SELANGORRIVER
PASIR PENAMBANG, KUALA SELANGOR
PASIR PENAMBANG COASTAL AREAS WERE OCCUPIED BY HEALTHY NATURAL MANGROVE FOREST, WHICH WERE INHABITED BY ABUNDANCE OF PLANT AND MARINE SPECIES.
DUE TO RICHNESS OF NATURAL RESOURCES, PASIR PENAMBANG DEVELOPED RAPIDLY. FISHERMEN BUILT THEIR SETTLEMENTS ALONG THE RIVERSIDE OF SELANGOR RIVER, LEADING TO MANGROVES DEFORESTATION.
THIS RAPID DEVELOPMENT AFFECTED THE LAND AND RIVER ECOSYSTEMS THAT DEPENDED ON MANGROVES TO SURVIVE. THUS, NATURAL RESOURCES DEPLETED AND BECAME EXTINCT. IN THE LONG RUN, FISHERMEN WILL LOSE THEIR SOURCES OF INCOME.
THIS CENTRE SERVES AS MANGROVES PROTECTION CENTRE AND A PLACE WHERE HUMAN AND NATURE COULD CONNECT WITHOUT THE INTERFERENCE OF FISHERMEN’S LIFESTYLE, WHILE PROTECTING NATURAL SPECIES ON THE LAND AND RIVER AROUND THE MANGROVES ECOSYSTEM.
THROUGH THE SYSTEM’S POROSITY AND FORM, THE FORCE OF THE WATER IS MITIGATED. ANCHORED AT THE TOP OF THE CONCRETE PIECES, THE MANGROVE’S ROOTS WILL EVENTUALLY BE ABLE TO SPREAD AND EVEN GROW ONTO THE SHORE.
THIS TIME, MANGROVE FOREST WILL BE REBIRTHED, NOT TO BE URBANISED AGAIN, BUT TO STAY ALONGSIDE THE FISHERMEN COMMUNITY, LOKATOPIA, THE ECOLOGICAL FISHERMEN CENTRE.
SITE PLAN
2
KUALA SELANGOR, SELANGOR, MALAYSIA
ACCESSABILITY SMELL VIEW WALKABILITY NOISE
NATURAL FEATURES
HYDROPONIC FARMING
MANGROVE AS NATURAL FILTER
MANGROVE POD
RAW JETTY COLUMN=FISH HABITATION
WOODEN
FISHERY MANGROVES
FISH FARMING
MANGROVE TRAIL
POROUS FABRIC
FILLED WITH
THE DESIGN IS CONSTRUCTED FROM TWO SEPARATE PIECES: A HEAD AND A FIN MADE FROM BAMBOO. BECAUSE THE HEAD’S BAMBOO IS LIGHTER THAN WATER, THE TWO ELEMENTS CAN FLOAT IN ADDITION TO ALLOWING MANGROVE ROOTS TO GROW THROUGH THE HEAD.
IN CONTRAST, THE FIN’S BAMBOO IS FILLED WITH UHPC: ULTRA HIGH-PERFORMANCE CONCRETE AND IS DENSER, STRENGTHENS THE FOUNDATION, PROMOTING THE HABITATION OF MARINE LIFE AND BARNACLE GROWTH.
GALLERY LOBBY
PLANT SHOP
BIRD OBSERVATORY
PUBLIC JETTY
FILTRATION JETTY
0 MONTH 2 MONTH 4 MONTH 6 MONTH
TIMBER
FABRIC
NATURAL POOL
WOOD PLANK
EVENT HALL
SHINGLES CONCRETE
GREEN WALL
CAFE PRODUCTION AREA
FISHERMEN JETTY
SORTING AREA LOADING BAY
BAMBOO
BAMBOO
FIN HEAD MANGROVES 3
UHPC
MANGROVE POD MAKING AND DEPLOYMENT
SITE IS LOCATED AT THE WESTERN SIDE OF PASIR PENAMBANG COASTAL AREA. THE SITE IS OCCUPIED BY COMMERCIAL BUILDINGS, MAINLY BUSINESSES RELATED TO FISHERY. THE SITE IS VERY IMPORTANT AS IT SERVE AS THE HARBOR FOR FISHERMENS TO MANAGE THEIR CATCH. THIS SITE ALSO SERVE AS THE CENTRE FOR DISTRIBUTING SEAFOODS AND EXPORTING THEM TO OTHER PLACES. IN OTHER WORDS, THIS SITE SERVES AS THE PLATFORM FOR FISHERMEN TO RUN THEIR ECONOMICAL AND SOCIAL LIFE.
MANGROVES ACTS AS THE IN-BETWEEN OF LAND AND RIVER. WHEN THE IN-BETWEEN WAS TAKEN DOWN, EVERY ELEMENTS OF LAND AND RIVER SURROUNDING IT WOULD FALL APART. AS HUMAN ACTIVITY BECAME THE MAIN FACTOR OF MANGROVES DEFORESTATION, THE ROLE OF MANGROVES IS INTERPRETED BEYOND THE TYPICAL; THAT IS BEING THE IN-BETWEEN OF LAND, RIVER AND HUMAN.
THIS IS AN EXPLORATION ON HOW MANGROVES CAN AID IN FISHERMEN’S ACTIVITIES, THUS BENEFITING BOTH HUMAN AND ALL MANGROVES ECOSYSTEMS.
LOKATOPIA SERVES AS MANGROVES PROTECTION CENTRE AND A PLACE WHERE HUMAN AND NATURE COULD CONNECT WITHOUT THE INTERFERENCE OF FISHERMEN’S LIFESTYLE, WHILE PROTECTING NATURAL SPECIES ON THE LAND AND RIVER AROUND THE MANGROVES ECOSYSTEM.
THE BUILDING SPACES AT THE GROUND FLOOR SPREAD OUTWARDS; TO PROVIDE EFFICIENCY FOR PEOPLE CIRCULATING AND DOING ACTIVITIES THROUGHOUT THE BUILDING. OPEN PLAZA CAN BE ACCESSED DIRECTLY FROM THE LOBBY. FISHERMEN WERE PROVIDED WITH A NEW ORGANIZED WAY OF WORKING. THE SPACE FOR FISHERMEN IS DESIGNED TO EASE THEIR DAILY TASKS WHILE NOT INTERFERING THE NATURE SURROUNDING.
THE EXPRESSION OF TIMBER STRUCTURE, TRANSPARENCY BETWEEN INDOOR AND OUTDOOR WAS INTEDED TO APPRECIATE SURROUNDING ELEMENTS. THE OPENINGS ALONG THE CORRIDOR ALLOWS PANORAMIC VIEWS OF SELANGOR RIVER.
THROUGH THE MAIN PROGRAMME “MANGROVE POD MAKING”, BABY MANGROVES WILL BE DEPLOYED ALONG THE RIVERFRONT THROUGH THE PROTECTIVE FLOATING POD, AND EVENTUALLY GROW TO THEIR MATURE PHASE TO LIVE INDEPENDENTLY WITHOUT THE PODS.
LEGEND
Ground Floor
1 Lobby
2 Toilet
3 Natural pool
4 Plaza
5 Jetty
6 Recreational area
7 Reading area
8 Watch tower
9 Social+BBQ area
10 Fish sorting area
11 Storage
12 Mangrove nursery
First Floor
13 Lounge deck
14 Mangrove farming
15 Plant shop
16 Event hall
17 Hydroponic farming
18 Prayer room
19 Fish production & storage area
Second Floor
20 Gallery/exhibition area
21 Management office
22 Cafe
23 Toilet
ROOF SYSTEM
FRAME SYSTEM
FLOOR SYSTEM
FISH MANAGEMENT & PRODUCTION
FISH CONVEYER 2. MANUAL FISH GRADING 3. FISH PULLEY COLUMN 4. FISH WASHING MACHINE
PRODUCTION
1.
5.
BAKAU POD DEPLOYMENT MINI TROLLEY TRACK ROTATING PULLEY
TRANSFER PROCESS
MANGROVE
BAKAU POD MAKING WORKSHOP + BABY MANGROVE NURSERY
3.
2.
MATURED
1.
INSULATION
FLOOR COOLING VISUAL CONNECTIVITY CROSS VENTILATION SUN PENETRATION
PENETRATION THIS
1 6 10 2 11 12 12 12 9 7 8 13 16 17 20 21 22 23 18 14 15 19 2 3 4 4 5 5 4
FIRST FLOOR PLAN
GROUND FLOOR PLAN
SECOND FLOOR PLAN
1 WOODEN SHINGLES
2 WATERPROOF MEMBRANE
3 BAMBOO CEILING
4 STRUCTURAL CONNECTION
5 CNC GLULAM BEAM
6 CNC GLULAM COLUMN
7 CNC GLULAM RAFTER
8 CNC GLULAM EAVES FRAMING
9 CNC GLULAM CANTILEVER BEAM
1 CNC GLULAM COLUMN
2 CNC GLULAM GIRDER
3 CNC GLULAM BEAM
4 ENGINEERED SELF-TAPPING SCREWS
5 ENGINEERED BOLTS
6 CLT DECKING
7 TIMBER FLOORING
EXPERIMENTATION ON MATERIAL TRANSITION AND JOINTING
A PIXELATED VERSION OF A SCARF JOINT IS USED TO TEST THE POTENTIAL OF TIMBER JOINERY. THE JOINT DETAIL STRATEGY IS DRIVEN BY THE MAXIMISATION OF SURFACE AREA BETWEEN ELEMENTS WHICH INCREASES THE TRANSFER OF FORCES IN THE OVERALL SYSTEM.
1 2 3 3 4 4 4 6 5 5 8 7
1 2 7 6 3 4 5 1 1 2 3 2 3 9 6
PHYSICAL MODEL_VIEW 1
8
PHYSICAL MODEL_VIEW 2
INDUS-TREE
AFFORDABLE AND SUSTAINABLE LIVING
FINAL YEAR PROJECT
TYPE: HOUSING
SITE: SHAH ALAM, SELANGOR, MALAYSIA
PROPOSED PETROL STATION
COMFORTABLE + AFFORDABLE
HOPES TO TURN THE OLD CONSTRUCTION SITE INTO A COMMERCIAL-COMMUNITY PROJECT CALLED “INDUS-TREE”, AN URBAN FARMING AND MIX-INCOME RESIDENTIAL IN SHAH ALAM.
THE LOCATION OF THE DEVELOPMENT IS UNIQUE – SITUATED AMIDST AN INNER INDUSTRIAL AND RESIDENTIAL AREA, IT WAS CRITICAL TO CREATE A WELCOMING, INCLUSIVE, AND ENERGETIC GATHERING PLACE, ALLOWING LOCALS TO ENJOY THE SAME EXPERIENCE OF “THE ENTERPRISE” VENUE OF SHAH ALAM SECTION 23.
THE TARGET USERS FOCUSED FOR THIS HOUSING PROJECT WERE LOW TO MEDIUM INCOME GROUP OF PEOPLE. MIIXING LOW INCOME GROUP (MINORITY) AND MEDIUM-INCOME GROUP (MAJORITY) WILL KEEP THE MINORITY FROM BEING THE VICTIM OF SOCIAL INEQUALITY, THUS PRODUCING A HEALTHY COMMUNITY.
THEREFORE, THE DESIGN DOESN’T AIM TO BE A “GENRE BUILDING”, LIKE THEY DO IN MOST SITUATION. INSTEAD, IT STARTS WITH THE CONSISTENCY OF THE PUBLIC CIRCULATION, PEDESTRIAN EXPERIENCE, LANDSCAPE INTERFACE, AND FINALLY LEADED TO A RESULT OF AMBIGUITY.
PROPOSED GREEN AREA
RECREATIONAL AREA
SITE PLAN
JALAN DIVIDEN 23/6
KEMUNINGSHAH ALAM (LKSA)
SITE B PERSIARAN PERUSAHAAN
LEBUHRAYA
PROPOSED GREEN AREA JALAN LABA DUA 23/14B VEHICLE ACCESS MAXIMISE VIEW GRID ORGANISATION SPECIFICATION OF SPACES TYPICAL UNIT LAYOUT LANDSCAPING 10
THE EXISTING CONDITIONS AND RELATING STRUCTURE OF THE CURRENT BUILDING HAD TO BE CAREFULLY INVESTIGATED AND INCORPORATED INTO THE ARCHITECTURAL DESIGN. THE LARGE SITE MEANT THAT ZONING HAD TO BE EXCEPTIONALLY CONSIDERED TO ENSURE SECTIONS FELT INTIMATE BUT ALSO RETAIN THE OPEN-PLAN BEER HALL EXPERIENCE. MINIMAL FINISHES CREATE A CONTEMPORARY INDUSTRIAL FEEL WHILST THE FOUND ITEMS TAKE INSPIRATION FROM THE DESIGN OF A FACTORY.
SERVICES
passive fire protection water electricity sewerage
fire staircase water tank suction tank + pump room final discharge water supply feeder pillar septic tank refuse compartment
GROUND FLOOR PLAN
THIS BUILDING CONSISTS OF FOUR TYPES OF UNITS. EACH UNIT TARGETED DIFFERENT KINDS OF USERS, SUITABLE TO THE MAIN GROUPS OF RESIDENTS AROUND THE AREA. WHILE THE ORIGINAL LAYOUTS WERE PROVIDED, FLEXIBILITY FEATURES WERE ADDED TO SUIT THE USERS NEEDS. THEREFORE, USERS WILL HAVE MORE OPTIONS IN PLANNING THEIR HOUSE AND CAN APPLY SOME CHANGES ACCORDING TO THEIR PERSONAL PREFERENCES.
TYPE 3 AND TYPE 4 COMES WITH ROTARY HYDROPONICS AS AFFORDABLE AND ADAPTIVE URBAN FARMING METHOD. THEY ALSO COMES WITH SOCIALIZING AREAS IN BETWEEN TWO UNITS TO ENCOURAGE SOCIAL INTERACTION.
TYPE 1 AND TYPE 2; EXPANDABLE SPACES CAN BE UTILISED AS LANDSCAPING WHEN NOT IN USE. THEY CAN BE USED TO ADD ANOTHER ROOM FOR EXPANDING FAMILY. EXPANDABLE BALCONY MODULE DESIGNED TO BE EASILY REMOVED AND BE REPLACED FOLLOWING SEASONAL CHANGE.
TYPICAL UNIT LAYOUT
UNIT TYPE
AXONOMETRIC EXPLODED
TYPE 1
TYPE 2
TYPE 3
TYPE 4
12
ROTARY HYDROPONICS SYSTEM
AFFORDABLE AND ENERGY EFFICIENT
ALTERNATIVE FOR URBAN FARMING SYSTEM
LIGHT SOURCE EFFICIENCY,
day night
CONSUMPTION UP TO 60% LESS ELECTRICITY
50% LESS WATER CONSUMPTION
THAN IN TRADITIONAL METHOD
OBTAIN HIGH QUALITY PRODUCT IN LESS TIME (UP TO 5 CYCLES PER YEAR)
CABLES TO SPIN THE CYLINDER (CONNECTED TO THE ENGINE AT ROOFTOP
CYCLINDER
PLANTS IN ROCKWOOL
LIGHTS FOR NIGHT USAGE
RESERVOIR WITH WATER & NUTRIENTS SUPPORT
STANDING SEAM ROOF SHEET
200X400mm I-STEEL SECONDARY BEAM
6mm THK. FOAM
CONNECTION ANGLES & BOLTS
70mm THK. FIBREGLASS WOOL INSULATION
40x100mm PURLIN
UNDERLINER STEEL DECKING
6mm THK. FOAM
SHEET METAL GUTTER
SHEET
70mm THK. FIBREGLASS WOOL INSULATION
STEEL ROOF TRUSSES
200X400mm I-STEEL SECONDARY BEAM
UNDERLINER STEEL DECKING
CONNECTION ANGLES & BOLTS
SHEET METAL GUTTER
STEEL ROOF TRUSSES
A
CEILING
FIBREGLASS INSULATION INSULATION TAPE
250x500mm I-STEEL PRIMARY BEAM
CONNECTION ANGLES & BOLTS
200X500mm I-STEEL SECONDARY BEAM
40X80mm HOLLOW CHANNEL
130x30mm ALUMINIUM TRANSOM
250x500mm I-STEEL PRIMARY BEAM
CONNECTION ANGLES & BOLTS
200X500mm I-STEEL SECONDARY BEAM
8mm THK. TEMPERED GLASS
SIDE JAMB
40X80mm
300X300mm I-STEEL COLUMN
& APRON
40x80mm HOLLOW CHANNEL
130x30mm HEAD JAMB FIBREGLASS INSULATION
LOUVRES
15MM THK. CEMENT BOARD
300X300mm I-STEEL COLUMN
70x100mm WALL FRAME
CONCRETE SLAB
250x500mm I-STEEL PRIMARY BEAM
HANGER WIRE
SIDE JAMB
CORRUGATED METAL DECK
250x500mm I-STEEL PRIMARY BEAM
300x300mm STEEL COLUMN
200x500mm I-STEEL BEAM
CONCRETE APRON
ANCHOR BOLT
PEDESTAL
300x300mm STEEL COLUMN
CONNECTION ANGLES & BOLTS
200x500mm I-STEEL BEAM
CONCRETE APRON
CONNECTION ANGLES & BOLTS
ANCHOR BOLT
PEDESTAL
CONCRETE FOOTING
250x500mm I-STEEL PRIMARY BEAM 200X500mm I-STEEL SECONDARY BEAM 40X80mm HOLLOW CHANNEL CORRUGATED METAL PANEL 40x80mm HOLLOW CHANNEL 70x100mm WALL FRAME HANGER WIRE STOOL APRON 130x30mm ALUMINIUM TRANSOM 8mm THK. TEMPERED GLASS 130x30mm HEAD JAMB FIBREGLASS INSULATION 15MM THK. CEMENT BOARD 250x500mm I-STEEL PRIMARY BEAM 70x100mm WINDOW CORRUGATED METAL DECK FLOOR TILES WINDOW SILL WINDOW BOARD 200x500mm I-STEEL BEAM 300x300mm STEEL COLUMN ANCHOR BOLT CONCRETE FOOTING 300X300mm I-STEEL COLUMN STEEL BASE PLATE NON-SHRINKING GROUT PEDESTAL 40x100mm PURLIN 200X400mm I-STEEL SECONDARY BEAM STANDING SEAM ROOF SHEET 6mm THK. FOAM UNDERLINER STEEL DECKING STEEL ROOF TRUSSES SHEET METAL GUTTER FIBREGLASS INSULATION INSULATION TAPE CONNECTION ANGLES BOLTS GRAVEL LOUVRES CONNECTION ANGLES & BOLTS 250x500mm I-STEEL PRIMARY BEAM 200X500mm I-STEEL SECONDARY BEAM 40X80mm HOLLOW CHANNEL CORRUGATED METAL PANEL 40x80mm HOLLOW CHANNEL 70x100mm WALL FRAME HANGER WIRE STOOL & APRON 130x30mm ALUMINIUM TRANSOM 8mm THK. TEMPERED GLASS 130x30mm HEAD JAMB FIBREGLASS INSULATION 15MM THK. CEMENT BOARD CONCRETE SLAB 250x500mm I-STEEL PRIMARY BEAM 70x100mm WINDOW FRAME CORRUGATED METAL DECK FLOOR TILES SHEAR STUD WINDOW SILL WINDOW BOARD CONCRETE APRON 200x500mm I-STEEL BEAM 300x300mm STEEL COLUMN 300X300mm I-STEEL COLUMN STEEL BASE PLATE NON-SHRINKING GROUT CONNECTION ANGLES & BOLTS 40x100mm PURLIN 200X400mm I-STEEL SECONDARY BEAM STANDING SEAM ROOF
INSULATION
FIBREGLASS INSULATION
TAPE CEILING TILES
GRAVEL
HOLLOW CHANNEL CORRUGATED METAL PANEL
40x80mm HOLLOW CHANNEL
STOOL
ALUMINIUM TRANSOM
GLASS
HEAD
70x100mm WALL FRAME HANGER WIRE
& APRON 130x30mm
8mm THK. TEMPERED
130x30mm
JAMB FIBREGLASS INSULATION 15MM THK. CEMENT BOARD CONCRETE SLAB
70x100mm WINDOW FRAME
FLOOR TILES SHEAR STUD WINDOW SILL WINDOW BOARD
CORRUGATED METAL DECK
STEEL BASE PLATE NON-SHRINKING GROUT
FIBREGLASS INSULATION INSULATION TAPE CEILING TILES
GRAVEL
SIDE JAMB LOUVRES I-STEEL
CORRUGATED METAL PANEL
STOOL
70x100mm WINDOW FRAME
FLOOR TILES SHEAR STUD WINDOW SILL WINDOW BOARD
CONCRETE FOOTING STEEL BASE PLATE NON-SHRINKING GROUT
TILES
STEEL ROOF TRUSSES
GRAVEL
CONNECTION ANGLES & BOLTS
A
B DETAIL C DETAIL B DETAIL C 14
LOUVRES DETAIL
DETAIL
DETAIL
BIOCONNECT 3rd Place
FUTURE CITY 2.0
COMPETITION
TYPE: URBAN DESIGN
SITE: KUALA LUMPUR OLD CENTRAL BUSINESS DISTRICT
IMAGINE A CITY THAT SURPASSES ALL OTHERS IN TERMS OF CONNECTIVITY—THE MOST CONNECTED CITY IN THE WORLD. WHAT IF WE COULD CREATE AN URBAN LANDSCAPE WHERE AI-MANAGED TRANSPORTATION SEAMLESSLY INTEGRATES WITH BIOSWALES, SUSTAINABLE PRACTICES, AND CULTURAL HERITAGE? PICTURE A VISIONARY CITY THAT PRIORITIZES EFFICIENT TRANSPORTATION SYSTEMS, HARNESSES THE POWER OF ADVANCED TECHNOLOGIES, AND STRATEGICALLY PLACES BIOSWALES TO MANAGE WATER RESOURCES EFFECTIVELY. CAN YOU ENVISION A CITY WHERE PEDESTRIAN-FRIENDLY SPACES FLOURISH, VIBRANT STREET MARKETS BUZZ WITH LIFE, AND LOW-RISE BUILDINGS HARMONIOUSLY ALLEVIATE CONGESTION? AND HOW MIGHT SUCH A CITY’S COMMITMENT TO SUSTAINABILITY, BIODIVERSITY, AND CUTTING-EDGE RESEARCH SHAPE A GREENER, SMARTER, AND MORE INCLUSIVE FUTURE?
MOST FAST DEVELOPING CITIES FAILED TO ADAPT TO THE INCREASING NUMBER OF PEOPLE LIVING , LEADING TO MANY SOCIALS AND ENVIRONMENTAL PROBLEM LATER ON. PROBLEM RANGING FROM STREET CONGESTION, POLUTION, LOW ACCESS TO CLEAN WATER ALL LEADS TO A LOWER QUALITY OF LIFE.
IS THERE A POSSIBILITIES WHERE A CITY PROVIDES A SOPHISTICATED ENOUGH PUBLIC TRANSPORTATION SYSTEM WHERE THE COMMUNITY DOES NOT HAVE TO RELY ON THEIR PRIVATE OWNED VEHICLE. THROUGH RESEARCH AND STUDIES FROM OTHER SUCCESSFUL CITIES DESIGN ALL OVER THE WORLD, WE NARROW DOWN THE MOST IMPORTANT FACTOR THAT MAKES A FUTURISTIC CITY SUCCESSFUL
A CITY SHOULD BE CONNECTED , NOT JUST PHYSICALLY THROUGH ROADS AND WALKWAYS BUT ALSO DIGITALLY WITH THE HELP OF ARTIFICIAL INTELLIGENCE.THESE DRASTIC CHANGES ON THE NATURAL LANDSCAPE OF KUALA LUMPUR BENEFITS NOT ONLY THE HUMAN COUNTERPART, BUT ALSO EVERYTHING ELSE THAT SURROUNDS IT.
16
MODEL: RHINOCEROS
POST RENDER: PHOTOSHOP
17
KUALA LUMPUR CENTRAL BUSINESS DISTRICT MIX MEDIA - 3D + DIGITAL DRAWING
IN BIOCONNECT, WE HAVE REIMAGINED THE CONCEPT OF A PARKING TOWER BY INTEGRATING AN INNOVATIVE SOLUTION FOR DRONES. OUR AI-ENABLED PARKING TOWER SERVES AS A CHARGING POD FOR DRONES WHILE THEY AWAIT THEIR NEXT DELIVERY ASSIGNMENT, ALSO FUNCTIONING AS A TOURIST/VISITOR WAITING DECK.
THE PARKING TOWER’S VERSATILE DESIGN EXTENDS BEYOND FUNCTIONALITY. THE VISITOR WAITING DECK, LOCATED ALONGSIDE THE DRONE CHARGING PODS, OFFERS AN EXCEPTIONAL EXPERIENCE FOR TOURISTS AND VISITORS. AS THEY AWAIT THEIR TURN OR SIMPLY IMMERSE THEMSELVES IN THE SURROUNDINGS, THEY HAVE THE OPPORTUNITY TO WITNESS THE ADVANCEMENTS IN DRONE TECHNOLOGY, ENGAGING WITH THE DYNAMIC ATMOSPHERE OF BIOCONNECT.
SMART CAR PARKING TOWER—A SAFE AND INTUITIVE SOLUTION THAT ALLOWS OUTSIDERS TO CONVENIENTLY DROP OFF THEIR PRIVATE VEHICLES FOR THE DURATION OF THEIR STAY. STRATEGICALLY POSITIONED ACROSS THE CITY, THESE PARKING TOWERS ENSURE EASY ACCESS FROM MULTIPLE POINTS, PROMOTING A SEAMLESS AND EFFICIENT EXPERIENCE.
A SUSTAINABLE TOWER COMBINING MULTPLE FUNCTION SUCH AS PARKING, RENEWABLE ENERGY GENERATION THROUGH SOLAR PANELS, DRONE CHARGING, RAINWATER HARVESTING, AND A TOURIST WAITING AREA. THIS INNOVATIVE FACILITY PROMOTES CONVENIENCE, SUSTAINABILITY, AND VISITOR SATISFACTION, SETTING A NEW STANDARD FOR PARKING STRUCTURES IN THE CITY.
18
THE PARCEL AND DELIVERY DROP-OFF POINTS IN HARMONY HAVEN ARE REVOLUTIONIZING THE DELIVERY PROCESS BY LEVERAGING ADVANCED TECHNOLOGIES. EQUIPPED WITH MICROCHIPS, DELIVERY DRONES SEAMLESSLY TRACK, RECORD, AND AUTOMATE THE ENTIRE DELIVERY PROCESS, ENSURING EFFICIENT AND TIMELY SERVICE.
THESE DRONES UTILIZE THEIR MICROCHIP TECHNOLOGY TO DETECT THE NEAREST DROP-OFF LOCATION, OPTIMIZING THE LAST-MILE DELIVERY AND ENHANCING THE OVERALL CONVENIENCE AND SPEED OF THE DELIVERY SERVICES WITHIN THE CITY.
THE AI-MANAGED PUBLIC TRANSPORTATION SYSTEM NOT ONLY PROVIDES EFFICIENT MOBILITY BUT ALSO TREATS PASSENGERS TO AN AWE-INSPIRING VIEW OF THE MESMERIZING BIOSWALES THAT ADORN THE CITY. AS THEY TRAVEL, PASSENGERS ARE CAPTIVATED BY THE LUSH GREENERY, COLORFUL FLOWERS, AND GRACEFULLY FLOWING WATER, CREATING A VISUALLY STUNNING AND ENGAGING EXPERIENCE. THE STRATEGICALLY PLANNED ROUTES OFFER GLIMPSES OF DIVERSE BIOSWALES, SHOWCASING THE HARMONIOUS COEXISTENCE BETWEEN URBAN INFRASTRUCTURE AND NATURE.
19
RECOGNIZING THE NEED FOR A SUSTAINABLE SOLUTION TO ADDRESS CONGESTION IN CITIES, OUR PROJECT LEVERAGES REINFORCED CONCRETE DESIGN TO CREATE MODULAR TUNNELS. THESE TUNNELS, SEAMLESSLY ATTACHED TOGETHER, FORM A COMPREHENSIVE, FLEXIBLE, AND EXPANDABLE TRANSPORTATION SYSTEM THAT CATERS TO THE FORESEEABLE FUTURE.
20
21
22
ISSUE AT HAND MANY YOUNG PROFESSIONALS AREN’T ABLE TO HAVE A CONDUCIVE HOUSE DUE TO THE EXTREME PRICE OF LAND
ISOLATED SPACE PLANNING
THE HYPER FOCUSED AND STRATEGIC SPACE PLANNING ALLOWS EACH CUBE TO BE ASSEMBLED AND DETACHED
HIDDEN PROTECTIVE MECHANISM
THIN ENVELOPS HIDDEN IN BETWEEN THE SLEEVE OF TROLLEY BELOW
STRUCTURE AS
TRANSPORTATION
THE LACK OF STRUCTURAL FOUNDATION REDUCE ITS IMPACT ON ENVIRONMENT WHILE ALLOWING IT TO BE
MICROHOME
MICROHOUSE 2.0
COMPETITION - HONORABLE MENTION
TYPE: SMALL HOUSING
SITE: PORTABLE
Honorable Mention
MOBILITY OF FUTURE HOUSE LIMITED DIMENSION OF 2.5X3M AND 3X3M CUBICLE MEANS THAT THE FUTURE YOUTH WILL NOT HAVE TO INVEST A LOT ON THE PRICE OF A LAND TO OWN HOME
Metal sheet roof
Electrical
Wi-fi
Plywood panel
Smart algae curtain
Trailer
system
biomass + O2
CO2
Solar panel
Steel frame
Energy collection
Steel post
protruded seatings and storage
Rainwater collection
Steel anchor
Plumbing
Water storage and filtration system
SMART ALGAE CURTAIN AFFORDABLE, LOW MAINTAINNCE AND ECO-FRIENDLY ALTERNATIVE THROUGH PHOTOSYNTHESIS PROCESS OF ALGAE THAT PROVIDES FOOD, CLEANED GREY WATER AND FRESH FILTERED AIR TO THE HOME. THE BYRODUCT CAN BE USED AS ANIMAL FOOD, NUTRIENT FOR PLANT AND BIO-FUEL.
AXONOMETRIC
feeding
filter
+ water pump +
vessel
24
THIS PROJECT WAS DERIVED FROM TWO CHOSEN SHAPES THAT DESCRIBES THE POWERFUL SOUND OF WOLVES’ HOWL. THE SHAPES IS THEN FORMED AS MOTIVES TO DEVELOP INTO A PATTERN. THE PATTERN WAS ACCENTUATED INTO THE CHARACTERISTICS OF THE SOUND WHILE REPRESENTING THE TWO DESCRIPTIVE WORDS OF “JUXTAPOSE” AND “INTERTWINE”ABSRACT TRAITS OF WOLVES’ HOWLS. THE FORM MUST INCLUDE A SPACE THAT CAN BE USABLE FOR HUMAN TO REACT TOWARDS THE SPACE THUS, EFFECTING THE EMOTION OF A PERSON.
DEEP FEELING OF ONE’S FEAR, FROM THE PREY THEY SEEK BUT YOU TO TREMBLE, THEIR BLOODLUST, THE FEAR BUBBLE BURSTING, THEIR TERROR RADIATING, AND HELPLESSNES STARTS HISSING FROM INVISIBLE TO VISIBLE. THE TRUE COLOURS ARE OUT, THE COLOURS OF A HOWLING WOLF.
TORROR
EMOTION EXPRESSED THROUGH PHYSICAL FORM
FIRST YEAR PROJECT
TYPE: SCULPTURE
SUBJECT: WOLF’S HOWL
MEDIUM: MODEL BOARD, SPRAY PAINT
MODEL MAKING_TORROR
SERIES OF MOCKUP MODULE WAS MODELLED, EXPERIMENTED AND DEVELOPED SO THAT IT FITS THE CHARACTERISTICS OF A WOLVES’ HOWL. WHILE THE FORM OF A MODULE RESEMBLES THE TANGIBLE ELEMENTS, THE SCULPTURE PRODUCED FROM THE CONNECTIONS OF ONE MODULE TO ANOTHER REFLECTS THE INTANGIBLE FORM A HOWL AS A WHOLE.
A WHOLE SERIES OF TRY AND ERROR LEAD TO VARIOUS TYPES OF JOINTINGS AND CONNECTIONS WHICH THEN BECAME AN IMPERFECTLY INTERTWINED, A LOOP-LIKE FORM OF A SCULPTURE THAT MIMICS THE OVERLAPPING SOUNDS PRODUCED. THE COMBINATION OF DIFFERENT FREQUENCY OF DIFFERENT HOWLS WAS INTERPRETED AS A LOOP HOLE WITHOUT AN ENDING, JUST LIKE WHEN A PACK OF WOLVES WAS CALLING OUT FOR EACH OTHER, WETHER FOR MOURNING, MATING, NOR FOR HOSTILE INTENTIONS.
TORROR WAS INSPIRED FROM THE WORD “TERROR”. THE IRONY IS THE TERROR DID NOT COME BY THE FIERCENESS OF THE WOLVES, BUT FROM WITHIN THEMSELVES. THE SCULPTURE INTENDS TO REPRESENTS THEIR LOUD BUT VOICELESS SOUND OF HELPLESSNESS AS THEY WERE TREATED BADLY BY MAN. TO BRING IT INTO QUESTION, ARE THESE SO-CALLED MERCILESS AND DANGEROUS CREATURE THE GUILTY ONE? ARE WE REALLY THE INNOCENT ONE?
MODULE 1
MOCKUP 1
PLAN
SECTION
FRONT ELEVATION
SIDE ELEVATION
HAND DRAWINGS DEVELOPMENT
MOCKUP 2 FINAL
MODULE 2
26
MODULE 3 (SELECTED)
PROJECT: LOKATOPIA FISHERMEN CENTRE
PROJECT: LOKATOPIA FISHERMEN CENTRE
PROJECT: LOKATOPIA FISHERMEN CENTRE
SITE INTERPRETATION
PROJECT: STRAVA INNOVATIVE CENTRE
SEKINCHAN, MALAYSIA
TASKS: INTERPRETATION OF SITE THROUGH 3D DIORAMA
SKETCH
SITE APPRECIATION
SEKINCHAN, MALAYSIA
NARRATIVE COLLAGE DIORAMA
FRAGMENTED PLOT 6
CHERAS CONNAUGHT MIXED USE DEVELOPMENT
PART 1 RIBA
VENTURE: HON ARCHITECTURE SDN. BHD.
JOB TITLE: ASSISTANT ARCHITECT
SITE: CONNAUGHT, CHERAS, KUALA LUMPUR
TASKS: PRESENTATION PREP, CONCEPT MODELLING, PRELIMINARY PLANNING, PRELIMINARY RENDER
SELF-PRACTICE (FREELANCE WORK)
COUNTRY HEIGHTS BUNGALOW RENOVATION PROJECT
FREELANCE INTERIOR DESIGNER
VENTURE: KAPENTA CREATIVE
JOB TITLE: INTERIOR DESIGNER
SITE: CYBERJAYA, SELANGOR
TASKS: SCHEMATIC DESIGN, 3D MODEL & RENDERING, DETAIL DRAWINGS, CONSTRUCTION DRAWINGS
MODEL MAKING
STRAVA INNOVATIVE CENTRE
YEAR 3 DEGREE
TYPE: COMMUNITY CENTRE
SITE: BRICKFIELDS, KUALA LUMPUR
WORK
EXPERIENCE