Anjali Vardani | Architectural Portfolio

Page 1

Selected Works

2019-2024 portfolio.
Anjali Vardani

ANJALI VARDANI

Education

Nagpur, Maharashtra

July 2019- May

Visvesvaraya National Institute of Technology, Nagpur (VNIT)

Department of Architecture and Planning

Bachelor of Architecture

CGPA: 9.43

awarded Academic Excellence award for the year 2021-22

MH July 17- Feb 19

M.K.H. Sancheti Public School & Junior College

Higher Secondary Certificate (HSC)

Percentage: 90.60%

Mount Carmel Girls’ High School

Secondary Secondary Certificate (SSC)

Percentage: 96.40%

Info.

Contact

Email

Others

Competitions

+91 9921441422

anjalivardani@gmail.com

https://www.linkedin.com/in/ anjali-vardani-781b96238

Languages

Interests

English, Hindi, Sindhi, Marathi

Reading

3D Visualization

Graphic Design

Photography

Solar Decathlon India Challenge 2022-23

Grand & Division Winners, Office Building Division

Net-zero Police Station Design for Nagpur Smart City

NASA GRIHA Trophy

Runner Up, Special Mention

Sustainable Griha Compliant GST building design in Ghaziabad

NASA HUDCO Trophy

Jurors’ Choice Award

Affordable Housing module design for EWS in the state of Kerala

Lock-Unlock Design Competition

Prison Design

Nasa Laurie Baker Trophy

Low-cost PHC Design in Gujarat per Laurie Baker principles

Nasa ANDC Trophy

Bus Terminal Design in Bangalore

Nasa Reubens Trophy

Handwork trophy- Pen Hatching

Workshops

Parametric Tools and Computational Design in Architecture

Council of Architecture, TRC Bhopal

Bamboo Joinery Workshop

Maharashtra Bamboo Assosciation + VNIT

Earthquake Resistant Design Practices

National Information Centre of Earthquake Engineering, IIT Kanpur

Introducing International Sustainability Program

Trailblazer at GBRI

Introduction to UI-UX Design

Karwaan India

Skills

Softwares

Drafting

Digital Modelling

Energy+ Climate Analysis

Visualization

Post Production

Miscellaneous

AutoCAD | Autodesk Revit

Autodesk Revit | Sketchup | Rhinoceros | Grasshopper

Ladybug | Grasshopper | Climate Consultant

Lumion Pro | Enscape 3D | Photoshop

Adobe Suite (Ps + Ai + Id)

Blender | Microsoft Office Suite

Curriculum Vitae 2 curriculum vitae.
2024
2022-23 2022 2022 2021 2020-21 2020 2019 2023 2023 2022 2022 2022 Nagpur, MH July 16- Mar 17
Nagpur,

Thesis Work

Site and Context study, Concept and Design Development, Plans and sections

Internship Work

Working Drawings: Elevation & Sections. Site images

Internship Work

Interior Design for Bedrooms

Competition Work

Solar Decathlon India

Competition Work

NASA GRIHA Trophy

Academic Work

Form Evolution, Design Development, Plans and sections

Anjali Vardani | Selected Works 2019-24 3 contents. 18 12 26 30 04 34 39 Akiri Residence 2023 ELV High Garden 2023 Punapur Polic Station 2022 GST Building 2021 Integrated Esports Arena 2024 Urban Insert 2023 Miscellaneous

Integrated Esports Arena

Arena Design

Location : Navi Mumbai

Builtup Area : 21,080 sq.m.

Focus Areas:

Indoor Arena Design, Structural Detailing, User group & Community building, Innovative Technology Integration.

Integrated Esports Hub 4
Thesis work

Analysis:

• the surrounding landuse consists of Commercial, Recreational (parks and grounds) and Residential, with some Public and semipublic use.

Inference:

• User groups such as 22-30 y/o ( from commercial corporate spaces), 12-20 y/o (from residential as well as schools, colleges) can be attracted at the center.

Location: Sector 29, Khargar, Navi Mumbai

Site Area: 65,390 sq.m. (16.15 acres)

Connectivity:

Navi Mumbai International Airport 16.2 km

Bus Stop 600m from site

• Located in a Highly developing area, with lots of Commercial and Recreational infrastructure coming up

• Well connected to the International Airport, metro line and to Mumbai area via road networks.

• The presence of target audience for Esports in both Navi Mumbai and Mumbai region.

Analysis:

• The site has an undulating slope, with the hightest contour lying in the middle of the site. Contour difference = 6 M

• Most of the site is gently sloping.

Inference:

• The site is majorly gently sloping, with all slopes lying under 10% making the site buildable

• Cut and fill will not be required.

Inference:

• Site

65390 sqm (16.15 acres)

• Perimeter: 1022.7 m

Analysis:

• As the site is situated on the main wide road heavy traffic can be recognized. Analysis:

Inference:

• Traffic noise is not inevitable and can be minimized by constructing sound barriers.

• The row of trees on the site edge parallel to the site can be enhanced and used as sound barriers.

Analysis:

• The site has existing rows of vegetation on the edges parallel to the roads.

Inference:

• This vegetation along with new additions can be used as • (a) noise buffers (b)can facilitate pedestrian movement and create transition spaces for the arena and public plazas

• The arena’s shape and the assosciated aerodynamics will play an important role in determing the impact on the immediate surrounding spaces.

• Continous air circulation (cross ventilation) to reduce heat and relief from stickiness.

Inference:

• Building should be oriented with the longer axis (north –south) aligned perpendicular to the prevailing winds to facilitate maximum air-flow and cross ventilation through the building. (Buildings can be oriented at an angle between 0° to 30° with respect to the prevailing wind direction.

• Site is located on a junction, having vehicles coming in from two roads (from Mumbai as well as Navi Mumbai Int. Airport

Inference:

• Possible Vehicular entry points as shown in the fig. above.

• Pedestrian entry points- access from the opposite central park, closeby Metro st. & neighbouring residential areas can be provided, considering the user group.

Analysis:

• The site has views of the Parsik hills on the western side and the Central park on the southern side.

• There are High rise developments (residential) on the northern and eastern side.

Analysis:

• Hours between 10am to 4pm are hot all year round and hence not very comfortable.

• City experiences high temperatures all year round.

Inference:

• In this climate air conditioning is always needed, but can be greatly reduced if building minimizes overheating.

• Materials with high heat insulation should be used.

• Climate responsive buildings in warm and humid climates used High ceilings and tall operable windows.

Inference:

• The hills can be used as a natural background for the building and its spaces, as well as the greenery of the central park serves the same purpose.

• The site being located in a High rise development area, but having the advantage of being in an undeveloped portion of neighbourhood, can be utilized to create Landmark / Pioneering building.

Anjali Vardani | Selected Works 2019-24 5 Anjali Vardani | BA19ARC001 Integrated Esports Arena Guided by: Dr. V.S. Kapse Site Analysis
Site Geometry and Dimensions Noise Analysis Access and circulation Contour and Slope analysis Landuse (on site + surrounding) Climate Analysis Climate Analysis : Sun Site Justification Views of and from site Views of and from site Bye laws Vegetation & Site features Site Location + Neighbouring Landmarks Summer Winds Winter Winds Rest of the year Time Table Plot- Dry bulb temp. Analysis: • Only 8.6% (751 hours) of the year lies in comfort range. • Adaptive comfort ventilation ( 49.5%), Sun Shading (29.3%) and Cooling (29.6%) are the most effective strategies that bring comfort hours to 100%. Analysis:
NW
SW.
• Summer winds are from the West,
and
from
NW.
• Winter winds are
North and
Analysis:
roughly polygonal in shape
Site is
side is 300.6 m
Longest
Area:
Possible vehicular entry points Possible pedestrian entry points Road circulation A A B C C B Central Park Pethpada metro st. Central park metro st. Central Park Tata Memorial Hospital Parsik Hills Hills Trek Point S8UL gaming house Godlike Esports Site
Integrated Esports Hub 6 Site Plan LEGEND: 1. Public entry 2. Athelete/Media/Officials entry 3. Training and Gaming Center entry 4. Main Arena 5. Event Spaces 6. Courtyard 7. Training Center Bootcamp 8. Gaming centre 9. Parking 10. Loading/unloading area 11. Service road 12. Pedestrian Ramps 13. Venicular Ramps 3 7 7 7 8 9 8 13 11 10 13 12 12 13 4 5 5 6 6 5 5 1 1 1 2 40 M WIDE ROAD 35M WIDE ROAD
Anjali Vardani | Selected Works 2019-24 7 GF Plan on Site
Integrated Esports Hub 8 Arena Floor Plans Ground Floor Plan Tier 1 Floor Plan Tier 2 Floor Plan VIP level Floor Plan
Anjali Vardani | Selected Works 2019-24 9
Integrated Esports Hub 10 Site Section
Space Truss Radial Type Cladding Aluminium Panels Tension Ring Structural Support RCC Column structures
Anjali Vardani | Selected Works 2019-24 11 Detailed Section through Arena

ELV High Garden

Internship work

Working Drawings

Location : Whitefield, Bengaluru

Builtup Area : 50960 sq.m.

Project Involvement:

Drafting Elevations and Sections of a high-rise Apartment, Exposure to Mivan construction technology.

Site Visits.

ELV High Garden 12
Anjali Vardani | Selected Works 2019-24 13
Site Images
ELV High Garden 14 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 W9 W1 W1 W1 W3 SD1 SD2 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD1 W3 W1 SD5 W1 SD1 W1 SD5 W1 SD1 W1 SD5 W1 SD1 W1 SD5 W1 SD1 SD4 SD5 W1 SD1 W1 SD5 W1 SD1 W1 SD5 W1 SD1 SD4 SD5 W1 SD1 W1 SD5 W1 SD1 W1 SD5 W1 SD1 SD4 SD5 W1 SD1 W1 SD5 W1 SD1 W1 SD5 W1 SD1 SD4 SD5 W1 SD1 W1 SD5 W1 SD1 W1 SD5 W1 SD1 SD4 SD5 W1 SD1 W1 SD5 W1 SD1 W1 W9 W1 W1 W1 SD2 SD1 SD1 SD2 W1 SD5 SD4 SD1 W1 SD5 SD4 SD1 W1 SD2 W9 W1 W1 W1 W3 SD1 SD1 W3 W1 SD5 W1 SD1 W1 SD5 W1 SD1 W1 SD2 W3 SD4 SD8 W21 SD5 W1 SD7 SD4 W1 W1 SD5 W1 FW6 W1 FW5 FW5 FW7 FW7 W11 W14 W10 W13 W11 W11 W11 W11 W11 W12 PODIUM FLOOR (FIRST) FFL LVL + 102.55 M/ 4.65 M SSL LVL + 102.50 M/ 4.60 M SECOND FLOOR FFL LVL + 105.55 M/ 7.65 M SSL LVL + 105.50 M/ 7.60 M THIRD FLOOR FFL LVL + 108.55 M/ 10.65 M SSL LVL + 108.50 M/ 10.60 M FOURTH FLOOR FFL LVL + 111.55 M/ 13.65 M SSL LVL + 111.50 M/ 13.60 M FIFTH FLOOR FFL LVL + 114.55 M/ 16.65 M SSL LVL + 114.50 M/ 16.60 M SIXTH FLOOR FFL LVL + 117.55 M/ 19.65 M SSL LVL + 117.50 M/ 19.60 M SEVENTH FLOOR FFL LVL + 120.55 M/ 22.65 M SSL LVL + 120.50 M/ 22.60 M EIGHTH FLOOR FFL LVL + 123 .55 M/ 25.65 M SSL LVL + 123 .50 M/ 25.60 M NINTH FLOOR FFL LVL + 126.55 M/ 28.65 SSL LVL + 126.50 M/ 28.60 M TENTH FLOOR FFL LVL + 129.55 M/ 31.65 M SSL LVL + 129.50 M/ 31.60 M ELEVENTH FLOOR FFL LVL + 132.55 M/ 34.65 M SSL LVL + 132.50 M/ 34.60 M TWELFTH FLOOR FFL LVL + 135.55 M/ 37.65 M SSL LVL + 135.50 M/ 37.60 M THIRTEENTH FLOOR FFL LVL + 138.55 M/ 40.65 M SSL LVL + 138.50 M/ 40.60 M FOURTEENTH FLOOR FFL LVL + 141.55 M/ 43.65 M SSL LVL + 141.50 M/ 43.60 M TERRACE LEVEL FFL LVL + 165.55 M/ 67.65 M SSL LVL + 165.50 M/ 67.60 M FIFTEENTH FLOOR FFL LVL + 144.55 M/ 46.65 M SSL LVL + 144.50 M/ 46.60 M SIXTEENTH FLOOR FFL LVL + 147.55 M/ 49.65 M SSL LVL + 147.50 M/ 49.60 M SEVENTEENTH FLOOR FFL LVL + 150.55 M/ 52.65 M SSL LVL + 150.50 M/ 52.60 M EIGHTEENTH FLOOR FFL LVL + 153.55 M/ 55.65 M SSL LVL + 153.50 M/ 55.60 NINETEENTH FLOOR FFL LVL + 156.55 M/ 58.65 M SSL LVL + 156.50 M/ 58.60 M TWENTY FIRST FLOOR FFL LVL + 162.55 M/ 64.65 SSL LVL + 162.50 M/ 64.60 M TWENTIETH FLOOR FFL LVL + 159.55 M/ 61.65 M SSL LVL + 159.50 M/ 61.60 M TERRACE HEADROOM LEVEL LVL + 168.50 M/ 70.60 M 4000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 STILT FLOOR SSL LVL + 98.50 M/ 0.60 M 71500 ROAD LEVEL LVL + 97.15 M 1500 70000 1500 A C B D F E VINEET R0 DATE OF FIRST ISSUE 27-04-22 © As per the copyright act of India 1957 this drawing is sole property of collage architecture studio and should not be reproduced without the consent of the architect. ARCHITECTS #111, AAYUSH 2H main road, East of NGEF Layout, Kasturinagar, Bengaluru 560043. Office Tel (080)41100208. DATE SCALE 1:200 REVISION SHEET LANDSCAPE GENERAL NOTES All dimensions are in millimeters unless otherwise mentioned. All levels indicated are in Mts unless otherwise specified. The written dimensions are to be followed and the dimensions are not to be measured from the drawing. This drawing is to be read in conjunction with all other consultants drawings. Any discrepancy in the drawing should be brought to the notice of the architect immediately. All dimensions shown are with respect to finished floor level unless otherwise mentioned. The revisions mentioned in this drawing are to be considered as latest and all the earlier drawings to be superseded Only the drawings signed by the architect are to be considered as Good for construction. Architect is not responsible for any construction done with drawings issued without signature. ARCHITECTURE STUDIO DWG NUMBER A1 TITLE APPROVED CHECKED DEALT ARUN DWG STATUS ADDRESS #111, AAYUSH 2H main road, East of NGEF Layout, Kasturinagar, Bengaluru - 560043. PROJECT JOB NUMBER CAS-A-2018-06 CLIENTS P.H.E. STRUCTURAL #37 Ramanashree Chambers Cubbon Road, Lady Curzon Rd, Tasker Town, Shivaji Nagar, Bengaluru 560001 #950/5 2nd Floor, 24th Main Rd, 2nd Phase, J. Nagar, Bengaluru 560078. 156/B,3rd floor,10th main road,5th cross, near Ashoka pillar, behind Simpli Namdhari store, Jayanagar 1st Block, Bengaluru 560011. Revised Units Plans 26-09-23 ANJALI N SLN 1000x2400 MKD MD D3 900x2400 D2 O3 D1 O2 O4 800x2100 1200x2100 O5 08 O6 O9 SIZE (IN MM) O1 10 1820x2100 D4 750x1500 D5 1500x2100 D6 2000x2100 D7 1500x2700 D8 07 D5A 900X1500 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL)--600 MM-600 MM UNITS MAIN DOOR ROOM ENTRY DOOR TOILET DOOR STAICASE ENTRY DOOR LIFT LOBBY ENTRY DOOR ELECTRICAL SHAFT DOOR STEPS FROM GROUND TO BASEMENT NEAR RWST FIRE SHAFT DOOR 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2100 MM 2100 MM 2100 MM 2700 MM 2100 MM SLN MKD SD4 2560x2400 SD3 13 SD2 12 14 3000x2400 3300x2400 15 18 16 SIZE (IN MM) 2700x2400 SD5 4360x2400 SD6 3460x2400 SD8 17 SD7 2850x2400 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL)---2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM SLN MKD W6 W5 23 24 1180x1500 2260x2400 25 28 26 29 SIZE (IN MM) 30 2700x2400 W7 1940x1500 W8 3160x1900 W10 3020x1900 W11 3360x1900 W12 27 W9 3600x2400 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 900 MM900 MM 1200 MM 1200 MM 1200 MM2400 MM 2400 MM 2400 MM 2400 MM 3100 MM 3100 MM 3100 MM 2400 MM SLN 3600x1900 MKD W13 W16 3320x1900 W15 33 W14 32 34 2660x2050 1250x1200 35 38 36 39 SIZE (IN MM) 31 1820x1200 W17 2500x1200 W18 1200x2400 W20 3460x1200 W21 37 W19 2400x2400 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 1200 MM 1200 MM 1050 MM 1200 MM 1200 MM 1200 MM1200 MMSTILT PARKING WINDOW STAICASE BLOCK WINDOW 3100 MM 3100 MM 2400 MM 3100 MM 2400 MM 2100 MM 2400 MM 2400 MM 2100 MM SLN 2500x1200 MKD FW2 FW5 4360x2400 FW4 43 FW3 42 44 2260x2400 1500x2400 45 48 46 49 SIZE (IN MM) 41 50 2850x2400 FW6 4320x2400 FW7 1700x2400 FW9 800x1200 V1 20290x4950 G1 47 FW8 3460x2400 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 1200 MM--950 MMSTANDARD TOILET VENTILATOR CLUBHOUSE_BANQUET HALL 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2100 MM 4950 MM 2400 MM SLN MKD OP2 OP1 53 54 3300x2700 5100x2700 55 58 56 59 SIZE (IN MM) 60 4040x2700 OP3 3300x2700 OP4 3460x2700 OP6 3461x2700 OP7 2700x2700 OP8 57 OP5 3460x2700 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL)---2700 MM 2700 MM 2700 MM 2700 MM 2700 MM 2700 MM 2700 MM 2700 MM STEPS FROM GROUND TO BASEMENT NEAR UGT CLUBHOUSE_BADMINTON, SQUASH, GYM, THEATRE STILT PARKING WINDOW STILT PARKING WINDOW STILT PARKING WINDOW STILT PARKING WINDOW STILT PARKING WINDOW STAICASE BLOCK WINDOW STAICASE BLOCK WINDOW STAIRCASE WINDOW NEAR BADMINTON COURT 62 63 64 6720x2100 OP10 7060x2400 OP11 2700x2400 OP12 61 OP9 6920x2100-2100 MM 2400 MM 2400 MM 2100 MM CLUBHOUSE_CONFERENCE & YOGA WAITING CLUBHOUSE_BANQUET HALL_FOYER CLUBHOUSE_RECEPTION LOUNGE CLUBHOUSE_RECEPTION LOUNGE CLUBHOUSE_RECEPTION LOUNGE CLUBHOUSE_RECEPTION OFFICE AREA CLUBHOUSE_BADMINTON COURT CLUBHOUSE_KIDS DAYCARE_LOUNGE CLUBHOUSE_YOGA & GYM TO SWIMMING DECK CLUBHOUSE_GYM TO SWIMMING DECK CLUBHOUSE_CAFE CLUBHOUSE_CAFE PANTRY 7060x4950 G2 13980x4950 G3 52 514950 MM 4950 MM CLUBHOUSE_INFANT PLAY AREA CLUBHOUSE_INDOOR GAMES 19 20 3300x2400 W1 3300x1500 W2900 MM STANDARD UTILITY WINDOW 2400 MM 2400 MM 40 1820x1200 FW1 1200 MM STAIRCASE WINDOW NEAR BADMINTON COURT 2400 MM SLN MKD SIZE (IN MM) DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 2400x2400 SD1 11 - 2400 MM 3460x2400 W3 21 - 2400 MM 1700x1500 W4 22 900 MM 2400 MM 1) ALL DIMENSIONS TO BE VERIFIED AS PER SITE CONDITIONS. 2) ALL DIMENSIONS ARE IN MM. 3) ALL HEIGHTS ARE WITH RESPECT TO FFL. 150 MM THK MASONARY WALL R.C.C. AS PER DETAIL 200 MM THK MASONARY WALL LEGEND HATCH PATTERN 100 MM THK MASONARY WALL CINDER FILLING FOR SUNK
Anjali Vardani | Selected Works 2019-24 15 W2 W1 SD5 SD1 W2 W1 SD5 SD1 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 SD5 SD4 W2 SD1 W2 SD1 W1 SD5 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 W2 SD1 W1 SD5 W2 W1 SD5 SD1 W2 W1 SD5 SD1 W2 SD4 SD5 SD1 W2 W1 SD5 SD1 W2 W1 SD5 SD1 W2 SD4 SD5 SD1 W2 W1 SD5 SD1 W2 SD4 SD5 SD1 W2 W1 SD5 SD1 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 FW3 SD5 W19 SD1 SD6 SD5 SD1 W2 W2 W1 SD5 SD1 W2 W1 SD5 SD1 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 FW3 SD5 W19 SD1 SD6 SD5 SD1 W2 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 W1 SD5 SD1 W2 W1 SD5 SD1 W2 SD1 SD4 SD5 SD1 SD1 SD1 SD1 SD1 OP11 W2 SD4 SD5 W2 SD1 SD4 SD1 SD5 SD5 SD4 W2 SD1 GROUND LEVEL SSL+97.90 SD1 SD1 SD1 SD1 SD1 SD1 SD1 SD1 SD1 PODIUM FLOOR (FIRST) FFL LVL + 102.55 M/ 4.65 M SSL LVL + 102.50 M/ 4.60 M SECOND FLOOR FFL LVL + 105.55 M/ 7.65 M SSL LVL + 105.50 M/ 7.60 M THIRD FLOOR FFL LVL + 108.55 M/ 10.65 M SSL LVL + 108.50 M/ 10.60 M FOURTH FLOOR FFL LVL + 111.55 M/ 13.65 M SSL LVL + 111.50 M/ 13.60 M FIFTH FLOOR FFL LVL + 114.55 M/ 16.65 M SSL LVL + 114.50 M/ 16.60 SIXTH FLOOR FFL LVL + 117.55 M/ 19.65 M SSL LVL + 117.50 M/ 19.60 M SEVENTH FLOOR FFL LVL + 120.55 M/ 22.65 M SSL LVL + 120.50 M/ 22.60 EIGHTH FLOOR FFL LVL + 123 .55 M/ 25.65 M SSL LVL + 123 .50 M/ 25.60 M NINTH FLOOR FFL LVL + 126.55 M/ 28.65 M SSL LVL + 126.50 M/ 28.60 M TENTH FLOOR FFL LVL + 129.55 M/ 31.65 M SSL LVL + 129.50 M/ 31.60 M ELEVENTH FLOOR FFL LVL + 132.55 M/ 34.65 M SSL LVL + 132.50 M/ 34.60 M TWELFTH FLOOR FFL LVL + 135.55 M/ 37.65 M SSL LVL + 135.50 M/ 37.60 M THIRTEENTH FLOOR FFL LVL + 138.55 M/ 40.65 M SSL LVL + 138.50 M/ 40.60 M FOURTEENTH FLOOR FFL LVL + 141.55 M/ 43.65 M SSL LVL + 141.50 M/ 43.60 M TERRACE LEVEL FFL LVL + 165.55 M/ 67.65 M SSL LVL + 165.50 M/ 67.60 M FIFTEENTH FLOOR FFL LVL + 144.55 M/ 46.65 M SSL LVL + 144.50 M/ 46.60 M SIXTEENTH FLOOR FFL LVL + 147.55 M/ 49.65 M SSL LVL + 147.50 M/ 49.60 M SEVENTEENTH FLOOR FFL LVL + 150.55 M/ 52.65 M SSL LVL + 150.50 M/ 52.60 M EIGHTEENTH FLOOR FFL LVL + 153.55 M/ 55.65 M SSL LVL + 153.50 M/ 55.60 M NINETEENTH FLOOR FFL LVL + 156.55 M/ 58.65 M SSL LVL + 156.50 M/ 58.60 M TWENTY FIRST FLOOR FFL LVL + 162.55 M/ 64.65 M SSL LVL + 162.50 M/ 64.60 M TWENTIETH FLOOR FFL LVL + 159.55 M/ 61.65 M SSL LVL + 159.50 M/ 61.60 M TERRACE HEADROOM LEVEL LVL + 168.50 M/ 70.60 M 4000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 STILT FLOOR SSL LVL + 98.50 M/ 0.60 M 71500 ROAD LEVEL LVL + 97.15 M 1500 70000 1500 A C B D F E VINEET R0 DATE OF FIRST ISSUE 27-04-22 © As per the copyright act of India 1957 this drawing is a sole property of collage architecture studio and should not be reproduced without the consent of the architect. ARCHITECTS #111, AAYUSH ', 2H main road, East of NGEF Layout, Kasturinagar, Bengaluru 560043. Office Tel (080)41100208. DATE SCALE 1:200 REVISION SHEET LANDSCAPE GENERAL NOTES All dimensions are in millimeters unless otherwise mentioned. All levels indicated are in Mts unless otherwise specified. The written dimensions are to be followed and the dimensions are not to be measured from the drawing. This drawing is to be read in conjunction with all other consultants drawings. Any discrepancy in the drawing should be brought to the notice of the architect immediately. All dimensions shown are with respect to finished floor level unless otherwise mentioned. The revisions mentioned in this drawing are to be considered as latest and all the earlier drawings to be superseded Only the drawings signed by the architect are to be considered as Good for construction. Architect is not responsible for any construction done with drawings issued without signature. ARCHITECTURE STUDIO DWG NUMBER A1 TITLE APPROVED CHECKED DEALT ARUN DWG STATUS ADDRESS #111, AAYUSH 2H main road, East of NGEF Layout, Kasturinagar, Bengaluru 560043. PROJECT JOB NUMBER CAS-A-2018-06 CLIENTS P.H.E. STRUCTURAL #37 Ramanashree Chambers Cubbon Road, Lady Curzon Rd, Tasker Town, Shivaji Nagar, Bengaluru 560001 #950/5 2nd Floor, 24th Main Rd, 2nd Phase, J. Nagar, Bengaluru 560078. 156/B,3rd floor,10th A main road,5th cross, near Ashoka pillar, behind Simpli Namdhari store, Jayanagar 1st Block, Bengaluru 560011. Revised Units Plans 26-09-23 ANJALI N SLN 1000x2400 MKD MD D3 900x2400 D2 O3 D1 O2 O4 800x2100 1200x2100 O5 08 O6 O9 SIZE (IN MM) O1 10 1820x2100 D4 750x1500 D5 1500x2100 D6 2000x2100 D7 1500x2700 D8 07 D5A 900X1500 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL)--600 MM-600 MM UNITS MAIN DOOR ROOM ENTRY DOOR TOILET DOOR STAICASE ENTRY DOOR LIFT LOBBY ENTRY DOOR ELECTRICAL SHAFT DOOR STEPS FROM GROUND TO BASEMENT NEAR RWST FIRE SHAFT DOOR 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2100 MM 2100 MM 2100 MM 2700 MM 2100 MM SLN MKD SD4 2560x2400 SD3 13 SD2 12 14 3000x2400 3300x2400 15 18 16 SIZE (IN MM) 2700x2400 SD5 4360x2400 SD6 3460x2400 SD8 17 SD7 2850x2400 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL)---2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM SLN MKD W6 W5 23 24 1180x1500 2260x2400 25 28 26 29 SIZE (IN MM) 30 2700x2400 W7 1940x1500 W8 3160x1900 W10 3020x1900 W11 3360x1900 W12 27 W9 3600x2400 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 900 MM900 MM 1200 MM 1200 MM 1200 MM2400 MM 2400 MM 2400 MM 2400 MM 3100 MM 3100 MM 3100 MM 2400 MM SLN 3600x1900 MKD W13 W16 3320x1900 W15 33 W14 32 34 2660x2050 1250x1200 35 38 36 39 SIZE (IN MM) 31 1820x1200 W17 2500x1200 W18 1200x2400 W20 3460x1200 W21 37 W19 2400x2400 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 1200 MM 1200 MM 1050 MM 1200 MM 1200 MM 1200 MM1200 MMSTILT PARKING WINDOW STAICASE BLOCK WINDOW 3100 MM 3100 MM 2400 MM 3100 MM 2400 MM 2100 MM 2400 MM 2400 MM 2100 MM SLN 2500x1200 MKD FW2 FW5 4360x2400 FW4 43 FW3 42 44 2260x2400 1500x2400 45 48 46 49 SIZE (IN MM) 41 50 2850x2400 FW6 4320x2400 FW7 1700x2400 FW9 800x1200 V1 20290x4950 G1 47 FW8 3460x2400 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 1200 MM--950 MMSTANDARD TOILET VENTILATOR CLUBHOUSE_BANQUET HALL 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2100 MM 4950 MM 2400 MM SLN MKD OP2 OP1 53 54 3300x2700 5100x2700 55 58 56 59 SIZE (IN MM) 60 4040x2700 OP3 3300x2700 OP4 3460x2700 OP6 3461x2700 OP7 2700x2700 OP8 57 OP5 3460x2700 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL)---2700 MM 2700 MM 2700 MM 2700 MM 2700 MM 2700 MM 2700 MM 2700 MM STEPS FROM GROUND TO BASEMENT NEAR UGT CLUBHOUSE_BADMINTON, SQUASH, GYM, THEATRE STILT PARKING WINDOW STILT PARKING WINDOW STILT PARKING WINDOW STILT PARKING WINDOW STILT PARKING WINDOW STAICASE BLOCK WINDOW STAICASE BLOCK WINDOW STAIRCASE WINDOW NEAR BADMINTON COURT 62 63 64 6720x2100 OP10 7060x2400 OP11 2700x2400 OP12 61 OP9 6920x2100-2100 MM 2400 MM 2400 MM 2100 MM CLUBHOUSE_CONFERENCE YOGA WAITING CLUBHOUSE_BANQUET HALL_FOYER CLUBHOUSE_RECEPTION & LOUNGE CLUBHOUSE_RECEPTION & LOUNGE CLUBHOUSE_RECEPTION & LOUNGE CLUBHOUSE_RECEPTION OFFICE AREA CLUBHOUSE_BADMINTON COURT CLUBHOUSE_KIDS DAYCARE_LOUNGE CLUBHOUSE_YOGA & GYM TO SWIMMING DECK CLUBHOUSE_GYM TO SWIMMING DECK CLUBHOUSE_CAFE CLUBHOUSE_CAFE PANTRY 7060x4950 G2 13980x4950 G3 52 514950 MM 4950 MM CLUBHOUSE_INFANT PLAY AREA CLUBHOUSE_INDOOR GAMES 19 20 3300x2400 W1 3300x1500 W2900 MM STANDARD UTILITY WINDOW 2400 MM 2400 MM 40 1820x1200 FW1 1200 MM STAIRCASE WINDOW NEAR BADMINTON COURT 2400 MM SLN MKD SIZE (IN MM) DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 2400x2400 SD1 11 - 2400 MM 3460x2400 W3 21 - 2400 MM 1700x1500 W4 22 900 MM 2400 MM 1) ALL DIMENSIONS TO BE VERIFIED AS PER SITE CONDITIONS. 2) ALL DIMENSIONS ARE IN MM. 3) ALL HEIGHTS ARE WITH RESPECT TO FFL. 150 MM THK MASONARY WALL R.C.C. AS PER DETAIL 200 MM THK MASONARY WALL LEGEND HATCH PATTERN 100 MM THK MASONARY WALL CINDER FILLING FOR SUNK
ELV High Garden 16 SD1 SD1 SD1 SD1 SD1 SD1 SD1 W2 W1 SD5 SD1 W2 W1 SD5 SD1 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 SD5 SD4 W2 SD1 W2 SD1 W1 SD5 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 W2 SD1 W1 SD5 W2 W1 SD5 SD1 W2 W1 SD5 SD1 W2 SD4 SD5 SD1 W2 W1 SD5 SD1 W2 W1 SD5 SD1 W2 SD4 SD5 SD1 W2 W1 SD5 SD1 W2 SD4 SD5 SD1 W2 W1 SD5 SD1 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 FW3 SD5 W19 SD1 SD6 SD5 SD1 W2 W2 W1 SD5 SD1 W2 W1 SD5 SD1 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 FW3 SD5 W19 SD1 SD6 SD5 SD1 W2 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 W1 SD5 SD1 W2 W1 SD5 SD1 W2 SD1 SD4 SD5 SD1 SD1 SD1 SD1 SD1 OP11 W2 SD4 SD5 W2 SD1 SD4 SD1 SD5 SD5 SD4 W2 SD1 SD1 SD1 PARKING BASEMENT FLOOR FFL +94.50 M SSL+94.20 M BASEMENT FLOOR FFL +94.50 M SSL+94.20 M STILT FFL +98.65 M SSL+98.50 M D5 D5 TREAD= 300 mm RISER EQUAL(~148.148mm) TREAD= 300 mm RISER = EQUAL (~148.148mm) D3 TREAD= 300 mm RISER = 150 mm BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 MD BALCONY SD1 W1 (REF. NOTE) LIVING BEDROOM 3000 TERRACE 1300 D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm D3 TREAD= 300 mm RISER = 150 mm BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING SD1 W4 3000 3000 D3 MD W1 SD1 BALCONY (REF. NOTE) LIVING BEDROOM 3000 MD W1 SD1 BALCONY (REF. NOTE) LIVING BEDROOM 3000 MD BALCONY (REF. NOTE) LIVING BEDROOM W1 SD1 3000 MD BALCONY SD1 SD1 (REF. NOTE) LIVING BEDROOM 3000 D5 D5 D5 D5 D5 D5 D5 D5 D5 D5 D5 D5 D5 D5 D5 D5 D5 D5 D5 D5 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 PARKING PARKING D3 TREAD= 300 mm RISER = EQUAL (~148.148mm) D3 SD1 FW9 W4 SD1 3000 3000 BALCONY (REF. NOTE) BEDROOM LIVING BALCONY (REF. NOTE) BEDROOM TERRACE 1300 6000 D5 MD W1 SD1 BALCONY (REF. NOTE) LIVING BEDROOM 3000 MD BALCONY (REF. NOTE) LIVING BEDROOM 3000 W1 MD BALCONY (REF. NOTE) LIVING BEDROOM 3000 W1 MD BALCONY (REF. NOTE) LIVING BEDROOM 3000 W1 MD BALCONY (REF. NOTE) LIVING BEDROOM 3000 W1 MD W1 SD1 BALCONY (REF. NOTE) LIVING BEDROOM 3000 MD W1 SD1 BALCONY (REF. NOTE) LIVING BEDROOM 3000 MD BALCONY SD1 SD1 (REF. NOTE) LIVING BEDROOM 3000 MD BALCONY SD1 SD1 (REF. NOTE) LIVING BEDROOM 3000 REF-DET-1 MD W1 SD1 BALCONY (REF. NOTE) LIVING BEDROOM 3000 MD W1 SD1 BALCONY (REF. NOTE) LIVING BEDROOM 3000 BASEMENT FLOOR FFL +94.50 M SSL+94.20 M STILT FFL +98.65 M SSL+98.50 M BASEMENT FLOOR FFL +94.50 M SSL+94.20 BASEMENT FLOOR FFL +94.50 M SSL+94.20 BASEMENT FLOOR FFL +94.50 M SSL+94.20 M PARKING PARKING PARKING PARKING PARKING PARKING PARKING PARKING MD W1 SD1 BALCONY (REF. NOTE) LIVING BEDROOM 3000 MD W1 SD1 BALCONY (REF. NOTE) LIVING BEDROOM 3000 landscape detail as per landscape consultants DRIVEWAY RFL +97.90 SSL+97.60 M landscape detail as per landscape consultants Y8 Y12 Y9 Y10 Y13 5800 5705 6175 4700 2580 3578 2252 3760 2998 725 3550 Y1 Y2 Y3 Y4 Y5 Y6 Y7 3400 REF-DET-1 MD BALCONY (REF. NOTE) LIVING BEDROOM W1 SD1 3000 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 PODIUM FLOOR (FIRST) FFL LVL + 102.55 M/ 4.65 M SSL LVL + 102.50 M/ 4.60 M SECOND FLOOR FFL LVL + 105.55 M/ 7.65 M SSL LVL + 105.50 M/ 7.60 M THIRD FLOOR FFL LVL + 108.55 M/ 10.65 M SSL LVL + 108.50 M/ 10.60 M FIFTH FLOOR FFL LVL + 114.55 M/ 16.65 M SSL LVL + 114.50 M/ 16.60 M SIXTH FLOOR FFL LVL + 117.55 M/ 19.65 M SSL LVL + 117.50 M/ 19.60 M SEVENTH FLOOR FFL LVL + 120.55 M/ 22.65 M SSL LVL + 120.50 M/ 22.60 M EIGHTH FLOOR FFL LVL + 123 .55 M/ 25.65 M SSL LVL + 123 .50 M/ 25.60 M NINTH FLOOR FFL LVL + 126.55 M/ 28.65 M SSL LVL + 126.50 M/ 28.60 M TENTH FLOOR FFL LVL + 129.55 M/ 31.65 M SSL LVL + 129.50 M/ 31.60 M ELEVENTH FLOOR FFL LVL + 132.55 M/ 34.65 M SSL LVL + 132.50 M/ 34.60 M TWELFTH FLOOR FFL LVL + 135.55 M/ 37.65 M SSL LVL + 135.50 M/ 37.60 M BASEMENT LEVEL FFL LVL + 94.50 M/ 4.00 M THIRTEENTH FLOOR FFL LVL + 138.55 M/ 40.65 M SSL LVL + 138.50 M/ 40.60 M FOURTEENTH FLOOR FFL LVL + 141.55 M/ 43.65 M SSL LVL + 141.50 M/ 43.60 M TERRACE LEVEL FFL LVL + 165.55 M/ 67.65 M SSL LVL + 165.50 M/ 67.60 M FIFTEENTH FLOOR FFL LVL + 144.55 M/ 46.65 M SSL LVL + 144.50 M/ 46.60 M SIXTEENTH FLOOR FFL LVL + 147.55 M/ 49.65 M SSL LVL + 147.50 M/ 49.60 M SEVENTEENTH FLOOR FFL LVL + 150.55 M/ 52.65 M SSL LVL + 150.50 M/ 52.60 M EIGHTEENTH FLOOR FFL LVL + 153.55 M/ 55.65 M SSL LVL + 153.50 M/ 55.60 M NINETEENTH FLOOR FFL LVL + 156.55 M/ 58.65 M SSL LVL + 156.50 M/ 58.60 M TWENTY FIRST FLOOR FFL LVL + 162.55 M/ 64.65 M SSL LVL + 162.50 M/ 64.60 M TWENTIETH FLOOR FFL LVL + 159.55 M/ 61.65 M SSL LVL + 159.50 M/ 61.60 M TERRACE HEADROOM LEVEL LVL + 168.50 M/ 70.60 M 4000 4000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 STILT FLOOR SSL LVL + 98.50 M/ 0.60 M 74000 ROAD LEVEL LVL + 97.00 M 2500 1500 70000 BASEMENT SLAB LEVEL SSL LVL + 94.20 M/ 4.30 M 300 STP RAFT LEVEL SSL LVL + 90.25 M/ 8.25 M 3950 4250 SUMP BOTTOM LEVEL SSL LVL + 89.00 M/ 9.50 M 1250 1250 FOURTH FLOOR FFL LVL + 111.55 M/ 13.65 M SSL LVL + 111.50 M/ 13.60 M landscape detail as per landscape consultants LANDSCAPE LFL +97.90 SSL+97.60 LANDSCAPE LFL +97.90 M SSL+97.60 M 3000 MD BALCONY (REF. NOTE) LIVING BEDROOM 3000 W1 MD W1 SD1 BALCONY (REF. NOTE) LIVING BEDROOM 3000 05-12-2023 ANJALI VINEET © As per the copyright act of India 1957 this drawing is sole property of collage architecture studio and should not be reproduced without the consent of the architect. ARCHITECTS #111, AAYUSH 2H main road, East of NGEF Layout, Kasturinagar, Bengaluru 560043. Office Tel (080)41100208. DATE SCALE 1:200 REVISION SHEET R11 LANDSCAPE GENERAL NOTES All dimensions are in millimeters unless otherwise mentioned. All levels indicated are in Mts unless otherwise specified. The written dimensions are to be followed and the dimensions are not to be measured from the drawing. This drawing is to be read in conjunction with all other consultants drawings. Any discrepancy in the drawing should be brought to the notice of the architect immediately. All dimensions shown are with respect to finished floor level unless otherwise mentioned. The revisions mentioned in this drawing are to be considered as latest and all the earlier drawings to be superseded Only the drawings signed by the architect are to be considered as Good for construction. Architect is not responsible for any construction done with drawings issued without signature. ARCHITECTURE STUDIO DWG NUMBER A1 TITLE APPROVED CHECKED DEALT ARUN DWG STATUS ADDRESS #111, AAYUSH 2H main road, East of NGEF Layout, Kasturinagar, Bengaluru - 560043. PROJECT JOB NUMBER CAS-A-2018-06 CLIENTS P.H.E. STRUCTURAL #37 Ramanashree Chambers Cubbon Road, Lady Curzon Rd, Tasker Town, Shivaji Nagar, Bengaluru 560001 #950/5 2nd Floor, 24th Main Rd, 2nd Phase, J. Nagar, Bengaluru 560078. 156/B,3rd floor,10th main road,5th cross, near Ashoka pillar, behind Simpli Namdhari store, Jayanagar 1st Block, Bengaluru 560011. R5 Revised Units Plans 21-08-23 R11 Revised Units Plans 05-12-23 N SLN 1000x2400 MKD MD D3 900x2350 D2 O3 D1 O2 O4 800x2050 1200x2100 O5 08 O6 O9 SIZE (IN MM) O1 10 1820x2100 D4 750x1450 D5 1500x2100 D6 2000x2100 D7 1500x2700 D8 07 D5A 900X1500 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL)--600 MM-600 MM UNITS MAIN DOOR ROOM ENTRY DOOR TOILET DOOR STAICASE ENTRY DOOR LIFT LOBBY ENTRY DOOR ELECTRICAL SHAFT DOOR STEPS FROM GROUND TO BASEMENT NEAR RWST FIRE SHAFT DOOR 2400 MM 2050 MM 2400 MM 2350 MM 2400 MM 2050 MM 2100 MM 2100 MM 2700 MM 2100 MM SLN MKD SD4 2560x2350 SD3 13 SD2 12 14 3000x2400 3300x2400 15 18 16 SIZE (IN MM) 2700x2400 SD5 4360x2400 SD6 3460x2350 SD8 17 SD7 2850x2400 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL)---2400 MM 2400 MM 2350 MM 2400 MM 2400 MM 2350 MM 2400 MM SLN MKD W6 W5 23 24 1180x1500 2260x2400 25 28 26 29 SIZE (IN MM) 30 2700x2400 W7 1940x1500 W8 3160x2050 W10 3020x2050 W11 3360x2050 W12 27 W9 3600x2400 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 900 MM900 MM 1050 MM 1050 MM 1050 MM2400 MM 2400 MM 2400 MM 2400 MM 3100 MM 3100 MM 3100 MM 2400 MM SLN 3600x2050 MKD W13 W16 3320x2050 W15 33 W14 32 34 2660x2050 1250x1150 35 38 36 39 SIZE (IN MM) 31 1820x1200 W17 2500x1200 W18 1200x2400 W20 3460x1200 W21 37 W19 2400x2400 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 1050 MM 1050 MM 1050 MM 1200 MM 1200 MM 1200 MM1200 MMSTILT PARKING WINDOW STAICASE BLOCK WINDOW 3100 MM 3100 MM 2350 MM 3100 MM 2400 MM 2100 MM 2400 MM 2400 MM 2100 MM SLN 2500x1200 MKD FW2 FW5 4360x2400 FW4 43 FW3 42 44 2260x2400 1500x2400 45 48 46 49 SIZE (IN MM) 41 50 2850x2400 FW6 4320x2400 FW7 1700x2400 FW9 800x1150 V1 20290x4950 G1 47 FW8 3460x2300 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 1200 MM--900 MMSTANDARD TOILET VENTILATOR CLUBHOUSE_BANQUET HALL 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2050 MM 4950 MM 5350 MM SLN MKD OP2 OP1 53 54 3300x2700 5100x2700 55 58 56 59 SIZE (IN MM) 60 4040x2700 OP3 3300x2700 OP4 3460x2700 OP6 3461x2700 OP7 2700x2700 OP8 57 OP5 3460x2700 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL)---2700 MM 2700 MM 2700 MM 2700 MM 2700 MM 2700 MM 2700 MM 2700 MM STEPS FROM GROUND TO BASEMENT NEAR UGT CLUBHOUSE_BADMINTON, SQUASH, GYM, THEATRE STILT PARKING WINDOW STILT PARKING WINDOW STILT PARKING WINDOW STILT PARKING WINDOW STILT PARKING WINDOW STAICASE BLOCK WINDOW STAICASE BLOCK WINDOW STAIRCASE WINDOW NEAR BADMINTON COURT 62 63 64 6720x2100 OP10 7060x2400 OP11 2700x2400 OP12 61 OP9 6920x2100-2100 MM 2400 MM 2400 MM 2100 MM CLUBHOUSE_CONFERENCE & YOGA WAITING CLUBHOUSE_BANQUET HALL_FOYER CLUBHOUSE_RECEPTION LOUNGE CLUBHOUSE_RECEPTION LOUNGE CLUBHOUSE_RECEPTION LOUNGE CLUBHOUSE_RECEPTION OFFICE AREA CLUBHOUSE_BADMINTON COURT CLUBHOUSE_KIDS DAYCARE_LOUNGE CLUBHOUSE_YOGA & GYM TO SWIMMING DECK CLUBHOUSE_GYM TO SWIMMING DECK CLUBHOUSE_CAFE CLUBHOUSE_CAFE PANTRY 7060x4950 G2 13980x4950 G3 52 514950 MM 4950 MM CLUBHOUSE_INFANT PLAY AREA CLUBHOUSE_INDOOR GAMES 19 20 3300x2400 W1 3300x1150 W21200 MM STANDARD UTILITY WINDOW 2400 MM 2350 MM 40 1820x1200 FW1 1200 MM STAIRCASE WINDOW NEAR BADMINTON COURT 2400 MM SLN MKD SIZE (IN MM) DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 2400x2350 SD1 11 - 2350 MM 3460x2400 W3 21 - 2400 MM 1700x1500 W4 22 900 MM 2400 MM 1) ALL DIMENSIONS TO BE VERIFIED AS PER SITE CONDITIONS. 2) ALL DIMENSIONS ARE IN MM. 3) ALL HEIGHTS ARE WITH RESPECT TO FFL.
Anjali Vardani | Selected Works 2019-24 17 SD1 SD1 SD1 SD1 SD1 SD1 SD1 SD1 SD1 W2 W1 SD5 SD1 W2 W1 SD5 SD1 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 SD5 SD4 W2 SD1 W2 SD1 W1 SD5 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 W2 SD1 W1 SD5 W2 W1 SD5 SD1 W2 W1 SD5 SD1 W2 SD4 SD5 SD1 W2 W1 SD5 SD1 W2 W1 SD5 SD1 W2 SD4 SD5 SD1 W2 W1 SD5 SD1 W2 SD4 SD5 SD1 W2 W1 SD5 SD1 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 FW3 SD5 W19 SD1 SD6 SD5 SD1 W2 W2 W1 SD5 SD1 W2 W1 SD5 SD1 W2 SD1 W1 SD5 SD5 SD4 W2 SD1 FW3 SD5 W19 SD1 SD6 SD5 SD1 W2 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 SD1 W1 SD5 W2 W1 SD5 SD1 W2 W1 SD5 SD1 W2 SD1 SD4 SD5 SD1 SD1 SD1 SD1 SD1 OP11 W2 SD4 SD5 W2 SD1 SD4 SD1 SD5 SD5 SD4 W2 SD1 D5 CORRIDOR SHAFT D4 3000 D5 CORRIDOR D4 3000 CORRIDOR D5 CORRIDOR D4 3000 D5 TRIPLE HEIGHT COURT D4 3000 D5 D4 3000 D5 TRIPLE HEIGHT COURT D4 3000 D5 D4 3000 D5 CORRIDOR D4 3000 D5 CORRIDOR TERRACE D4 3000 D5 D4 3000 1300 V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) D5 BALCONY BEDROOM TOILET TRIPLE HEIGHT COURT D4 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) V1 SD3 BEDROOM TOILET BALCONY 3000 (REF. NOTE) (REF. NOTE) D5 CORRIDOR D4 3000 CORRIDOR REFUGEE AREA CLUSTER D5 D4 3000 CORRIDOR CORRIDOR D5 D4 3000 CORRIDOR CORRIDOR D5 D4 3000 CORRIDOR CORRIDOR D5 D4 3000 CORRIDOR D5 D4 3000 CORRIDOR CORRIDOR D5 D4 3000 CORRIDOR D5 D4 3000 CORRIDOR CORRIDOR D5 D4 3000 CORRIDOR CORRIDOR D5 D4 3000 CORRIDOR CORRIDOR D5 D4 3000 CORRIDOR STAIRCASE FFL +102.10 M SSL+102.05 M STAIRCASE FFL +101.05 SSL+101.00 M STAIRCASE FFL +100.00 M SSL+99.95 M STAIRCASE FFL +98.95 SSL+98.90 LANDSCAPE LFL +97.90 M SSL+97.60 M LANDSCAPE LFL +97.90 M SSL+97.60 M STILT FFL +98.65 M SSL+98.50 STILT FFL +98.65 M SSL+98.50 M 4300 3400 3950 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-6 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-1 REF-DET-8 REF-DET-7 REF-DET-9 REF-DET-9 REF-DET-9 REF-DET-10 REF-DET-11 REF-DET-10 REF-DET-5 REF-DET-6 REF-DET-6 BASEMENT FLOOR FFL +94.50 SSL+94.20 M BASEMENT FLOOR FFL +94.50 M SSL+94.20 BASEMENT FLOOR FFL +94.50 SSL+94.20 M BASEMENT FLOOR FFL +94.50 M SSL+94.20 landscape detail as per landscape consultants DRIVEWAY RFL +97.90 M SSL+97.60 M landscape detail as per landscape consultants landscape detail as per landscape consultants D4 D5 D4 D5 REF-DET-16 Y8 Y12 Y9 Y10 Y13 5800 5705 6175 4700 2580 3578 2252 3760 2998 725 3550 Y1 Y2 Y3 Y4 Y5 Y6 Y7 3400 PODIUM FLOOR (FIRST) FFL LVL + 102.55 M/ 4.65 M SSL LVL + 102.50 M/ 4.60 M SECOND FLOOR FFL LVL + 105.55 M/ 7.65 M SSL LVL + 105.50 M/ 7.60 M THIRD FLOOR FFL LVL + 108.55 M/ 10.65 M SSL LVL + 108.50 M/ 10.60 M FIFTH FLOOR FFL LVL + 114.55 M/ 16.65 M SSL LVL + 114.50 M/ 16.60 M SIXTH FLOOR FFL LVL + 117.55 M/ 19.65 M SSL LVL + 117.50 M/ 19.60 M SEVENTH FLOOR FFL LVL + 120.55 M/ 22.65 M SSL LVL + 120.50 M/ 22.60 M EIGHTH FLOOR FFL LVL + 123 .55 M/ 25.65 M SSL LVL + 123 .50 M/ 25.60 M NINTH FLOOR FFL LVL + 126.55 M/ 28.65 M SSL LVL + 126.50 M/ 28.60 M TENTH FLOOR FFL LVL + 129.55 M/ 31.65 M SSL LVL + 129.50 M/ 31.60 M ELEVENTH FLOOR FFL LVL + 132.55 M/ 34.65 M SSL LVL + 132.50 M/ 34.60 M TWELFTH FLOOR FFL LVL + 135.55 M/ 37.65 M SSL LVL + 135.50 M/ 37.60 M BASEMENT LEVEL FFL LVL + 94.50 M/ 4.00 M THIRTEENTH FLOOR FFL LVL + 138.55 M/ 40.65 M SSL LVL + 138.50 M/ 40.60 M FOURTEENTH FLOOR FFL LVL + 141.55 M/ 43.65 M SSL LVL + 141.50 M/ 43.60 M TERRACE LEVEL FFL LVL + 165.55 M/ 67.65 M SSL LVL + 165.50 M/ 67.60 M FIFTEENTH FLOOR FFL LVL + 144.55 M/ 46.65 M SSL LVL + 144.50 M/ 46.60 M SIXTEENTH FLOOR FFL LVL + 147.55 M/ 49.65 M SSL LVL + 147.50 M/ 49.60 M SEVENTEENTH FLOOR FFL LVL + 150.55 M/ 52.65 M SSL LVL + 150.50 M/ 52.60 M EIGHTEENTH FLOOR FFL LVL + 153.55 M/ 55.65 M SSL LVL + 153.50 M/ 55.60 M NINETEENTH FLOOR FFL LVL + 156.55 M/ 58.65 M SSL LVL + 156.50 M/ 58.60 M TWENTY FIRST FLOOR FFL LVL + 162.55 M/ 64.65 M SSL LVL + 162.50 M/ 64.60 M TWENTIETH FLOOR FFL LVL + 159.55 M/ 61.65 M SSL LVL + 159.50 M/ 61.60 M TERRACE HEADROOM LEVEL LVL + 168.50 M/ 70.60 M 4000 4000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 STILT FLOOR SSL LVL + 98.50 M/ 0.60 M 74000 ROAD LEVEL LVL + 97.00 M 2500 1500 70000 BASEMENT SLAB LEVEL SSL LVL + 94.20 M/ 4.30 M 300 STP RAFT LEVEL SSL LVL + 90.25 M/ 8.25 M 3950 4250 SUMP BOTTOM LEVEL SSL LVL + 89.00 M/ 9.50 M 1250 1250 FOURTH FLOOR FFL LVL + 111.55 M/ 13.65 M SSL LVL + 111.50 M/ 13.60 M REF-DET-6 CORRIDOR FFL +94.668 M SSL+94.20 M CORRIDOR FFL +98.80 M SSL+98.50 M REF-DET-4 05-12-2023 ANJALI VINEET © As per the copyright act of India 1957 this drawing is a sole property of collage architecture studio and should not be reproduced without the consent of the architect. ARCHITECTS #111, AAYUSH ', 2H main road, East of NGEF Layout, Kasturinagar, Bengaluru 560043. Office Tel (080)41100208. DATE SCALE 1:200 REVISION SHEET R5 LANDSCAPE GENERAL NOTES All dimensions are in millimeters unless otherwise mentioned. All levels indicated are in Mts unless otherwise specified. The written dimensions are to be followed and the dimensions are not to be measured from the drawing. This drawing is to be read in conjunction with all other consultants drawings. Any discrepancy in the drawing should be brought to the notice of the architect immediately. All dimensions shown are with respect to finished floor level unless otherwise mentioned. The revisions mentioned in this drawing are to be considered as latest and all the earlier drawings to be superseded Only the drawings signed by the architect are to be considered as Good for construction. Architect is not responsible for any construction done with drawings issued without signature. ARCHITECTURE STUDIO DWG NUMBER A2 TITLE APPROVED CHECKED DEALT ARUN DWG STATUS ADDRESS #111, AAYUSH 2H main road, East of NGEF Layout, Kasturinagar, Bengaluru 560043. PROJECT JOB NUMBER CAS-A-2018-06 CLIENTS P.H.E. STRUCTURAL #37 Ramanashree Chambers Cubbon Road, Lady Curzon Rd, Tasker Town, Shivaji Nagar, Bengaluru 560001 #950/5 2nd Floor, 24th Main Rd, 2nd Phase, J. Nagar, Bengaluru 560078. 156/B,3rd floor,10th A main road,5th cross, near Ashoka pillar, behind Simpli Namdhari store, Jayanagar 1st Block, Bengaluru 560011. R11 Revised Units Plans 05-12-23 R5 Revised Units Plans 21-08-23 SLN 1000x2400 MKD MD D3 900x2350 D2 O3 D1 O2 O4 800x2050 1200x2100 O5 08 O6 O9 SIZE (IN MM) O1 10 1820x2100 D4 750x1450 D5 1500x2100 D6 2000x2100 D7 1500x2700 D8 07 D5A 900X1500 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL)--600 MM-600 MM UNITS MAIN DOOR ROOM ENTRY DOOR TOILET DOOR STAICASE ENTRY DOOR LIFT LOBBY ENTRY DOOR ELECTRICAL SHAFT DOOR STEPS FROM GROUND TO BASEMENT NEAR RWST FIRE SHAFT DOOR 2400 MM 2050 MM 2400 MM 2350 MM 2400 MM 2050 MM 2100 MM 2100 MM 2700 MM 2100 MM SLN MKD SD4 2560x2350 SD3 13 SD2 12 14 3000x2350 3300x2400 15 18 16 SIZE (IN MM) 2700x2400 SD5 4360x2400 SD6 3460x2350 SD8 17 SD7 2850x2400 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL)---2350 MM 2400 MM 2350 MM 2400 MM 2400 MM 2350 MM 2400 MM SLN MKD W6 W5 23 24 1180x1500 2260x2400 25 28 26 29 SIZE (IN MM) 30 2700x2400 W7 1940x1500 W8 3160x2050 W10 3020x2050 W11 3360x2050 W12 27 W9 3600x2400 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 900 MM900 MM 1050 MM 1050 MM 1050 MM2400 MM 2400 MM 2400 MM 2400 MM 3100 MM 3100 MM 3100 MM 2400 MM SLN 3600x2050 MKD W13 W16 3320x2050 W15 33 W14 32 34 2660x2050 1250x1150 35 38 36 39 SIZE (IN MM) 31 1820x1200 W17 2500x1200 W18 1200x2400 W20 3460x1200 W21 37 W19 2400x2400 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 1050 MM 1050 MM 1050 MM 1200 MM 1200 MM 1200 MM1200 MMSTILT PARKING WINDOW STAICASE BLOCK WINDOW 3100 MM 3100 MM 2350 MM 3100 MM 2400 MM 2100 MM 2400 MM 2400 MM 2100 MM SLN 2500x1200 MKD FW2 FW5 4360x2400 FW4 43 FW3 42 44 2260x2400 1500x2400 45 48 46 49 SIZE (IN MM) 41 50 2850x2400 FW6 4320x2400 FW7 1700x2400 FW9 800x1150 V1 20290x4950 G1 47 FW8 3460x2300 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 1200 MM--900 MMSTANDARD TOILET VENTILATOR CLUBHOUSE_BANQUET HALL 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2400 MM 2050 MM 4950 MM 5350 MM SLN MKD OP2 OP1 53 54 3300x2700 5100x2700 55 58 56 59 SIZE (IN MM) 60 4040x2700 OP3 3300x2700 OP4 3460x2700 OP6 3461x2700 OP7 2700x2700 OP8 57 OP5 3460x2700 DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL)---2700 MM 2700 MM 2700 MM 2700 MM 2700 MM 2700 MM 2700 MM 2700 MM STEPS FROM GROUND TO BASEMENT NEAR UGT CLUBHOUSE_BADMINTON, SQUASH, GYM, THEATRE STILT PARKING WINDOW STILT PARKING WINDOW STILT PARKING WINDOW STILT PARKING WINDOW STILT PARKING WINDOW STAICASE BLOCK WINDOW STAICASE BLOCK WINDOW STAIRCASE WINDOW NEAR BADMINTON COURT 62 63 64 6720x2100 OP10 7060x2400 OP11 2700x2400 OP12 61 OP9 6920x2100-2100 MM 2400 MM 2400 MM 2100 MM CLUBHOUSE_CONFERENCE YOGA WAITING CLUBHOUSE_BANQUET HALL_FOYER CLUBHOUSE_RECEPTION & LOUNGE CLUBHOUSE_RECEPTION & LOUNGE CLUBHOUSE_RECEPTION & LOUNGE CLUBHOUSE_RECEPTION OFFICE AREA CLUBHOUSE_BADMINTON COURT CLUBHOUSE_KIDS DAYCARE_LOUNGE CLUBHOUSE_YOGA & GYM TO SWIMMING DECK CLUBHOUSE_GYM TO SWIMMING DECK CLUBHOUSE_CAFE CLUBHOUSE_CAFE PANTRY 7060x4950 G2 13980x4950 G3 52 514950 MM 4950 MM CLUBHOUSE_INFANT PLAY AREA CLUBHOUSE_INDOOR GAMES 19 20 3300x2400 W1 3300x1150 W21200 MM STANDARD UTILITY WINDOW 2400 MM 2350 MM 40 1820x1200 FW1 1200 MM STAIRCASE WINDOW NEAR BADMINTON COURT 2400 MM SLN MKD SIZE (IN MM) DESCRIPTION LINTEL AT (FROM FFL) SILL AT (FROM FFL) 2400x2350 SD1 11 - 2350 MM 3460x2400 W3 21 - 2400 MM 1700x1500 W4 22 900 MM 2400 MM 1) ALL DIMENSIONS TO BE VERIFIED AS PER SITE CONDITIONS. 2) ALL DIMENSIONS ARE IN MM. 3) ALL HEIGHTS ARE WITH RESPECT TO FFL.

Akiri Residence

Internship work

Conceptual Design

Location : Whitefield, Bengaluru

Builtup Area : 590 sq.m.

Project Involvement:

Interior Modelling for bedrooms & toilets, Common areas like Formal & Informal Living; Rendering. Presentation Work.

Akiri Residence 18
Akiri Residence 20
Anjali Vardani | Selected Works 2019-24 23
Akiri Residence 24
Anjali Vardani | Selected Works 2019-24 25

Punapur Police Station

Competition work

Net-zero Building Design

Location : Nagpur, Maharashtra

Year : 2022-23

Project Involvement:

In-depth research, site visits, Resilience analyst, Affordability, Graphics.

Punapur Police Station 26

The floor plan is zoned as per security requirements. Most of the public functions are located near the entrance to restrict public access to sensitive areas. These areas are organized using a public courtyard.

A second courtyard is private to police officers and wraps all official working spaces around it. It ensures natural light in all spaces while also maintaining the required level of security, being separated from the public courtyard. The PDEC tower works in conjuction with the two courtyard to ensure a free flow of breeze. The tower has micronizers which dampen and cool the outdoor air, which comes down, absorbs heat and excapes from courtyard through stack effect.

Anjali Vardani | Selected Works 2019-24 27 Team V0 | Final Design Report 28 Punapur Police Station Area for future expansion Confiscated Vehical Parking Confiscated Vehical Parking Art Installations Pocket Park Visitor’s Parking Emergency Vehical Parking The site has been organized to have sepration between secure functions such as suspect’s entry and emergency parking and public areas such as the park. Site Plan Team V0 Final Design Report 29 Punapur Police Station 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 19 19 20 21 23 24 25 26 27 28 22 19 Ground Floor Plan 6000 3000 4500 3000 3000 3500 3000 6000 3000 6000 6000 3000 6000 3000 2750 3000 2750 3000 3000 4000 5000 3000 3000 3000 3000 6000 GROUND FLOOR PLAN 10 0 ENQUIRY COUNTER ENTRANCE FOYER WAITING AREA COMMUNITY SEMINAR ROOM STATION DIARY VERIFICATION SECTION BARRACKS BOOKING AND STORAGE DETENTION DETENTION DETENTION WOMEN'S HELP DESK GUARD ROOM PDEC WIND SHAFT PDEC WIND SHAFT +0.65 ROUTINE WRITER WIRELESS SECTION CHAMBER (WELFARE) CHAMBER (CRIME) CHAMBER (WIRELESS) API CHAMBER STORAGE AND PDEC SERVICING CONSTABLE ROOM FD AREA FOR KITCHEN ROOT ZONE TREATMENT AREA lvl +2.75 STORE lvl +0.00 lvl +1.10 WOMEN'S WASHROOM MEN'S WASHROOM N 6000 3000 4500 3000 3000 3500 3000 6000 3000 6000 6000 3000 6000 3000 2750 3000 2750 3000 3000 4000 5000 3000 3000 3000 3000 6000 GROUND FLOOR PLAN 10 2 3 4 ENQUIRY COUNTER ENTRANCE FOYER WAITING AREA lvl +0.80 COMMUNITY SEMINAR ROOM +1.10 +0.00 VERIFICATION SECTION BARRACKS BOOKING AND STORAGE DETENTION 03 DETENTION 04 WOMEN'S HELP DESK PDEC WIND SHAFT PDEC WIND SHAFT +0.65 ROUTINE WRITER WIRELESS SECTION WITNESS INTERROGATION ROOM CHAMBER (WELFARE) CHAMBER (CRIME) PI CHAMBER (WIRELESS) UTILITY AND OFFICE API CHAMBER STORAGE AND PDEC SERVICING CONSTABLE ROOM FD ED AREA FOR ROOT ZONE TREATMENT AREA +2.75 STORE +0.00 +1.10 WOMEN'S WASHROOM MEN'S WASHROOM CUTOUT ABOVE N 08 01 02 03 04 05 06 07 08 09 10 15 11 16 12 17 13 18 14 19 20 21 22 23 24 25 26 27 28 Entrance Foyer Reception Enquiry Counter Waiting Area Community Room Cafeteria + Kitchen Public Courtyard Station Diary Verification Section Women’s Help Desk Washrooms Routine Writer Barracks Records Booking and Storage Constable Room Guard Room Training Room Detention Storage and Services Witness Interrogation API Chamber Private Courtyard Utility and Office PI Chamber (Welfare) PI Chamber (Crime) PI Chamber (Wireless) Wireless Section LEGEND FD ED PDEC SHAFT PDEC SHAFT lvl 0.00M lvl +1.10M lvl +1.10M lvl 0.00M lvl +0.80M A A lvl +2.75M lvl +2.75M Equinox 63.51 deg Winter Solstice 42.22 deg Summer Solstice 72.31 deg lvl +6.60M lvl +9.90M +16.60M lvl +3.30M lvl +1.10M

Concept And Design Development

Law enforcement through a new lens.

A new police station for the people of Pardi that responds to the complex operational needs of keeping law enforcement at work while standing as a symbol to how architecture can inspire a more sustainable future for police stations around India through deep connections with its place, culture and community.

Suggested mode of operation for maximum

and

- 83.6m

Building plane is extruded to 9.6m height.

Inorder to form a self-shading structure whilst creating a dynamic and visually engaging exterior.

The different activity areas are stacked over one another with respect to the nature of activities.

West windows closed in the afternoons all year round atleast from 3:30PM till sunset.

Northern and Southern windows can be kept open or closed as per user requirement.

Summer months are shaded.

Suggested mode of operation for maximum window shading, thermal comfort and energy performance: Eastern windows closed during summers from 8-10AM.

West windows closed in the afternoons all year round atleast from 3:30PM till sunset.

The wall to window ratios (WWR) have been optimized (average 18%) to have spatial daylight autonomy in 47.4% of the floor area. The sunlight exposure (>1000 lux) have been limited to 6.9% of the area, mostly near the courtyards.

Northern and Southern windows can be kept open or closed as per user requirement.

Summer months are shaded.

The average illuminance in the building is 658

Punapur Police Station 28 Architectural Design Team V0 Final Design Report N 22.5 00. SITE 01. SITE ZONING 02.
03. BUILDING
05. PROGRAMS 06.
BUILDING ORIENTATION
MASS
CIRCULATION CORES
08.
09.
10. PV
Building oriented with longer side facing 22.5 deg from the north.
07. PDEC COURTYARD BAMBOO LOUVERS
PANEL
04.
STAGGERING OF FORM
Addition of PV panels on the roof top to meet the energy require ments of the building. Provide shading and ventilation, which helps regulate the temperature inside the building, at the same time, create a more comfortable and inviting environment for its occupants. Insertion of two courtyards, with one for public-centric usage and the second is surrounded by private activities. Two staircases are provided accompanied with the lift core by one side. Integration of PDEC system to cool the office spaces via the false ceiling. Site zoned with the building footprint dividing public and private uses on the site.
AB
BC -117.3m CD -115.5m DA -135m Public Private High security A B C D Total plot area is 12152 sqm. Building footprint Area for future expansion Confiscated vehicle parking Pocket park and public art installation Team V0 Final Design Report Fig. : Elevation and Section of Bamboo Shading Device Fig. Built-it-yourself Toolkit 30 Punapur Police Station Daylight 6 1 credit 47.4% sDA 6.9%* ASE 658 avg luxblinds open * No Binds Floorplan
lux, above the minimum requirement of 200-500 lux recommened by BIS. Fig. Daylight Autonomy and Illuminance Graphs Fig. : Form Interations based on Incident Solar Radiation Daylight and Illuminance Initial Iteration Final Iteration
How effective is the operable shading device?
Team V0 Final Design Report 31 Punapur Police Station Fig. Percentage of window exposed to direct sunlight when shading device is closed vs open. Fig. Elevation and Section of Bamboo Shading Device Fig. Built-it-yourself Toolkit
shading
CLOSED OPEN EAST WEST SOUTH NORTH
How effective is the operable
device?
window shading, thermal
energy
windows closed
comfort
performance: Eastern
during summers from 8-10AM.
Team V0 Final Design Report 31 Punapur Police Station Fig. Percentage of window exposed to direct sunlight when shading device is closed vs open. Fig. Elevation and Section of Bamboo Shading Device Fig. Built-it-yourself Toolkit How effective is the operable shading device? CLOSED OPEN EAST WEST SOUTH NORTH Suggested operation window comfort performance: Eastern during 8-10AM. West in year 3:30PM Northern windows open user Summer shaded.

Resilience

Resilience against heatwaves

The city faces the threat of heat waves (especially in May), and to ensure comfort during such events is important.

Strategies such as Passive downdraft evaporative cooling (PDEC), building orientation optimization, self-shading of the structure and the mass using bamboo skin and shading devices, stack effect in courtyards, and using wall and roof assemblies with higher U-values than conventional configurations have been used for maximizing thermal comfort.

Thermal comfort during heatwaves

Fire Safety

The presence of ammunition and increased consumption of electrical equipment in the Police station leads to increased chances of fire.

• 20% reduction in lighting power density and 10.8% lower electrical consumption with optimized daylighting design.

• Annual revenue of Rs. 17,3,065 generated from excess energy produced by PV panels, reducing OPEX by 41% and recovering excess capex in 5.5 years.

Fire safety norms are adopted based on the NBC-Part 4 to make the building resilient during fire emergencies.

• Dimmed lighting fixture linked to sensors saves up to 30% of lighting cost and complete shutting down of appliances saves up to 50% energy and cost.

• Use of Lithium Ion Batteries reduces OPEX by 20% compared to the base case.

Simulations with values of thermal comfort acheived during Heat vawes have been shown here. Heatwave period in Nagpur: 148th to 155th day of the year (28th May to 4th June - “Navtapa”)

NV Zone: 28.5 deg to 33.2 deg PDEC Zone: 23.7 deg to 30.6

Cooling Systems:

Thermal comfort was achieved in all 3 zones during the critical heatwave period successfully.

Flood Resilience

With Nagpur experiencing an increase in extreme heavy rainfall-triggered floods and the site being located in a depressed area, the building needs to be resistant to localized flooding.

Elevated Plinth: The plinth of the buildings is raised to 1.1 m which prevents entry of water into the interiors. Fly-ash brick with cement plaster was selected as the primary material for the walls, as their characteristics such as drying time, durability, porosity, and amount of water absorbed, ensure a better Post-flood resistance strategy.

Bioretention swales: They are designed to capture and filter runoff from the parking areas, while also enhancing the aesthetics of the site by incorporating a variety of vegetation. The swales not only improve air quality, but also act as a cost-effective alternative to traditional stormwater management methods.

• Reduction in OPEX cost by 34% annually.

• Sensors control the lighting and temperature of the utilizing area based on the system operating, saving 35% in OPEX annually.

Water Performance:

• Cost-cutting of Rs. 2,73,967.5 on water bills annually due to rainwater harvesting and greywater treatment.

Resilience against power outages

• 43% water saved due to the use of low-flow faucets and fixtures, saving Rs. 1,17,806.025.

The site in Pardi, being in the outskirts of the city, is susceptible to frequent power cuts, particularly during summers. Therefore, it is crucial for the police station to have a backup power source in case of emergencies.

ENERGYOPTIMISATION

Life Cycle Cost and Benefit Comparision

The upfront cost being reduced, gives a direct picture that how green systems are helping to achieve net zero structure and saving cost at the same instance. Also, LCCA makes the decision making easier. The LCCA for various green building systems was done for a period of 25yrs and 60yrs, in comparison to the base case. There was an increase of 9% in CAPEX i.e. from 10.64 Cr to 11.70 Cr , due to the strategies and the systems used which in turn makes a reduction of 15.7% in OPEX compared to Base case

To address this issue, we propose the use of a lithium-ion solar battery that stores electricity generated from the rooftop solar panels. During blackouts, the stored energy can be used to power essential services such as server rooms, wireless and communication systems, life safety systems, including egress lighting, smoke evacuation, fire alarm systems, elevators, etc. Moreover, the radio systems will be on standby power, enabling the station to manage operations during emergencies.

Sufficiency and Autonomy for critical functions

Water facility:

Total water storage capacity / Daily water demand = Days of Autonomy i.e. 1.50,000/7346= 20.4 days of autonomy

Energy Efficiency:

Total water storage capacity (critical storage + main storage) at a given point is 1,50,000 L and daily water demand is 7346 L.

Annual energy consumption is 2,43,478 kWh which includes lighting, cooling, and equipment.

The total annual energy generated using solar PV (both rooftop and parking panels) is 2,43,750 kWh

In all the months (except May, June, July, August), excess energy is generated out of which energy to power essential services for 24 hrs is stored in lithium-ion batteries on site, and the remaining is utilized in the energy sharing mechanism. In the months where energy generated is insufficient, it is taken from the local mini grid or the city grid and stored in the batteries for emergency uses.

Anjali Vardani | Selected Works 2019-24 29
Team V0 Final Design Report 22 Punapur Police Station
deg VRF Zone: 24.3 deg to 27.3 deg NV Zone: 32.9 deg PDEC Zone: 28.8 deg VRF Zone: 28.2 deg IMAC acceptability range during May Achieved maximum RT: Days Relative Humidity [%] Temperature [°C] Apr May Aug Sep Time 100 T-Operative Relative Humidity NV Days 15 Temperature [°C] Apr May Aug Sep Time 100 15 18 30 T-Operative Relative Humidity PDEC Days 15 Apr May Aug Sep Time 20 100 15 18 30 T-Operative Relative Humidity VRF Fig. :VRF zone temperature graph during heatwaves Fig. : Building orientation to minimize heat gain. Fig. Bioretention swales around the site perimeter. Fig. PDEC tower working with courtyard. Fig. : Plinth elevated to 1100MM. Fig. :NV zone temperature graph during heatwaves Fig. :PDEC zone temperature graph during heatwaves
FIRE ALARM SYSTEMS SMOKE DETECTION PASSIVE DOWNDRAFT EVAPORATIVE COOLING (PDEC) BUILDING ORIENTATION LITHIUM-ION BATTERIES ENERGYOPTMSATON Energy ciency Energy Procurement Energy Geneeration FIRE ALARM SYSTEMS SMOKE DETECTION PASSIVE DOWNDRAFT EVAPORATIVE COOLING (PDEC) ELEVATED PLINTH ENERGY OPTIMISATION LITHIUM-ION BATTERIES WIRELESS & COMMUNICATIONS SERVER ROOMS ENERGYOPTIMISATION Energy ciency Energy Procurement Energy Geneeration FIRE ALARM SYSTEMS SMOKE DETECTION PASSIVE DOWNDRAFT EVAPORATIVE COOLING (PDEC) BUILDING ORIENTATION ELEVATED PLINTH ENERGY OPTIMISATION LITHIUM-ION BATTERIES WIRELESS & COMMUNICATIONS SERVER ROOMS
Energy E ciency Energy Procurement Energy Geneeration FIRE ALARM SYSTEMS SMOKE DETECTION PASSIVE DOWNDRAFT EVAPORATIVE COOLING (PDEC) BUILDING ORIENTATION ELEVATED PLINTH LITHIUM-ION BATTERIES WIRELESS & COMMUNICATIONS SERVER ROOMS Team V0 Final Design Report 23 Punapur Police Station
PASSIVE DOWNDRAFT EVAPORATIVE COOLING (PDEC) ELEVATED PLINTH LITHIUM-ION BATTERIES WIRELESS & COMMUNICATIONS
Fig. : Critical functions continue using lithium-ion batteries during power cuts. Fig. : Fire escape plan
08 Fire safety
Table
building specifications
Fig. : Annual Energy Generation Vs Consumption Emergency Exit Emergency Exit Emergency Exit Emergency Exit Main Exit LIFT LIFT Legend Escape route Way towards exit Fire extinguisher Fire Alarm DO NOT use Lift in case of fire Team V0 Final Design Report 33 Punapur Police Station
Solar
Fig. Economic Feasility of VRF in 25 Years Fig. Economic Feasility of Solar PV in 25 Years Fig. : Economic Feasility of Solar PV in 60 Years Fig. : Economic Feasility of VRF in 60 Years 4 5 6
Variable Refrigerant Flow (VRF) Photovoltaics
Energy:

GST Building

Competition work

Net-zero Building Design

Location : Ghaziabad, UP Year : 2021-22

Project Involvement:

GRIHA Research, live case study, Material study, Conceptual Planning, LCC calculation.

Occupancy sensors in bathrooms, meeting rooms, and cabins.

Green Parking lots with swales and water storing pavements.

Light Shelves on S and fins on E & W facades help minimize glare.

Use of gunny bags and curing compounds.

Thin plans (16.8M) to optimize daylighting.

Living Machines for blackwater treatment upto BOD 10 level.

Overdeck earthen pot insulation above roof RCC slab.

All service areas placed along West and East.

Radiant Cooling coupled with BLDC fans and DOAS.

Smart meters for monitoring water and energy consumption.

Energy Performance Index = 36.29

Management

Optimization

Waste Management

Costing

Payback period calculation for RWH, radiant cooling and PV.

Smoke room with no smoking signages.

Computer screensavers showing real time IAQ and energy data. Rice Husk Insulation

Metering and Monitoring

Embodied Energy = 1283 MJ/m2.

Criterias and Strategies

GST Building GRIHA Trophy 2021-2022 10 64GRI-62 GRIHA Trophy 2021-2022 View of the atrium and lobby with living machine GRIHA
Construction
Energy
Occupant
Water
Solid
Sustainable
LCC
Socio
Innovation Sustainable
Performance
Comfort
Management
Building Materials
Economic Strategies
Site Planning
Construction site plan showing barricading, restrooms, toilets etc RWH with gravity based sand filter. Dedicated waste storage space before treatment / recycling. Personal Thermal Comfort Systems. RCC Slab with 30% pulverised fly ash (PFA). Fire extinguishers with condensed aerosol forming solid compound. Topsoil preservation use for landscaping in other areas. Energy & water management; and building materials LCC study. IAQ monitoring systems: One sensor for each space >30 m2. Low flow fixtures. (W/C: 4/2 LFF, Urinal 1 LFF, Lavatory Faucet 4.5 LFF) Multicoloured waste bins
compost bins in canteen. Massing
the building done in a manner to reduce heat gain. Air Curtains
doorways
particle kickback prevention. C&D Waste Blocks
fly ash mortar. Ramps,
toilets
and
of
at
with
masonry with
Tactile paving, wheelchair accessible
and parking. Xeriscaping

Form Development

Concept

Anjali Vardani | Selected Works 2019-24 31 GRIHA Trophy 2021-2022 2 Trophy 2021-2022
Climate Analysis
all oriented at 12 degrees to the North to optimize daylighting. Massing of the building is done in a manner to reduce heat gain and achieve mutual shading. wind. 100% of the service areas are added on the East and West. roof is added over the central block for enhancing daylighting. Xeriscaping is done in the niches. Location: Ghaziabad, UP, India Climate Type: Local Steppe Climate Annual Precipitation: 764mm Air Quality Index: Very Dangerous to Hazardous Solar Generation Potential: High as incident radiation is 4.997 kWh/sqm/day. Wind Generation Potential: Low due to low wind speeds. O ce O ce Admin Lift Toilets Ancillary Rooms Fire Staircase Annual Incident Radiation Analysis: 1 January - 31 December 2 Low Impact Design Changing the imageability of government buildings from opaque, rigid and unsustainable to public accessible indoor spaces and office layouts. Months Cold Comfortable Hot Strategies December, January 10:30AM 12PM 4PM -5:30PM 12PM - 4PMPlant trees at not less than 45 deg from solar shaded windows. • 10 percent solar windows within 15 deg of true south. • Organize the floor plan so that the sun penetrates into daytime spaces. No sun shading required. February 10:30AM 12PM 5PM - 5:30PM MarchApril, May, JuneJuly, AugSept, OctNovANNUAL CLIMATIC STRATEGIES Months Acceptability Range Mix Mode Buildings (Temperature Range in deg C) January 90% 25.27 - 18.35 February 25.67 18.35 March 26.92 - 20.00 April 28.73 21.81 May 30.24 23.32 June 30.54 23.62 July 30.13 23.21 August 29.87 - 22.95 September 29.75 22.83 October 29.26 22.34 November 28.06 21.14 December 20.30 19.52 The acceptability range of IMAC model was used to determine temperature setpoints of water cooling chillers. Mixed mode of ventilation was chosen in order to control air quality of the interiors when the outdoor air quality is poor. Design using 90% acceptability range takes care of the subjective component of thermal comfort. 27.8% of the hours can be made comfortable by sun shading while cooling is required for 47.1% hours. Monthly design strategies were derived from the psychometric chart. DBT time table plot shows a large part of the occupancy hours are uncomfortable (according to IMAC) February and November have the most comfortable hours. For all months except for December and January, sun shading is required. Windows are shaded from 10:30AM 5:30PM from March to October. Prevalent wind direction from January to December for 10AM 6PM is North West. Summer winds are also from North West. IMAC: Monthly Comfort Range Sun Shading Hours Dry Bulb Temperature Plot Psychometric Chart with strategies Wind Rose Diagram Open office areas with work desks which increase use deviating from cell like layout. Permeable made recycled polyethylene reservoir reservoir surface it with used tender parking. 5 Metre wide internal road for Fire Tender. Swales on the perimeter for stormwater. The site additional proposed. Tactile Paving in all accessible areas. 24 Universal 2 1 3 4 5 6 7 8 9 2 Xeriscaping 3 4 1 Legend 1 2 3 4 5 6 7 8 9 10 5 M Wide Road Tactile Paving Xeriscaping Bioretention Swale Shaded Outdoor Seating Car Parking 2 Wheeler Parking Bicycle Parking Anaerobic Baffled Reactor Segregated Garbage Collection Area with wheelchair assesibilty with wheelchair assesibilty Accessibility GRIHA Trophy 2021-2022 5 Elevation facing West Longitudinal Section Elevation facing South Exploded View 2 3 4 5 6 Material Pallete 1. C&D Blocks 2. FRP with rice husk and mineral oil 3. Clay Pots 4. Lime Plaster 5. RCC with 30% PFA 6. Polycarbonate GRIHA Trophy 2021-2022 64GRI-62 GRIHA Trophy 2021-2022 Front Facade View Elevation facing West Longitudinal Section Elevation facing South Exploded View 2 3 4 5 6 Material Pallete 1. C&D Blocks 2. FRP with rice husk and mineral oil 3. Clay Pots 4. Lime Plaster 5. RCC with 30% PFA 6. Polycarbonate

Construction Management

3 m high continuous barricading along the site boundary.

12 Air and Soil Pollution Control

25% site is undisturbed during and post construction.

2 Low Impact Design

Construction Site Plan showing areas for material and construction waste storage, restrooms with toilets, smoke room, drinking water facility etc.

Topsoil shall be stripped to a depth of 200 mm from areas proposed for the building, roads, and paved areas. It shall be stockpiled to a height of 400 mm in designated areas and shall be re-applied to site during plantation of the proposed vegetation on the site and in green roofs.

5 Top Soil Preservation

Gunny bags shall be used for curing along with biobased curing agents which reduce water usage during construction. Constructed areas shall be covered with jute or tarpaulin to reduce evaporation rates.

6 Construction Management Practices

Foam based dust supressents shall be used instead of water spray to reduce water consumption during construction.

13 Water Demand Reduction

Average daily solar irradiance: 4.997 kWh/sqm/day which promises a positive solar potential.

Solar PV panels 2m x 1m in size have been used to meet the energy demand of the building. Each panel generates 422 Kwh per year.

Panels have an anti-reflective coating that reduces the glare and improves the light transmittance, thus increasing the efficiency of the PV module.

PV panels are installed directly facing south, with operation angles of 45 deg in winter, 75 deg in summer, and 65 deg for the remaining part of the year for optimum irradiance.

Roof

A variety of strategies have been employed which leads to a Net-Positive Water design.

Living Machines root based wastewater treatment technology is used, as a cost effective, natural and sustainable treatment system for wastewater. The root based treatment is a combination of the physical, chemical and biological processes and works without electricity, minimum maintenance, less manpower and

= 0.263 kWh/m2-K U-Value = 0.4 kWh/m2-K

Low ODP and GWP Materials

▶ An effective water cycle restricts municipal water demand to 5 months of the year.

Potable water demand is reduced by 30% from baseline 45 lpd, by the use of low flow fixtures.

Landscape water demand is reduced by 50% by the use of Drip irrigation, Native species plantation with a plant factor of 0.15 and Xeriscaping.

Assembly 16 MM Reflective China Mosaic Tile Finish

Water use in radiant cooling system has optimized according to monthly requirement. blackwater is recycled by Living Machines (root based water treatment).

▶ The lower resistance and conductivity values of C&D blocks are justified by the presence of aggregate with a lower density and lower thermal conductivity than the natural aggregate.

The system uses natural vegetation and the plant specific associated microbiota,

▶ Fly Ash Mortar is used to reduce cement consumption.

The subsurface flow treatment is totally free of mosquitoes and unpleasant odour.

The treated water is used for irrigation, gardening and toilet flushing.

▶ Recycled aggregates are used in RCC elements.

The treated water also achieves the permissible limit for sewage discharge in the

The living machine is proposed near the entrance lobby and is exposed to increase and sustainability.

The plants get diffused light through the polycarbonate roof and since the system is

Organic paint containing soya bean, whey protein, neem oil and casein are used for interior wall and ceiling finishes, as it has low VOC content and is lead free.

12 Maintaining Good IAQ

MM Overdeck Earthen Pot Insulation

MM RCC Slab with 30% PFA and Water Cooled PEX Pipes

MM Cement Plaster

Solid Waste Management

▶ Anaerobic baffled reactor treatment recycles greywater which is used for toilet flushing.

Rice Husk Insulation is used for internal walls which is CFC and HCFC free.

▶ Blackwater from toilets is treated by root zone treatment to BOD 10 level and part of it is used for irrigation.

The insulation is in the form of board made from rice husk or rice husk ash , bonded by resin under the application of pressure and temperature.

Multicoloured waste bins to store e-waste, organic waste, plastic waste, paper waste, and other inorganic solid waste have been provided for building occupants to ensure segregation of waste at the source.

▶ Sustainable filters (gravity based sand filters) are used in RWH system.

U Value = 0.0418 – 0.0746 W/(m.K)

Dedicated, segregated, and hygienic storage space has been provided near the site exit for storage before pickup by municipal garbage trucks for treatment/recycling.

Refrigerants used in recirculating chillers of radiant slabs are free from CFC and HCFC. Use of refrigerants is restricted to only 1 room i.e chiller room on ground floor.

100% organic waste generated is used as manure for landscaping, therefore diverting organic waste from landfill sites.

Fire extinguishers installed in the project contain condensed aerosol forming solid compound FPC, which is non-pyrotechnic and is based on eco-friendly naturally occurring potassium salts and halon free.

Composting bins have been provided in the canteen.

GST Building GRIHA Trophy 2021-2022 4 64GRI-62 GRIHA Trophy 2021-2022 Legend Ground Floor Plan First Floor Plan Second Floor Plan Legend Legend Waiting Area Toilets Toilets Toilets Living Machine Cafeteria Auditorium Open Office Open Office Open Office Assistant Commisioner’s Cabin Assistant Commisioner’s Cabin Assistant Commisioner’s Cabin Deputy Commisioner’s Cabin Deputy Commisioner’s Cabin Deputy Commisioner’s Cabin Office of the Additional Commisioner of Tax Adjunct Additional Commisioner’s Cabin Meeting Room Meeting Room Meeting Room Green Terrace Green Terrace Attorney’s Office Storage Room Record Room Server Room Chiller Room 1 3 4 5 6 6 2 2 2 2 2 2 6 2 9 5 5 10 3 14 13 12 11 10 4 6 6 2 2 2 7 6 6 6 7 7 7 6 7 7 3 3 3 3 3 3 3 3 3 3 7 7 7 7 7 4 4 4 4 4 4 4 4 4 4 7 7 8 8 4 4 4 4 4 4 4 4 4 4 8 8 8 8 8 3 3 3 3 3 3 3 3 3 3 8 8 8 2 1 2 2 2 3 3 3 4 4 4 5 5 5 6 6 6 7 7 7 8 9 10 11 12 13 14 N N N
1. Anoxic Reactor 2. Closed Aerobic Reactor 3. Open Aerobic Reactor 4. Open Aerobic Reactor 5. Clarifier 17 Waste Management-Post Occupancy 18 Organic Waste Treatment On-Site
GRIHA Trophy 2021-2022 8
CONSUMPTION WATER SOURCES Cooling Use % Cooling Use (L) Irrigation Use % Irrigation Use (L) Total Consumption Municipal Water (L) Rainwater Greywater (L) 0% - 5% 1,279 629,029 1062551 288,765 50% 12,788 5% 1,279 641,816 957792 288,765 50% 12,375 50% 12,375 632,250 598620 279,450 50% 12,788 30% 7,673 648,210 44897 288,765 0% - 90% 22,275 629,775 0 279,450 0% - 90% 23,018 650,768 14966 288,765 0% - 90% 23,018 650,768 94782 288,765 0% - 90% 20,976 593,038 20,000 164621 263,149 30% 7,673 90% 23,018 658,440 20,000 84805 288,765 90% 22,275 90% 22,275 652,050 20,000 59862 279,450 100% 25,575 90% 23,018 676,343 20,000 74828 288,765 90% 22,275 90% 22,275 652,050 10,000 354184 279,450 90,000 Rainwater Management Water Quality and Self Sufficiency 16 Water Quality and Self Sufficiency Wastewater Treatment Water Demand Reduction Water Supply and Consumption Water Cycle Domestic Use Use LPD/Head 45 Number of people 450 Total LPD 20250 Cooling Use 5.5 Tr per Day (peak) 150 Max LPD 825 Irrigation Use 1 Area m2 1300 Percent use Use in LPD Greywater in LPD Blackwater in LPD 30% 6075 6,075 15% 3038 3,038 2% 405 203 203 20% 4050 4,050 3% 608 608 Toilet Flushing 30% 6075 6,075 20250 9,315 10,935 Greywater 34,00,340 Treated Water Blackwater 22,17,373 Treated Water 2,02,479 Municipal Sewage 12,71,419 L Gravity Sand Filter Treatment Annual Consumption 38,82,688 L RWH 8,33,080 L Municipal Supply 90,000 L Irrigation 2,02,479 L Root Zone Treatment Drinking + Cooking (23%) 12,01,150 L Washing + Cleaning (45%) 33,28,340 Anaerobic Other Uses (2%) 1,47,926 L Toilet Flushing (30%) 22,17,373 L End Uses 4/2 LPF 4.5 LPM 1 LPF 4 LPM CFD Analysis Shadow Analysis Water Net Positive + GRIHA Trophy 2021-2022 6 64GRI-62 GRIHA Trophy 2021-2022
Solar
Generation External Wall Assembly 8 Renewable Energy Utilization 19 Utilization of Alternative Materials in Building 19 Utilization of Alternative Materials in Building 23 Safety and Sanitation for Construction Workers 9 Low ODP AND GWP Materials
Power
Operation angles of PV panels
N
80
150
12
Internal Finish U-Value
Internal Finish (Organic Paint) 12 MM Lime Plaster (0.73 W/m-k) 15 MM Lime Plaster (0.73 W/m-k) VLT = 59% SHGC = 0.25 6 MM Therm Glass + 12 MM Air Gap + 6 MM Clear Glass in UPVC Window Frame with 15 MM Cement Fibre Board Vertical Louvers (east) 200 MM C&D Waste Blocks (0.6 W/m-k)

Cooling in Slabs and underfloor DOAS

This has a huge impact on design of the building, because this air-and-water system removes the need for large plenum space required by all-air systems, saving considerable height on each floor.

2 Low Impact Design

Maximizing Views while Minimizing Glare

Indoor Air Quality

Air Curtains: Air curtains are installed at doorways to ensure limited air mixturing when the doors are opened.

View plays an important role in an occupant’s appraisal of the interior environment and to establish contact with the exterior environment. The WWR were decided in a way that views are maximized and visual discomfort due to glare is minimized.

Particle kickback from the ground is avoided by adding a suction duct at the bottom.

Percentage of area with good view and minimal sun: 84% Percentage of area with >3% view: 81%

The radiant cooling system inherently provides a healthier indoor air quality as there is no recirculation of air in the system. Reduced chiller capacity as compared to conventional forced air conditioning. About 35% reduction in annual energy consumption.

Latent

Reduces indoor pollution because contaminants are not transferred readily between rooms, as is the case with centralized HVAC. Avoids condensation in highly humid conditions, while using radiant cooling.

Indoor Air Quality

Air Curtains: Air curtains are installed at doorways to ensure limited air mixturing when the doors are opened.

sensor is

1 digital display showing monitored values for CO, CO2 , temperature, and

Screensavers of computers show real time energy consumption of the building along with air quality parameters. This gives the users control over their own environment and a sense of responsibilty towards energy saving.

Maintaining Good IAQ

Light Shelves on southern facades and fins on east and west facades help minimize glare.

The sill level is kept at 1.1m given the requirements of the work desks. It also reduces area to be glazed and helps achive a lower WWR.

Personal Comfort System

Fans and low-wattage devices are embedded into desks to warm or cool an empolyee on demand. The system focuses on the most thermally sensitive parts of the body, such as the head and feet.

Particle kickback from the ground is avoided by adding a suction duct at the bottom.

This flexibility on the part of the occupants can translate into less energy spent maintaining a fixed temperature set-point. It also cools down the equipments which increases their efficiency.

IAQ monitoring systems: One sensor is installed for each space ≥30 m2.

1 digital display showing monitored values for CO, CO2 , temperature, and RH is installed at each floor level.

Screensavers of computers show real time energy consumption of the building along with air quality parameters. This gives the users control over their own environment and a sense of responsibilty towards energy saving.

GRIHA Trophy 2021-2022 7 64GRI-62 GRIHA Trophy 2021-2022 healthier in to reduction not with humid Radiant
Air
Computer Screensaver
Curtains
12
30 Innovation
BLDC Fans Radiant Slab DOAS
One
64GRI-62
GRIHA Trophy 2021-2022
7
GRIHA Trophy 2021-2022 Sensible Loads: Radiant Cooled Slabs Loads: DOAS
The depth of floor has been restricted to 16.3M which ensures 90% of the space is lit by useful daylight (200-1000 lux) for most of the daylit time of the day. Glare Analysis Annual Study : Open Office Space on Ground Floor 60 deg Cone of Vision Analysis Radiant Cooling in Slabs and underfloor DOAS Air Curtains Computer Screensaver Reduces Cooling Loads BLDC Fans Keeps Insects and Pollutants Out Increases Quality Control Facade WWR North 32% South 20% East 15% West 13% 10 Visual Comfort 7 Energy Optimization 11 Thermal and Accoustic Comfort 7 Energy Optimization 12 Maintaining Good IAQ 12 Maintaining Good IAQ 30 Innovation 2 Low Impact Design 2 Low Impact Design 7 Energy Optimization 1. Daylight Window with U= 1.04 W/m2 2a. Highly Reflective Deep Solar Shade 2b. Reflective Internal Light Shelf 3. Vision Window with U= 1.04 W/m2 4. Vertical Fins 5. Sill 6. C&D Blocks Wall 7. External Finish Work surface at 900mm height Depth of floor plate to ensure 90% daylight 6.8 m 6.8 m 4.2 m 3.6 m 1.1 m 16.3 m Thermal Comfort
Radiant cooling is coupled with BLDC Fans (Reversible Direction) which can increase heat removal capacity of ceiling by upto 2 times. BLDC Fans Radiant Slab DOAS This has a huge impact on design of the building,
this air-and-water system
need
large
required
saving considerable
floor.
because
removes the
for
plenum space
by all-air systems,
height on each

Urban Insert

Academic work

Mixed-use High Rise

Location : Nagpur, Maharashtra

Year : 2023

Focus Areas: Responding to Urban Context, Transit-oriented development, Pedestrian precinct, Mixed-use design and development.

Urban Insert 34

THE SITE.

The site is located adjacent to Yashwanth Stadium, close to the Sitabuldi metro station in Nagpur.

SEPERATING THE ENTRIES.

Restricitng the vehicular circulation towards the ends of the site, providing majority of the site for pedestrian movement.

PEDESTRIAN MOVEMENT.

Majority of the site has pedestrian circulation along with a Public market, green areas and landscaping making it a Public Precinct.

GROUND LEVEL CONNECTIVITY.

Public centered acitivities like the public market, retail stores and food courts have been placed at the ground levels for easy access.

MID-LEVEL CONNECTIVITY.

Connecting the buildings in line with the adjacent building heights, along with pedestrain bridges connecting buildings and the metro.

CREATING A LANDMARK.

Raising the height of the office block to higher levels to create a landmark in the middle of the city, promoting the TOD.

Anjali Vardani | Selected Works 2019-24 35 Site. Pedestrianzone
form
evolution.
Urban Insert 36 Legend 1. Sunken Court 2. Recreational Block 3. Commercial Block 4. O ces 5. Hotel 6. Public Market 7. Overhead Metro 8. Connecting Footbridge 9. Pedestrian Pathway 10. Vehicular Entry 11. Pedestrian Main Entry 2 6 3 4 5 10 11 10 1 9 7 8
site plan g.f. plan on site 0 0 10 10 20 20 50 50 30 30
site plans.
Anjali Vardani | Selected Works 2019-24 37 OFFICE LOBBY ANCHOR SHOP ANCHOR SHOP ANCHOR SHOP ANCHOR SHOP ANCHOR SHOP ANCHOR SHOP ANCHOR SHOP ANCHOR SHOP ANCHOR SHOP GROUND FLOOR PLAN OFFICE LOBBY SECOND FLOOR PLAN 2800 SQ M. 2560 SQ M. SUPERMARKET 1010 SQ M. OFFICE LOBBY 2184 SQ M. OFFICE LOBBY 11-13TH FLOOR PLAN 1430 SQ M. 930 SQ M. 7-10th FLOOR PLAN 14-16TH FLOOR PLANS 31950 SQ M. TOTAL COMMERCIAL + OFFICE OFFICE LOBBY ANCHOR SHOP DEPARTMENTAL STORE FOURTH FLOOR PLAN 1010 SQ M. 2560 SQ M. RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL DOUBLE HEIGHT LOBBY RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL OFFICE LOBBY SIXTH FLOOR PLAN FOOD COURT AREA 2010 SQ M. 1 2 3 4 5 6 7 1 B D E G H F C A 2 3 4 5 6 7 B D E G H F C A 1 2 3 4 5 6 7 1 B D E G H F C A 2 3 4 5 6 7 B D E G H F C A 1 2 3 4 5 6 7 1 B D E G H F C A 2 3 4 5 6 7 B D E G H F C A 1 2 3 4 5 6 7 1 B D E G H F C A 2 3 4 5 6 7 B D E G H F C A 1 2 3 4 5 6 7 8 9 1 B D E G H F C A 2 3 4 5 6 7 8 9 B D E G H F C A I I 1 2 3 5 7 8 9 K K E G H F E G H F E G H F E G H F B D C A B D C A 1 2 3 5 7 8 9 1 2 3 5 7 8 9 1 2 3 5 7 8 9 Offices Service core Commercial Hotel rooms Banquet & Dining

section showing the facade details

details

Urban Insert 38
view of the office block plan of the external facade

Miscellaneous photography.

Anjali Vardani | Selected Works 2019-24 39
Patwon ki Haweli, Jaisalmer Jaswant Thada, Jodhpur
Anjali Vardani | Selected Works 2019-24 40
Anjali Vardani anjalivardani@gmail.com +91 9921441422 thank you.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.