What is a Grade A Warehouse ?

Page 1

What is a Grade A Warehouse ?

• Investing in the right Warehouse with the required specifications is considered vital for any Business in any industry.

• To cater to the needs of the growing Industrial sector, state-of-the-art Grade A warehousing facilities are constructed to maximize the profitability of supply chains. Even smaller industrial and manufacturing units are eyeing space in Grade A Warehouse.

Location, amenities, quality of construction, space, location and clients speaks for A grade facility.

The construction of Grade A Warehouse involves managing a numerous complex tasks. An array of factors is evaluated before finalizing a location for the construction of the warehousing facilities. The location of the warehouse directly contributes to the efficiency of the company as well as the overall customer experience.

The following parameters are evaluated before identifying the location of Grade A warehousing:

Connectivity , Availability of Manpower, Existence of Social Infrastructure and an Ecosystem

Also requires obtaining a range of permits for setting up a warehouse in the region Land Use (CLU), Building Plan Sanction, Consent to Establish, Environment Clearances, Labor Department License, Electrical Connection License, etc. On the other hand post-construction approvals like Fire NOC, Consent to Operate, Occupational Certificate, etc.

S.no Specifications Grade A Warehouse/ Factory/ Hybrid building 1 Ceiling center height 40 to 50' above plinth level 2 Side height Minimum 33' above plinth level - ideally 40' 3 Floor load bearing capacity 6 metric ton/ square meter (warehouse) 15 metric ton / square meter (factory) - can be decided at final stage 4 Flooring Type VDF/ Timex/ FM2/ Laser screed for warehouse - Industrial Flooring for factory - Can be decided at final stage 5 Loading deck/ running platform height and canopy Plan for a Continuous loading platform with canopy on the loading side, also provide for a ramp for container access to inside the building 6 Plinth level and ground level Plinth level should be 1.2 meters from the normal ground level - Normal ground level to be 1 meter above road level 7 Structure Precast concrete walls up to 3 meters above plinth level & Galvanized Steel PEB above 3 meters in the sides and roof
8 Roof Type Standing seam (Seamless screwless with leak proof) - Galvanized Steel with provision for solar panels on the outer side and provision for insulation on the inner side 9 Roof Slope 1:10 or 1:20 slope (10-20 degree downward slope) depending the local climatic conditions 10 No of shutters/ docks & dock levellers One loading/ unloading dock per 5000 square feet - alternate docks to have dock levelers 11 Automated shutters with sensors and emergency exits Automated shutters linked to fire alarms and emergency exits with way markers - can be finalized at final stage 12 Insulation Roof - Mandatory with XLPE 9 mm foam sheets 13 Span Ideal span of 24 meters by 16 meters - based on the width of the building 14 Ventilators Ridge Vent in the roof and air vents on the side walls (PEB) & windows with grills on walls
15 Translucent Lighting Panels in Roof & side walls Sufficient lighting to ensure minimal use of electricity for lighting 16 Office space Road facing Provision for mezzanine for workstations, sufficient cabins and conference rooms, dining areas and toilets with view of the working areasGlazed and well paneled 17 Safer, secure and comfortable working environment for all concerned Plan for space for cafeteria, driver and labor resting rooms, separate toilet facilities for white and blue collar personnel, dining areas, security room and first aid room 18 Fire Fighting – Fire NOC, Ceiling sprinkler system, Fire Alarm and deduction system with PAS, Fire hydrants Mandatory full fire hydrant set up and slots for extinguishers with adequate outside set-backs for fire vehicular movement. Provisions for sprinkler system to be made with space reserved for sump, pumps and piping above the EOT crane provision 19 Mandatory approvals and NoCs DTCP plan sanctions, CTE, CTO, Pollution/ environment Nocs, Completion/ Occupations certificats, Mandatory
21 Water management/ Good water sources/ Rain &Storm Water Management/ STP/ Septic tank/ water re-cycling system Bore well to start with and water testing to be done. Mandatory rain water harvesting, storm, provision for etp/ stp to be made 20 Additional points for factory Ramp for containers to drive into the facility. Provision for mounting EoT cranes. Space for additional infrastructure such as power transformers and worker areas to be planned 21 Internal roads & other open areas RCC in loading areas, paver blocks in other areas 22 100% power back up Provision to be made for minimum 0.5 KVAgenerator per 1000 sft 23 Parking areas As per government stipulations and sufficient parking space should be available for employees and for commercial vehicles
24 High compound walls Minimum 3 meter concrete walls with wire mesh for an additional 1 meter 25 Solar power Provision on the rooftop to be made for solar panels 26 Green zone and open area spaces Landscaped areas and open areas add to the overall ambience - Plan OSR effectively 27 Earthquake proof and flood proof To consider seismic zones and take adequate precautions against natural calamities and flooding at planning stage 28 Other points Lightning arrestor, waiting areas, lobby, good visible signage, electrical panel room 29 Transparency Hidden charges, common areas, carpet area - all should be open and transparent 30 People beyond property Reputation and profile of contractor/ consultant should be good and he should be qualified

ALLWAREHOUSES

YOU
THANK
the Advantage of Having Tons of Warehousing options By Opting for the best Warehouse for Rent in Chennai
Get

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.