WHIRLWIND METALIC SCULPTURE DESIGN - ARC 433

EXOSKELETON PIN UP BOARD INSTILLATION - ARC 433

FURROW VALLEY COMPETITION IN AFGHANISTAN - ARC 401

SHARJAH FILM AND CINEMA CENTER COMPREHENSIVE STUDIO PROJECT - ARC 402

2 01 02 03 04

Concept

Whirlwinds are technically tornadoes but the difference between both terms is that rather than starting from the sky downwards, whirlwinds start from the ground and move upwards. In this piece, the intention was to capture the beginning.

The general drive for this piece was to use the properties of the KUKA Prc system to generate an object locked in motion. By creating these two multi-planer bent pieces and copying them along a central axis, a dynamic gesture is realised.

01 WHIRLWIND
ARC 433
Final geometry Top view Side view Bottom view Fillet curves Defined curves Original geometry
Step 1: Generate basic geometry Step 2: Define specific path
3
Step 1: Fillet curve loop
Whole piece: 6 parts - 2 pieces repeated Radius: 400 mm Part B: 1100 mm Part A: 1700 mm 4
5
6

ARC 433

THE EXO-SKELETON

F22: ARC 433: ADVANCED DIGITAL FABRICATION

CONCEPT

The throught behind this project was to utilize the KUKA prc system to bend a fluid pattern across a set number of modules. This fluid motion came from the fluttering of a birds wings and the positions at a given instance during flight. The motion is seen as an echo when looked at from different positions and gives the sculpture its dynamic nature while being locked in motion. In order to achieve this deviation a virtual framework was built as a grid that had fixated points which gradually shifted across the modules and from there lines were drawn in relation to the moment

GENERATIVE DIAGRAM

02
EXOSKELETON
Intention Diagram Intention Sketch Deviation Diagram Concept Sketch
OVERHEAD SKELETON+REINFORCMENT Using overhead Top 7

GENERATIVE DIAGRAM

PIN-UP STRATEGY

The strategy for the board is to use 4mm acyrlic sheets that have an etched grid with pin hole points at standard paper size locations.

Deviation Diagram Concept Sketch Middle Panel A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A3 A3 A3 A3 A3 A3 A3 A3 A2 A2 A2 A2 A1 A1
Pin up connector view Ghosted Perspective Etched Acyrlic allows for visibility into the internal guts of the structure GROUND Top view Front elevation Side elevation Back view Front view Skeleton Reinforcement Pin
8
up panels

REINFORCEMENT: EXPLODED AXON AND PARALLEL CONNECTION

CHALLENGES:

Fabricating issues:

1. The difference in tolerance of things in rhino vs real life, ex: placement on the ground and top, things move and shift.

2. When zip tieing things still slip and slide on top of each other and shift.

3. While dry fitting, it was hard to find the actual position of where things meet in space.

4. At first we didn’t grasp that challenge of reinforcement splits until we actually dry fit them.

5. When the pipes came back from powder coaters, parts needed to be filed to make things fit.

6. Since it’s a team project we sometimes find it hard to compromise with each other’s schedule.

Design issues:

1. Since the geometry of the module being complicated, it was hard to find rules for pipe length and bends sequence. Pipes are either too long or too short sometimes we have to recut them.

2. It was challenging to find ways to reinforce the module and make it rigid and not weak as the module’s geometry contains very few rules.

3. The reinforcement was challenging because it has to be structurally supporting the module and it has to be bend through the robot. It was hard to check the splits for all before outputting to the file.

4. It was challenging to maintain hierarchy between skeleton module and reinforcement and pin up.

SCALE 1:1.25
9
Top reinforcment Middle reinforcment Bottom reinforcment

CONTEXT

REINFORCEMENT: EXPLODED AXON AND PARALLEL CONNECTION

10
11
12

FURROW VALLEY ARC 401

Concept

The historical Bamyan region in Afghanistan spans thousands of years accross several empires and nations that took claim of the cultural crossroad. Being situated on the silk road has allowed for great influences to come in and out of the region. In recent years, war has taken over the area. Once home to thousands of Bhuddist monks who resided in ancient manmade caves that housed one of the largest sculptures in the world. The taliban’s engagement in the area has disturbed its normal flow of life, so much so that they have forced people to leave their homes and find refuge at the Bamyan caves. The cave dwellers live in poverty and directly under the mercy of natural elements. The goal of this project was to create a community that would house and sustain the cave dwellers of Bamyan

03
Concept sketch 13
14
Birds-eye view render
Site plan 15
Vegitation diagram 16
17 Compound plan
18 Sections
19 Wall sections
20
Renders

SHARJAH FILM AND CINEMA

ARC 402

Concept

The Al-Ghafiya area is situated almost between the Ajman/ Sharjah border. It is home to middle-class families that have lived in the area for generations. While it is a resedential area, the community seems quite inactive so this project was proposed to attract more attention and visitors. A film and media cultural center, designed to host premiers and events for the people.

21 04
Insertion sketch Concept sketch Plaza sketch
22 Exterior render
Interior render 23
Interior render 24
Light theatre 25
Dark Theatre 26
27 PN A1 SITE PLAN 1:500 @ A2 TN SPRING 2023 ARC 402-2023 25.381543, 55.409652 Professor Igor Peraza ARC 402 COMPREHENSIVE STUDIO Spring 2023 American University of Sharjah Department of Architecture College of Architecture, Art &Design SHARJAH CENTER FOR FILM AND MEDIA, AL GHAFEYA, SHARJAH, UAE NOT FOR CONSTRUCTION, FOR DESIGN PURPOSE ONLY OBSIDIA SHARJAH, UAE AHMED AMMAR | SUNA CHOI 1 2 3 4 5 6 1 2 3 4 5 F E D C B A F E D C B A 6 TEAM INFORMATION TEAM INFORMATION ISSUE PROJECT INFORMATION SHEET TITLE SHEET NUMBER REV. DESCRIPTION DATE 01 100% ISSUE FOR S.D. 22/FEB/2022 02 50% ISSUE FOR D.D. 22/MAR/2022 THIS DRAWING IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. IF USED FOR CONSTRUCTION, THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR LOCAL CODE COMPLIANCE. ALL DRAWINGS, PLANS, SKETCHES ETC. ARE PROVIDED TO CLIENTS BASED UPON INFORMATION PROVIDED BY THE CLIENT AND DRAWN IN ACCORDANCE WITH COMMON BUILDING PRACTICES AND LOCAL CODES. NONE OF THE EMPLOYEES OF THE DESIGN STUDIO ARE REGISTERED ARCHITECTS, ENGINEERS OR LAND SURVEYORS. ALL DIMENSIONS AND SPECIFICATIONS SHOULD BE VERIFIED BY CLIENT AND OR CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS. IF DIMENSIONS AND SPECIFICATIONS ARE NOT VERIFIED BY CLIENT AND/OR CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS THE DESIGN STUDIO WILL BE HELD HARMLESS AND ASSUMES NO LIABILITY FOR CHANGES AND/OR REVISIONS MADE TO PLANS BY CLIENT AND/OR CONTRACTOR.
28 THIS DRAWING IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. IF USED FOR CONSTRUCTION, THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR LOCAL CODE COMPLIANCE. ALL DRAWINGS, PLANS, SKETCHES ETC. ARE PROVIDED TO CLIENTS BASED UPON INFORMATION PROVIDED BY THE CLIENT AND DRAWN IN ACCORDANCE WITH COMMON BUILDING PRACTICES AND LOCAL CODES. NONE OF THE EMPLOYEES OF THE DESIGN STUDIO ARE REGISTERED ARCHITECTS, ENGINEERS OR LAND SURVEYORS. ALL DIMENSIONS AND SPECIFICATIONS SHOULD BE VERIFIED BY CLIENT AND OR CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS. IF DIMENSIONS AND SPECIFICATIONS ARE NOT VERIFIED BY CLIENT AND/OR CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS THE DESIGN STUDIO WILL BE HELD HARMLESS AND ASSUMES NO LIABILITY FOR CHANGES AND/OR REVISIONS MADE TO PLANS BY CLIENT AND/OR CONTRACTOR. 22/MAR/2023 02 22/FEB/2023 100% ISSUE FOR S.D. 01 DATE DESCRIPTION REV. SHEET NUMBER SHEET TITLE PROJECT INFORMATION ISSUE TEAM INFORMATION TEAM INFORMATION AHMED AMMAR | SUNA CHOI OBSIDIA SHARJAH, UAE NOT FOR CONSTRUCTION, FOR DESIGN PURPOSE ONLY SHARJAH CENTER FOR FILM AND MEDIA, AL GHAFEYA, SHARJAH, UAE Professor Igor Peraza ARC 402 COMPREHENSIVE STUDIO Spring 2023 American University of Sharjah Department of Architecture College of Architecture, Art &Design 6 A B C D E F A B C D E F 5 4 3 2 1 6 5 4 3 25.381543, 55.409652 ARC 402-2023 SPRING 2023 2 1 50% ISSUE FOR D.D. J K L M N O P H G F 10 11 12 13 14 15 E D 9 8 7 6 5 5 4 3 2 1 C B A I 03 100% ISSUE FOR D.D. 03/MAY/2023 open to above 1:150 @ A2 A1 GROUND FLOOR PLAN UP UP UP UP UP UP UP PN TN 20.00 15.00 m 10.00 m 10.00 m 2.25 m 10.00 m 10.00 m 10.00 m 5.00 m 10.00 10.00 7.50 m 10.00 m 7.50 m 13.00 m 7.50 m 7.50 m 4.80 m 10.00 m 8.20 m 10.00 m 1.75 0.94 m 1.00 m 0.94 m 1.00 m 1.00 m 2.00 m 1.00 m 1.00 m 4.00 m 1.00 m 1.00 m 1.50 1.00 m 1.00 m 1.00 1.00 m 1.91 m 9.75 m 1.20 m 1.00 1.00 m 1.00 m 1.00 m 8% -1.2m 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47 1.48 1.49 1.50 1.51 1.52 1.53 1.54 2.0 1.55 1.56 1.57 1.58 1.59 1.60 1.61 1.62 1.63 1.64 1.65 1.66 1.67 1.68 1.69 1.70 1.71 1.72 1.73 1.74 1.75 1.76 1.77 1.78 1.79 1.80 1.81 1.82 1.83 1.84 1.85 1.86 1.87 1.88 1.89 1.90 1.91 1.92 1.93 1.94 1.95 1.96 1.97 1.98 1.99 1.0 1.80 m A451 A1 A301 A1 A302 A1 113 A 114 115 A 116 A 117 A 111 110 A 107 106 A 105 A 112 A 104 108 A 109 118 103 A303 A1 100 122 sqm ELEVATOR 101 7 sqm SECURITY RECEPTION 102 16 sqm LIGHT THEATRE 103 200 sqm 104 48 sqm EXHIBITION TUNNEL 105 DARK ROOM 24 sqm 106 CAFE 77 sqm 107 EXHIBITION HALL 365 sqm DISPLAY AREA 108 128 sqm MULTIPURPOSE 109 MULTIPURPOSE 110 35 sqm 41 sqm 54 sqm 119 A 112 365 sqm EXHIBITION HALL 107 DARK THEATRE 111 300 sqm 114 115 117 MEP MEP WASHROOM 11 sqm 17 sqm 24 sqm STORAGE 41 sqm WASHROOM 116 101 ZOETROPE LOADING DOCK 25 sqm 100 102 113 A302 A1 A303 A1 A402 A1 A450 A1 A401 A1
29 1:150 @ A2 A1 TN PN FOUNDATION PLAN 0.6x0.6x2.7m CJ CJ CJ CJ CJ 0.6x0.6x4.4m 0.6x0.6x4.4m 0.6x0.6x4.4m 0.6x0.6x4.4m 0.6x0.6x9.4m 0.6x0.6x9.4m 0.6x0.6x9.4m ELEVATOR LOADING DOCK SLAB ON GRADE CONCRETE SLAB SLAB ON GRADE CONCRETE SLAB STACK VENT SLAB ON GRADE CONCRETE SLAB SHALLOW CONCRETE FOUNDATION EGRESS EGRESS LOAD BEARING CONCRETE WALL 0.6x0.6x9.4m 0.6x0.6x9.4m 0.6x0.6x9.4m CJ STEEL I-BEAM STEEL PLATE SHALLOW CONCRETE FOUNDATION ON-GRADE CONCRETE BEAMS CONCRETE FOOTING 3 INCH PVC PIPE MANHOLE F2 F2 F2 F2 F2 CJ 0.6x0.6x9.4m 0.6x0.6x9.4m 0.6x0.6x9.4m 0.6x0.6x9.4m 0.6x0.6x9.4m 0.6x0.6x14.4m 0.6x0.6x14.4m 0.6x0.6x14.4m 0.6x0.6x6.9m 0.6x0.6x6.9m CJ 0.6x0.6x6.9m 0.6x0.6x6.9m 0.6x0.6x6.9m 0.6x0.6x4.1m 0.6x0.6x2.2m 0.6x0.6x6.9m CJ CJ CJ CJ 0.6x0.6x7.5m 0.6x0.6x4.4m 0.6x0.6x4.4m 0.6x0.6x9.1m 0.6x0.6x6.9m 0.6x0.6x6.9m CJ CJ CJ CJ CJ CJ CJ CJ 0.6x0.6x6.9m 0.6x0.6x9.4m 0.6x0.6x9.4m 0.6x0.6x4.2m CJ CJ CJ 0.6x0.6x9.4m 0.6x0.6x9.4m 0.6x0.6x9.4m 0.6x0.6x9.4m 0.6x0.6x9.4m 0.6x0.6x9.4m 0.6x0.6x9.4m 0.6x0.6x9.4m CJ 0.6x0.6x9.4m 0.6x0.6x7.5m 0.6x0.6x6.9m 0.6x0.6x4.4m 0.6x0.6x4.4m 0.6x0.6x3.8m 0.6x0.6x6.9m 0.6x0.6x6.9m CJ -0.9m -1.2m -1.21m -1.22m -1.22m -1.21m -1.2m -1.23m -1.24m -1.8m -2.1m 1.80 1.80 m 1.80 1.80 m 1.80 m 1.80 m 5.80 3.00 m 5.80 3.00 10.00 8.20 m 10.00 m 20.00 m 4.80 m 7.50 m 7.50 m 13.00 7.50 m 10.00 m 7.50 10.00 m 10.00 m 5.00 m 10.00 m 10.00 10.00 m 10.00 10.00 13.70 m 10 12 13 14 15 C B A P O N M L K J I H G F E D 9 8 7 6 5 5 4 3 11 1 2 THIS DRAWING IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. IF USED FOR CONSTRUCTION, THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR LOCAL CODE COMPLIANCE. ALL DRAWINGS, PLANS, SKETCHES ETC. ARE PROVIDED TO CLIENTS BASED UPON INFORMATION PROVIDED BY THE CLIENT AND DRAWN IN ACCORDANCE WITH COMMON BUILDING PRACTICES AND LOCAL CODES. NONE OF THE EMPLOYEES OF THE DESIGN STUDIO ARE REGISTERED ARCHITECTS, ENGINEERS OR LAND SURVEYORS. ALL DIMENSIONS AND SPECIFICATIONS SHOULD BE VERIFIED BY CLIENT AND OR CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS. IF DIMENSIONS AND SPECIFICATIONS ARE NOT VERIFIED BY CLIENT AND/OR CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS THE DESIGN STUDIO WILL BE HELD HARMLESS AND ASSUMES NO LIABILITY FOR CHANGES AND/OR REVISIONS MADE TO PLANS BY CLIENT AND/OR CONTRACTOR. TEAM INFORMATION TEAM INFORMATION ISSUE PROJECT INFORMATION 22/MAR/2022 50% ISSUE FOR D.D. 02 22/FEB/2022 100% ISSUE FOR S.D. 01 DATE AHMED AMMAR | SUNA CHOI OBSIDIA SHARJAH, UAE NOT FOR CONSTRUCTION, FOR DESIGN PURPOSE ONLY SHARJAH CENTER FOR FILM AND MEDIA, AL GHAFEYA, SHARJAH, UAE ARC 402-2023 1 Professor Igor Peraza ARC 402 COMPREHENSIVE STUDIO Spring 2023 American University of Sharjah Department of Architecture College of Architecture, Art &Design 2 3 4 5 6 25.381543, 55.409652 1 2 3 4 5 F E D C B A F E D C B DESCRIPTION REV. A 6 SHEET NUMBER SHEET TITLE SPRING 2023
30
31 4 5 3 6 1 2 2 1 3 SPRING 2023 4 ARC 402-2023 5 F 25.381543, 55.409652 E Professor Igor Peraza ARC 402 COMPREHENSIVE STUDIO Spring 2023 American University of Sharjah Department of Architecture College of Architecture, Art &Design D SHARJAH CENTER FOR FILM AND MEDIA, AL GHAFEYA, SHARJAH, UAE C NOT FOR CONSTRUCTION, FOR DESIGN PURPOSE ONLY B OBSIDIA SHARJAH, UAE AHMED AMMAR | SUNA CHOI TEAM INFORMATION A F TEAM INFORMATION E ISSUE D PROJECT INFORMATION C SHEET TITLE B SHEET NUMBER REV. DESCRIPTION DATE 01 100% ISSUE FOR S.D. A 6 22/FEB/2022 02 22/MAR/2022 50% ISSUE FOR D.D. THIS DRAWING IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. IF USED FOR CONSTRUCTION, THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR LOCAL CODE COMPLIANCE. ALL DRAWINGS, PLANS, SKETCHES ETC. ARE PROVIDED TO CLIENTS BASED UPON INFORMATION PROVIDED BY THE CLIENT AND DRAWN IN ACCORDANCE WITH COMMON BUILDING PRACTICES AND LOCAL CODES. NONE OF THE EMPLOYEES OF THE DESIGN STUDIO ARE REGISTERED ARCHITECTS, ENGINEERS OR LAND SURVEYORS. ALL DIMENSIONS AND SPECIFICATIONS SHOULD BE VERIFIED BY CLIENT AND OR CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS. IF DIMENSIONS AND SPECIFICATIONS ARE NOT VERIFIED BY CLIENT AND/OR CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS THE DESIGN STUDIO WILL BE HELD HARMLESS AND ASSUMES NO LIABILITY FOR CHANGES AND/OR REVISIONS MADE TO PLANS BY CLIENT AND/OR CONTRACTOR. A401 STAIR DETAIL 4300 1:10 D5 125 2650 65 900 2550 315 300 300 300 300 300 300 300 300 300 6615 3300 315 615 315 900 615 900 315 615 315 900 615 315 900 615 315 900 615 315 1900 65 1800 3150 3150 3100 4800 4800 2550 315 1650 300 1200 3150 2400 300 65 315 300 65 150 120 615 315 45 900 300 450 45 615 75 3100 8950 6600 300 1200 65 65 35 MAIN STAIR PLAN MAIN STAIR ELEVATION MAIN STAIR ELEVATION MAIN STAIR SECTION MAIN STAIR SECTION MAIN STAIR DETAIL 1 MAIN STAIR DETAIL 2 A1 C1 E1 D3 C3 A3 1:50 1:50 1:50 1:50 1:50 1:10 01 02 03 04 05 06 07 08 09 12 13 15 16 18 19 21 20 17 14 11 10 09 08 07 06 05 04 03 02 01 32 31 30 29 28 27 26 25 24 23 22 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 +4.5m 3.3m 0.0m D5 C5 C5 C3
32 LIGHT CINEMA MEP E1 A1 HVAC AXO E4 DARK CINEMA MEP 01 F 5 22/FEB/2023 4 02 3 DATE 2 DESCRIPTION 1 6 REV. 5 SHEET NUMBER 4 SHEET TITLE 3 PROJECT INFORMATION 2 ISSUE 1 TEAM INFORMATION TEAM INFORMATION 50% ISSUE FOR D.D. 22/MAR/2023 03 100% ISSUE FOR D.D. 10/MAY/2023 6 A B C D E F A B C D AHMED AMMAR | SUNA CHOI OBSIDIA SHARJAH, UAE E NOT FOR CONSTRUCTION, FOR DESIGN PURPOSE ONLY SHARJAH CENTER FOR FILM AND MEDIA, AL GHAFEYA, SHARJAH, UAE Professor Igor Peraza ARC 402 COMPREHENSIVE STUDIO Spring 2023 American University of Sharjah Department of Architecture College of Architecture, Art &Design 25.381543, 55.409652 ARC 402-2023 SPRING 2023 100% ISSUE FOR S.D. THIS DRAWING IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. IF USED FOR CONSTRUCTION, THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR LOCAL CODE COMPLIANCE. ALL DRAWINGS, PLANS, SKETCHES ETC. ARE PROVIDED TO CLIENTS BASED UPON INFORMATION PROVIDED BY THE CLIENT AND DRAWN IN ACCORDANCE WITH COMMON BUILDING PRACTICES AND LOCAL CODES. NONE OF THE EMPLOYEES OF THE DESIGN STUDIO ARE REGISTERED ARCHITECTS, ENGINEERS OR LAND SURVEYORS. ALL DIMENSIONS AND SPECIFICATIONS SHOULD BE VERIFIED BY CLIENT AND OR CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS. IF DIMENSIONS AND SPECIFICATIONS ARE NOT VERIFIED BY CLIENT AND/OR CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS THE DESIGN STUDIO WILL BE HELD HARMLESS AND ASSUMES NO LIABILITY FOR CHANGES AND/OR REVISIONS MADE TO PLANS BY CLIENT AND/OR CONTRACTOR. MEP HVAC A601 KEY SUPPLY DUCT RETURN GRILL SUPPLY AIR RETURN AIR MAIN SUPPLY
33 DETAIL 03 D5 B5 1:10 DETAIL 02 F5 CINEMA WALL SECTION 1:35 F3 +0.0 +4.5 +8.85 +11.525 +12.725 +13.7 +14.05 1:10 DETAIL 01 1:10 PARAPET CAP CONCRETE COPING WHITE GRAVEL EPDM RUBBER RIGID INSULATION STEEL FRAMING REBAR CORRUGATED CONCRETE STRUCTURAL I-BEAM TRUSS SYSTEM STEEL FRAMING INTERIOR ACOUSTIC BARRIER SYSTEM STRUCTURAL I-BEAM FELT COVER WOOD BOARD ACOUSTIC BARRIER FRAMING RIGID INSULATION METAL FACADE SYSTEM METAL FACADE SYSTEM BASE PLATE FELT COVER DECKING TRUNKING CAVITY FOR MEP EPDM RUBBER RIGID INSULATION CONCRETE SLAB ON GRADE REBAR GROUND INSULATION GRAVEL 4 INCH DRAINAGE PIPE EARTH KEY PLAN 750 575 900 400 400 14050 4100 3950 3875 6 TEAM INFORMATION TEAM INFORMATION ISSUE PROJECT INFORMATION SHEET TITLE SHEET NUMBER REV. DESCRIPTION DATE 01 100% ISSUE FOR S.D. 22/FEB/2022 02 50% ISSUE FOR D.D. 22/MAR/2022 B C D E F A B C D E F 5 4 3 2 1 6 5 4 3 2 1 A SPRING 2023 ARC 402-2023 25.381543, 55.409652 Professor Igor Peraza ARC 402 COMPREHENSIVE STUDIO Spring 2023 American University of Sharjah Department of Architecture College of Architecture, Art &Design SHARJAH CENTER FOR FILM AND MEDIA, AL GHAFEYA, SHARJAH, UAE NOT FOR CONSTRUCTION, FOR DESIGN PURPOSE ONLY OBSIDIA SHARJAH, UAE AHMED AMMAR | SUNA CHOI 4500 350 975 1200 2675 4350 D5 A450 B5 A450 F5 A450 03 100% ISSUE FOR D.D. 03/MAY/2022
34 22/MAR/2022 22/FEB/2022 1 2 3 DATE 4 5 AHMED AMMAR | SUNA CHOI SHARJAH, UAE NOT FOR CONSTRUCTION, FOR DESIGN PURPOSE ONLY SHARJAH CENTER FOR FILM AND MEDIA, AL GHAFEYA, SHARJAH, UAE Professor Igor Peraza COMPREHENSIVE STUDIO American University of Sharjah Department of Architecture College of Architecture, Art &Design 25.381543, 55.409652 6 ARC 402-2023 THIS DRAWING IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. IF USED FOR CONSTRUCTION, THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR LOCAL CODE COMPLIANCE. ALL DRAWINGS, PLANS, SKETCHES ETC. ARE PROVIDED TO CLIENTS BASED UPON INFORMATION PROVIDED BY THE CLIENT AND DRAWN IN ACCORDANCE WITH COMMON BUILDING PRACTICES AND LOCAL CODES. NONE OF THE EMPLOYEES OF THE DESIGN STUDIO ARE REGISTERED ARCHITECTS, ENGINEERS OR LAND SURVEYORS. ALL DIMENSIONS AND SPECIFICATIONS SHOULD BE VERIFIED BY CLIENT AND OR CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS. IF DIMENSIONS AND SPECIFICATIONS ARE NOT VERIFIED BY CLIENT AND/OR CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS THE DESIGN STUDIO WILL BE HELD HARMLESS AND ASSUMES NO LIABILITY FOR CHANGES AND/OR REVISIONS MADE TO PLANS BY CLIENT AND/OR CONTRACTOR.
ΔΚΛΑ

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Ahmed Ammar Portfolio by AKAADES - Issuu