Page 1

AL E XANDER BREIG PORTFOLIO 2013 - 2019


Architectural Graduate Portfolio November 2013 - February 2015 www.salmondreed.co.nz


Ellison chambers fitout auckland, new zealand DOCUMENTATION


housing new zealand apartments auckland, new zealand

concept design - cad modeling - documentation (in progress)


Vice chancellors fitout

University of Auckland, new zealand Design and full documentation (Completed)


existing

existing

Bridge removal and wall repairs

existing


south wall repairs


Architectural Graduate Portfolio August 2016 - April 2018 www.trevorhewett.co.uk


LINLEY Stables, INTERNAL ALTERATIONS SHROPSHIRE, UK 2016 - Present


G.07 up

D

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.

CU

To stair pendent light

SVP.03

Key

Construction no

Extract fan ducted through eaves Retain and patch repair plaster Combustion air supply to boiler Thermal board lining to walls Brickwork to remain exposed Combustion air supply to wood stove Wall mounted ladder; hatch over New balustrade Oil-fired boiler Wood burning stove GF wood burning stove flue

Works: Retain existi 100mm Rockwool S place with stapled n joists and walls with SoundBloc plasterbo floor rooms refurbish

Floors

Location: Rooms F.0

Location: Room F.0

Works: Remove dec 150mm wide T&G s

Location: Room F.0

Works: Lay Marmole

Part Ground Floor Plan

Walls

Location: Room F.0

Works: Over existin Kingspan K17 therm 12.5mm plasterboar system. Masonry ab

Location: Room F.0

Oil Tank Over

Works: Over existin Kingspan K17 therm 12.5mm plasterboar lining system; Firelin Insulated wall linings remain exposed. T&

U [AH.04 over]

Location: Room F.0

A

up

A2

F.03e

Location: Room F.0

Works: Over existin Kingspan K17 therm 12.5mm plasterboar

DF.05

8 B

F.03a

A1

WF.01

Works: Increase siz reclaimed oak lintel lime mortar.

A

Switch to ground floor

P

B

Location: Room F.0

Works: Over existin Kingspan K17 therm 12.5mm plasterboar

A1

Location: Room F.0

B

Works: Repair exist exposed full height; w1800mm; reclaime reclaimed bricks in l

B

Location: Room F.0

Works: Patch repair fit 25x175mm beade edge of plaster.

RF.01 A1

DP

V

F.03

B

WF.02

V

B

A1

Location: Room F.0

Works: Apply top co backing coat.

F.03b

Location: Room F.0

Works: Over existin Kingspan K17 therm 12.5mm plasterboar Masonry above to re above.

RF.03

C

DP

C DP

2

W

B

A1

A1

F.03c

Y

B

RF.02

WF.18

D B

A1

DP

D

A1

F.03d

G

WF.03 F E

DP

DP

DF.01

CH 209.81

C

D

D

C

K

[AH.02]

J

DF.02

Hatch

E H B

DP

DP

B

F.04

RF.13 up

B

B

4

DP

up A1

A1

P

DP

RF.15

A1

WF.04

F.02

5

B

X

F.02a

A1

A1

A1

DP

F.02c

F.02b

RF.05

B

DP

DF.03

RF.06

B

WF.07

WF.06

WF.05 F

G

U

First Floor

RF.16

RF.07

DP

B

H

J

W

K

Y


tes:

Location: Room F.01 (below turret only). Works: New 50x150mm ceiling joists spanning between truss ties; 150mm Rockwool insulation between joists; 19mm bitumen coated OSB decking board over. new 25mm t&g boarded ceiling; woodstain finish; new roof access trap to detail

04

cayed T&G softwood floorboards; fix new softwood floorboards.

01 Studio 1; west wall L-L, east wall P-L

ng unplastered masonry walls, fix 40mm mal board lining (25mm insulation bonded to rd with skim finish) on Gypliner metal stud bove to remain exposed.

ze of doorway DF04 to h2600 x w1800mm; over; quoin up jambs with reclaimed bricks in

02 Studio 2; west wall E-F; south wall F-K;

ng unplastered masonry walls, fix 65mm mal board lining (50mm insulation bonded to rd with skim finish) on Gypliner metal stud.

LED flood light (side mounted to truss) LED Strip lighting (at top of wall) Fluorescent Strip UHM CU

Underfloor heating manifold Consumer unit Combustion air vents / Mechanical vent

F.06c

Extractor fan

Location: Room F.01, south wall Works: Install blacksmith-made fixed ladder for access to cupola, to detail. Install sink on base unit to detail, waste pipe.

Radiator

Location: Room F.03a Works: Install sink on base unit to detail, waste pipe.

ting brick wall in lime mortar, leaving brick face increase size of doorway DF03 to h2600 x ed oak lintel over; quoin up jambs with lime mortar.

Note: Pendant lights to have dimmer switches

Location: Room F.03e Works: Install WC suite, soil pipe.

03 Studio 3

F.05, F.06 Electrical cabling to be housed in surface mounted galv. conduit up to wall plate.

Mechanical & Electrical Services Location: Rooms F.01, F.02, F.03. F.04 Works: New electrical power installations; surface mounted conduit in F.03, concealed cables and flush fittings elsewhere. New lighting installations. New data cable installation. Extract fan from WC cubicle ducted through north wall.

r existing lime plastered walls with lime plaster; ed board at wall/ceiling junction to mask top

04 Store. East, west and south walls.

oat plaster over previously-applied plaster

F.03e, F.06c TBC

F.06b

New oil-fired boiler in F.04 with flue terminal through roof. New flat panel pressed steel radiators below windows; central heating circulation pipework in first floor void. Provision for future connection to estate biomass boiler in lieu of oil-fired boiler.

04 Store. North wall.

ng unplastered masonry walls, fix 65mm mal board lining (50mm insulation bonded to rd with skim finish) on Gypliner metal stud. emain exposed. New T&G access hatch

Switch adjacent to GF door A1

L

Z

M 6

N

P

Q

WF.16

WF.17 B

B

B

RF.12

4

S

F.06 F.06a

DP

RF.11 DP

DP

R WF.15

1

SVP.03

A1

K B

A1

F.07a

B

A1

A1

RF.17

DF.06

F.07

A1

A1

T

U

DP

A1

11 8 A1 A1

DP

DP

F.05

A1

A1

A1

Lights in clock tower loft TBC

DP

RF.08

RF.09

F.05a

[ AH.03 over]

7

DP

RF.10

Cont. to ground floor

X

F.05c

F.05b

up

DF.04

[AH.01]

B

A1

A1

A1

WF.14

B

WF.08 L

B

F.01c

F.01b

DP

F.01a

B

A1

8

B

F.01

A1

A1

A1

3

K

Multi way switch Pull cord Internal light fitting (Refer to schedule)

Location: Room F.01, north west corner Works: Install wood burning stove, flue and twinwall stainless steel chimney (painted matt black above roofline); core drill through north wall for permanent combustion air suppy; cast louvre on external face; form constructional hearth.

Location: Room F.03, Works: New softwood ogee architraves to window reveals WF.02-WF.03 to match profile of extant architrave to window WF.01; lime plaster to window reveals and soffits where missing.

02 Studio 2, east wall K-K

Data point socket 1 way switch

Fittings and fixtures

Location: Room F.02 Works: New 10mm painted MDF linings to splayed window reveals and soffits on 7mm Actis Triso-sols multifoil insulation; roll moulding around reveals and soffit to detail to windows WF.05-WF.07; WF.04 to have 19x53mm painted softwood ogee architraves to match architrave of WF.01.

ng unplastered masonry walls, fix 40mm mal board lining (25mm insulation bonded to rd with skim finish) on Gypliner metal stud.

External rcd protected socket

DP

Location: F.05c Works: New balustrade on line T-U, to detail.

Location: Room F.01 Works: New 10mm painted MDF linings to splayed window reveals and soffits on 7mm Actis Triso-sols multifoil insulation; roll moulding around reveals and soffit to detail.

02 Studio 2; north wall F-K

Shaver socket Fused spur

Location: F.04 Works: Construct new flight of steps with balustrade; 25mm bullnosed softwood treads, softwood risers, 150mm T&G boards to landing; softwood balustrade to detail.

Windows Location: Rooms F.01, F.02, F.03, F.06 Works: Retain existing windows; new 30mm bullnosed softwood window boards where missing.

01 Studio 1, door DF04

5 amp lighting socket

ss

RCD

Location: Doorway DF.01 Works: Reform steps at door threshold; 25mm bullnosed softwood treads.

Doors Location: DF01, DF02, DF03, DF04, DF05. Works: New painted framed ledged and braced doors, frames and linings to detail. Existing ledged and boarded door DF.03 to be removed for use elsewhere on the estate.

ng unplastered masonry walls, fix 65mm mal board lining (50mm insulation bonded to rd with skim finish) on Gypliner metal stud ne board within 1.0m of woodburning stove. s up to wallplate level; masonry above to &G infill to access hatch above.

5a

Staircases Location: Rooms F.03; F.05 Works: New balustrades to existing staircases, to detail; painted newels, handrails base rails and slatted balustrades.

Location: Room F.01 Studio 1 Works: for access to turret 50x150mm softwood joists between tie beams of trusses M-M and N-N;

01 Studio 1; north wall L-P, south wall P-L.

Twin switched socket outlet Twin switched floor mounted socket outlet Switched fused connection unit

Skirting boards Location: Rooms F.01, F.02, F.03, F.04 Works: Painted 25x175mm torus pattern softwood skirting boards to match extant section in room F.03.

Location: Room F.04 Store Works: Take down defective plasterboard ceiling; 50mm Kingspan insulation between rafters with 50mm air gap over for ventilation; 40mm Kingspan thermal board lining to underside of rafters 25mm insulation, 12.5mm plasterboard and skim finish, painted.

eum sheet flooring.

Switched socket outlet

Location: F.02 40mm Kingspan thermal board panels on west face of truss J-J with painted MDF removable access panel with 25mm mm insulation on back.

Location: Rooms F.01, F.02, F.03 Studios 1-3. Works: New insulated plaster ceilings to underside of rafters to sloping ceiling; 50mm Kingspan insulation between rafters with 50mm air gap over for ventilation; 40mm Kingspan thermal board lining to underside of rafters 25mm insulation, 12.5mm plasterboard and skim finish, painted.

03e WC cubicle

LEGEND

Partitions Location: F.03e Works: Painted beaded tongue and groove panels on softwood studs to form full height WC cubicle; Rockwool between studs for sound attenuation.

Ceilings

01, F.02, F.03, F.04

ing floorboards; provide new insulation below; Sound Slab insulation between joists held in nylon mesh; seal gaps at perimeter between h expanding foam; (two layers 12.5mm Gyproc oard; skim finish to be installed when ground hed at a later date).

WF.09 M

WF.11

WF.10 N

P

Q

WF.12 R

WF.13 S

T

U

Z N 0

0.5

1.0

1.5

2.0

2.5

Rev P: General revision 07.06.17) Rev N: General revision (24.05.17) Rev M: General revision (11.05.17) Rev L: F.06 M & E revision (26.04.17) Rev K: M & E general revision (11.04.17) Rev J: Revision to room F.04 (05.04.17) Rev H: Radiators general revision (22.03.17) Rev G: M & E general revision (22.02.17) Rev F: Pipework layout indicated (13.01.17) Rev E: Lighting layout and minor revisions (16.11.16) Rev D: Minor revision (25.10.16) Rev C: General revision (02.09.16) Rev B: General revision (20.07.16) Rev A: General revision (11.07.16)

Dimensions must not be scaled from this drawing. This drawing is copyright and must not be reproduced.

Revisions

The Stables, Linley Hall

Proposed First Floor Plan

for

Mr J Moores

Trevor Hewett RIBA

Date: Scale:

1:50 @ A1 1:100 @ A3

www.trevorhewett.co.uk

Drg. No:

Jcsm.1 200

The Architecture Studio, 22 Broad Street, Ludlow SY8 1NG Tel: 01584 877992 Email: info@trevorhewett.co.uk

07.06.17

Status: Tender

P


LINLEY HALL, INTERNAL ALTERATIONS SHROPSHIRE, UK 2017 - Present


WS.16

WS.17

WS.18

WS.19

WS.20

WS.21

WS.02

WS.01

WS.04

WS.03

WS.05

9.

WF.14

WF.17

WF.16

WF.18

WF.01

WF.19

WF.02

WF.03

WG.05

WG.04

16. 3.

10.

DF.01

11.

6.

4.

5.

12.

2.

15.

7.

WG.14

WG.13

WG.18

14.

WG.16

WG.02

WG.01

WG.03

WG.04

DG.06 13.

DG.01

DG.02

East Elevation

Embankment: Take down cast stone balustrade and stone pier adjoining south west corner; form grass embankment in front of remaining part of flanking wall.

South Elevation

WS.06

WS.07

WS.08

WS.09

WS.10

WS.12

WF.09

WF.10

WF.12

East Elevation

WS.11

WS.12

WS.13

WF.11

WF.12

WF.13

WS.14

WS.16

WS.15

WS.17

WS.18

WS.19

WS.2

WS.20

Section A

A WF.06

WF.07

WF.08

WF.14

WF.14

(WF.15)

WF.17

WF.16

WF.18

WF.1

WG.18

WG.1

16.

3.

DF.01

DF.02

A 2.

4.

12. 5.

15.

Section A

WG.05

WG.07

WG.14

WG.13

8. 13.

DG.04

WG.08 DG.03

North Elevation

(WG.12) DG.04

DG.05

DG.06

DG.06

West Elevation Proposed alterations

Related Applications (Blue) North Terrace: Remove masonry below window WF.08, lower stone cill and construct pair of doors DF.02 to allow access onto new north terrace; extend stone architraves down to new cill level. Remove wired glass roof and install new structural glass roof and stone paving on new concrete structure to create new north terrace; construct stone steps down to lawn; and new stone balustrade with pier ends to east and west flanks; refer to detail drawings.

1.

Stone paved terrace.

2.

Stone steps.

South Elevation

Related Applications (Blue) West Elevation: Remove windows WG.09, WG.10 and WG.11; set aside frames for reuse; break out rubble stone walls below cill level to form doorways; quoin up jambs in reclaimed stone; install new single glazed cast iron pairs of doors with internal shutters; refer to detail drawings.

Related Applications (Blue) North Terrace: Remove window WG.06; break out masonry wall below cill level to form doorway; enlarge opening and install new half-glazed door; construct new internal stone steps; construct new stone outer leaf to enclosing walls with rusticated blind arches and corner piers.

0

1.0

2.0

3.0

4.0

5.0

Dimensions must not be scaled from this drawing. This drawing is copyright and must not be reproduced.

Revisions

Linley Hall, Bishops Castle, Shropshire

Proposed Elevations

for

Mr J Moores

Trevor Hewett RIBA

Date:

21.12.17

Scale:

1:100 @ A1 / 1:200 @ A3

www.trevorhewett.co.uk

Drg. No:

Jcsm.5 321

The Architecture Studio, 22 Broad Street, Ludlow SY8 1NG Tel: 01584 877992 Email: info@trevorhewett.co.uk

Status: LBC

WS.06

WS.07

WS.08

WS.09

WS.10

WF.09

WF.10

Section A

WF.06

WF.07

WF.08

DF.02


21

WS.02

WS.01

WS.04

WS.03

WS.05

9.

WF.01

19

WF.02

WF.03

WG.05

WG.04

16. 3.

10.

11.

6.

4.

5.

12.

14.

16

WG.02

WG.01

WG.03

WG.04

13.

DG.01

DG.02

East Elevation

Embankment: Take down cast stone balustrade and stone pier adjoining south west corner; form grass embankment in front of remaining part of flanking wall.

East Elevation

WS.12

WS.11

WS.12

WS.13

WF.11

WF.12

WF.13

WS.14

WS.15

A WF.12 16.

3.

A 2.

4.

12. 5.

15.

WF.14

(WF.15)

2.

15.

7.


Z

G.22

:

G.24

: :

Z

: :

Z

:

Z

:

Z

:

Z

:

Z

:

DG.39

Z

:

FC

Z

Z

Z

Z

Z

Z

Z

Z

:

Z Z

Z

Z

Z

:

IC.12

IC.14b

WG.05

:

Covered Way G.20

:

WG.07

:

:

IC.13 A

:

IC.16

:

DG.02

DG.03

:

IC.14

PIR

IC.14a

IC.17

:

Drain

DG.40

IC.15

:

:

A

:

A

:

:

STVP DG.25

DG.27

:

WG.22

LEGEND

:

Larder G.09a

DG.26

IC.11

A

:

A

Switched socket outlet

:

USB

:

:

:

PIR

WG.03 WM

TMS

FC

TP

Cloaks

Cloaks

STVP

DG.12

STVP

Under W/T

DB

DATA

5a

Estate Cabinet

J

Dimmable

L

Dimmable

K

E DG.33 E

DG.05

A

G

E

A

B DG.10

B

Vestibule G.01a

Stair Hall G.01

F

5a

5a

5a

FR

5a

Inner Lobby G.03

DG.52

DATA

C

OPEN FIRE

Blank plates

F

GU

Blank plates

Switch for ribbon light

Cup'D

DB M

C 5a

5a

A

DATA

Macerator fuse

5a

USB

DG.13

A

WC G.04 DG.14

A

FR WM

Fridge Washing machine

DW

Dishwasher Island service entry point Existing

Combined water drain - below ground Surface water drain - below ground Foul water drain - below ground Foul water drain - within screed Foul water drain - above ground Heating channel - below floor slabs Drain diameter Assumed route Rodding point Floor connector Gully Soil stack vent pipe Inspection chamber Rainwater pipe

Existing Existing

Proposed stud partition / Wall lining Proposed masonry wall

Coffee station

DATA

Demolish

Blank plates

Related applications Under floor heating manifold

DG.15

UFH DATA DATA

5a

Thermostat

Proposed blockwork partition WG.02

5a

DATA

Rodding Point

Proposed wall alterations

A

Outer Lobby G.02

Cup'D

N

SEP

DG.18 Close and seal door

A

Muniments Room G.06

DW

DATA

(WG.12)

A

5a

DG.19

5a

Oven Cooker controls

GRILLE

DATA

STAT

40 / 100 / 150 AR RP FC GU STVP IC RWP

C

C

C

C

F

FC

DG.51 DG.11

Kitchen G.08

Television inlet

Broadband floor mounted socket

STAT

2a

5a

5a DATA

DG.06

Telecom socket

Ethernet socket x2

KEY: Thermostat controls

C

STAT

5a

Telecom master socket

Extractor fan

F

A

H

Distribution board

Combustion air vents / Mechanical vent

DG.01

DG.32

A

Electric cable PIR (Passive infrared sensor)

Fused spur

TH

C

Above W/T

( B indicates "nautical" light) ( C Indicates pier mounted up-light)

Telecoms cable

Picture light socket RP

5a

SEP

STAT

DG.17

BT

DG.50

F

2a

Dimmer switches

Above Cabinet

A

TV DATA

5a

To ext. lighting

DB

WM

5a

DATA

:

IC.60a

G.18

:

Lift Plant G.19

Lift G.14

WC G.10a 5a

West Terrace

Strip lighting IC.10

:

Lift Lobby G.13

1 way switch 2 gang

IC.60

STAT

F

Back Hall G.12

Extract

A

DG.04

DG.30

Z

AGA

HOB

B

Laundry G.16

2

Ceiling mountedDHW light service fitting ( A indicates pendant) DHW secondary ( B indicates bulkhead) ( C indicates chandelier) Mains cold water Fluorescent tube HTG Flow ( D indicates panel + transistor) ( E indicates recessed) HTG Return Wall mounted light fitting ( A indicates bulkhead)

Cup'D

DB

2 amp lighting socket 1 way switch

Uplight recessed within pilaster crown molding

A

Plant Room G.11

Switched fused connection unit 2a

Z

Utility G.10

DG.20

D

DG.31

DG.36

RP

A

DG.40

Extraction to ext. chimney

:

Cup'D

:

A

:

Switch to first floor

GU

A

:

Pantry G.09

:

A

:

FC

:

DATA

DG.58

Wine FR

IC.18

D

:

With dual USB ports

Twin switched socket outlet

Twin switched floor mounted socket outlet

GU

IC.61 D

:

Q

Counter

:

P

DG.24

GU

:

DB

:

A

F

A D

:

C A

:

B

:

A

WG.04

FC

Cup'D

:

WG.21

:

WG.20

FC

3 Phase

DG.34

:

FR

D

:

FR

WG.08

D

D

Trolley lift

IC.62

USB

GU

IC.05

GU

A RWP/GU

Arsenal G.07

WG.14

WG.15

GU

5a DATA

Cup'D

Cup'D

DW

Office G.05

WG.01

DATA

DATA DATA

IC.09

WG.16

WG.13

IC.08

IC.07

IC.06 IC.04

N

Dimensions must not be scaled from this drawing. This drawing is copyright and must not be reproduced.

Rev F: General revision Rev E: General revision Rev D: General revision Rev C: General revision Rev B: General revision Revisions Rev A: General revision

Linley Hall, Bishops Castle, Shropshire

Proposed Ground Floor Plan M&E

0

0.5

1.0

1.5

2.0

2.5

for

(21.03.18) (15.03.18) (08.03.18) (01.03.18) (22.02.18) (15.02.18)

Mr J Moores

Trevor Hewett RIBA

Date:

21.03.18

Scale:

1:50 @ A1 / 1:100 @ A3

www.trevorhewett.co.uk

Drg. No:

Jcsm.5 402

The Architecture Studio, 22 Broad Street, Ludlow SY8 1NG Tel: 01584 877992 Email: info@trevorhewett.co.uk

Status: Building Regs

F


15.

21.

15.

15.

F.04 Butler's Servery

F.04 Butler's Servery

22.

11.

F.04 Butler's Servery

22.

16.

23.

19.

WF.11

13.

DG.20

DG.19

8.

12. 4.

WF.11

F.04 Butler's Servery

11.

8. 9.

10.

17.

19.

17. 17.

F.04 Butler's Servery

13.

WF.11

7.

7.

12.

16.

16.

WF.11

18.

(20.)

20.

21.

(14.)

19.

5. 6.

2.

8.

21.

6.

2.

12.

13.

5.

11.

15.

6.

8.

3.

9.

15.

3.

3.

10.

25.

WG.08

16.

16. 10.

17.

G.09 Pantry DG.24

24. 17.

18.

WG.08

G.09 Pantry

G.09 Pantry

G.09a Larder

DG.20

ELEVATION A 15. 16. 17. 18. 19. (20.) 21. 22. 23. 24. 25.

11.

G.09 Pantry

Fridge

19.

G.09 Pantry

Fridge

Wine

SECTION D - D

SECTION B - B

Butler's Pantry

Butler's Pantry

Turned oak newel cap; half newel cap over half newels against walls. Existing windows to be retained. Existing doors to be retained. Marble upstand to servery counter, with marble capping and shaped end pieces. Freestanding Butler's Pantry servery counter to bespoke design (shown in outline only). Freestanding china cabinet omitted for clarity. Existing cornice and coved ceiling to be retained. Fire surround to be retained. Dado rail to be retained below servery counter top. Oak treads and risers. Wine fridge and flanking wine storage racks.

Wine

SECTION A - A

Elevation B

Butler's Pantry

WG.08

DG.20

DG.34

Proposed alterations (1.) Remove existing partitions - refer to as existing drawing. 2. Form stairwell opening in first floor. 3. New oak dog-leg staircase. 4. New half-glazed partition enclosing larder. 5. Larder shelves. 6. Existing window panes to be replaced with perforated zinc for larder ventilation. 7. Dado rail to be retained. 8. Skirting board to be retained. 9. Bullnosed oak capping to offset in wall at floorboard level. 10. Freestanding servery workbench. 11. Oak boarded soffit. 12. Oak dado boards flanking staircase. 13. Oval profile oak handrail. 14. Oak boarded balustrades enclosing staircase.

18.

(1.)

8.

4.

WG.07

10.

(1.)

14.

3.

14.

18.

16.

12.

15.

7.

8.

(1.)

Butler's Pantry

Butler's Pantry

Proposed alterations 0

200

400

600

800

1000

Dimensions must not be scaled from this drawing. This drawing is copyright and must not be reproduced.

Linley Hall, Bishops Castle, Shropshire

for

Mr J Moores

Revisions Rev A: General revision (15.02.18)

Proposed Elevations Butler's Pantry and Stairs

Trevor Hewett RIBA

Date: Scale:

1:20 @ A1

www.trevorhewett.co.uk

Drg. No:

Jcsm.5 602

The Architecture Studio, 22 Broad Street, Ludlow SY8 1NG Tel: 01584 877992 Email: info@trevorhewett.co.uk

15.02.18

Status: LBC

A

(1.) 2. 3. 4. 5. 6. 7. 8 9. 10.

Remove existing partitions - refer to as existing drawing. Form stairwell opening in first floor. New oak dog-leg staircase. Dado rail to be retained. Skirting board to be retained. Bullnosed oak capping to offset in wall at floorboard level. Oak boarded soffit. Oak dado boards flanking staircase. Turned oak newel cap; half newel cap over half newels against walls. Existing windows to be retained.

11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21.

Existing doors to be retained. Marble upstand to servery counter, with marble capping and shaped end pieces. Freestanding Butler's Pantry servery counter to bespoke design (shown in outline only). Freestanding china cabinet omitted for clarity. Existing cornice and coved ceiling to be retained. Fire surround to be retained. Dado rail to be retained below servery counter top. Oak treads and risers. Freestanding servery workbench. Freestanding china cabinet. Matching cabinet to house dumb waiter.

0

200

400

600

800

1000

Dimensions must not be scaled from this drawing. This drawing is copyright and must not be reproduced.

Linley Hall, Bishops Castle, Shropshire

for

Mr J Moores

Revisions

Rev A: General revision (15.02.18)

Proposed Sections Butler's Pantry and Stairs

Trevor Hewett RIBA

Date: Scale:

1:20 @ A1

www.trevorhewett.co.uk

Drg. No:

Jcsm.5 603

The Architecture Studio, 22 Broad Street, Ludlow SY8 1NG Tel: 01584 877992 Email: info@trevorhewett.co.uk

15.02.18

Status: LBC

A


9. WF.08

WF.07

10. DF.02

11.

12.

LINLEY HALL Proposed External Works SHROPSHIRE, UK 2017 - Present

Proposed alterations 1. Stone paved terrace. 2. Stone steps. 3. Stone piers. 4. Rusticated stone plinth. 5. Bullnosed stone steps. 6. New doors below sash window. 7. Stone architrave extended down to cill. 8. Stone subcill lowered to floor level. 9. Existing moulded stone string course. 10. Ashlar stone facing. 11. Moulded stone plinth. 12. Lawn.

LINLE Proposed Nor

SHROP

2017 -


A

9.

16.

16.

3.

3.

10.

Section A

11.

A 2.

4.

6.

4.

12. 5.

5.

15.

7.

15.

12.

WF.09

6.

3.

Proposed alterations

7.

1. 2.

8.

1. 5. 2.

4.

14.

8.

West Elevation

13.

DG.03

DG.02

Section A

East Elevation A

WF.08

PSHIRE, UK 0

200

400

600

800

1000

Dimensions must not be scaled from this drawing. This drawing is copyright and must not be reproduced.

Linley Hall, Bishops Castle, Shropshire

for

Mr J Moores

DF.02

North Terrace: Proposed North Elevation

Trevor Hewett RIBA

Date: Scale:

1:20 @ A1

www.trevorhewett.co.uk

Drg. No:

Jcsm.5 311

The Architecture Studio, 22 Broad Street, Ludlow SY8 1NG Tel: 01584 877992 Email: info@trevorhewett.co.uk

FFL

Revisions

20.12.17

Status: LBC

1.

17.

FL

206.90

207.30

Stone paved terrace. Stone steps.

3.

Stone piers.

4.

Rusticated stone plinth.

5.

Rusticated stone voussoirs.

6.

Squared sandstone rubble.

7.

Sandstone rubble set back 100mm.

8.

New four panel oak door.

9.

Existing moulded stone string course.

10.

Ashlar stone facing.

11.

Moulded stone plinth.

12. 13.

EY HALL rth Terrace Steps

- Present

2.

Stone voussoirs.

13.

Stone plinth.

14.

Existing embankment.

15.

North lawn.

16.

Turned stone balustrade.

17.

Etched structural glass.


Housing Development Ludlow, SHROPSHIRE, UK 2016 - Present


RL 8.125

RL 8.125

CT CT

CT

TB

TB

CT

TB

FFL 2.600

TB TB

FFL 2.600

CT OF

FB

Carport

FB TB

GFL 0.150

FB

FB TB

GFL 0.150

OP

OP

East Elevation

South Elevation

RL 8.125

RL 8.125

CT

CT

TB

TB

FFL 2.600

CT

CT

CT

CT

TB

TB

TB

CT

FFL 2.600

FB GFL 0.150

FB

FB

FB

Carport

FB

GFL 0.150 OP

West Elevation

North Elevation 0

1.0

2.0

3.0

4.0

5.0

Dimensions must not be scaled from this drawing. This drawing is copyright and must not be reproduced.

Development at The Linney, Ludlow

for

Key FB: TB: CT: OP: OF:

Facing brick Timber boarding Clay tile Oak post on brick pedestal Oak framing

Mc Cartneys

Revisions

Units 1 to 3 Proposed Elevations

Trevor Hewett RIBA

Date:

26.02.18

Scale:

1:50 @ A1 / 1:100 @ A3

www.trevorhewett.co.uk

Drg. No:

Mccr.1 213

The Architecture Studio, 22 Broad Street, Ludlow SY8 1NG Tel: 01584 877992 Email: info@trevorhewett.co.uk

Status: Planning


FFL 7.450

RL 7.450

CT

CT

FFL 2.600

CT

FFL 2.600 FFL 2.600 CT

TB GFL 0.150

OF

TB FB

FB

TB

TB

FB

FB

GFL 0.150

Carport

FB

FB

OP

OP

West Elevation

South Elevation

FFL 7.450

RL 7.450

CT

CT

CT

CT

CT

FFL 2.600

FFL 2.600

CT

OF

Carport

TB FB OP

CT

TB FB

TB

TB FB

OF

TB

FB

GFL 0.150

FB

FB

GFL 0.150

OP

North Elevation

East Elevation 0

2.0

3.0

4.0

5.0

Dimensions must not be scaled from this drawing. This drawing is copyright and must not be reproduced.

Key FB: TB: CT: OP: OF:

1.0

Facing brick Timber boarding Clay tile Oak post on brick pedestal Oak framing

Development at The Linney, Ludlow

for

Mc Cartneys

Revisions

Units 4 & 5 Proposed Elevations

Trevor Hewett RIBA

Date:

26.02.18

Scale:

1:50 @ A1 / 1:100 @ A3

www.trevorhewett.co.uk

Drg. No:

Mccr.1 215

The Architecture Studio, 22 Broad Street, Ludlow SY8 1NG Tel: 01584 877992 Email: info@trevorhewett.co.uk

Status: Planning

A


18d pitch

Freelance Architectural Designer

CR

House Extension, Marlborough, nz August 2019 - JUNE 2019 C

WG.23 PT

TB

PROPOSED EXTENSION

EXTENSION N O R T H E L E V A T I O N 'A' SCALE 1:50


A

25d pitch

Remove existing sash window and install new casement window.

6300

25d pitch WF.01 WF.02 CR

WG.04

WG.02 TB

WG.21

TB

CR

GFL

WG.22

TB

WG.05 WG.20 FFL

PT

PT DP

DP

DG.01

PROPOSED EXTENSION

PROPOSED EXTENSION

A

C

PROPOSED EXTENSION W E S T E L E V A T I O N 'B' SCALE 1:50

PROPOSED EXTENSION

C

EXTENSION S O U T H E L E V A T I O N 'C' SCALE 1:50


CL

A

25d pitch PROPOSED EXTENSION

WG.14

VOID

25d pitch

Remove existing sash window and install new casement window.

6300

2000 DG.09

CL

DG.08

18d pitch

SURVEYED AREA 3050

VOID

MASTER BEDROOM G.01

1765

GRASS

WF.01

DG.07

WF.02

CR

CR

WARDROBE 3050 G.01a

A

WG.01

202

PLAN

C

800

WG.23 PT

WG.04

WG.02 DG.10

TB

TB

WG.21

TB

WG.13

WG.22

PROPOSED EXTENSION

D 202

FP

DP PROPOSED EXTENSION

CONSERVATORY G.03

DG.20

HALLWAY G.07a

FP

FAMILY ROOM G.10

WG.13 C

EXTENSION DG.18 S O U T H E L E V A T I O N 'C' SCALE 1:50

SECTION A-A SCALE 1:50

SCALE 1:50

4200

PT

PROPOSED EXTENSION

C

PROPOSED EXTENSION W E S T E L E V A T I O N 'B'

A

DG.20 B

WG.20 FFL

DG.01

DG.05

A DG.01

WG.20

FFL A

E X T E N SDG.11 ION N O R T H E L E V A T I O N 'A' SCALE 1:50

2742

DG.01

PROPOSED EXTENSION

WG.12

WG.05

TB

PT

DG.18

7470

New engineered beam New sliding doors

DP

B

CR

GFL

EN SUITE G.02

WG.21

202

DF.14

WF.07

SITTING ROOM 3050 G.11

Colonade

PLAYROOM F.01

GFL

DG.06

WG.20 DP

25d pitch

FP

C

3050

New engineered beam

FAMILY ROOM G.10 WG.11 5175

25d pitch

PROPOSED EXTENSION

PROPOSED EXTENSION

WG.22

2000

3480

VOID 3420

3050

CONSERVATORY G.12

HALLWAY G.07a

DP

3075

WG.23

WG.10

2000

KEY TB CR BR FP PT DP

DG.19 DG.13 WG.03

GFL

DF.14 WG.09

WF.07 2350

3050

DG.14 3200

SLIDER

1740

PLAYROOM F.01

UTILITY G.08

KITCHEN G.09

ENTRANCE G.07

3420

DG.03

DG.02

FFL

C

New engineered beam AGA

New sliding doors

DG.04

WG.06

WG.07

WG.08

CONSERVATORY G.03

WG.20

DG.20

HALLWAY G.07a

FP

FAMILY ROOM G.10

DG.20 - SCALE 1:10

GRASS

DG.18

DG.01

2025

B

FP

WG.13

SECTION A-A

WG.05

GROUND

10

3200

BEDROOM 2 G.06

DG.15

2025

BATHROOM G.05

2330

3200

WG.04

2345

New engineered beam

1765

C 202

VOID

SCALE 1:50

FLOOR

PLAN PROPOSED EXTENSION

C

I N T E R N A L E L E V A T I O N 'D' PARTITION DOORS SCALE 1:20

Timber boarding Corrugated roofing Brick Fireplace Painted timber pilaster Downpipe


400

5

163

10

18 40 40 16

50

15

15

311

8

8

8

16 50

5

5

274

70

2760

2760

10

50

VARIES

336

350

138

Section A

Section A

FFL

DORIC CAPITAL BASE 路 DETAILS SCALE 1:5

138

D O R I C P I L A S T E R 路 ELEVATION P I L A S T E R 'A' & 'B' SCALE 1:10 0

100

200

300

400

500

D O R I C P I L A S T E R 路 ELEVATION PILASTER 'C' SCALE 1:10 0

100

200

300

400

500

C

INTERIOR

80

EXTENSION EXTERNAL WALL

A

B

DORIC PILASTER路PLAN SECTION A-A SCALE 1:10


Freelance Architectural Designer West Melton House, Christchurch, NZ June - July 2019


RL 6143

RL 6143

30째

30째 BB

BB

CR

CR CR

CR

CL 2900

CL 2900

Lintel 2250

Lintel 2250

BR

PLINTH 600

CR

CR

CR

BR

BR

WG.09

BR

WG.10

BR

PLINTH 600

GFL 200

CR

WG.15

BR

BR

BR

GFL 200

RM

GL 000

RM

RM

DP

RM

GL 000

EAST

WG.05

DP

DP

ELEVATION

WEST

RM

RM

DP

ELEVATION

RL 6143

30째

CR

PRODUCED BY AN AUTODESK STUDENT VERSION

CR

CR BB

CL 2900

Lintel 2250

PT

BR

PLINTH 600

GFL 000

BR

WG.01

WG.02

WG.03

BR

RM

GL -200

BR

WG.04

RM

RM

SOUTH 1485

600

1800

600

1265

1100

WG.07

WG.06

WG.08

BR

RM

DG.01

DP

DP

BR

WG.05

DP

WG.20

DP

ELEVATION

BF

BF BF

1050

8650

7900

RL 6143

30째

BR CR

CL 2900

BF

BF

RM

CR

RM

WG.20

BR Lintel 2250

WG.12

North Facade Detail

1:20 @ A1

BR

PLINTH 600

BR

BR

BR WG.11

GFL 200

RM

GL 000

RM

DG.02

DP

2055

2680

WG.12

2620

BR

KEY:

WG.14

NORTH

DG.03

WG.13

RM

RM

DG.04

DP

ELEVATION 0

0.5

1.0

1.5

2.0

2.5

DP CR BR BF RM PT BB

Downpipe (Aluminum) Corrugated roofing Brick veneer (Painted) Brick facings (Painted) Rendered masonry Painted timber Board & Batten

DG.03


PLAN A WG.20

B DG.03

WG.13

WG.14

DG.04

* Diocletian Window Above

WG.12

WG.11

DG.02

G.07a Wardrobe

DG.17

DG.20

G.05 Conservatory

G.07b Ensuite 3150

WG.15 G.07 Bedroom 1

C

4620

2700

2700

G.03 Living / Dining Room

G.06 Bedroom 2

DG.15

DG.18

G.11 Hallway

DG.10

DG.11

DG.19

DG.12

DG.13 G.02 Bedroom 4 / Office

G.09 Bathroom

2300

OP

PR

D

E OS

RA

S

A EP

2300

G.04 Kitchen

G.01 Entrance

HWC1

G

WG.09

G.04a Pantry

2700

G.08 Utility

TE

Wood Burner

2700

DG.05

GE

C

2700

DG.14

DG.16

A AR

WG.10

PRODUCED BY AN AUTODESK STUDENT VERSION

ROOF

HWC2

2700

G.10 Bedroom 3 2700

WG.01

WG.02

WG.06

WG.03

WG.07

WG.08

DG.01

B WG.04

WG.05

GROUND 0

0.5

1.0

1.5

2.0

A

FLOOR PLAN

2.5

N

PRELIMINARY ALEXANDER BREIG

Dimensions must not be scaled from this drawing. This drawing is not suitable for construction and is copyright and must not be reproduced.

Revisions:

REV A : MINOR AMENDMENT 01.08.19

Site TBC

Date:

01/08/2019

Scale:

1:50 @ A1 / 1:100 @ A3

for

Alexander and Gerda Breig

Proposed Floor and Roof Plan

BAS, MArch. (Pro) (Hons) 4 Ashford Grove - Rapaura - Blenheim - Marlborough - NZ Tel: 03 5705186 Email: Breiga01@wairaka.com

Status: Sketch


Freelance Architectural Designer Islamic Memorial - Christchurch June 2019 - Present


END

Profile for Alexander Breig

Architectural Portfolio 2019 - Alexander Breig  

Architectural Portfolio 2019 - Alexander Breig  

Advertisement