KEY TO SYMBOLS
GENERAL NOTES TO CONTRACTOR
REVISION TABLE
FOLEY FIORE
NEW CAST IN PLACE CONCRETE
ARCHITECTURE
SIMPSON SHEAR WALLS (See Structural)
1. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL BUILDING CODES, AMENDMENTS, RULES, REGULATIONS, ORDINANCES, LAWS, ORDERS, AND APPROVALS THAT ARE REQUIRED BY PUBLIC AUTHORITIES HAVING JURISDICTION OVER THE WORK. IN THE EVENT OF CONFLICT, THE MOST STRINGENT REQUIREMENTS SHALL APPLY.
BATT INSULATION
SHEET NAME & NUMBER
REVISION
SHEET NAME & NUMBER
REVISION
SPRAY FOAM INSULATION
A 0.0
Basement Demo Plan
A 5.3
Interior Elevations - Mudroom Bath
A 0.1
First Floor Demo Plan
A 5.4
Interior Elevations - Family Room
A 0.2
Second Floor Demo Plan
A 5.5
Interior Elevations - Master Bath
A 1.0
Proposed Basement Plan
A 5.6
Interior Elevations - Master Bedroom
A 1.1
Proposed First Floor Plan
Y
A 5.7
Interior Elevations - Master Closet
A 1.2
Proposed Second Floor Plan
Y
A 5.8
Interior Elevations - Butlers Pantry & Laundry
A 1.3
Proposed Roof Plan
A 5.9
Interior Elevations - Front Hall
A1.4
First Flooring Plan
A 5.10
Interior Elevations - Dining & Powder Room
Y
A1.5
Second Flooring Plan
A 5.11
Interior Elevations - Office
Y
4. ASBESTOS ABATEMENT, LEAD PAINT REMOVAL, AND OTHER HAZARDOUS MATERIAL REMOVAL IS NOT IN THE CONTRACT. SHOULD THE CONTRACTOR ENCOUNTER THE PRESENCE, OR POSSIBLE PRESENCE, OF POTENTIALLY HAZARDOUS MATERIALS, THE CONTRACTOR SHALL NOTIFY THE OWNER FOR INSTRUCTIONS PRIOR TO CONTINUING WORK.
A 3.0
Prop. Ext. Elevations - N&W
Y
A 5.12
Interior Elevations - Playroom
Y
A 3.1
Prop. Ext. Elevations - S&E
Y
A 5.13
Interior Elevations - Playroom
Y
5. WORK SHALL BE PERFORMED IN A SAFE AND ORDERLY MANNER WITH DUE CONSIDERATION FOR THE SAFETY AND PROTECTION OF ALL PERSONNEL, EXISTING SURFACES, MATERIALS AND EQUIPMENT. DUST PROTECTIVE DEVICES SHALL BE INSTALLED AND MAINTAINED AS NECESSARY AND AS REQUIRED BY THE OWNER OR AUTHORITIES.
A 4.0
Proposed Building Sections
A 5.14
Interior Elevations - Gym
Y
A 4.1
Proposed Building Sections
A 5.15
Interior Elevations - Bedroom/Bath 1
Y
A 5.0
Interior Elevations - Kitchen & Dining
Y
A 5.16
Interior Elevations - Bedroom/Bath 2
Y
A 5.1
Interior Elevations - Kitchen Island
Y
A5.17
Interior Elevations - Bedroom/Bath 3
Y
A 5.2
Interior Elevations - Mudroom
Y
A 7.1
Proposed First Floor Reflected Ceiling Plan
Y
A 7.2
Proposed Second Floor Reflected Ceiling Plan
Y
2. BEFORE COMMENCING WORK, THE CONTRACTOR SHALL VISIT THE SITE, ACCOMPANIED BY THE OWNER AND ARCHITECT, AND SHALL NOTE THE EXISTING CONDITIONS AFFECTING THE WORK. THE CONTRACTOR SHALL EXAMINE ADJOINING WORK FOR ASSURANCE THAT NO CONDITIONS EXIST TO PREVENT THE COMPLETION OF FIRST CLASS WORK. IF CONTRACTOR OBSERVES FIELD CONDITIONS THAT ARE AT VARIANCE WITH THE WORK SHOWN IN THE CONTRACT DOCUMENTS, THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY IN WRITING SO THAT ACTION MAY BE TAKEN TO ACCOMMODATE THE CONDITION PRIOR TO BEGINNING CONSTRUCTION.
0 A0.0
0 A0.0
EXTERIOR ELEVATION LOCATOR
SECTION LOCATOR
2 3 A0.0 1
3. IF UNUSUAL CONDITIONS ARE ENCOUNTERED DURING CONSTRUCTION, SUCH AS CONFLICTS BETWEEN NEW CONSTRUCTION AND EXISTING UTILITIES, ANY OF WHICH HAVE TO BE REROUTED OR MODIFIED, OR ANY OTHER SUBSTANTIAL COMPLICATION WHICH COULD NOT BE FORESEEN AT THE OUTSET OF CONSTRUCTION, THE OWNER, ARCHITECT, CONTRACTOR AND AFFECTED SUBCONTRACTORS SHALL MEET TO DETERMINE A FAIR AND EQUITABLE SOLUTION AS EACH ISSUE OCCURS. CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES BETWEEN THE DRAWINGS AND EXISTING CONDITIONS BEFORE COMMENCEMENT OF WORK. CONTRACTOR ASSUMES RESPONSIBILITY FOR ANY SUCH WORK UNDERTAKEN WITHOUT NOTIFYING AND RECEIVING APPROVAL FROM THE ARCHITECT.
INTERIOR ELEVATION LOCATOR
EXTERIOR WINDOW & DOOR # REFERENCE SCHED.
0
INTERIOR DOOR # REFERENCE SCHED.
Y
8. BUILDING SHALL BE MAINTAINED IN WEATHERPROOF & SECURE CONDITION THROUGHOUT WORK.
PROPOSED PLOT PLAN - NOT TO SCALE
9. VERIFY THAT NO CONFLICTS EXIST IN LOCATIONS OF ANY AND ALL MECHANICAL, PHONE, ELECTRICAL, LIGHTING AND PLUMBING AND THAT ALL REQUIRED CLEARANCES FOR INSTALLATION AND MAINTENANCE OF EQUIPMENT ARE PROVIDED.
DRAWING INDEX 10. DIMENSIONS SHALL BE FROM FACE OF FRAMING, UNLESS NOTED OTHERWISE.
13. ERECT AND INSTALL ALL WORK LEVEL, PLUMB, SQUARE, TRUE, STRAIGHT AND IN PROPER ALIGNMENT. 14. PATCH AND REPAIR FINISHES DISTURBED OR DAMAGED BY REMOVAL OR NEW WORK OPERATIONS, OR AS REQUIRED TO ACCOMMODATE NEW FINISHES. WHERE REMOVAL OF WORK EXPOSES HOLES, CRACKS, ANCHORAGE INSERTS, OR OTHER IMPERFECTIONS, THEY SHALL BE SUITABLY REPAIRED BY THE GENERAL CONTRACTOR TO MATCH THE EXISTING ADJACENT SURFACES. OPENINGS IN CEILINGS, FLOORS, AND WALLS AS A RESULT OF REMOVAL OF THE EXISTING MECHANICAL, PLUMBING AND ELECTRICAL WORK SHALL BE INFILLED. PATCH AS REQUIRED TO MATCH ADJACENT FINISHES OF EXISTING CONSTRUCTION. PATCHING MATERIALS SHALL COMPLY WITH FIRE RATED CONSTRUCTION REQUIREMENTS WHERE APPLICABLE. 15. WHEN PROJECT IS COMPLETE, CLEAN AND POLISH GLASS, HARDWARE, AND OTHER SUCH ITEMS WITH FACTORY FINISHES. REMOVE ALL DUST WITH TREATED DUST CLOTHS OR VACUUM CLEANERS. WASTE AND REFUSE CAUSED BY THE WORK SHALL BE REMOVED FROM PREMISES AND DISPOSED OF BY CONTRACTOR. CLEAN SITE AT END OF PROJECT. REMOVE DUST, DEBRIS, OILS, STAINS, FINGERPRINTS, AND LABELS FROM EXPOSED SURFACES, INCLUDING GLAZING. 16. ALL STAIRS TO CONFORM TO BUILDING CODE. IRC 2009 R311.7 AND MASSACHUSETTS RESIDENTIAL CODE 780 CMR R311.1 & R311.2
A0
Title Page
X1.0 X1.1 X1.2 X1.3
Existing Basement Plan Existing First Floor Plan Existing Second Floor Plan Existing Roof Plan
X3.0 X3.1
Existing Exterior Elevations Existing Exterior Elevations
A 0.0 A 0.1 A 0.2
Basement Demo Plan First Floor Demo Plan Second Floor Demo Plan
A 1.0 A 1.1 A 1.2 A 1.3 A1.4 A1.5
Proposed Basement Plan Proposed First Floor Plan Proposed Second Floor Plan Proposed Roof Plan First Flooring Plan Second Flooring Plan
A 3.0 A 3.1
Proposed Exterior Elevations - North and West Proposed Exterior Elevations - South and East
A 4.0 A 4.1
Proposed Building Sections Proposed Building Sections
A 5.0 A 5.1 A 5.2 A 5.3 A 5.4 A 5.5 A 5.6 A 5.7 A 5.8 A 5.9 A 5.10 A 5.11 A 5.12 A 5.13 A 5.14 A 5.15 A 5.16 A5.17
Interior Elevations - Kitchen & Dining Interior Elevations - Kitchen Island Interior Elevations - Mudroom Interior Elevations - Mudroom Bath Interior Elevations - Family Room Interior Elevations - Master Bath Interior Elevations - Master Bedroom Interior Elevations - Master Closet Interior Elevations - Butlers Pantry & Laundry Interior Elevations - Front Hall Interior Elevations - Dining & Powder Room Interior Elevations - Office Interior Elevations - Playroom Interior Elevations - Playroom Interior Elevations - Gym Interior Elevations - Bedroom/Bath 1 Interior Elevations - Bedroom/Bath 2 Interior Elevations - Bedroom/Bath 3
A 7.1 A 7.2
Proposed First Floor Reflected Ceiling Plan Proposed Second Floor Reflected Ceiling Plan
A 8.0A8.5
Proposed Exterior Details
S0.01 S1.00 S1.01 S1.02 S1.03 S3.01 S3.02 S3.03
General Notes Foundation Plan First Floor Framing Plan Second Floor Framing Plan Roof Framing Plan Sections Sections Sections
Y
04/28/2023 BULLETIN SET 4
0
7. SAFETY MEASURES: AT ALL TIMES, THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE. INCLUDING THE SAFETY OF PERSONS AND PROPERTY, AND FOR ALL NECESSARY INDEPENDENT REVIEWS OF THESE CONDITIONS. THE ARCHITECT'S, ENGINEER'S OR OWNER'S JOB SITE REVIEW IS NOT INTENDED TO REVIEW THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES.
12. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING AND INFORMING TRADES OF THEIR SEQUENCE OF WORK OPERATIONS, AND MAKING CERTAIN THAT THEY HAVE COORDINATED THEIR WORK WITH ONE ANOTHER. GENERAL CONTRACTOR SHALL SEQUENCE WORK IN THE MOST ECONOMICAL AND EFFICIENT MANNER TO BENEFIT THE OWNER. OUT OF SEQUENCE WORK WHICH IS REQUIRED TO MEET THE INTENT OF THE CONSTRUCTION DOCUMENTS, OR DIRECTED BY THE GENERAL CONTRACTOR SHALL NOT CAUSE THE OWNER ANY ADDITIONAL EXPENSE.
Y
4
6. DEBRIS SHALL BE CONTAINERIZED AND REMOVED FROM THE SPACE AND BUILDING ON A REGULAR BASIS, IN ACCORDANCE WITH AN AGREEMENT MADE BETWEEN THE OWNER AND THE CONTRACTOR.
11. DO NOT SCALE DRAWINGS. IF A DIMENSION IS IN QUESTION, CONTACT THE ARCHITECT FOR CLARIFICATION. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE, LARGE SCALE DRAWINGS SHALL TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS. CONTRACTOR SHALL VERIFY EXISTING DIMENSIONS AS NECESSARY AND BE RESPONSIBLE FOR COORDINATION WITH NEW WORK. NO WORK SHALL BEGIN UNTIL SUCH COORDINATION HAS BEEN PERFORMED.
Y
316 Cambridge St. Cambridge, MA 02141 6 1 7 .. 5 4 7 .. 8 0 0 2
Date: 01/26/22 4/15/22 4/22/22 10/13/22 11/01/22 01/20/23 4/28/23
Revision: ISSUE FOR PRICING Issue for Permit Issue for Const. Bulletin Set 1 Bulletin Set II Bulletin set III Bulletin Set 4
Scale: As Noted Title: Title Page
Sheet: