an ADA ramp from ground level to lobby.

• Tenant signage throughout reception and on exterior facade of building.

BROADWAY | PROPOSED FACADE UPGRADES

570 BROADWAY

• New water clear storefront glazing, entry doors, and transom glass captured in an oil rubbed dark statuary bronze.

• New statuary bronze building entrance signage.

• New exterior lighting wall scones to be studied further.

• New exterior building and tenant signage to be studied further.

6 TH FLOOR | PROPOSED AMENITY LOUNGE & CONF CENTER

AMENITY CENTER

• Multiple meeting rooms of various sizes to accommodate different group sizes.

• Boardrooms for executive meetings and smaller gatherings.

• Audiovisual equipment, including projectors, screens, microphones, and sound systems.

• The ability to reconfigure spaces to suit different event layouts, such as classroom, theater, U-shape, or banquet style.

• Modern audiovisual equipment and technical support for presentations and multimedia needs.

• Video conferencing facilities for remote participants.

ADJACENT BUILDING

PRINCE STREET

ROOFTOP | PAVILION ADDITION CONCEPT

ZRD1 - ZONING

Zoning floor area analysis to be completed to determine if a ZRD1 will be feasible to reallocate ZFA from previously nondeducted mechanical spaces and shafts and relocate the zfa to the roof. This concept proposes extending the existing elevators to align with the new roof pavilion. The location for the proposed roof pavilion is aligned with the existing elevator shafts and stairs to accommodate vertical transportation.

DUE DILIGENCE 05

PROJECT INFORMATION:

Zoning Districts: M1-5/R9X Land Use: Commercial & Office Building

SIGNAGE REQUIREMENTS: NYC ZONING RESOLUTION

42-532 Non-Illuminated Signs: In all districts, as indicated, non-illuminated signs with total surface areas not exceeding six times the street frontage of the zoning lot, in feet, but in no event more than 1,200 square feet for each sign, are permitted.

However, in any Manufacturing District in which residences or joint living-work quarters for artists are, under the provisions of the Zoning Resolution, allowed as-of-right or by special permit or authorization, the total surface area of all such permitted signs shall not exceed six times the street frontage of the zoning lot, in feet, and that the surface area of each sign shall not exceed 750 square feet.

42-533 Illuminated or Flashing Signs: In all districts, as indicated, illuminated or flashing advertising signs are not permitted.

Illuminated or flashing signs, other than advertising signs, and accessory or advertising signs with indirect illumination are permitted, provided that the total surface area of all such signs, in square feet, shall not exceed:

(a) for illuminated or flashing signs other than advertising signs, five times the street frontage of the zoning lot, in feet, and that the surface area of each sign shall not exceed 500 square feet; and

(b) for accessory or advertising signs with indirect illumination, five times the street frontage of the zoning lot, in feet, and that the surface area of each sign shall not exceed 750 square feet.

However, in any Manufacturing District in which residences or joint living-work quarters for artists are, under the provisions of the Zoning Resolution, allowed as-of-right or by special permit or authorization, the total surface area of all such permitted signs shall not exceed five times the street frontage of the zoning lot, in feet, and that the surface area of each sign shall not exceed 500 square feet.

42-541 Permitted Projection: In all districts, as indicated, except as otherwise provided in Section 42-542 (Additional regulations for projecting signs), no permitted sign shall project across a street line more than 18 inches for doubleor multi-faceted signs or 12 inches for all other signs, except that:

ZONING & LAND USE MAP

(a) in M1-5B, M1-5M and M1-6M Districts, for each establishment located on the ground floor, non-illuminated signs other than advertising signs may project no more than 40 inches across a street line, provided that along each street on which such establishment fronts, the number of such signs for each establishment shall not exceed two two-sided signs separated at least 25 feet apart, and further provided that any such sign shall not exceed a surface area of 24 by 36 inches and shall not be located above the level of the first story ceiling.

(b) for zoning lots occupied by more than two theaters designed, arranged and used for live performances of drama, music or dance and located within the area bounded by West 34th Street, Eighth Avenue, West 42nd Street and Tenth Avenue, permitted signs may project across a street line no more than 4 feet, 6 inches, provided the height of any such signs shall not exceed 55 feet above curb level.

42-542 Additional Regulations for Projecting Signs: In all districts, as indicated, permitted signs other than advertising signs may be displayed as follows:

(a) Non-illuminated signs may be displayed on awnings or canopies permitted by the Administrative Code, with a surface area not exceeding 12 square feet and with the height of letters not exceeding 12 inches. Any commercial copy on such signs shall be limited to identification of the name or address of the building or an establishment contained therein.

(b) Signs may be displayed on marquees permitted by the Administrative Code, provided that no such sign shall project more than 48 inches above nor more than 12 inches below such marquee.

42-543 Height of Signs: In all districts, as indicated, permit ted signs shall not extend to a height greater than 40 feet above curb level, provided that non-illuminated signs or signs with indirect illumination may extend to a maximum height of 75 feet.

568-578 BROADWAY | DESIGN PARAMETERS

APPENDIX 05

SPACES SPEAK.

Creating An Active Urban Experience

850 3rd Avenue

Agenda

• Development Team Overview and Qualifications

• Existing Site Conditions

• Proposed Renovations

• Construction Timeline and Plan of Finance

• Inducement Argument - i.e. why M-CORE incentives are needed to advance the project

• How proposal aligns with the 10 Project Criteria & Program Goals

OWNER

HPS Investment Partners is a leading global investment firm that seeks to provide creative capital solutions and generate attractive riskadjusted returns for our clients. At our core, we share a common thread of intellectual rigor and discipline that enables us to create value for our clients, who have entrusted us with approximately $101 billion of assets under management as of May 2023.

LEASING AGENTS

Cushman & Wakefield is a leading global commercial real estate services firm for property owners and occupiers with approximately 52,000 employees in approximately400 offices and 60 countries. In 2022, the firm reported revenue of $10.1 billion across its core services of property, facilities and project management, leasing, capital markets, and valuation and other services.

ARCHITECT

Established in 1987, Vocon creates distinctive, productive work environments for private and public sector clients across the globe through the delivery of full-scale architectural project capabilities, including architecture, interior design, branding, graphic design, workplace strategy, and change communications.

RETAIL LEASING AGENTS

Newmark Group, Inc. is a world leader in commercial real estate, seamlessly powering every phase of the property life cycle. Newmark’s services and products include real estate brokerage, leasing, capital markets (including investment sales), global corporate services, industrial and logistics services, landlord representation, multifamily, property management, retail services, tenant representation, valuation and advisory services, real estate management technology systems, workplace and occupancy strategy, consulting, project management, and lease administration.

FACADE CONSULTANT

MdeAS is led by a collective group of diverse individuals with a common goal of creating architecture that connects people and place. Coming from different cultural and educational backgrounds, each leader brings a unique perspective and skill set to the office. They are advocates for social action, mentors for young designers, and architects of the future.

MECHANICAL ENGINEER

AMA was founded in 2000 with the underlying philosophy that successful, long-term relationships are built by being attentive to clients. We provide mechanical, electrical, plumbing, fire protection, technology, lighting and acoustical design services, as well as commissioning, design-build and electrical product manufacturing.

GENERAL CONTRACTOR

STO Building Group is a family of construction companies committed to setting the highest standards of excellence in everything we do. We provide a complete range of construction services, including site selection analysis, design constructibility review, aesthetic enhancements, interior fit-outs, new building construction, and building infrastructure upgrades and modernization.

EXPEDITOR CODE CONSULTANT

Rizzo-Brookbridge is an industry-leading building solutions firm partnering with clients to make buildings safe, healthy, resilient and sustainable.

With a full spectrum of services, Rizzo-Brookbridge brings extensive expertise in building code and zoning consulting, sustainability services, and life safety inspections.

Current State

Current Properties on the 3rd Avenue Corridor with more than 20% of the total building SF Available and/or more than 100,000 SF Available.

Placemaking

Activate the Urban Environment

• Enlivening the Intersection

• Accessibility for the Community

• Energize the Street scape Inspire Back to Work

• Welcoming Street to Seat Experience

• Designing for Convenience

• Improve Light and Views

Program

606,294 TOTAL RSF

Activate the Urban Environment

Encourage “Open Restaurant” Retail

Public Arts within the Lobby

Childcare Center

Dedicated Entrance on 52nd

Inspire Back to Work

Renovated Lobby

Green Terraces

21st Floor Conference Center and Roof Garden

Increased Window Size

3rd & 52nd Exploration

Activating the Ground Plane

3RD AVENUE

Enlivening the Intersection

Activate the Urban Environment

Encourage “Open Restaurant” Retail

Public Arts within the Lobby

Childcare Center

Dedicated Entrance on 52nd

Inspire Back to Work

Renovated Lobby

Green Terraces

Increased Window Size

Proposed Ground Plane

3RD AVENUE

Second Floor Childcare

3RD AVENUE

Enhancing the Entrance

Existing Entrance Proposed Entrance

Upgrading the Lobby

Existing Lobby

Engaging the Neighborhood

Providing Conveniences

Studying the Workplace

Micro Suites

Rooftop Amenity

Proposed Floor 21 Layout

HVAC

LL 97 Renovation Scope

HPS has conducted a full assessment of the building’s compliance with near and mid-term requirements under LL97. The building primarily utilizes electricity and steam. Electricity powers lighting, plug loads and motors. Steam is used for heating and air conditioning (via the water-cooled chillers with steam turbines). The building has great potential to electrify and drastically reduce its carbon footprint, given that the steam utilities used for both heating and cooling are comparatively carbon intensive.

Since the building is considerably unoccupied, it will not be subject to LL97 fines between the years 2024 to 2029 but will exceed the carbon allocations by 2030 resulting in fines. However, this is largely due to its current underutilization and not a true representation of the building’s efficiency. A predictive analysis was also performed assuming the building is at full occupancy and carbon emissions and fines substantially increased. The following are two tables summarizing the assessments.

• Upgrade and/or replace the perimeter HVAC induction unit systems with new energy efficient induction units, 2-pipe fan coils, or variable refrigerant heat pumps.

• Convert the existing steam driven chiller plant to an electrical driven chiller plant.

• Improve zone control, after-hours operation and part load efficiencies of HVAC equipment.

• Modernize BMS control system.

• Modernize the elevators to improve performance and aesthetics, with new floors in cabs (restoring the mid-century modern charm), and destination dispatch.

Sustainability

Green Initiatives

With the support of the MCore benefit, HPS will be pursuing a number of steps that will have positive sustainable impacts on the building. In addition to already being LEED Gold our sustainable efforts will allow the building to meet or exceed code mandated energy efficiencies and LL 97 requirements for 2025, 2030, and 2035 benchmarks by upgrading building systems that have a material impact on energy usage. Key components under consideration are:

• New View Glass Windows will be double paned, which provides insulation benefits as compared to the current single paned windows. We also plan to use View® Smart Glass, which intelligently adjusts the tint of the window based on exterior daylight conditions, thus reducing the heat transmitted from the sunlight and the resulting cooling demand of the building. It has been shown to reduce peak load by 5% and overall energy usage by 10% on average.

• Reduce energy usage and carbon footprint with upgraded mechanical and electrical equipment controls, as well as modern direct digital control systems, devices and equipment.

• Improve economizer systems, part load performance, and operations to increase energy savings and reduce carbon emissions.

• Convert the existing steam driven chilled water plant to electric driven chillers, reducing carbon emissions.

• Replace induction units with modern and energy efficient equipment (i.e. low profile induction units, 2-pipe fan coil units or variable refrigerant heat pumps).

• Upgrade domestic heating systems with electric water cooled or air-cooled heat pump units in lieu of instant steam heaters. This will fully electrify up to potentially 80% of the building and lay the groundwork for the full electrification of the building by the early 2030s, when the leases for tenants on the 17th-20th floors are set to expire energy usage.

• Lobby and Bathroom Lighting will be replaced with LED lights, and through our specifications for tenant build-outs, we will require efficient lighting (LED or equivalent) in every unit.

• New & Modernized Elevators will require less elevator runs and reduce the building’s overall energy usage.

• Well and Fitwell certifications will also be pursued to maximize the assets future value to tenants and New York City.

Incubator Discussions

• We have had initial discussions with Cambridge Innovation Center and we’ve reached out to Tier 1 and Tier 2.

• The current situation with WeWork has created uncertainty in the market, and we believe many of these companies are first looking to potentially vacant or vacating WeWork space to open locations – which we understand would be a quicker and more cost-effective go to market solution for them.

• However, HPS is open to housing an experienced incubator assuming the economic terms work for all parties, and looks forward to doing so.

Budget + Timeline

Planned Renovation Scope without M-CORE

Without the renovations we could pursue with M-CORE, the building would have a lesser street presence, few to no amenities, less modern appearance and window line, and less energy-efficient systems for the next decade with the ownership likely paying modest fines under LL97.

Absent M-CORE, HPS would likely pursue a much lesser renovation scope given current market conditions. The limited renovation scope would include:

• Demolition, but not for the interior column covers

• Bathroom renovations, but likely to a lesser scope

• Lobby repainting and lighting updates, but no change to the entry

• Retail leased as-is, with no connection to the second floor or daycare

• No HVAC or Induction Unit Changes

• Elevator modification but no destination dispatch or changes in cab appearance

Economics of M-CORE

Alignment with Project Criteria

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.