Page 1

1 ANUPAMA SAHA anupama.arch@gmail.com +61435193301

https://www.linkedin.com/in/anupama-sahab1286a11


PROFESSIONAL EXPERIENCE | SCOTT CARVER | SYDNEY

MASTERS IN ARCHITECTURE | UNSW | SYDNEY

BACHELOR IN ARCHITECTURE | SPA | INDIA

Content

1 2 3

3


Graduate of Architecture

anupama.arch@gmail.com [+61435193301] WORK EXPERIENCE 12. 2015 - Present Responsibilities and Duties:

Graduate of Architecture Scott Carver Pty Ltd, Sydney NSW, Australia

Design • Actively involved in design process, reporting to the Project Leaders Documentation • Coordinate the documentation of the project. Ensure the architectural and consultants’ documentation are checked and confirmed for consistency with the detailed design intent and with quality, cost and time parameters • Assess regulatory context; The implications of the law, relevant codes, regulations and industry standards are identified, understood and assessed • Prepare preliminary project evaluations, programs and feasibility studies • Monitor construction progress systematically and ensure compliance with the contract provisions and budget

05. 2014 - 12.2015

ANUPAMA SAHA

4

Student of Architecture Scott Carver Pty Ltd, Sydney NSW, Australia

Responsibilities and Duties: • • • •

Supporting in the development of design and technical documents as required in teams Contributing in project research, benchmarking and continue professional development Working in presentation drawings for clients according to the aim & meeting instructions Working cooperatively within a team environment

11. 2012 - 02.2014

University Lecturer University of Asia Pacific Dhaka, Bangladesh

Responsibilities and Duties: • Lectures to students • Conduct tutorials in different subjects within the prescribed course • Conduct research in particular fields

07. 2014 - 11.2012

Architect Riddhi Architects Dhaka, Bangladesh

01. 2011 - 03.2011

Student of Architecture Shiriesh Malpani and Associates Delhi, India

06. 2010 - 07.2010 04.2011 - 04.2011

Student of ARchitecture Arc Architectural Consultants Dhaka Bangladesh


MEMBERSHIP

2015

2012

Masters in Architecture

University of New Southwales (UNSW) Sydney, Australia

Bachelor in Architecture

School of Planning and Architecture (SPA) New Delhi, India

2006

Class 12

Udayan Higher Secondary School Dhaka, Bangladesh

R E S U M E

EDUCATION

Australia • Australian Institute of Architects (AIA) A+Membership (62877) Bangladesh • Candidate Member (CS222), Institute of Architects, Bangladesh (IAB) • Member, Registration Committee, CAA Dhaka 2013

SKILLS Design

Revit

Documentation

Adobe InDesign

Design Research

Adobe Illustrator

Analysis Diagrams

Adobe Photoshop

Team Work

Sketch Up

Management

AutoCAD

INTERESTS

HOBBIES

- Sustainability in Design - Future Design Parameters - Materials - Leadership - Documentation Efficiency - Design Execution & Management - Site Supervision

5 Travelling Photography Food Cycling Movie


WORK EXPERIENCE PROJECTS | SCOTT CARVER PTY LTD, SYDNEY

7


PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

BASIC ROLES Design - Actively involved in design process, reporting to the Project Leader. Documentation - Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems. - Coordinate the documentation of the project. Ensure the architectural and consultants’ documentation are checked and confirmed for consistency with the detailed design intent and with quality, cost and time parameters Project Management To confirm objectives and conditions at inception of project, - Establish site conditions - Assess regulatory context; The implications of the law, relevant codes, regulations and industry standards are identified, understood and assessed - Prepare preliminary project evaluations, programs and feasibility studies; The need for consultants, contractors and suppliers is established - Establish requirements for, and coordinate, specialists To provide contract administration for the construction of a project - Administer a standard form construction contract - Establish and maintain administrative processes ensuring progressive fulfillment of requirements of contract documents - Monitor construction progress systematically and ensure compliance with the contract provisions and budget

8

SOFTWARES USED Revit (Advance) BIM modelling, drafting, drawing production, presentation drawings, scheduling, Coordination with consultants Aconex & Union Square (Advance) Online document management Indesign, Photoshop & Illustrator (Advance) Presentation drawings AutoCAD(intermediate) Sketchup (intermediate)


PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

CONTENTS Residential - -

- - - -

Harold Park Affordable Housing 139 Bowden Street, Meadowbank Wentworth Point - Block C Sirius Construction Phase 33 Henderson Road Alexandria – DA Submitted Discovery Point 2- Residential Tower- Under Construction Wentworth Point – Regatta - B Under Construction

Mixed Use: Retail + Residential - -

Catholic Diocese Commercial Development Parramatta Kogarah RSL Club ( DA & Tender Stage) Wentworth Point Block E Mixed Use Development Walker Street Residential Conversion Wentworth Point Lot 8 - Stage 1 DA Wentworth Point Block E & H Stage 1 DA 210-220 George Street Hotel and Residential Development Wentworth Point Block H Mixed Use Development

Retail - - -

The Rosenthal Project North Kellyville Woolworths Wentworth Point Block E Marina Square- Retail Leichhardt Marketplace WW Petrol - Shop 200 Woolworths Petrol @ Batemans Bay WW Petrol Standards Review 2015

Master Plan -

Bridge Plaza Batemans Bay Holsworthy Plaza Campbelltown Centre of Excellence

Landmark Project -

Sydney Opera House VAPS Project

9


FOR INFORMATION 90% DESIGN SUBMISSION ADCO REVIEW

THE ROSENTHAL PROJECT Market: Retail + Public | GBA 30,000 sqm incl. 650 carparks | Tender & Construction | Cost: 65M Project Role: Senior Graduate [Documentation Team Member] Supervising Architect: Robert Sanderson [NSW 5150] [Scott Carver] Project Status: Under construction

2

1

TOW 85.610

TOW 85.610 FOLDED COLORBOND PARAPET CAPPING

FOLDED COLORBOND PARAPET CAPPING NOMINAL 1200H MECH PLANT BY LESSEE

RWS-102 GUTTER TO HYD DETAILS

EWS-101 ;EXTERNAL WALL SYSTEM - TYPE 1

CORRUGATED METAL LINING TO INTERNAL FACE OF ALL PARAPETS FIXED HORIZONTALLY

RFS101 + INS-101 INS-301

CORRUGATED METAL LINING TO INTERNAL FACE OF ALL PARAPETS FIXED HORIZONTALLY

PEP-101 ;PLANT EQUIPMENT PLATFORM CONFORM

FLASHING

ROOF LEVEL FFL 84.600

RFS-102 FOLDED COMPOSITE FASCIA

RWS-103 GUTTER TO HYD DETAILS

FOLDED COLORBOND CAPPING OUTRIGGER TO STRUCT ENG DETAIL

RFS-102 FOLDED COLORBOND CAPPING FOLDED COMPOSITE FASCIA

275

Project Description: Design and construct documentation for a new Public Domain and retail development for Lane Cove Council with 30,000 sqm area including 650 carparks over four levels on a 7127sqm site. The project includes two major supermarket (COLES and ALDI) and a few small tenancies on the park level.

FCL 83.350

CLG-401 EXPOSED RAFTER PAINT FINISH+TIMBER INFILL

SYPHONIC DRAINAGE TO HYD DETAILS

FX-111

FCL 83.100

FCL 82.780

FINISHED CEILING LINING BY LESSEE

FCL 82.800

CLG-401

BULKHEAD

EXPOSED RAFTER PAINT FINISH+TIMBER INFILL

EWS-101 ;EXTERNAL WALL SYSTEM - TYPE 1

2700

RETAIL BLOCK 2

REFER TO LANDSCAPE DRAWINGS FOR PAVER DETAILS

CONCRETE PLINTH AT EACH COLUMN TO STRUCT ENG DETAILS

STRUCTURAL VOID FORMER STRUCTURAL SLAB TO ENG DETAIL

PROTECTION BOARD

FINISHED FLOOR BY LESSEE

WPS601 WPS-602

FCL 80.100

REFER TO LANDSCAPE DRAWINGS FOR PAVER DETAILS

LEVEL 02 - PARK

SECTION - BLOCK 2 CROSS SECTION

1

1 : 25

Construction principally concrete framed, with piling walls retaining the large excavation. The building is enclosed with non-load bearing masonry infill and perimeter walls. Wall along the laneways includes brick facades and timber finishes. The major wall to the residential areas is a “naturalistic” stone wall.

[Project]

Level One, One Chifley Square Sydney NSW 2000 Australia www.scottcarver.com.au +61 2 9957 3988

[Client]

THE ROSENTHAL PROJECT

0

ADCO CONSTRUCTIONS PTY LIMITED

0.25

[Scale]

0.5

0.75

1

RETAIL BLOCK 2 - PARK LEVEL SEC

1.25 m

1 : 25 @ A0

[Ref]

20160050

Level of Responsibility: Documentation, design input, ensuring design addresses accessibility standards, National Construction Code (NCC) , Section J and JV3 Energy Modelling Report; contributing to the BIM Revit model in team. Participate in designing the individual buildings and public plaza including façade designing and materials working out the levels to accessibility and slip resistance codes and other standards. FOR INFORMATION

[Status]

Level of Participation: Most part of the experience was of a participant level with some aspects at an executive level.

10

A

8376

B

C

8400

D

8400

8400

E

F

8525

cD

cB

8525

G

H

8525

J

8650

K

8700

8575

L

[Nom. Architect]

[Print Date]

N

8400

P

8400

cF

1

U

1

AR-CD1071

AR-CD1072

T

FSL 78.755 B

FSL B 78.496 B

FSL 78.798 B

B

FSL 78.982

FSL 78.845 B

B

FSL 79.106

FSL 78.931

FSL 79.041

SP-W

FSL 79.411

FSL 79.256

BIRDWOOD LANE FSL 79.184

FSL 79.293

FSL 79.654

B

1:20

8600

B

7

B B

DOWN TO RETAIL

ESCALATOR 2

UP FROM RETAIL

SP-W

LOW

VOID

PARK RETAIL BLOCK 3

SP

PUBLIC ART

WATER FEATURE

PARENTS RM

FSL 80.500

PARK REFER TO LANDSCAPE ARCHITECTS DRAWINGS FOR LAYOUT AND DETAIL

LIFTS FROM RETAIL AND CARPARK LEVELS BELOW

EXTENT OF VOID BELOW

FSL 81.356

9

SFL 79.850

ANE L L

SP

STAGE

2

FSL 81.244 FFL 80.300

GREEN ROOM

RL 80.700

LP

SP

SP-W

SP

A/V STORE

8

THA

RETAIL ENTRY SFL 79.350

FSL 81.588

FSL 81.703

SEN

SFL 79.350

FSL 79.404

ACC

1 B

ESCALATOR 1

FFL 79.900

FSL 79.440

BIRDWOOD AVE

FSL 82.217

FSL 81.807

RO

SFL 79.350

SFL 79.350

FSL 79.650

B

BE VOID

8700

FSL 80.628

B

NT OF

8700

FSL 80.285

B FSL 81.120

B

EXTE

PARK RETAIL BLOCK 2

1:33

4

FSL 81.851 FSL 81.186

FSL 80.747

B

PARK RETAIL BLOCK 1

3

FSL 79.961

B

R

FFL 79.900

LIFTS FROM CARPARK LEVELS BELOW

HYDRANT BOOSTER SPRINKLER BOOSTER COLD WATER METERS GAS METERS

FSL 80.403

FSL 80.079

FSL 79.772

FSL 79.000

1

2

FSL 82.007

S

FSL 78.890

FSL 78.701

FSL 78.610

3 10

LP

FFL 80.900

SP

4

COMM WOMENS

SP

SFL 79.350

CLNR

MENS

SP

ACC

11

PLENUM LP

SP-W SP-W

17000

5

FSL 80.100 0 1:2

PARK RETAIL BLOCK 4

FSL 81.710 FSL 80.350

SP SP-W

FSL 81.510

6

SFL 81.550

FSL 81.010

SP

cD

cB A

B

C

D

F

G

H

J

ROSENTHAL AVE PROPOSED PEDESTRIAN BRIDGE SUBJECT TO PART 5 APPLICATION

FUTURE DEVELOPMENT

FFL 80.750

6

U

ERL 73.802

cF E

FSL 79.900

SP-W

SFL 81.550

SP

SP

Park Level Plan

5

SP-W

KERB INDICATED 2M FROM BOUNDARY TO BE CONFIRMED BY CIVIL / TRAFFIC ENGINEER

K

L

17/11/2017 5:30:50 PM History

M

8400

Robert Sanderson 5150

[File]

1:25

PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

A B

M PROPOSED NEW ROUNDABOUT TO SEPARATE APPLICATION

N

T

P

S R

FSL 80.313

[Rev#]

[Description]

A

FOR INFORMATION

05.05.2017

B

FOR INFORMATION

08.05.2017

C

50% DESIGN REVIEW RESPONSE

09.06.2017

[Date]

D

FOR INFORMATION

E

FOR INFORMATION

05.07.2017 13.07.2017

F

FOR INFORMATION

22.08.2017

G

FOR INFORMATION

08.09.2017

H

RETAIL WALL FRAMING

03.10.2017

I

FOR INFORMATION

06.10.2017

J

FOR INFORMATION

20.10.2017

K

FOR INFORMATION

03.11.2017

L

90% DESIGN SUBMISSION ADCO REVIEW

17.11.2017

[Dwg No]

AR-CD3425


Robert Sanderson 5150

[File]

P

N

M

L

K

[Print Date]

17/11/2017 5:00:54 PM History

EWS-101

ROOF LEVEL FFL 84.600

WATER FEATURE MENS PLANT ROOM L2.17

BAL-101

WIN-101

CLEANERS ACCESSIBLE WC L2.16

[Rev#]

[Description]

A

FOR INFORMATION

05.05.2017

[Date]

B

FOR INFORMATION

08.05.2017

C

FOR INFORMATION

22.08.2017

D

FOR INFORMATION

04.09.2017

E

FOR INFORMATION

08.09.2017

F

FOR INFORMATION

06.10.2017

G

FOR INFORMATION

20.10.2017

H

90% DESIGN SUBMISSION ADCO REVIEW

17.11.2017

BAL-101

L2.15

L2.14

RETAIL BLOCK 3 & 4 FFL 80.900 LEVEL 02 - PARK

TENANCY 2

8

MEZZANINE LEVEL

TENANCY 2 AMENITIES

TENANCY 2 - (BOH)

L1.A01

AR-CD5150

L1.A03

TENANCY 1A

D103 L1.FS4

L1.A02

FFL 78.000

MEZZANINE PLANT ACCESS STAIR

L1.C01

LEVEL 01 - RETAIL FFL 74.750 ROCK CONTOU R

FAN ROOM

CARPARK

B0.20

ELEC/COMMS B0.19

D62 B0.19

LEVEL B0 - CARPARK / DOCK

11

FFL 71.500 D34 B1.15

ROCK CONTOUR

CARPARK

LEVEL B1 - CARPARK FFL 68.680 D17 B2.FS6

CARPARK LEVEL B2 - CARPARK FFL 65.860

D03 B3.02

CARPARK LEVEL B3 - CARPARK FFL 63.040

2

OVERALL SECTION 02 - PART 2 1 : 100

A

B

C

D

cB

E

F

cD

EWS-101 EWS-101

G

H

J

K

L

cF

EWS-101

EWS-101

EWS-101

ROOF LEVEL

EWS-101

FFL 84.600

STAGE LEVEL FFL 80.700 LEVEL 02 - PARK EXHAUST DUCT

EXHAUST DUCT

TENANCY 1A L1.C01

MEZZANINE LEVEL

LIGHTING ZONE

500

EXHAUST DUCT

FFL 78.000

3200 CLEARANCE

EXHAUST DUCT

TENANCY 1A L1.C01

LEVEL 01 - RETAIL

COLES (BOH) B0.10

ROCK CONTOUR

D47 B0.09

COLES AMENITIES & OFFICE B0.09

FFL 74.750

HYDRAULIC SERVICE PLANT ROOM B0.11

RAINWATER REUSE TANK B0.12

CARPARK

CARPARK

ROCK CONTOUR

LEVEL B0 - CARPARK / DOCK FFL 71.500

COMMS B1.09

RECEPTION B1.08

AIRLOCK

CARPARK

CARPARK

CARPARK

CARPARK

B1.07

LEVEL B1 - CARPARK

BLK-102

FFL 68.680

4

AR-CD5150

D11 B2.02

D12 B2.03

LEVEL B2 - CARPARK

BLK-102

FFL 65.860

5

AR-CD5150

CARPARK

CARPARK

D01 B3.01

LEVEL B3 - CARPARK FFL 63.040

1

AR-CD5150

1

OVERALL SECTION 01 - PART 1 1 : 100

Section [Project]

Level One, One Chifley Square Sydney NSW 2000 Australia www.scottcarver.com.au +61 2 9957 3988

[Client]

THE ROSENTHAL PROJECT ADCO CONSTRUCTIONS PTY LIMITED

0

1

2

3

4

SECTIONS - SHEET 1

5m

1 : 100 @ A0

[Scale]

[Ref]

20160050

[Dwg No]

AR-CD2211

[Rev]

H

PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

FOR INFORMATION

[Status]

[Nom. Architect]


Market: Retail | Status: Completed | GBA 14967 sqm | 26 tenancies inc. Woolworths | Cost 25M Project Role: 2IC Supervising Architect: Robert Sanderson [NSW 5150] [Scott Carver] Project Status: Project completed in July 2017 Level of Responsibility: North Kellyville Square represented a significant leap in responsibilities and roles primarily because only two people were working on the project, me and the Project Leader; also, due to the sheer scale of the project and number of stakeholders. My role was to manage the project after design development through construction documentation and construction advice, as project 2IC, continuously liaising directly with project managers, sub-consultants, builders to provide decisions on design and project parameter. Co-ordinating architectural and consultants’ documentations for consistency with the detailed design intent and with quality, cost and time parameters. Also, inspecting construction work in progress and meeting sub-contractors and engineers weekly on site, initially supervised by the Project Leader, later on my own; moreover, to ensure compliance with plans, specifications and quality standards. The role also included guidance to the client on establishing Retail Management programs and manuals for leasing purposes; followed by post construction defects inspection. Level of Participation: The role was primarily of an executive level.

35

RFS-501

RFS-501

CAPPING WITH RIGID POLYSTYRENE BACKING

150

50

3° FALL 100

INSERT PACKER TO SUIT

100

"V" FOLD IN FASCIA CAPPING TO PREVENT OIL CANNING

TOP OF WALL LEVEL VARIES

TOP HAT SUPPORT @ 600 mm CRS

20

20

220

40 INS-301 INS-101

MIN OVERLAP

100

RFS-511 FOAM CLOSER RFS-101

RFS-505 MAX HEIGHT FLAT BACK SHEETING < 300mm

CRIMPED SHEETING

TOP OF WALL LEVEL VARIES

COLORBOND KLIPLOK HI-TEN STEEL ROOF SHEETING ON 75mm INSULATION, FOIL SARKING & WIRE SAFETY MESH AS PER ARCH. SPECIFICATION

600

NOTE : OUTLETS TO BE SUPPLIED BY SYPHONIC DRAINAGE CONTRACTOR & INSTALLED & SEALED BY ROOFER

RFS-101

200

220

"V" FOLD IN FASCIA CAPPING TO PREVENT OIL CANNING TOP HAT SUPPORT @ 600 mm CRS RFS-505, IF<300MM RFS-506, IF>300MM

HARDWOOD PACKER TO SUIT

3° FALL

100

150

80

50

100

RFS-511 FOAM CLOSER

50

FLASHING FITTED UNDER GUTTER

80

INS-101 INS-301 SIDE SUPPORT AS REQUIRED INSULATION CONTINUOUS AROUND BOX GUTTER STEEL PURLIN & CLEAT TO ENG DETAIL

200

PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

North Kellyville Square

RWS-401

STEEL RAFTER TO ENG DETAIL

CON-201 PRE-CAST CONCRETE PANEL TO ENG DETAIL. PAINT FINISH

12

IWS-101 IWL-102 INS-111 IWS-101 IWL-102 INS-111

11

SECTION - TYPICAL FLASHING AT TILT ROOF TO PARAPET

12

1:5

RWS-101 - TYPICAL BOX GUTTER (SYPHONIC) 1:5

440

MIN CAPP RFS-511

50

150

COLORBOND BAFFLE FLASHING TURN UP AT ONE END, NOTCH OVER RIBS ABD FASTEN TO UNDERLAPPING SHEET

35

3° FALL

RFS-511

TOP OF WALL LEVEL VARIES

FALL

20

RFS-101 TURN UP AT END "V" FOLD IN FASCIA CAPPING TO PREVENT OIL CANNING

100

INS-101 INS-301

RFS-506

80

59

20 30

STEEL STRUCTURE TO ENGINEERS DETAILS

200

PURLINS TO ENG. DETAIL STEEL STRUCTURE TO ENG. DETAILS RAFTER TO ENG'S DETAIL

TYPICAL TILT PANEL PARAPET CAPPING

9

1:5

SECTION - TYPICAL ROOF EXPANSION JOINT

10

1:5

SECTION - TYPICAL RIDGE 1:5

GUTTER RETURN

MAXIMUM 15MM DEEP SAW CUT FOR INSTALLATION OF FOLDED METAL FLASHING RFS-506 ON FURRING CHANNELS AT 600 MAX. CRS.

UNDER FLASHING TO SHEET JOINT

RFS- 511 FOAM CLOSER

BOX GUTTER WIDTH

35

RFS-101

RFS- 502 RFS-101

INS-101 INS-301

40

SMOKE EXHAUST

RFS-501

GUTTER RETURN

RFS-502

80

5

RFS-511 FOAM CLOSER STRIP RFS-501

GUTTER TRAY

RFS-501 RFS-502

RFS-502

INS-101 INS-301 RFS-101

100

RFS-511 FOAM CLOSER

GUTTER TRAY

MIN OVERLAP

INS-101 INS-301

150

150

200

8

50

220

100

RFS-501 INSERT PACKER TO SUIT

PLAN - TYPICAL BOX GUT 1:5

4


PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

North Kellyville Square - Photos on Completion

13


FOR

Status: Nom. Architect

Bs B

Ds

C

Es

D

Fs

E

Gs

F

G

Hs1 Hs2

Is

H

ROB

15/04/2

Print Date:

I

J

K

L

M

N

O

P

Q

Rev.

R

Description

E F

North Kellyville Square

TENANCY UPDAT UPDATED TENAN DRAWING UPDATED TENAN DRAWINGS

G

FOOD RETAILS

1

NON-FOOD RET

11

12

V 5 1

2

3

6

7

4 8

NEWSAGENT/ TOBACCONIST

9

10

CAFE (FOOD)

2

T05 115 m²

V

PHARMACY

MASSAGE

T08 201 m²

T07 115 m²

NAILS

T09 61 m²

HAIR & BEAUTY

T10 60 m²

RESTAURANT

T11 79 m²

MAJOR

T12 137 m²

2S

LICENSED SEA V

3

4

BWS 186 m²

4s 5

7

5

M4

MAJOR 4275 m²

1500

CAFE (FOOD)

Tenancy Sched

T04 114 m²

Name

20250

6

115

TAKE AWAY (FOOD)

7

T02 40 m²

CHICKEN (FOOD) T03 90 m²

8 8s

T12 T13 T14 T15 T16

FOOD

T01 150 m²

O

9

O O

UP

10

Status:

UP

UP

A

B

T17

DN

UP

10s

C

D

E

Occupanc

T01 T02 T03 T04 T05 T07 T08 T09 T10 T11

LICENCED SEATING ZONE

6

PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

A

Cs

File:

F

Nom. Architect

G

H

I

J

K

L

M

N

O

P

Q

File: T18 Print Date: T19

R

Rev.

D E

11

F

Ground Floor Plan

RESTAURA TAKEAWAY TAKEAWAY TAKEAWAY BAKER/CAF NEWSAGEN PHARMACY MASSAGE NAILS HAIR AND BEAUTY RESTAURA RESTAURA REAL ESTA DRYCLEAN ANCILARY MEDICAL FO MEDICAL CENTRE R GYM 15/04 CARWASH

Description

DA ISSUE UPDATED TENA DRAWING UPDATED TENA DRAWINGS

NOTE: T06 HAS BEEN DISC AND T07 HAVE BEEN MERG TENANCIES, T05 AND T07.

1

14

T18 451 m²

2

MEDICAL CENTRE T17 201 m²

T16 63 m²

T15 58 m²

T14 72 m²

T13 130 m²

2S 3

4

Scott Carver Pty Ltd

Telephone +61 2 9957 3988

Level One, One Chifley Square

hello@scottcarver.com.au

Sydney NSW 2000 Australia

www.scottcarver.com.au

Project Client

NORTH KELLYVILLE RETAIL DEVELOPMENT

6 CASHIER AND LAUNDRY BY TENANT

7 T19 104 m²

8

9 10

11

Basement Plan

LEASING PLA Reference No.

0

5

1:500 @ A3

1:250 @ A1

RG PROPERTY 2.5

5

7.5

10

12.5

17.5

25m

20140074

Discipline


2 ISSU CON CER 3 FOR 4 AS E The final The dep draw

Level - Mezzanine 4500

FFL 81.85 WOOLWORTHS TRADING AREA

Level - Ground 3350

FFL 77.35 Level - Basement

North Kellyville Square

FFL 74.00

SECTION 3 - CD203

3

1 : 200

Bs Bs AA

Cs Cs1 Cs Cs1

BB

Ds Ds

CC

Es Es

DD

Fs Fs

EE

Gs Gs

FF

GG

Hs1 Hs2 Hs2 Hs1

IsIs

HH

II

JJ

KK

LL

MM

NN

OO

PP

QQ

RR

GARBAGE & 1 AD-CD210 RECYCLING

T01 147 m²

BLK-102

STAIR 3

73400

ELEC. MTR ROOM 1

SECTION 2 - CD1 CD203

42

3350 3350

Level - Ground Level - Ground FFL 77.35 FFL 77.35 Level - Basement Level - Basement FFL 74.00 FFL 74.00

BIORETENTION SUBSTATION BASIN

CP EXHAUST ROOM

4500 4500

Level - Mezzanine Level - Mezzanine FFL 81.85 FFL 81.85

CON-210 PT-501

1 : 200

Es A

Bs

Fs

B

E

F

C

Cs Cs1

Gs Ds D

G

Es Hs1 Hs2 H

IsFs

E

I

F

Gs J

G

K

Hs1 Hs2 H

Is L

I

M

J

N

K

O

L T10

P

M

N

Q

O

R

P

Q

R

T11

Level - Mezzanine

Level - Mezzanine

FFL 81.85 4500

ENTRY

T09

T12

FFL 77.35 HWU

Level - Ground

Level - Ground T17

73950

VOID

Level - Basement

73850 T15/16

FFL 77.35

3350

WOOLWORTHS TRADING AREA

T08

WOOLWORTHS TRADING AREA

4500

FFL 81.85 WOOLWORTHS TRADING AREA

3350

Ds

Level - Basement FFL 74.00

FFL 74.00

SECTION 31 -- CD203 CD 203 SECTION

31

200 11 :: 200

Cs Cs1

Ds

8s C

B

D

7 AD-CD513 Scott Carver Pty Ltd Level One, One Chifley Square Sydney NSW 2000 Australia

Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au

Es

Fs

Gs

E F G NORTH KELLYVILLE RETAIL DEVELOPMENT

Hs1 Hs2 H

Is 10

I

10s

J

K

L

M

N

10

10s

O

P

Q

R

Project Client

20140074

GARBAGE & RECYCLING

163

RFS-101 INS-101

Level - Mezzanine FFL 81.85

Is

J 4500

CON-210 PT-501

Level - Ground

BIORETENTION BASIN LVR-102

FFL 77.35

BLK-102

Level - Basement

73400

STEEL STRUCTURE TO ENGG. DETAILS

2559

FFL 74.00 RFS-101

ELEC. MTR ROOM 1

SECTION 2 - CD203

2

1 : 200

8 AD-CD513

Ds

Es E

INS-101

Fs F

Gs

Hs1 Hs2

G

Is

H

I

J

K STEEL STRUCTURE TO ENGG. DETAILS L

M

N

RWS-111 200MM HALF RD EG DP- RWS-201

12 AD-CD513

O

P

Q

12

RFS-101 INS-101

R

RWS-111 200MM HALF RD EG

AD-CD513

T10

Level - Mezzanine

CON-201 PT-501[C1]

T08

ENTRY

T09

FFL 81.85

T12

PLANT ROOM VOID

IWS-102 INS-203 IWL-102,WP

FFL 77.35 T17

73950

Level - Basement

73850 T15/16

3350

Level - Ground HWU

INS-111

4500

CLG-101 +2700

WOOLWORTHS TRADING AREA

FFL 74.00

15

LEVEL - ROOF

LEVEL - ROOF

FFL 83.35

SECTION 1 - CD 203 D.M05

1 : 200

1500

WWX.2 CON-201 PT-501[C1] BLK-102

Scott Carver Pty Ltd Level One, One Chifley Square Sydney NSW 2000 Australia

Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au

Level - Mezzanine

NORTH KELLYVILLE RETAIL DEVELOPMENT Project INS-131 CON-201 PT-501[C1]

CLG-205 +4000

FFL 83.35

Level - Mezzanine

FFL 81.85

Client

RG PROPERTY

Level

FFL 85.35

T11

BLK-102

BLK-102

1

5 AS B The final The dep draw tena infor inclu

Reference No.

RG PROPERTY

3350

Bs 8 A

PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

WOOLWORTHS TRADING AREA

FFL 81.85

Reference No.

20140074 Ceiling FFL 81.35

STEEL JOIST TO SUPPORT THE SUSPENDED FIBRE CEMENT CEILING

CLG-302 +2700 CLG-101 +2700

8

1200

AD-CD512

VOID BAKERY FRZ 4 m²

BAKERY COOLROOM 6 m²

BLK-101

2100

BAL-102

50mm SETDOWN

Level - Ground

170THK

BOTTOM OF PANEL INS-131

INS-131

LICENCED SEATING AREA

150mm THICK PRECAST

DOOR

WOOLWORTHS TRADING AREA 2924 m²

T03

77.25

BOTTOM OF PANEL

77.25

SFL 77.350

2400

800

SLOPE 1:40

SLOPE 1:20

1:40

1:20

FFL 77.35

Level - Ground FFL 77.35

500X1200 CON-102 INS-131, 25MM BELOW THE BEAMS

LOADING DOCK

500X1200 CON-102

500X1200 CON-102

900X400mm EDGE BEAM

INS-131, 30MM BELOW THE SLAB

400Ø COLUMN

BLK-101

WALL SECTION BETWEEN GRID Ds & E 1 : 25

2

WALL SECTION WW TO LOADING DOCK 1 : 25

Level - Basement

FFL 74.00

FFL 74.00

NOTE: STRUCTURE AS PER ENGINEERS DETAILS

NOTE: STRUCTURE AS PER ENGINEERS DETAILS

1

Level - Basement

3

WALL SECTION WW TO EXIT-LOADING DOCK 1 : 25

4

WALL SECTION BWS TO PARKING 1 : 25


16

PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

North Kellyville Square - Site Inspection Images


PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

North Kellyville Square - Site Inspection Images

17


127-131 BOWDEN STREET 3 STOREY COMMERCIAL BUILDING

ANGAS STR

8 ANGAS STREET 5 STOREY RESIDENTIAL FLAT BUILDING

UNDERDALE LANE

Rev.

Description

Date

139 Bowden Street, Meadowbank

UNDERDALE LANE

L

.000

17

.325

18

18

21

20

.094

.442

.822

U N D E R D A L E 17

.059

Market: Residential | Status: Section 96, Site Area 750 sqm, FSA 2000 sqm around 22 dwellings, Cost: 11M

.621

Project Role: 2IC Level of Responsibility: 15 .842 14 13 .729 12

BOWDEN STREET

BIN COLLECTION AREA. 11 x 240L

ANGAS LANE

14 .101

STAIR 9 ENTRY

PATH DRIVEWAY

ROOF

GARBAGE COLLECTION AREA

SUBSTATION 2

SUBSTATION 1

ROOF

EXISTING TWO STOREY FACTORY BUILDING

PEDESTRIAN RIGHT OF WAY

PEDESTRIAN RIGHT OF WAY

141 BOWDEN STREET 6 STOREY RESIDENTIAL FLAT BUILDING

AS LAN E

Site Plan

Status:

1:200 @ A1

U.N.O.

0

10

15000

Dwg. No.

Issue

AD DA004

Rev. C

BALCONY 203

KITCHEN

PEBBLE ROOF BELOW

4000

1

L5.02 4.2 m3

LDY

BALCONY 202

BATH

BATH

BATH

COMMS

2 BED

UP

2 BED

203 LIVING / DINING

202 LIVING / DINING

ST

ST

Status:

UP

BED 2

L

2

2

2

2

2750

2

2

BUILDING LINE BELOW 3250

8

Typical Floor Plan A

B V

C S

W D R

E T

U F

G O

H P

19/10/2017 2:14:23 PM

Print Date:

201

LIVING/ DINING

BED 1

RODNEY PAESLER 5938

Nominated Architect:

1 BED

ST

ST

BED 2

2. REFER LANDSCAPE PLANS FOR PLANTING DETAILS

BED

LOBBY

9

BATH BED 1

1. REFER BASIX TABLES FOR ENERGY EFFICIENCY REQUIREMENTS.

201

KITCHEN

9

Date 19.10.2017

3.REFER DA REPORTS FOR ADDITIONAL COMPLIANCE ITEMS

LIFT

ST

19/10/2017 4:12:05 PM

Description

S96 ISSUE

GENERAL NOTES:

BALCONY DP

KITCHEN

ST

LOBBY

6

RISER

9705

BATH

L5.01 7.5 m3

LDY

BATH

BED LIFT

17452

1

RISER

1 BED

20170047

20m

COMMS

17452

6

KITCHEN

15

RODNEY PAESLER 5938

Print Date:

APPROVED ADJOINING BUILDING

4000

204 LIVING / DINING

Discipline

Project

5

APPROVED ADJOINING BUILDING

ST

SITE PLAN

Title

Client

204

4

2 1

BILLBERGIA

BALCONY

3

4 3

L6.04 5.8 m3

Nominated Architect:

1

5

139 BOWDEN STREET, MEADOWBANK Project

Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au

2

1

L5.11 5.8 m3

Scott Carver Pty. Ltd. Level 8, 71 Macquarie Street Sydney NSW 2000 Australia

LV2

LV1

L5.09 5.8 m3

BOWDEN STREET

19 ANGAS STREET 8 STOREY RESIDENTIAL FLAT BUILDING

ANGAS LANE

Section 96 Changes: • Two bed units modified to have two bathrooms and a laundry cupboard. • Additional window (w1) to second bedrooms and removal of bottom lower light (w2) to all windows. • Additional winter garden to level five • Change roof configuration to suit new winter gardens. INFORMATION ONLY • Change wall cladding from face brick to cementitious cladding • North wall, adjacent to the 133-137 bowden street • building modified to be solid to screen approved building. • Windows relocated • INFORMATION Column ONLY relocated • Storage area increased

.223

15-17 ANGAS STREET 8 STOREY RESIDENTIAL FLAT BUILDING

RL 11.750

Q I

Rev. C

Description

Date 19.10.2017

S96 ISSUE

X J

21.5m LEP HEIGHT LIMIT

3000

2 BED

602

601

SFL 23.40

DA LEVEL 5A

No. 141 1 BED 5 STOREY 503 RESIDENTIAL BUILDING

1 BED

3000

ROOF A

504

LEVEL 4B

SFL 22.90 1 BED

1 BED

502

501

DA LEVEL 4A

SFL 20.40

1 BED

3000

SFL 17.40

304

SFL 19.90 2 BED

403

1 BED

402

2 BED

401

2 BED

303

1 BED

302

LEVEL 2B

3000

2 BED

301

SFL 14.40 203

2 BED

LEVEL 1B

NATURAL GROUND LINE

SFL 11.40 4000

Scott Carver Pty. Ltd. Level 8, 71 Macquarie Street Sydney NSW 2000 Australia

Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au

DA LEVEL 1A

1:100 @ A1

139 BOWDEN STREET, MEADOWBANK 102 Project

2 BED + STUDY

BILLBERGIA

LOBBY

0

2

3

4

5

HYD SERVICES

3650

PARKING

BASEMENT LEVEL 2 UPPER

20170047

Discipline

Dwg. No.

AD DA112

SFL 6.90

BASEMENT LEVEL 1 LOWER SFL 3.25

PARKING

PARKING

PARKING

3000

2850

SFL 4.10

SFL 1.25

Project

10m

DA GROUND LEVEL A MECH RISER

2400

3300

PARKING

7

LEVEL 1 FLOOR PLAN

Title

DEEP SOIL ZONE

1

SFL 7.40

BASEMENT LEVEL UPPER

SFL 10.90 BOWDEN ST

U.N.O.

2 BED 101

COURTYARD

SFL 13.90

201

Client

LOBBY

GROUND LEVEL B

LEVEL 2A

1 BED

202

1. TWO BED UNITS MODIFIED TO HAVE TWO BATHROOMS AND A LAUNDRY CUPBOARD. 2. ADDITIONAL WINDOW (W1) TO SECOND BEDROOMS AND REMOVAL OF BOTTOM LOWER LIGHT (W2) TO ALL WINDOWS. 3. ADDITIONAL WINTER GARDEN TO LEVEL FIVE. 4. CHANGE ROOF CONFIGURATION TO SUIT NEW WINTER GARDENS. 5. CHANGE WALL CLADDING FROM FACE BRICK TO CEMENTITIOUS CLADDING (WF1). 6. NORTH WALL, ADJACENT TO THE 133-137 BOWDEN STREET BUILDING MODIFIED TO BE SOLID TO SCREEN APPROVED BUILDING. 7. WINDOWS RELOCATED. 8. COLUMN RELOCATED 9. STORAGE AREA INCREASED

3000

204

2 BED

LIST OF CHANGES

SFL 16.90

4000

3000

ANGAS LN

1 BED

LEVEL 3A

3000

LEVEL 3B

404

BOUNDARY

3000

1 BED

SFL 27.20 LEVEL 6A SFL 25.90

BED 1

LEVEL 5B .26 E: 24 RIDG

6

TOW 27.100 TOW 26.200 141 BOWDEN STREET

1300

TOW 26.700

TOW 26.700

SFL 26.40

3000

LEVEL 6B

TOW 27.600

3000

6

BOUNDARY

18

133-137 BOWDEN STREET 3 STOREY FACTORY BUILDING

ANG

PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

13 ANGAS STREET INDUSTRIAL BUILDING

DA BASEMENT LEVEL 2 LOWER SFL 0.25

Section

LIST OF CHANGES

1. TWO BED UNITS MODIFIED TO HAVE TWO BATHROOMS AND A LAUNDRY CUPBOARD. 2. ADDITIONAL WINDOW (W1) TO SECOND BEDROOMS AND REMOVAL OF BOTTOM LOWER LIGHT (W2) TO ALL WINDOWS. 3. ADDITIONAL WINTER GARDEN TO LEVEL FIVE. 4. CHANGE ROOF CONFIGURATION TO SUIT NEW WINTER GARDENS. 5. CHANGE WALL CLADDING FROM FACE BRICK TO

Issue

C


Market: Residential | Status: Tender Stage | GBA 6009 sqm | 86 Dwellings | Cost: 20.6M Project Role: Documentation Team Member Supervising Architect: Peter St Clair [NSW 7325] [Scott Carver] Project Status: Under Construction

[Status]

FOR INFORMATION

[Nom. Architect]

PETER ST CLAIR /7325

[File]

20150166-DA-DA01

[Print Date]

25/08/2017 12:30:18 PM History

[Rev#]

[Description]

A B C D E F H G I

FOR INFORMATION FOR INFORMATION FOR INFORMATION FOR INFORMATION FOR INFORMATION FOR INFORMATION FOR INFORMATION FOR INFORMATION FOR INFORMATION

[Date] 02.06.2017 09.06.2017 14.06.2017 23.06.2017 07.07.2017 12.07.2017 09.08.2017 01.08.2017 25.08.2017

Level of Responsibility: Coordination and integration of information and project materials from relevant consultants and specialists, adoption of strategies, program and process of documentation to enable project delivery, incorporation of the project requirements and objectives in accordance with Project Brief and approved detailed design, ensuring design addresses accessibility standards and contributing to the BIM Revit model as an active team member. B2

C2

2500

6950

AD-CD214

G2

H2

4250

I2

4250

J2

4250

K2

4250

L2

4250

M2

4250

2500

1

3

AD-CD221

AD-CD215

AD-CD215

2

AD-CD214

02

6950

1

4

9

AD-CD214

N2

2350

5

9

AD-CD215

AD-CD541

9

AD-CD215

AD-CD541

AD-CD541

2

BL CTF

AD-CD541

D11 U-101

236 1.1

6

1

LDY BED 3

U-101

AD-CD224

D212 FS-?

FH

D37 U-101

S

AD-CD541

D11 U-102

WC

SFL 11.660

D21 U-101

D41 U-101

U-101

D01 U-101

ENTRY

WC

D21 U-102

F

L-101

LIVING

1B U-102

D01 U-102 D01 U-108

U-108

LIVING

ENTRY

KITCHEN WC

5

1B U-110

D11 U-110 BED 1

U-110

D21 U-110

ENTRY

D38 U-110

S

WC

LDY

BED 1

LIVING

LIVING

LIVING

LIVING

LIVING

LIVING

L-101

H

D11 U-103

1720

1B U-103 KITCHEN

LOBBY 1 L-101

RL 11.660 KITCHEN

D44 U-019 U-019

2B U-019

H

KITCHEN

D44 U-018 U-018

KITCHEN

2B U-018

2B U-017

KITCHEN

D44 U-017 U-017

KITCHEN

KITCHEN

D44 U-016 U-016

2B U-016

2B U-015

D44 U-015 U-015

D44 U-014 U-014

KITCHEN

S

H

H

LDRY

S

LDRY

H

S

H

LDRY

S

LDRY

H

S

H

2B U-014

2B U-013

LDRY

S

D44 U-013 U-013 LDRY

D44 U-012 U-012

H

S

H

D L-102

L-102

L-102

2B U-012

LOBBY 2 L-102

C

5

AD-CD541

LDY

1B U-108

D21 U-019

WC

D21 U-018

WC

D21 U-017

WC

D21 U-016

WC

D21 U-015

D21 U-014

WC

WC

D21 U-013

WC

1B U-107

D21 U-012

WC

D44 U-103

D21 U-105

KITCHEN

LIVING

D45 U-107 D21 U-107

S

FS-?

D01 U-418

U-019 BED 1

KITCHEN

1B U-109

281 1.44

LIVING

1501 3575

1

AD-CD541

BL CTF

LDRY

U-109 U-109

S

L-101 D21 U-109

D11 U-109

ENTRY

U-109

1550

252 1.43

261 1.40

WC

BED 1

BL CTF

-

---

253 1.42

D11 U-019

D11 U-018 U-018

U-017

D11 U-017

D11 U-016 U-016

U-015

D11 U-015

D11 U-014 U-014

U-013

D11 U-013

D11 U-012 U-012

BED 1

BED 1

BED 1

BED 1

BED 1

BED 1

BED 1

BED 1

BL CTF

EX

257 1.39

BL CTF

8

AD-CD541

W216 1.38

BL CTF MBL4

BL CTF

W216 1.37

W216 1.36

BL CTF

MBL4

MBL4

BL CTF

W216 1.35

MBL4

BL CTF MBL4

W216 1.34

BL CTF MBL4

W216 1.33

BL CTF

W216 1.32

BL CTF

MBL4

W216 1.31

MBL4

MBL4

BL CTF

257 1.30

261 1.29

D45 U-106

S

LDY

MBL4

D47 U-106

LIVING

4s

D11 U-106 U-106 D21 U-106 WC

4

BL CTF

S

BED 1

4t

267 1.26

SFL 10.140

LIVING

LIVING

249 1.41

5635

3s

D15 U-106

WC

KITCHEN

S

1398

6

3 3000

BED 2

SFL 11.660

D11 U-107

250 1.25

2B U-106

ENTRY

FH

H

AD-CD541

4u BL CTF

L-102

ENTRY

250 1.27

BED 1

8

5

AD-CD541

COURTYARD BELOW

5

AD-CD541

5

4

AD-CD542

AD-CD216

Level One, One Chifley Square Sydney NSW 2000 Australia www.scottcarver.com.au +61 2 9957 3988

2s

D11 U-105

1B U-105

277 1.24

F

D01 U-107

250 1.23

BED 1

S

D01 U-103

D11 U-107

KITCHEN

ENTRY

WC

D37 U-105

D21 735

ENTRY

H

LDRY

S

KITCHEN

D01 105

729

L-102

S

WC

G

KITCHEN

LDY LDRY

KITCHEN

LDY

H

LIVING

1

949

LDY

229 1.16

RL 11.660

1B U-104

U-104

U-104 S

940 258 1.15

D11 U-108

H

U-110

S

TER CTF 258 1.14

E

L-101

L-101

D44 U-108

S

D01 U-110

TER CTF 258 1.13

E

D L-101

D45 U-108

1622

236 1.45

AD-CD541

TER CTF 258 1.12

LDY G

S

254 1.46

AD-CD216

TER CTF 258 1.11

LDY

C

270 1.47

BL CTF

MBL5

6

TER CTF 258 1.10

129 1.7

KITCHEN

U-102 ENTRY

D44 U-102

S

U-101

S

BL CTF 258 1.9

D11 U-104

D21 U-104

ENTRY

U-105

3B U-101

KITCHEN

U-101

AD-CD541

S

U-104

275 1.22

2590

BED 2

1

TER CTF 258 1.8

SFL 19.260

1803

AD-CD541

TER CTF

BED 1

D15 U-101

LIVING

D44 U-104

LIVING

BL CTF

BED 1

WC

279 1.19 259 1.18

LIVING

236 1.2

5

MBL4

BL CTF

LIVING BED 1

257 1.17

4

273 1.21

4118

257 1.6

MBL4

259 1.5

AD-CD541

3890

271 1.4

BL CTF

AD-CD541

2075

250 1.3

2

MBL4

9

BL CTF

264 1.20

1885

MBL4 MBL4

BL CTF

BL CTF

1350

390

MBL4

AD-CD541

MBL4

2228

9

F2

4250

AD-CD214

1

AD-CD541

E2

4250

3

3450

AD-CD222

D2

2350

2

MASTER METER/ WATER MET REGULA ER TOR ASS & GAS EMBLY

A2

1

PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

Harold Park Affordable Housing

[Project]

[Client]

HAROLD PARK AFFORDABLE HOUSING CITY WEST HOUSING PTY LTD

0

[Scale]

1.5

3

4.5

6

GA LEVEL 1

7.5 m

1 : 100 @ A1

[Ref]

20150166

[Dwg No]

AD-CD124

[Rev]

I

19


PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

20

Veridian & Kogarah RSL CLUB Market: Residential | Built Area: GBA 17000sqm, 170 dwellings | Status: DA stage, Tender & Construction | Cost: 80M Project Role: Documentation Team Member Supervising Architect: John Ferres [NSW 4955], Hon Diec [NSW9232] [Scott Carver] Project Status: Under Construction Level of Responsibility: Documentation, design input, ensuring design addresses accessibility standards and contributing to the BIM Revit model as an active team member. Tender & Construction Stage: Faรงade design, set up systems and strategies for documentation DA Stage: unit layout, master plan, massing concept design, study SEPP 65.


PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

Veridian & Kogarah RSL CLUB

21


Market: Retail | Status: DA and D&C Tender | GFA 10,870 sqm of retail | Cost: 2.5M Project Role: 2IC Supervising Architect: Robert Sanderson [NSW 5150] [Scott Carver] Project Status: Under Construction Level of Responsibility: Attending meetings with clients as Project 2IC, discussing brief, feasibility studies, design options, fee agreement, project scopes with clients, analysis and evaluation of project requirements and objectives for DA submission BLAXLAND ROAD A

B 8795

B1 7200

C 7200

C1 7200

D

D1

7200

E1

7200

F

7200

F1

7200

G

7200

G1

7200

H

7200

7200

PRELIMINARY

[Status]

H1

I

7200

I1

7200

7200

J

J1

7200

7200

Robert Sanderson /5150

[Nom. Architect]

K 7200

[File]

7/08/2017 2:19:24 PM

[Print Date]

History

3A 1

7200

2

3

AD-CD202

AD-CD202

AD-CD202

[Rev#]

[Description]

A B C

Preliminary Preliminary Preliminary

[Date] 26.07.2017 04.08.2017 07.08.2017

3

NO. 4 PROPOSED LEASEABLE AREAS 5200

4A

2000

AD-CD204

4

Name STAIR (3A) 43 m²

4B

Area

GROUND FLOOR SHOP 1&2 FANTASTIC SHOP 3 SHOP 5 SHOP 6 B1 - MEZZANINE MEZZANINE MEZZANINE TENANCY STORAGE ROOM Grand total

7200

UP

2576 m² 355 m² 2488 m² 1193 m² 838 m² 115 m² 13 m² 7579 m²

7200

5

SHOP 3 355 m²

5A

SHOP 5 2488 m²

NO. 4 PPROPOSED GFA

SHOP 6 1193 m²

Name

7200

SHOP 1&2 FANTASTIC 2576 m²

200

7200

6

AD-CD204

4

1

4070

2

6A

AD-CD204

TOILET 37 m²

4930

7200

200

AD-CD202

200

7

10770

7200

SERVICE BAY 2 54 m²

Area

GROUND FLOOR ACC. TOILET ELECTRIC DISTRIBUTION ROOM FEMALE TOILET GARBAGE DISPOSAL GAS M RM MALE TOILET SERVICE BAY 2 SHOP 1&2 FANTASTIC SHOP 3 SHOP 5 SHOP 6 TELECOM TOILET TOILET B1 - MEZZANINE CORRIDOR 1 CORRIDOR 2 MEZZANINE MEZZANINE TENANCY STORAGE ROOM Grand total

8 m² 13 m² 17 m² 20 m² 3 m² 23 m² 54 m² 2576 m² 355 m² 2488 m² 1193 m² 5 m² 37 m² 11 m² 215 m² 71 m² 838 m² 115 m² 13 m² 8054 m²

PARKING REQUIRED 8057/60 = 135 PARKING PROVIDED 186 ACC. TOILET 8 m²

200 2950 100 2950 200

MALE TOILET 23 m²

7A

ELECTRIC DISTRIBUTION ROOM 13 m²

4050

5600

UP

UP

4000

The drawings have been produced based on drawings collected from Council by client.

200

The drawings are,

1200

200

STAIR 1 16 m²

STAIR 2

A004 - p.r. design co. on June 1990 A007 - p.r. design co. on June 1990 A008 - p.r. design co. on June 1990 A009 - p.r. design co. on June 1990 A010 - p.r. design co. on June 1990 A011 - p.r. design co. on June 1990 A014 - p.r. design co. on June 1990 WD01B - Archworks Architects Pty Ltd produced on March 94 WD01E - Archworks Architects Pty Ltd produced on March 94 WD02A - Archworks Architects Pty Ltd produced on March 94 WD02D - Archworks Architects Pty Ltd produced on March 94 WD02E - Archworks Architects Pty Ltd produced on March 94 WD03A - Archworks Architects Pty Ltd produced on March 94 WD04E - Archworks Architects Pty Ltd produced on March 94

6330

FEMALE TOILET 17 m²

GARBAGE DISPOSAL 20 m² TELECOM

200 2770 200 7260

7200

200

TOILET 11 m²

8

1000

8A 7200

A2 & A3- Produced on May 1989

9

The dimensions are not checked on site and completely based on brief site inspection and photographs. 4

PRELIMINARY

[Status]

AD-CD204

Robert Sanderson /5150

[Nom. Architect]

[File]

4/08/2017 3:29:29 PM

[Print Date]

History

11600 [Rev#]

25500 3000

Level One, One Chifley Square Sydney NSW 2000 Australia www.scottcarver.com.au +61 2 9957 3988

2

Intergen Property Partners

[Client]

AD-CD212

L

Retail Development Blaxland Road, Campbeltown

[Project]

L

M

N

O

7483

P

2

4

6

8

M

N

8934

2633

O

2

[Ref]

AD-CD212

M

N

P

6450

20150148

O

AD-CD102

Name GROUND FLOOR GROUND FLOOR LETTABLE AREA B2 - FIRST FLOOR FIRST FLOOR LETTABLE AREA Grand total

19 18 18

6870

[Dwg No]

17

16

UP

6300

STAIR 1

6300

GOODS LIFT 9 m²

UP

UP

NEW LIFT 7 m²

B2 - GROUND FLOOR - PROPOSED 1 : 200

2

6300 NEW LIFT 7 m²

12

The drawings have been produced based on drawings collected from Council by client.

11 10 M

B2 - MEZZANINE - PROPOSED 1 : 200

PARKING REQUIRED 2186/60 = 36.4 PARKING PROVIDED 37

12

L

1

937 m² 5 m² 5 m² 5 m² 3 m² 5 m² 2186 m²

MEN WC 5 m²

13

12

11 10

Area

1227 m²

13

6300

11 10

GROUND FLOOR GROUND FLOOR LETTABLE AREA B2 - FIRST FLOOR FIRST FLOOR LETTABLE AREA MEN WC MEN WC ROOM ROOM WOMEN WC Grand total

GOODS LIFT 9 m²

14

6300 NEW LIFT 7 m²

937 m² 2164 m²

WOMEN WC 5 m²

STAIR 2 7 m²

14

13

12

FIRST FLOOR LETTABLE AREA 937 m²

STAIR 1 7 m²

STAIR 2 7 m²

GOODS LIFT 9 m²

ROOM 3 m² ROOM 5 m² MEN WC 5 m²

15

UP

STAIR 1 7 m²

14

13

AD-CD212

15

STAIR 2

Area

1227 m²

6300

15

14

1

16 NO FLO OR

15

C

6300

1

AD-CD212

6300

1

AD-CD212

[Rev]

6300

16

6300

17

6300

GROUND FLOOR LETTABLE AREA 1227 m²

6870

17

16

04.08.2017

NO. 8 PROPOSED GFA Name

17

[Date]

Preliminary

NO. 8 PROPOSED LEASEABLE AREAS

P

19

18

[Description]

NO. 4 - GROUND FLOOR PLAN - PROPOSED A

10 m

1 : 200 @ A1 L

19

18

2

[Scale]

AD-CD212

6300

19

0

1500

22

E

7200

7200

PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

Retail Redevelopment Blaxland Road Campbelltown

The drawings are,

11 10 N

O

P

3

B2 - FIRST FLOOR - PROPOSED 1 : 200

A004 - p.r. design co. on June 1990 A007 - p.r. design co. on June 1990 A008 - p.r. design co. on June 1990 A009 - p.r. design co. on June 1990 A010 - p.r. design co. on June 1990 A011 - p.r. design co. on June 1990 A014 - p.r. design co. on June 1990 WD01B - Archworks Architects Pty Ltd produced on March 94 WD01E - Archworks Architects Pty Ltd produced on March 94 WD02A - Archworks Architects Pty Ltd produced on March 94 WD02D - Archworks Architects Pty Ltd produced on March 94 WD02E - Archworks Architects Pty Ltd produced on March 94 WD03A - Archworks Architects Pty Ltd produced on March 94 WD04E - Archworks Architects Pty Ltd produced on March 94 A2 & A3- Produced on May 1989 The dimensions are not checked on site and completely


Market: Retail | Status: Construction Stage | NLA 12,000 sqm | Cost: 35M Project Role: Senior Graduate Supervising Architect: Robert Sanderson [NSW 5150] [Scott Carver] Project Status: Under Construction

Project Description: Design development and documentation of a major retail project in Wentworth Point Development. The project included a new retail center, 45 Commercial and Specialty retail tenancies including COLES supermarket and New Shopping Centre. The project includes free form and curved design with 1500 carpark, thus is challenging to document and execute. Construction is concrete framed with masonry external walls, stud partitions internally and concrete slab as roof with residential component above. Level of Responsibility: Documentation, design input, ensuring design addresses accessibility standards, design and presentation drawing production, marketing plans, design brochure, producing detailed section and contributing to the BIM Revit model as an active team member

PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

Wentworth Point - Block E Marina Square

23


PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

24

Wentworth Point - Block C Sirius Construction Phase Market: Mixed use | 770 dwellings | status: under construction, dollar value: 195 million Role: Door schedule, tagging & annotations, concrete set outs â&#x20AC;&#x153;Sirius is a new foreshore community of 703 residential apartments at Wentworth Point, directly adjacent to the proposed new bridge across Homebush Bay. Combining a strongly articulated tower with linear podium blocks, this development defines the Wentworth Point gateway as approached from the north-east. Wintergardens and angled balconies are orientated to the expansive city and harbour views, whilst capturing winter sun. A generous landscaped rooftop terrace flows from the tower, across the northern podium, providing a strong connection to the water and across to Rhodes. To the west another rooftop landscape space opens to the north, with a more serene and sheltered aspect. This scheme is the fifth in a continuing evolution of the broader Wentworth Point Marinas precinct masterplan with Billbergia Developments.â&#x20AC;?

(Ref: http://www.scottcarver.com.au/cms-ourwork/sirius--wentworth-point.phps)


Proposed Shadow DCP Shadow

33 Henderson Road Alexandria HENDERSON RD

HENDERSON RD

Market: Residential | 28 dwellings | Status: DA stage Role: BIM Modelling, unit layout, study SEPP 65, shadow study, DA drawings

DA SUBMISSION

Status:

Rodney Paesler 5938

Nom. Architect

16/04/2015 2:13:52 PM

Print Date:

Rev.

PM

2 PM

Description

A

DA Issue

Date

13/04/2015

1 pm

21 June

GARDEN RD

June

PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

NOTE: DCP Shadows based off maximum allowable building envelope

2 pm

HENDERSON RD

PM

3 pm

June

DA SUBMISSION

Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au

33 Henderson Rd Alexandria

1:1000 @ A3

U.N.O.

Rev.

Project

A B

Client

Woolloomooloo Property Trust 33 Henderson Rd Alexandria

Scott Carver Pty Ltd Level 8, 71 Macquarie Street Sydney NSW 2000 Australia

Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au

Rodney Paesler 5938 20/04/2015 3:57:15 PM

Print Date:

0

10

20

Description

30

Client

40

50m

Neighbouring Building Shadow PHOTOMONTAGE

- HENDERSON LOOKING WEST

Discipline

Drawing. No.

Rev.

DA-402 B

20140133

Title Discipline

Drawing. No.

Rev.

DA-302 A

20140133

NOTE: DCP Shadows based off maximum allowable building envelope

HENDERSON RD

Reference No.

Reference No.

DCP Shadow

Woolloomooloo Property Trust

Title

13/04/2015 20/04/2015

Proposed Shadow

Project

SHADOW DIAGRAMS - SHEET 2

Date

DA Issue DA Issue

25

HENDERSON RD

1 PM

2 PM

21 June

1 pm

21 June

DA SUB

Status:

GARDEN RD

Scott Carver Pty Ltd Level 8, 71 Macquarie Street Sydney NSW 2000 Australia

GARDEN RD

GARDEN RD

Status: Nom. Architect

Rodn

Nom. Architect

16/04/2

Print Date:

Rev.

A

Description

DA Issue

2 pm

HENDERSON RD

UP UP

UP

GROUND FLOOR

3 PM

3 pm

21 June

Scott Carver Pty Ltd Level 8, 71 Macquarie Street Sydney NSW 2000 Australia

Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au

33 Henderson Rd Alexandria

1:1000 @ A3

SHADOW DIAGRAMS - SHEET 2

U.N.O.

Project

Title

Client

Woolloomooloo Property Trust

Reference No.

0

10

20

30

40

50m

20140133

Discipline

Drawing. No.

Rev.

DA-402 B

CROSS VENTILATION CROSS VENTILATION CROSS VENTILATION -

CROSS VENTILATION N/A

COUN CROSS VENTILATED 19 N/A

8 TOTAL

27

LEVEL 1 - 3 Scott Carver Pty Ltd Level 8, 71 Macquarie Street Sydney NSW 2000 Australia

Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au

33 Henderson Rd Alexandria

1:250 @ A3

VENTILATION COMPLIANC

U.N.O.

Project Client

Woolloomooloo Property Trust

Reference No.

0

5

10

20140133

Discipline

D

D


PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

26

Discovery Point Building 2 - Residential Tower Market: Residential | Built Area:16524 sqm, 200 dwellings | Status: Under Construction Role: Concrete set out, hydraulic plans, steels for awning, dimensioning, construction details, site visit


Market: Public Building | Built Area: 7000 sqm | Status: Under Construction Role: Basement plans, gatehouse, dock office fixed furniture details

PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

Sydney Opera House VAPS Project

27


PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

E

F

Wentworth Point Block G

MSC6A WIDTH - REFER TO SCHEDULE

MIN. 20mm GAP BETWEEN SCREEN & WALL

MIN.20mm GAP BETWEEN SCREEN & WALL

MIN. 20mm GAP BETWEEN SCREEN & WALL

11

AD-CD631

1100

Market: Mixed Use | 330 dwellings | Status: Constructed Role: Detail elevations, fixing grids, set down slabs, toilet and kitchen set out LEVEL 7 RL 21.350

2400 4 EQUAL PANELS

C EQ L EQ

200

200 CTW2

AD-CD411

TD

4

450

TSP

4

AD-CD411

400 CL

ELEVATION 01

TSP

CL

ELEVATION 02

BATHROOM BA1/S 2400

1 : 50 C EQ L EQ

13

TSP

4

C

CL

TSP

10

820 10 450 BATHTUB CL ELEVATION 01

AD-CD411

CL

ELEVATION 02

2400

200

200

CL

2400

TR

850

1200 C 200 L

TSP

10 2

GLM3

BATH

CTW2

TR

820

STB2

960

3

GLS1

310

220

MDO1

650 230 SCREEN

GLM1

610 CL

1

1850

MSC6A- 1 G1- 03

1850

4 EQUAL PANELS

CTW2 VANITY

1130

TSP

400

C/L OF SUPPORT POSTS HEBIND

C EQ L EQ

2400 FRAME 830 STUD WALL C CL 750 400 L 450 DUCT

1600

310

30

BATH

CTW2

1 : 50

1525 70 150 BATHTUB 650 SCREEN

TR

850

TD

AD-CD411

L BATHROOM BA1/T

2

GLM3

1130

2

LEVEL 6 RL 18.350 STB2

14

AD-CD411

1600

10

2400

3

GLS1

SCREEN

820

960

1850 MDO1 TR

CL

1

650 230 SCREEN

GLM1

7

AD-CD411

CL

VANITY

1200 C 200 L

DUCT

1850

4 EQUAL PANELS

200

CTW2

220

70 150 1525 BATHTUB 650 SCREEN

AD-CD411

200

SCREEN

2400 FRAME 830 STUD WALL C CL 750 450 L 400

15

30

1

MSC6A HEIGHT REFER TO SCHEDULE

1130

CTW2 TSP

CL

TR

SHOWER

TR

2

310

30

2100 CL

2400

GLM3

1100

MDO2

3

SHOWER

STB2

960

1

1850

VANITY

GLS2

7

220

800 70 150 SCREEN

DUCT

1850 860 SCREEN

GLM1

2100 FIXED SCREEN

2400 STUD WALL FRAME C CL 450 L 400

850

830 750

11

AD-CD411

TSP

TSP

LEVEL 5 450 CL 15.350 RL

820 10 400 BATHTUB C ELEVATION 01 L

4

ELEVATION 02

SHOWER / TUB

BATHROOM BA1/T2

6

TSP

TSP

820 10 400 BATHTUB C ELEVATION 01 L

4

5

1 : 50

CL MSC6B- 1 G1- 02

MSC10D- 2 G1- 02

MIN.20mm GAP BETWEEN SCREEN & WALL LEVEL 2 RL 5.950

MIN. 20mm GAP BETWEEN SCREEN & WALL

4

MSC6B WIDTH REFER TO SCHEDULE

5

1 : 50

E

F

SUPPORT POSTS AT EQUAL SPACINGS

ELEVATION - MSC10A TO MSC10D - GRID F11 1 : 50

2000 WPM

30

1130

310

2100 SCREEN

30

850

1130 310

2100 SCREEN

30 850 1000

2100 1130 C L 1100 310

1130 310 2000 WPM

1 6

1000

ELEVATION 04 1650

3. REFER GA FLOOR PLANS FOR DOOR

ELEVATION - M

1130

5. ALL FLOOR TILES TO BE CTF1

310

100 TR

6. FOR INTERIOR FINISHES REFER TO A FINISHES SCHEDULE

5

GPO LS

7. 19mm MARINE PLYWOOD LOCALISED 1 : 50 TO STUD WORK TO ALLOW FOR INSTAL

1000

1100

2. ALL FEATURE WALL TILES TO ALIGN IN THE EVENT THAT CUT TILES SIZES D VERTICAL AND HORIZONTAL JOINTS O ALIGN, CTW TO BE OFFSET AGAINST C NOT ALIGN - TBS WITH ARCHITECT ON

220

FIXTURES, WHERE REQUIRED.

TYPE

WIDTH (mm)

HEIGHT (mm)

MSC3A MSC3B MSC3C MSC3C MSC4A MSC4C MSC4C MSC4D MSC4D MSC5A MSC5A MSC5A MSC5B MSC6A MSC6B MSC6C MSC7A MSC7B MSC8A MSC8B MSC8C MSC8D MSC10A MSC10B MSC10B MSC10C MSC10D MSC10E MSC10E MSC10F MSC10F MSC10G MSC10G MSC10H MSC10J MSC10K

2500 2500 2500 2500 1220 1920 1920 5277 5277 1300 1300 1300 1300 7225 5825 5300 3100 3100 3460 4210 3405 3460 7225 7225 7225 7225 5825 1195 1195 1045 1045 860 860 1195 1045 860

2580 2780 2980 2980 2020 2020 2020 1320 1320 14000 14000 14000 45400 13350 1750 8800 1700 2800 2300 2300 2438 2438 2000 1800 1800 1750 1350 1800 1800 1800 1800 1800 1800 1750 1750 1750

ELEVATION 02

PROJECTION (mm)

ELEVATION 03 CL

1650

2700

650 MSC10A / MSC10B / MSC10C WIDTH SCREEN REFER TO SCHEDULE 100 300 300 300 300 480 480 480 480

GLS3

LOW HEIGHT RC WALL BELOW MSC10

TR

ELEVATION 04

F

SHOWER MSC10B- 1 G1- 04

TR

GPO LS

TSP

MSC6A- 1 G1- 03

ELEVATION 02

8

ELEVATION 03

ELEVATION 04

AD-CD631

SUPPORT POSTS AT

SCOTT CARVER PTY LTD SITE IMAGE PTY LTD TAYLOR THOMSON WHITTING PTY LTD

CIVIL:

TAYLOR THOMSON WHITTING PTY LTD

HYDRAULIC:

STEVE PAUL & PARTNERS

ELECTRICAL:

HARON ROBSON

HARON ROBSO

MECHANICAL:

ZENITH AIR PTY

KEY PLAN

G2

4

U.N.O. 1:50 @ A1 AD-CD623

0

MSC6A WIDTH REFER TO SCHEDULE

1

2

MIN. 20mm GAP BETWEEN SCREEN & WALL

1 : 50

STRUCTURAL:

STEVE PAUL &

ELECTRICAL:

REFER TO SHEET AD-CD001 FOR FULL CONSU CONTACT INFORMATION; GENERAL NOTES, LE

3

Scott Carver Pty. Ltd.

G

Telephone +61 2 9957 3988

G4

BATHROOM/ENS. LAYOUTS

Title

4

11

LANDSCAPE ARCHITECT:

TAYLOR THOMS

HYDRAULIC:

G1

3

ARCHITECT:

TAYLOR THOMS

CIVIL:

AD-CD623

AD-CD623

21

SITE IMAGE PTY

STRUCTURAL:

CL

WENTWORTH POINT MARINAS - BLOCK G

LEVEL 7 RL 21.350

SCOTT CARVER

LANDSCAPE ARCHITECT:

TSP

1195

ELEVATION - MSC7A & MSC7B - GRID R21

MSC7A- 1 G2- 07

5

100

SUPPORT POSTS AT EQUAL SPACINGS

TSP

REFER TO DETAIL 4 / AD-CD631

NOTE FOR MSC SCREEN / LOUVRE DETAILS REFER TO SHEETS CD631 & CD632

MDO3

1650

220

830 SHOWER

ARCHITECT:

1000

1 1 1 1 5 1 2 1 1 1 2 3 STB2 3 1 1 4 1 1 1 2 1 2 2 1 1 1 2 5 2 6 3 7 4 1 2 3

1130

LEVEL INSTANCE

310

vv

1130

CL

TSP

TSP

1195

310

CL

PLAN - MSC6A - GRID F11

1 : 50

1. ALLOW FOR MIRRORED VERSION OF REFER TO GA FLOOR PLANS TO CONFI

150

830

SCHEDULE - METAL SCREENS / LOUVRES

2100 CL

MIN. 20mm GAP BETWEEN SCREEN & WALL

LEVEL 2 RL 5.950

BATHROOM NOTES

150 1000

150 SHOWER

310

TR

30

2100 CL

2400 2400

MSC7A- 1 G2- 07

MIN.20mm GAP BETWEEN SCREEN & WALL

LEVEL 2 RL 5.950

4. ALL WALL TILES TO BE CTW1 UNLES

2100 SCREEN

HEIGHT REFER TO SCHEDULE

2400

Billbergia Constructions Pty Ltd

5

AD-CD623

960

220 220 1650

21

1B G2-705

MSC10A / MSC10B / MSC10C WIDTH REFER TO SCHEDULE MSC10B- 1 G1- 04

WIDTH REFER TO SCHEDULE

NOTE: SUPPORT POSTS AT EQUAL SPACINGS

ELEVATION 03

TSP

400

G2 05 G2 08 2700 G2 06 C EQ L EQ 4 EQUAL PANELS G2 07 G4 07 200 200 G4 07 G4 07 CTW2 GLM1 G1 07 G1 08 G2 04 G2 04 NOTE : ENSURE G2 04 DOOR CLEARANCE G3 02 GLM3 1 G1 03 SHOWER G1 02 WIDTH G2 04 MIN. 20mm GAP BEWTEEN MIN. 20mM GAP BETWEEN TD REFER TO SCHEDULE 3 SCREEN & WALL SCREEN & WALL G2 07 G2 CTW208 G1 01 TSP 1 G1 450 45001 AD-CD632 G3 02 LEVEL 9 G3 C RL 27.350 CL L 02 G1 03 G1 04 G1 05 ELEVATION 01 G1 06 G1 02 C/L OF MSC7B- 1 G2 04 SUPPORT G2- 08 G2 05 POSTS Telephone +61 2 9957 3988 Scott Carver Pty. Ltd. BEHIND G2 04 CL hello@scottcarver.com.au Level 8, 71 Macquarie Street CL CL G2 05 Project www.scottcarver.com.au Sydney NSW 2000 Australia G2 04 Client G2 05 G2 06 LEVEL 8 RL 24.350 G2 06 G2 06

MIN. 20mm GAP BETWEEN SCREEN & WALL

ELEVATION - MSC6A & MSC6B - GRID F11

LOW HEIGHT RC WALL BELOW MSC10

HEIGHT REFER TO SCHEDULE

LEVEL 3 RL 9.150

C/L OF SUPPORT POSTS HEBIND

CL

HEIGHT REFER TO SCHEDULE

MSC6B HEIGHT REFER TO SCHEDULE

CL

4

BATHROOM BA3

LEVEL 3 RL 9.150 CL

E

MSC7B HEIGHT REFER TO SCHEDULE

2 MSC10A- 2 G1- 03

ELEVATION 01

LEVEL 4 RL 12.350 TSP

LS

CTW2 TSP

450

MSC7A HEIGHT REFER TO SCHEDULE

LEVEL 4 RL 12.350

TD

BA2/T:G3-706 BATH (INSTEAD OF SHOWER)

960

8 AD-CD631

HEIGHT REFER TO SCHEDULE

1

AD-CD623

AD-CD631

VANITY

ELEVATION 02 MSC6B WIDTH 1650 650 REFER TO SCHEDULE SCREEN

SHOWER

4

MDO2

650 70 150 SCREEN

MSC10B- 1 G1- 04

3

LEVEL 5 2700 RL 15.350 STUD WALL FRAME C CL 450 L 450

DUCT

1 : 50

MIN. 20mm GAP BETWEEN SCREEN & WALL

WPM CONTINUES BELOW BATHTUB

Date 24.03.2015 27.03.2015 13.04.2015 03.06.2015 23.07.2015

STB2 GLM3

TSP

1 : 50 830 750

Description For Information Construction Certificate 3 Issue Revisions as clouded Revisions as clouded For Construction

ELEVATION - MSC6A & MSC6B - GRID F11

4

1

GPO

GLM1

1100

4

LEVEL 5 RL 15.350

23/07/2015 5:04:43 PM

GLS3

BATHROOM BA2

MSC6A- 1 G1- 03

8

HEIGHT REFER TO SCHEDULE

MDO2

2

200

CTW2

LEVEL 6 RL 18.350

MSC10B- 1 G1- 05

2400 4 EQUAL PANELS

C EQ L EQ

200

1650

650 70 150 SCREEN

VANITY

CL

C/L OF SUPPORT POSTS HEBIND

SHOWER / TUB

850

1100 MSC6A HEIGHT REFER TO SCHEDULE

DUCT

Rev. A B C D 1

ELEVATION 01

LEVEL 7 RL 21.350

2400 FRAME 830 STUD WALL C CL 750 450 L 400

LEVEL 6 RL 18.350

CL

TSP

610 CL ELEVATION 04

1130

MIN. 20mm GAP BETWEEN SCREEN & WALL

11

CL

LS

Doug Southwell 7362

Print Date:

AD-CD631 LEVEL 7 RL 21.350

2000 WPM

Nominated Architect:

WPM CONTINUES BELOW BATHTUB

CL

1195

SHOWER / BATHTUB

2100 SCREEN

SCREEN & WALL

1 : 50

FOR CONSTRUCTION

850

3

WPM EXTENDS UP TO VANITY

Status:

30

2400

TYPICAL BATHROOM - WPM MIN.20mm GAP BETWEEN

AD-CD631

MSC10C- 1 G1- 06

2100 310 1130 CL 1100

2400 960 TSP

ELEVATION 03 150

30

NOTE: SUPPORT POSTS AT EQUAL SPACINGS

GPO TD

CL

ELEVATION 02

2000 WPM

MIN.20mm GAP BETWEEN SCREEN & WALL

Client

100

TSP

450

850

MIN. 20mm GAP BETWEEN SCREEN & WALL

11

C/L OF SUPPORT Billbergia Constructions Pty Ltd POSTS HEBIND

220

BATH

CL

960

MSC6A WIDTH - REFER TO SCHEDULE

MIN. 20mm GAP BETWEEN SCREEN & WALL

ELEVATION 02

WENTWORTH POINT MARINAS - BLOCK G 1850 Project

1 : 50

E

MSC10A / MSC10B / MSC10C WIDTH REFER TO SCHEDULE

TSP

450

ELEVATION 04

SHOWER / BATH

BATHROOM BA1/T2

F

F

CTW2

CL LEVEL 3 RL 9.150 TSP

ELEVATION 01

TR

SHOWER / TUB

E

CL

CTW2

TR

6

100

GPO LS TSP

450

Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au

CL

1600

310

TR

SHOWER

CL

ELEVATION 03 Scott Carver Pty. Ltd. Level2400 8, 71 Macquarie Street Sydney NSW 2000 Australia 830

SCREEN

GLS1

TD

Sim

1

1195

TR

SHOWER

8

5

AD-CD411 TSP

Description Preliminary For Information For Information Construction Certificate 3 Issue For Construction Revisions as clouded Revisions as clouded

GLS3

GLM3

AD-CD411

Dou

31/07/

1650 650 SCREEN

1850

STB2

AD-CD411

AD-CD411

AD-CD411

CL

STB2 GLM3

SHOWER / BATH

1 : 50

650 230 SCREEN

MSC6B- 1 G1- 02

GLM1

CL

12

2400

TR

1850

CL

4 EQUAL PANELS

200

CTW2

1000

220 1650 1650

1130 310MDO2

30

850

3

BATHROOM BA3

5

ELEVATION 02

NOTE : ENSURE DOOR CLEARANCE 1

2

GLM1

220

830

4

CL

Print Date:

TSP

200 CTW2

1130

CL

C EQ L EQ

200

3

10 2

400 CL

2400

960

1850

1

MDO1

820 10 450 BATHTUB CL ELEVATION 01

TSP

30

CL

610

220

VANITY

10

200

TSP

2

BATH

400

SHOWER

Rev. A B C D ELEVATION 021 2 3

CTW2

TSP

2400

CTW2 TSP

AD-CD411

TR

850

4

2400

820

CL

TSP

FRAME 830 STUD WALL C CL 400 L 450 750 DUCT

TD

CL

2

13

1200 C 200 L

10

1 : 50

STB2 GLM3

AD-CD411

MSC6B HEIGHT REFER TO SCHEDULE

820

2400

3

14

AD-CD411

1200 C 200 L

MDO1

960

1

VANITY

TR

ELEVATION 04 2700 C EQ L EQ 4 EQUAL PANELS

960

DUCT

7

AD-CD411

1

2700 STUD WALL FRAME C CL 450 L 450

1600

650 70 150 SCREEN

220

VANITY

2400

DUCT

BATHROOM BA1/T

1525 70 150 BATHTUB 650 SCREEN

650 SCREEN

GLM1

GLS1

TR

2

4 EQUAL PANELS

200

CTW2

1850

70 150 1525 BATHTUB 650 SCREEN

200

830 750 230

LS

TSP

450

1195

ELEVATION 03 CL

1 : 50

1850

TD GPO

AD-CD411 ELEVATION 01

BATHROOM BA2

4

100

Sim

5

AD-CD411

AD-CD411

4

TSP

ELEVATION 02

220

1100

C EQ L EQ

2400 FRAME 830 STUD WALL C CL 750 450 L 400

15

AD-CD411

TR BA2/T:G3-706 BATH (INSTEAD OF SHOWER)

8

FOR CONSTR

Status: GLS3 Nominated Architect:

LEVELSTB2 4 RL 12.350

GLM3

AD-CD411 SHOWER

2

TSP

CL

2400

1 : 50

3

2

400 CL

ELEVATION 01

220

GLM1 1850

12

1

TSP

SCREEN

450

TSP

4

AD-CD411

4

BATHROOM BA1/S

1

1130

TR

200

CTW2

830 SHOWER

ELEVATION 02 1650 650 SCREEN

2400 4 EQUAL PANELS

C EQ L EQ

AD-CD411

MDO2

310

GLM3 SHOWER TD

VANITY

CTW2 TSP

28

30

2100 CL

2400

3

SHOWER

STB2

960

1

TR

2

DUCT

GLS2

AD-CD411

1850

VANITY

GLM1

7

220

DUCT

MDO2

800 70 150 SCREEN

200 CTW2

AD-CD623

ELEVATION 01

200 2400

2100 FIXED SCREEN

C EQ L EQ

200

650 70 150 SCREEN

2400 STUD WALL FRAME C CL 450 L 400

850

WPM CONTINUES BELOW BATHTUB

AD-CD631

2400 FRAME 830 STUD WALL C CL 750 450 L 400

850

830 750

11

AD-CD411

1850 860 SCREEN

SHOWER / BATHTUB

1

1 : 50

8

2400 4 EQUAL PANELS

WPM EXTENDS UP TO VANITY

960

TYPICAL BATHROOM - WPM

3

2000 WPM

2400

1 : 50

5m

Project

Discipline-Dwg. No.

20130053

AD-CD4


Market: Residential | Built Area: NLA 15000sqm, 800 dwellings | Status: DA stage Role: Conceptual 3D model, marketing plans, leasing plans

PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

Wentworth Point Block E Mixed Use Development

29


PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

30

Bong Bong Town Centre Market: Retail Masterplan | Status: Concept Role: Sketch up 3D modelling, area calculation, preparing presentation drawings, report, presentation


Market: Retail Masterplan | Status: Stage 1 DA Role: Sketch up 3D modelling, area calculation, preparing presentation drawings, BIM modelling of master plan to details in Revit, residential detail layouts, sheet layouts and presentation

PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

Bridge Plaza Batemans Bay Retail

31


PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY

32

Campbelltown Centre of Excellence Market: Retail Masterplan | Built Area: 330 dwellings | Status: Concept Role: Master plan, block plan, graphic presentation


33

PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY


WORK EXPERIENCE PROJECTS | STUDENT OF ARCHITECTURE [OVERSEAS]

35


WORK EXPERIENCE | TRAINEE

36 ARC ARCHITECTURAL CONSULTANTS, BANGLADESH

GROUND FLOOR PLAN

FIRST FLOOR PLAN

THIRD TERRACE RESORT LTD.DHAKA


Ground Floor Plan

Section AA

First Floor Plan

Typical Floor Plan

Section BB

CHOUMUHANI RESIDENCE

South Elevation

East Elevation

North Elevation

West Elevation

PRACTICAL TRAINING

37


38 ARC ARCHITECTURAL CONSULTANTS, BANGLADESH


PRACTICAL TRAINING SHIERISH MALPANI ASSOCIATES , NEW DELHI, INDIA

39


ACADEMIC PROJECTS ACADEMIC PROJECTS | MASTERS IN ARCHITECTURE, UNSW

41


3000

MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

500

1000

2500

SEPERATED PLATFORM FOR DIFFERENT OWNER

7000

NOISE BARRIER

CONCEPT SKETCH 1 : 25 3000

1

2500

SEPARATED PLATFORM SEPERATED FOR DIFFERENT SECOND PLATFORM FOR DIFFERENT OWNER OWNER LIVING ON TOP FLOOR

1000

500

SERVICES

NOISE BARRIER AND NOISE BARRIER BUFFER SERVICE BETWEEN TWO HOUSE

1

7000

PODS for International Students CONCEPT SKETCH 1 : 25

Accommodation

SEPARATED PLATFORM SEPERATED FOR DIFFERENT SECOND PLATFORM FOR DIFFERENT OWNER OWNER LIVING ON TOP FLOOR

Aim for a co-ordinate

Social Isolation

Safety 3000

2500

Living/ Dining/ Sleeping

Store

• easing financial pre

Cultural Barrier

• ensuring and impro

7000

500

42

ISSUES AND CHALLENGES FOR INTERNATIONAL STUDENTS

Social Network NOISE BARRIER AND NOISE BARRIER BUFFER SERVICE BETWEEN TWO HOUSE

• better support for s

Visa and Legal Issues

Language Barrier

Store

2

TYPE H

3

1 : 25

2 1

Public Transport

TYPE H

3

1 : 50

• addressing the gaps students

Financial Hardship

SERVICES RAISED BY A METER TO ALLOW THE SERVICES TO Umemployment BE LOCATED ON GROUND TO EASE UP THE PLUG IN PROCESS OF THE SERVICES.

• strategies for buildi

MEZZANINE FAMILY UNIT

UNPRECEDENTED SHIFT in the Wor

1 : 50

CONCEPT SKETCH

1000

1

Discrimination

1000

3000

Living/ Dining/ Sleeping

MEZZANINE FAMILY UNIT

SERVICES RAISED BY A METER TO ALLOW THE SERVICES TO BE LOCATED ON GROUND TO EASE UP THE PLUG IN PROCESS OF THE SERVICES.

1 : 50

WATER DRAINAGE

1 : 50

CONCEPT SKETCH 1 : 25 WATER DRAINAGE

60% of the House Package cost is for LAND PRICE

Living/ Dining/ Sleeping

Store

240,000 Australian households can’t afford a house any more

RENT = MORTGAGE D

If you Buy a hous

Living/ Dining/ Sleeping

Store

PROTOTYPE 2

30,554 2

TYPE H 1 : 50

PROTOTYPE 2

3

MEZZANINE FAMILY UNIT 1 : 50

4

Section 2 1 : 50

7

Student Visa per month in

Australia

M

SYDNEY

in


Organization Principles

Boundary line - Face to face and parallel Pods fails to ensure privacy - Generates Regimental and Monotonous open spaces and edge conditions

Organization Principles

MASTER PLAN

- Facilitate better privacy and outlook - Generates Dynamic open spaces and edge conditions

Organization Principles

Scale: 1:500

MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

PODS

Land + House = UNAFFORDABLE | Land in Rent+ Own House = THE DEAL Boundary line

MASTER PLAN

MASTER PLAN

Scale: 1:500

Scale: 1:500

POD GROUNDS

- Face to face and parallel Pods fails to ensure privacy - Generates Regimental and Monotonous open spaces and edge conditions

Boundary line

- Facilitate better privacy and outlook - Generates Dynamic open spaces and edge conditions

- Face to face and parallel Pods fails to ensure privacy - Generates Regimental and Monotonous open spaces and edge conditions

- Facilitate better privacy and outlook - Generates Dynamic open spaces and edge conditions

POD GROUND

Land + House = UNAFFORDABLE Land + House | Land = UNAFFORDABLE in Rent+ Own House | Land=in THE Rent+ DEAL Own House = THE DEAL - Close proximity to the Universities

POD GROUNDS - Near to Public Transport

POD GROUNDS

POD GROUND

POD GROUND

8 MINS Lands waiting to Universities be developed - Close proximity to the Universities --Close proximity to the

- Near to Public Transport

- Near to Public Transport

- Lands waiting to be developed

8 MINS to be developed - Lands waiting

- No Land Price

- No Land Price

- No Land Price

8 MINS

- Sense of ownership and own house

Environment Friendly, no Excavation --Sense of ownership and own house - Sense of ownership and own house --Environment no Excavation FlexibilityFriendly, of moving

- Environment Friendly, no Excavation

- Flexibility of moving

- Flexibility of moving

- Sense of Community

- Sense of Community

- Safety and security - Safety and security

- Safety and security

Vegetation Vegetation

Vegetation Public Transport Public

- Sense of Community

8 MINS

8 MINS

8 MINS

8 MINS 8 MINS

Public Aerial Transport View Transport

8 MINS

Aerial View Aerial View

43


MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

Children Activity Park

Children Park

Bike Parking

Exercise/ Yoga Ground

Vehicular Entry

Bike Parking

Community Garden

Seating Around Trees

Bike Racks

Services

Multi Purpose Hall

Communal Laundry/ Store

Bins

Portable Community Garden

Yoga Ground

SITE PLAN

Cage Storage for Residents

Exercise Park

Wooden Deck Seating

Soft Paving Allowing to recharge Aquifer

Multi Purpose Hall

Scale 1:200

44

N

JOURNEY

Pedestrian


UP

3000

4000

UP

3000

10

AD-102

1000

1000

2800

18 SQ.M

TYPE A: 1 MODULE, 1 FLOOR, 1 OWNER

6000

2500

1000

11

2968

11

6500

AD-102

1000

3000

AD-102

32 SQ.M

12

12

AD-102

1000

3000

6500

AD-102

2500

TYPE B: 1 MODULE + 1 MEZZANINE, 1 FLOOR, 1 OWNER

36 SQ.M

TYPE C: 2 MODULES,2 FLOORS, 1 OWNER

2500

6000

MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

PROTOTYPES 6000

7000

AD-102 AD-109

1000

3000

3000

18 SQ.M

500

13 1

13 1

AD-102 AD-109

18 SQ.M

2500

TYPE D: 2 MODULES,2 FLOORS, 2 OWNERS 6000 500

18 SQ.M 11

14

3000

3000

AD-102

9500

2500

AD-102

13 1

1000

AD-102 AD-109

32 SQ.M

6000

11

AD-102

12500

32 SQ.M

2500

500

3000

15

AD-102

3000

2500

TYPE E: 2 MODULES + 1 MEZZANINE, 2 FLOORS, 2 OWNERS

1000

3000

TYPE F: 2 MODULES + 2 MEZZANINES,2 FLOORS, 2 OWNERS

16

AD-102

32 SQ.M

45


MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

Potential Sites

46

PROJECT Housing in Sydney has illustrated the dilemma of density and the need for creating pleasant places to live in. Within the sector of housing for students, there has been a lack of individual residential living facilities for the students who just arrived in Sydney and wish to cope up to the new urban setting. 60% of the worldâ&#x20AC;&#x2122;s population is expected to be living in cities by 2030. In particular, as Australia is a country of migrants, 54% among them are international students, with the preference of living around universities within the cities. - Any potential site around universities within the radius of 8 min bike rides could be an option for the project.

8 MINS

-The idea is to have this type of housing as model for future opportunities and demands

8 MINS

-The particular site I have chosen to test the proposal is 279 Gardeners Rd, Eastlakes NSW. 8mins bike ride from UNSW.

ISSUES -Scarcity of urban land -Preference for urban living


ew 4

UP

12m

20m

UP

Ground Floor Plan

1:250 @ A3

Communal Green Space

Entry/ Vehicular-Pedestrian Circulation 0

5

10

Title Drawing. No.

AD-102

Landscape Planing

MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

UP

Ground Floor Plan

1:250 @ A3

Title

Drawing. No.

0

5

AD-102

10

Ground Floor Plan

1:250 @ A3

Title Drawing. No.

0

5

10

AD-102

N PM 12:00

20m UP

ER

M

M

SU

12m

E

W

R

TE

IN

W

S

Aligning Podium to Current Street Scale

Building Separation Creates Courtyard

North South Oriented Block

Ground Floor Plan

1:250 @ A3 0

5

10

3D View 4

47

Title Drawing. No.

AD-102


MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

First Floor Plan

48

Second Floor Plan

CLUSTER PLAN - North facing apartments - Screening for the external stair ensures the privacy of the stair facing apartments - Planter on the full glazed sides - Individual and group study areas in communal areas and on the roof under fly roof - Communal functions on the ground extends to the courtyard

Roof Plan


MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW) P L A N T E R

49 3

2

Section 21 1 : 50

AD-111

1

Type C 1 : 50

3

3

AD-111

AD-111

Mezzanine 1 FFL 2.550

Ground Fl. FFL 0.300

2

TYPE C 1 : 50 Type C

1:100 @ A3

Title Drawing. No.

0

4

8

0

1

2

3

4

5m

AD-111


MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

TYPE PLAN

Extended views through the glazing from the bedding areas on mezzanine.

50

- Cross ventilated - Common areas on the ground, private areas on the mezzanine. - Private areas stagger with the corridor in section. - Extended views through the glazing from the bedding areas on mezzanine. - The lowest internal area is 22.4 sqm; the highest is 40 sqm with a footprint of 24.47 sqm - Total apartment number: 59 - Accessible unit number: 11 - Car park number: 12 (in BaSement) - Bike parking number: 60 on ground

LANDSCAPE


1

T Y P E

P L A N T E R

P L A N T E R

Type A

2

1 : 50

TYPE A - M

TYPE A

3

1 : 50

1 : 50

6

Section 20 1 : 50

First Fl.

Fl.

FFL 4.800

4.800

Mezzanine 1

zanine 1

FFL 2.550

2.550

Social Dimension

Ground Fl.

nd Fl.

A

FFL Road0.300 Lvl

d0.300 Lvl

Type A

1

TYPE A - M

2

1 : 50

4

1 : 50

Occupancy : Single

-

Area: 16.64+6.2= 23 sqm

-

FFL 0.000

0.000

-

Section 18

3

1 : 50

Planter = 2 sqm SIte Plan FFL 0.000

TYPE A

Type A

1 : 50

Title Drawing. No.

AD-109

T Y P E

P L A N T E R

P L A N T E R

P L A N T E R

P L A N T E R

First Fl. FFL 4.800

First Fl. FFL 4.800

Mezzanine 1 FFL 2.550

Mezzanine 1 FFL 2.550

B

3

AD-110

Social Dimension

3

Ground Fl. FFL 0.300

Ground Fl.

1

1

Type B

Type B 1 : 50

2

1 : 50

T Y P E

P L A N T E R

-

Occupancy : Couple

-

Area: 20.48+9= 30 sqm

-

Planter = 2 sqm

Type A Title

AD-110

TYPE B - M

2

TYPE B - M

FFL 0.300

1 : 50

AD-109

TYPE B

3

TYPE B

3

1 : 50

Drawing. No.

1 : 50

1 : 50

P L A N T E R

51

Mezzanine 1 FFL 2.550

Type B

C Ground Fl.

1 P L A N T E R

1 : 50

T Y P E

3

AD-111

3

AD-112

1

Type C

3

1 : 50

Section 21

Title Drawing. No.

AD-110

2

1 : 50

AD-110

-

Occupancy : Couple

-

Area: 22.4sqm

-

Planter = 2 sqm

TYPE C 1 : 50

P L A N T E R

First Fl. P L A N T E R

P L A N T E R

FFL 4.800

3

AD-111

Mezzanine 1 FFL 2.550

3

First Fl.

Mezzanine 1

AD-112

FFL 4.800

FFL 2.550

2

TYPE C 1 : 50

1 : 50

2

3

4

5m

FFL 2.550

Social Dimension

TYPE D - M

1:100 @ A3

1 : 50

-

TYPE D Type C 3Occupancy : Couple + 1 Child 1 : 50 Title

Drawing. No.

0

Type D

1

Mezzanine 1

Ground Fl. FFL 0.300

2

1

Title Drawing. No.

0

D

Type C

1:100 @ A3

Ground Fl. FFL 0.300

Type D 1 : 50

Title Drawing. No.

FFL 0.300

Type C

Type B

Social Dimension

2

1

2

3

TYPE D - M 1 : 50

4

5m

AD-111

-

Area:Ground 22.69+12.737= 35.5 sqm Fl.

-

Planter = 2 sqm

FFL 0.300

3

TYPE D 1 : 50

MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

1

AD-111


MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

4

52

A101

04.

2

3D View 2

03.

02. 3

3D View 2 Copy 1

As indicated @ A2 0

1

2

3

4

3

Unnamed 2 Section

CONSTRUCTION 5m

Prefabricated Press Box Construction System Delivers a 30% savings. Installation can be accomplished in a nominal time

Better option compared to on-site construction in terms of, - Weather delays, - Security, - Theft of materials, - Delivery costs, and - Most importantly labour costs.

As indicate 0

1 : 25

01.

- -

3D View 2 Copy 1

1

2

3


100x50 mm Timber Joist 500 c/c 100x50 mm Timber Joist 500 c/c with 100mm Fibre Glass Insulation 10mm Acoustic Matt Acoustic under Lying 5mm Carpet

10mm External Cladding 8mm Adhesive To Cladding 2mm Water Resistant Sheet 5mm Fibre Cement Sheet 75mm Stud Framing with Fibre Glass Insulation 5mm Fibre Cement Sheet 2 Layers of 10mm Plaster board

MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

Frame Structure of Steel Column 150x75mm and I-beam 150x75mm 100x100 Steel T-Beam 1500 c/c

53 08

07

06

05

01

02

03

04


MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

ADAPTIVE REUSE OF ROXY THEATRE Parramatta, Sydney

BOY YOU TURN ME INSIDE OUT , DIANA ROSS (1980) BOY YOU TURN ME INSIDE OUT , DIANA ROSS (1980)

E INSIDE OUT , DIANA ROSS (1980)

Street Pattern: George Street, Parramatta Street Pattern: George Street, Parramatta

Plan:

N ME INSIDE OUT , DIANA ROSS (1980)

amatta

plified

en simplified

Section: Compact Organization Plan: Compact Organization and and Section: Compact Organization Compact Organization Porus organization Porus organization and and Porus organization Porus organization

Pattern of settlement has been simplified Pattern of settlement has been simplified

Plan:

Plan:

Section: Compact Organization and Porus organization

Compact Organization and Porus organization

Compact Organization and Porus organization

Public Roof Terrace

Section: Compact Organization and Porus organization

The heights of OLD and NEW

Site Plan

Day Night Functions

Scale 1:1000

Site Plan

The low sun enters the spaces designed for the day functions from From the plinth level, esThe roof of the volumes are Day Night Functions The heights of OLD and NEW Public Roof Terrace calators lead directly to lowered so only the Roxy Towsides and roof The low sun enters the spaces designed for the day functions from From the plinth level, esThe roof of the volumes are the roof terraces. From er is the highest one calators lead directly to lowered so only the Roxy Towsides and roof their people can enjoy the the roof terraces. From er is the highest one panorama of Parramatta. their people can enjoy the panorama of Parramatta.

Scale 1:1000

Site Plan

ghts of OLD and NEW

roof of the volumes are d so only the Roxy Tower is the he heights of highest OLD and one NEW

Scale 1:1000

Day Night Functions The low sun enters the spaces designed for the day functions from sides and roof Day Night Functions

Site Plan Scale 1:1000

The low sun enters the spaces designed for the day functions from The roof of the volumes are Old and New Skyline Courtyards and Light wells owered so only the Roxy Towsides andskyline roof had been influenced by the The new The distance between the blocks allows natural daylight to enter Old highest and New Courtyards and Light wells er is the oneSkyline old skyline. the intermediate spaces below. The new skyline had been influenced by the The distance between the blocks allows natural daylight to enter old skyline. the intermediate spaces below.

54

Courtyards and Light wells The distance between blocks allows natural daylight to enter Courtyards andthe Light wells the intermediate spaces below.

luenced by the

d by the

The distance between the blocks allows natural daylight to enter the intermediate spaces below.

Old and New

1

North Elevation

1

ROXY ROXY

1 2 3 4 Anupama Saha, 3447032

y and the Built Masses ined as old heritage.

A Background to CELEBRATE the Old

North Elevation Scale 1:100

A Background to CELEBRATE the Old

Scale 1:100

Scale 1:100

1 2 3 4 Anupama Saha, 3447032

ry lobby and the Built Masses e retained as old heritage.

447032

North Elevation

The old stairs in the main entry lobby and the Built Masses A Background to CELEBRATE the Old around the lobby front courtyard areMasses retained as old heritage. The old stairs in the main entry and the Built A Background to CELEBRATE the Old around the front courtyard are retained as old heritage.

Old and New

ROXY

North Elevation Scale 1:100


Section BB’

Scale 1:200

Scale 1:200

Third Floor Plan Scale 1:200

Second Floor Plan Scale 1:200

Section BB’ Scale 1:200

MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

Third Floor Plan

Second Floor Plan Scale 1:200

55 First Floor Plan Scale 1:200

First Floor Plan Scale 1:200


MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

Key plan

Key plan

Section AAâ&#x20AC;&#x2122; Scale 1:100

Section AAâ&#x20AC;&#x2122; Scale 1:100

The Roxy Theatre (Existing Building) The Roxy Theatre (Existing Building)

- Entry: Symmetrical and celebrated - Historic facade-facing Street Entry: George Symmetrical and celebrated - Blank facade separating the building from - Historic facade facing George Street the active street- life Blank facade separating the building from - Levels and multi height main hall - Solid walls hiding the active zone of the - To make the old and historic stand main out hall the active street life - Levels and multi height premise - To turn it inside-out - Solid walls hiding the active zone of the - To make the old and historic stand out premise

Design Development

Y

ROXY ROXY

56

of the

- Tidy up the overall massing

Design Development

ding)

t ng from

- To turn it inside-out

- Various level of intimacy - Private intimate well as united - Variousspaces level of as intimacy unique space - Private intimate spaces as well as united - Tidy up the overall massing unique space

- Levels and multi height main hall - To make the old and historic stand out - To turn it inside-out

- Various level of intimacy - Private intimate spaces as well as united unique space - Tidy up the overall massing

Anupama Saha, 3447032 Anupama Saha, 3447032

4

11 2 23 3 4 4

Anupama Saha, 344703


Scale 1:200

Plinth Floor Plan Scale 1:200

2

1 2 3 4

Anupama Saha, 3447032

MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

First Floor Plan

57


MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

HOUSE DESIGN

Parramatta, Design Brief

58

Sydney

Site: Minto, Sydney Area: 30m X 17.5m Climate: Mild Temperate Client: First home buyer To develop a SYSTEM (for the users to design their OWN HOUSE) of structure, space design, shading and ventilation, orientatio and privacy in affordable range. Creates, - An integrated/ intimate house ambience - Distinct/ non- identical formal expression for each different house


MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

Design Brief

Design Brief Site: Minto, Sydney

30m X 17.5m Site: Minto, Sydney Area: Climate: Mild Temperate Area: 30m X 17.5m Client: First home buyer Climate: Mild Temperate To develop a SYSTEM (for the users to design their OWN HOUSE) of structure, space design, shading and ventilation, orientatio and privacy in affordable range. Creates, Client: First home buyer - An integrated/ intimate house ambience - Distinct/ non- identical formal expression for each different house

To develop a SYSTEM (for the users to design their OWN HOUSE) of structure, space design, shading and ventilation, orientatio and privacy in affordable range. Creates, - An integrated/ intimate house ambience - Distinct/ non- identical formal expression for each different house

N Site Plan

59

Anupama Saha | z3447032

Scale: 1:100

House That Grows

N Site Plan Scale: 1:100

House That Gro


FOUR BEDROOM UNIT

TWO BEDROOM UNIT

PROGRAM

GRID

BEDROOM LIVING KITCHEN + DINING BATHROOM PARKING

3X3 3X4 3X4 2X1

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 3

1 1 1 1

14 20 20 3 57

PROGRAM

GRID

BEDROOM LIVING KITCHEN DINING BATHROOM PARKING

3X3 3X4 3X4 3X4 2X1

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3

2 1 1 1 1

28 20 20 20 3 91

PROGRAM

GRID

BEDROOM LIVING KITCHEN DINING BATHROOM LAUNDRY+ LOUNGE PARKING

3X3 3X4 3X4 3X4 2X1 3X4

Two studios could be rented keeping the integrity of the mother home

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3 20

4 1 1 1 2 1

56 20 20 20 6 20 142

Flexibility & Adaptability TWO BEDROOM UNIT PROGRAM

GRID

BEDROOM LIVING KITCHEN DINING BATHROOM PARKING

3X3 3X4 3X4 3X4 2X1

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3

2 1 1 1 1

28 20 20 20 3 91

FOUR BEDROOM UNIT PROGRAM

GRID

BEDROOM LIVING KITCHEN DINING BATHROOM LAUNDRY+ LOUNGE PARKING

3X3 3X4 3X4 3X4 2X1 3X4

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3 20

4 1 1 1 2 1

56 20 20 20 6 20 142

FOUR BEDROOM UNIT PROGRAM

GRID

BEDROOM LIVING KITCHEN DINING BATHROOM LAUNDRY+ LOUNGE PARKING

3X3 3X4 3X4 3X4 2X1 3X4

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3 20

4 1 1 1 2 1

56 20 20 20 6 20 142

A

D

C

B

A

C

Orientation and Natural Ventilation

B

Pergola with vertical screen to protect the low angel sun

D

MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

ONE BEDROOM UNIT

Section AA

Key Plan

Section CC

Section BB

Section DD

Anupama Saha | z3447032

N North NorthElevation Elevation

60

Scale Scale1:100 1:100

South SouthElevation Elevation Scale Scale1:100 1:100 75MM 75MM X 150 X 150 MM MM WOODEN WOODEN BEAM BEAM 30MM THICK CORRUGATED 30MM THICK CORRUGATED IRON SHEET IRON SHEET 35MM X 130 MM STEEL 'C''C' BEAM 35MM X 130 MM STEEL BEAM

2° 2° SLOPE SLOPE

80MM 80MM X 80 X 80 MM MM STEEL STEEL BOX BOX SECTION SECTION

FIBRE CEMENT BOARD FIBRE CEMENT BOARD SEALANT SEALANT

15MM FIBRE CEMENT BOARD 15MM FIBRE CEMENT BOARD

METAL GUTTER METAL GUTTER

50MM THICK INSULATION 50MM THICK INSULATION

BOX SECTION BOX SECTION

80MM X 35MMWOODEN WOODEN BATTENS 80MM X 35MM BATTENS C/C 500 MM C/C 500 MM 15MM FIBRE CEMENT BOARD 15MM FIBRE CEMENT BOARD

West WestElevation Elevation Scale Scale1:100 1:100

WOODEN FLOORING WOODEN FLOORING WOODEN FRAME WOODEN FRAME NEAT CEMENT FINISH NEAT CEMENT FINISH 80MM X 80 MM STEEL BOX SECTION 80MM X 80 MM STEEL BOX SECTION SEALANT SEALANT MM CEMENT RENDERING 1515 MM CEMENT RENDERING 150 MM THICK CONCRETE PLINTH 150 MM THICK CONCRETE PLINTH

External ExternalWall WallDetail Detail

Gutter GutterDetail Detail

Scale Scale1:20 1:20

Scale Scale1:20 1:20

East EastElevation Elevation Scale Scale1:100 1:100 Anupama AnupamaSaha Saha| z3447032 | z3447032


MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)

North Elevation Scale 1:100

South Elevation Scale 1:100 75MM X 150 MM WOODEN BEAM 30MM THICK CORRUGATED IRON SHEET 35MM X 130 MM STEEL 'C' BEAM

2° SLOPE

80MM X 80 MM STEEL BOX SECTION

FIBRE CEMENT BOARD SEALANT

15MM FIBRE CEMENT BOARD

METAL GUTTER

50MM THICK INSULATION

BOX SECTION

61

80MM X 35MM WOODEN BATTENS C/C 500 MM 15MM FIBRE CEMENT BOARD

West Elevation Scale 1:100

WOODEN FLOORING WOODEN FRAME NEAT CEMENT FINISH 80MM X 80 MM STEEL BOX SECTION SEALANT 15 MM CEMENT RENDERING 150 MM THICK CONCRETE PLINTH

External Wall Detail

East Elevation

Gutter Detail

Scale 1:20

Scale 1:100

Scale 1:20 ONE BEDROOM UNIT PROGRAM

GRID

BEDROOM LIVING KITCHEN + DINING BATHROOM PARKING

3X3 3X4 3X4 2X1

Anupama Saha | z3447032

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 3

1 1 1 1

14 20 20 3 57

TWO BEDROOM UNIT

ONE BEDROOM UNIT PROGRAM

GRID

BEDROOM LIVING KITCHEN + DINING BATHROOM PARKING

3X3 3X4 3X4 2X1

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 3

1 1 1 1

14 20 20 3

14 20 20 3

1 1 1 1

14 20 20 3 57

PROGRAM BEDROOM LIVING KITCHEN DINING BATHROOM PARKING

Adaptability

Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3

2 1 1 1 1

28 20 20 20 3 91

3X3 3X4 3X4 3X4 2X1

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3

2 1 1 1 1

ONE BEDROOM UNIT

PROGRAM

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M)

3X3 3X4 3X4 3X4 2X1

14 20 20 20 3

2 1 1 1 1

PROGRAM

28 20 20 20 3

BEDROOM LIVING KITCHEN + DINING BATHROOM

PROGRAM

GRID PARKING

BEDROOM LIVING KITCHEN DINING BATHROOM LAUNDRY+ LOUNGE PARKING

3X3 3X4 3X4 3X4 TWO BEDROOM UNIT 2X1 3 PROGRAM X4

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M)

3X3 3X4 3X4 2X1

14 20 20 3

1 1 1 1

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3 20

4 1 1 1 2 AREA (Sq. 1 M)

14 20 20 3 57

56 20 20 20 6 20(Sq.M) TOTAL AREA

Flexibility & Adaptability BEDROOM

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M)PROGRAM

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M)

3X3 3X4 3X4 3X4 2X1 3X4

14 20 20 3

1 1 1 1

14 20 20 20 3 20

4 14 1 20 1 20 13 2 57 1

GRID 3X3

14

NUMBER 2

28

PROGRAM

GRID

BEDROOM LIVING KITCHEN DINING BATHROOM PARKING

3X3 3X4 3X4 3X4 2X1

PROGRAM

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3

2 1 1 1 1

28 20 20 20 3 91

ONE BEDROOM UNIT PROGRAM

GRID

BEDROOM 3X3 LIVING 3X4 FOUR +BEDROOM KITCHEN DINING UNIT 3X4 BATHROOM 2X1 PROGRAM GRID PARKING

56BEDROOM LIVING 20KITCHEN 20DINING 20BATHROOM 6PARKING ONE BEDROOM UNIT 20 142

TWO BEDROOM UNIT GRID

GRID 3X3 3X4 3X4 2X1

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 3

1 1 1 1

14 20 20 3 57

TWO BEDROOM UNIT

GRID GRID

BEDROOM BEDROOM 3X3 LIVING LIVING 3X4 KITCHEN KITCHEN + DINING 3X4 DINING BATHROOM 2X1 PARKING BATHROOM LAUNDRY+ LOUNGE PARKING

91

PROGRAM

BEDROOM LIVING

91KITCHEN + DINING

FOUR BEDROOM UNIT

GRID

28 20ONE BEDROOM UNIT 20 20PROGRAM 3 BATHROOM PARKING

ONE BEDROOM UNIT

FOUR BEDROOM UNIT

GRID

BEDROOM LIVING KITCHEN DINING BATHROOM PARKING

57

TWO BEDROOM UNIT

Sq. M) NUMBER TOTAL AREA (Sq.M)

PROGRAM

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 1 14 20 1 20 20 1 20 3 1 3 AREA (Sq. M) NUMBER TOTAL AREA (Sq.M)

GRID 3X3 3X4 3X4 3X4 2X1

14 20 20 20 3

2 1 1 1 1

28 20 20 20 3

91

GRID

BEDROOM 3X3 LIVING 3X4 FOUR BEDROOM UNIT KITCHEN + DINING 3X4 BATHROOM 2X1 PROGRAM GRID PARKING BEDROOM LIVING KITCHEN DINING BATHROOM LAUNDRY+ LOUNGE TWO BEDROOM UNIT PARKING

Two studios could be rented keeping the integrity of the mother home

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M)

3X3 3X4 3X4 3X4 2X1 3X4

PROGRAM

GRID

BEDROOM LIVING KITCHEN DINING BATHROOM PARKING

3X3 3X4 3X4 3X4 2X1

AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 1 14 20 1 20 20 1 20 3 1 3 AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3 20

4 1 1 1 2 1

57 56 20 20 20 6 20

142 AREA (Sq. M) NUMBER TOTAL AREA (Sq.M)

14 20 20 20 3

2 1 1 1 1

28 20 20 20 3

Two studios could be rented keeping the integrity of the mother home


ACADEMIC PROJECTS BACHELOR IN ARCHITECTURE | SPA | INDIA

63


BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE

People, Power and Bureaucracy National Secretariat Complex, Sher-e-Bangla Nagar,Dhaka INTRODUCTION In contemporary usage, the term ‘Democracy’ refers to a government chosen by the people. The constitution protects the rights of citizens, maintains order, and limits the power of bureaucracy. So the actual power in democracy lies with the people. As stated by Abraham Lincoln, ‘The government – of the people, by the people, for the people’- cultivates a critical relationship between Bureaucracy and democracy using people as the connecting medium. The architectural vocabulary of government buildings are such that it denotes a physical expression of man’s relationship to the bureaucracy. The democratic debates in such environments are activities fostered thus by the architectural design of the space. The democratic imperative, defined as citizens, have the right to participate in political decisions that affect their daily live. Citizens have created some of the most highly respected, resonant and realized statuses in the form of bureaucrats. This in turn has given position and authority to such eminent buildings in the world of architecture. The supreme governing institutes like parliament building, secretariat, courts etc. act as a constant reminder of the aspirations of nations and their values. But unfortunately, people have been kept out of these govt. buildings due to privacy and security issues of late. Through my thesis, I intend to introduce public and cultural amity to such kind of buildings, maximize public participation, and yet take care of the security concerns. The project is the secretariat complex of the master plan done by Louis I Kahn in Sher-e-Bangla Nagar, Dhaka, Bangladesh. Since the master plan has been already dishonoured by govt., there is a need of a design which sits in harmony with the assembly complex and reunites the master plan. This project is an attempt to develop an architectural design that symbolizes democracy against bureaucracy, is deeply rooted in its context and symbolizes the power entrusted with the citizens.

64

HYPOTHESIS

The thesis is intended to achieve an architectural expression that symbolizes democracy as well as pays heed to a master piece of architecture in closer context.


- To achieve an architectural vocabulary that symbolizes democracy by encouraging people’s participation in the democratic process. - To investigate the possibility of attaching a truly “public” image to the complex as opposed to the “closed” environment adopted in recent times. - Organization and the relation of the executive and the legislature. - To search for a design solution accepting the presence of a master piece in architectural history and paying heed to something significant in closer context.

RESEARCH • Primary Issue: -Philosophy Of Louis I. Kahn • Secondary Issue: -Architecture as an expression of political power -Symbolism in architecture and the role of architecture in the image of the city -Architecture and Democracy -Sustainable Architecture • Tertiary Issues: -Bangladeshi Vernacular Architecture

CASE STUDIES

PROJECT

65

National Secretariat of the People’s Republic of Bangladesh. Client : The project is owned by Government of Bangladesh. Related Ministry: Ministry of Housing & Public Works Total Site Area: 45.46 acres (1,84,654 sq.m.) Site Location: Sher-E- Banglanagar, Dhaka, Bangladesh. Bye-laws Ground Coverage: 50% max Height Restrictions: 35m FAR: 1 bye-laws

ARCHITECTURAL THESIS

• Palace of Assembly, Chandigarh, India • Assembly complex for Chennai, TN, India • Paliament of Australia • Natonal Secretariat, Thimpu, Bhutan

BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE

OBJECTIVE


BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE

CONCEPT The basic conceptual framework is drawn on three levels: - Master plan level, - Site plan level and - Macro/module level

MASTER PLAN

SITE PLAN

66 MODULE PLAN 1

2

1

2

3

4

3

4

Square

Golden Rectangle

Square


The whole design has been evolved on basis of two narratives. 1. The people 2. Bureaucracy. ‘Bureaucracy’ has been expressed through the order and the symmetry of the mass, and on contrary, ‘People’ by the asymmetry in design, showing the true power of people in democratic system to break the order of bureaucrats.

Hierarchy: Servant and served spaces in primary level

Hierarchy: Servant and served spaces in secondary level

Linear controlled system

Ministry Organisation

67 ARCHITECTURAL THESIS

FORM

BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE

CONCEPT NARRATIVE


BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE

View of Single Module

Master Plan

View of Court

68 View From Public Deck The Crown of Bureaucrats

Section

The Crown of People


South Elevation

Section AA

Section YY Section ZZ

ARCHITECTURAL THESIS

BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE

Site Plan

North Elevation

69


BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE

Strong seggregation of people and bureaucrats world

Grand Atrium

M O D U LE DETAILS

70

Spontaneous entry of people yet intact bureaucratsâ&#x20AC;&#x2122; world


Block A

BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE

LIGHTING SYSTEM

Block B Grand Atrium

ARCHITECTURAL THESIS

Typical Floor Plan

71


BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE

Aerocity Delhi

City Centre of The Future

72


YEAR FIVE : URBAN

73

BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE


BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE

74

• Consideration of edge situation: Green open space and towers of lower height being located towards the edge of the site • Main plaza being located on the road from the metro accentuating the pedestrian axis • Separate entry/ exit for the non-residential functions ensure uninterrupted residential central zone • The highest towers being juxtaposed to the green lawn offers the interactive view to maximum flats • Continuity of green open spaces

CONTEXTUAL RESPONSE AND EDGE RESPECT Entry for EWS block

Entry for community centre and Banquet hall Service entry

Separate entry to the nursing home

Main entry to the complex

Individual entry to `the school Metro station

Connectivity of open green space Entry & Exit to the site Axis maintained from the metro station to main entrance plaza

• CONTINUITY OF GREEN OPEN SPACES • CONSIDERATION OF EDGE SITUATION •GREEN OPEN SPACE OR LOWER HEIGHT TOWERS ARE LOCATED TOWARDS THE EDGE OF THE SITE • THE PLAZA IS BEING LOCATED ON THE ROAD FROM THE METRO AECCENTUATING THE PEDESTRIAN AXIS

GREEN OPEN SPACE

ROAD


YEAR FOUR : HOUSING

75

BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE


BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE

76

SITE:  ZONNING

COMMUNITY CENTRE:  Located just next to the plot where Noida City Centre is proposed

MAIN RESIDENTIAL  BLOCKS:  Located around   the inclusive green open the inclusive green open  space undisturbed by  vehicular traffic

NOIDA CITY CENTRE COMMUNITY CENTRE

EWS:  located aside  with their own green  open space and  p y separate entry/ exit.

NURSING HOME: •Located Located such that  such that makes it easily  accessible from other  adjoining residential  plot and vehicular  road. • It is isolated by virtue  of its location from the  main residential area of  the complex the complex

SCHOOL: The school is  strategically  proposed to  blend in with  the housing  but at the  same time  maintaining  its own its own  integrity    RESIDENTIAL GREEN NURSING HOME NURSING HOME EWS SCHOOL COMMERCIAL

•Peripheral vehicular road makes all the cores  accessible •Central pedestrian zone 


BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE

-Each and every spaces are naturally ventilated -Cross ventilation to all the bed rooms -Window protection for sun and rain water -Minimum circulation space -Undivided spaces of dining and living provide large party spaces

YEAR FOUR : HOUSING

77


BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE

78

-To not disturb the pedestrian membrane but take them in a pleasurable journey through the site, thus create connection between the other buildings around the site -Built space around the interactive open space -Individual interacting spaces as well as public meeting place. -Sustainable and suitable for climatic condition of Delhi


YEAR THREE : PUBLIC B.

79

BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE


80


YEAR TWO : HOUSE STUDY

81

BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE


82 Study the scopes of rock architecture and design of a youth hostel in Hampi considering a very hot and humid climatic condition, that includes two dormatories of 10 beds on a site area of 2050 sq.


YEAR ONE

83


84


85


86


Thanks for taking time to go through my journey of Architecture

87

Port Folio_Anupama Saha  

Architectural Design Work

Port Folio_Anupama Saha  

Architectural Design Work

Advertisement