G.07 up
D
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.
CU
To stair pendent light
SVP.03
Key
Construction no
Extract fan ducted through eaves Retain and patch repair plaster Combustion air supply to boiler Thermal board lining to walls Brickwork to remain exposed Combustion air supply to wood stove Wall mounted ladder; hatch over New balustrade Oil-fired boiler Wood burning stove GF wood burning stove flue
Works: Retain existi 100mm Rockwool S place with stapled n joists and walls with SoundBloc plasterbo floor rooms refurbish
Floors
Location: Rooms F.0
Location: Room F.0
Works: Remove dec 150mm wide T&G s
Location: Room F.0
Works: Lay Marmole
Part Ground Floor Plan
Walls
Location: Room F.0
Works: Over existin Kingspan K17 therm 12.5mm plasterboar system. Masonry ab
Location: Room F.0
Oil Tank Over
Works: Over existin Kingspan K17 therm 12.5mm plasterboar lining system; Firelin Insulated wall linings remain exposed. T&
U [AH.04 over]
Location: Room F.0
A
up
A2
F.03e
Location: Room F.0
Works: Over existin Kingspan K17 therm 12.5mm plasterboar
DF.05
8 B
F.03a
A1
WF.01
Works: Increase siz reclaimed oak lintel lime mortar.
A
Switch to ground floor
P
B
Location: Room F.0
Works: Over existin Kingspan K17 therm 12.5mm plasterboar
A1
Location: Room F.0
B
Works: Repair exist exposed full height; w1800mm; reclaime reclaimed bricks in l
B
Location: Room F.0
Works: Patch repair fit 25x175mm beade edge of plaster.
RF.01 A1
DP
V
F.03
B
WF.02
V
B
A1
Location: Room F.0
Works: Apply top co backing coat.
F.03b
Location: Room F.0
Works: Over existin Kingspan K17 therm 12.5mm plasterboar Masonry above to re above.
RF.03
C
DP
C DP
2
W
B
A1
A1
F.03c
Y
B
RF.02
WF.18
D B
A1
DP
D
A1
F.03d
G
WF.03 F E
DP
DP
DF.01
CH 209.81
C
D
D
C
K
[AH.02]
J
DF.02
Hatch
E H B
DP
DP
B
F.04
RF.13 up
B
B
4
DP
up A1
A1
P
DP
RF.15
A1
WF.04
F.02
5
B
X
F.02a
A1
A1
A1
DP
F.02c
F.02b
RF.05
B
DP
DF.03
RF.06
B
WF.07
WF.06
WF.05 F
G
U
First Floor
RF.16
RF.07
DP
B
H
J
W
K
Y