AFS Wall to Wall November 2016

Page 1

WalltoWall ADELAIDE CANBERRA BRISBANE MELBOURNE SYDNEY

N OV E M B E R 2 0 1 6

MORE THAN

45,000

2 m

A F S LO G I C WA L L® + R E D I WA L L® I N S TA L L E D T H I S I S S U E


8+2

39

5,001m2

HEIGHT

UNITS

INSTALLED

AFS AFS AFS AFS

2

NSW

LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L®

1 6 2 M M PA RT Y WA L LS 1 6 2 M M E X T E R N A L WA L LS 1 6 2 M M C O R R I D O R WA L LS 2 0 0 M M LIFT & STAIR CORE

9–11 Arncliffe Street, Wolli Creek


3


PVC PERMANENT FORMWORK

4+1

33

LOGICWALL®

HEIGHT

UNITS

REDIWALL®

AFS AFS AFS AFS

LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L®

3,175m2 457 m2

1 5 0 M M EXTERNAL WALLS 1 5 0 M M P L A N T E R WA L LS 1 6 2 M M PA RT Y WA L LS 2 0 0 M M L I F T & STA I R C O R E

AFS REDIWALL® 200MM BASEMENT RETAINING WALLS

4

NSW

143–159 Botany Road, Waterloo


REDUCED CRANAGE Lightweight panels avoid costly tower cranage

RAPID INSTALLATION 3 men can install 100m2 in just one day

LESS WALL, MORE FLOORSPACE Increase floor area for each unit by up to 10%

5


9+2

56

5,674m2

HEIGHT

UNITS

INSTALLED

A F S LO G I C WA L L® 1 5 0 M M E X T E R N A L WA L LS A F S LO G I C WA L L® 1 6 2 M M LIFT & STAIR CORE

6

QLD

Sky Gardens, 1–5 Cremin Street, Upper Mount Gravatt


‘‘

Fast floor cycle…consistent quality

The builder requested we investigate the feasibility of changing to AFS LOGICWALL® in lieu of blockwork walls to increase living space inside units and speed up construction time. The installation speed was quick, there was a good level of consistency through floor rises and the desired outcome for the client was achieved.” CHRIS BEALE, STRUCTURAL ENGINEER, INERTIA ENGINEERING

Bloomer has now utilised the AFS LOGICWALL® system across 6 projects and about to embark on our next. The AFS LOGICWALL® system was chosen on this project due to the load bearing structural capacity along with the speed and cleanliness on site. The AFS LOGICWALL® systems are a full shop drawn system which dramatically reduced waste on site. With the accelerated floor cycles we stayed well ahead of our project program and in turn handed over to our extremely satisfied client 2 months ahead of schedule. AFS LOGICWALL® and the team offered us the complete package and we will enjoy working with them across all our live projects and well into the future. TY DALGARNO, PROJECT MANAGER, BLOOMER CONSTRUCTION (QLD) PTY LTD

With the accelerated floor cycles we stayed well ahead of our project program

’’


6+2

108

1,467m2

HEIGHT

UNITS

INSTALLED

A F S LO G I C WA L L® 2 0 0 M M I N T E R N A L WA L LS A F S LO G I C WA L L® 2 6 2 M M I N T E R N A L WA L LS A F S LO G I C WA L L® 2 6 2 M M L I F T & STA I R C O R E

8

VIC

Solstice Apartments, 132–144 Camberwell Road, Hawthorn East


LESS TOOLS & MATERIALS

REDUCED CRANAGE

AVOID EXTRA EXPENSE

Reduced transportation time and costs

Lightweight panels avoid costly tower cranage

Hardwearing substrate ready for skim coat, render or painting

9


PVC PERMANENT FORMWORK

5

24

LOGICWALL®

HEIGHT

UNITS

REDIWALL®

2,179m2 250 m2

A F S LO G I C WA L L® 1 5 0 M M EXTERNAL WALLS A F S LO G I C WA L L® 1 6 2 M M PA RT Y WA L LS A F S LO G I C WA L L® 2 0 0 M M L I F T & STA I R C O R E AFS REDIWALL® 200MM BASEMENT RETAINING WALLS

10 12

QLD

20–22 Primrose Street, Sherwood


‘‘

Shop drawn…delivered to site

AFS LOGICWALL® and REDIWALL® Systems were chosen to replace all blockwork from ground floor walls through to rooftop. Not only were we chasing a tight program on this project, AFS LOGICWALL® and REDIWALL® Systems were shop drawn system and delivered to site in packs allocated for all areas across the slab. The whole floor arrived on two semis which provided us with significant reductions in crane time. In addition to this, the system had very little waste when compared to a wet trade material like block work. We had a very enjoyable experience on our first project so much so that our director here at Bulkbuild Digen has now had AFS fully designed into his very own development and we will be using it across our other key client projects ongoing. GREG CUFF, PROJECT MANAGER, BULKBUILD PTY LTD

’’

The whole floor arrived on two semis which provided us significant reductions in crane time


PVC PERMANENT FORMWORK

4

77

LOGICWALL®

HEIGHT

UNITS

REDIWALL®

AFS AFS AFS AFS AFS AFS AFS AFS AFS

LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L®

2,447m2 81 m2

1 2 0 M M INT/EXT WALLS 1 2 0 M M BLADE WALLS 1 2 0 M M CORRIDOR WALLS 1 2 0 M M PARTY WALLS 1 6 2 M M INT/EXT WALLS 1 6 2 M M BLADE WALLS 1 6 2 M M CORRIDOR WALLS 1 6 2 M M LIFT & STAIR CORE 2 0 0 M M LIFT & STAIR CORE

A F S R E D I WA L L® 2 0 0 M M I N T E R N A L WA L LS

12

NSW

BUPA Aged Care, 142 Carrington Road, Queens Park


‘‘

Simple, cost effective wall design

Using LOGICWALL® and REDIWALL® allowed for a simple cost effective load bearing wall design, saving the client’s time and money. MICHAEL GROGAN, DIRECTOR, BIRZULIS ASSOCIATES

13

’’


5+2

31

3,508m2

HEIGHT

UNITS

INSTALLED

AFS AFS AFS AFS

14

LO G I C WA L L速 LO G I C WA L L速 LO G I C WA L L速 LO G I C WA L L速

150MM 162MM 162MM 162MM

C O R R I D O R WA L LS E X T E R N A L WA L LS PA RT Y WA L LS L I F T & STA I R C O R E

NSW

147 Parramatta Road, Granville


REDUCED CRANAGE

ACCURACY CUTS WASTE

AVOID EXTRA EXPENSE

Lightweight panels avoid costly tower cranage

Made to measure panels avoids waste and disposal costs

Hardwearing substrate ready for skim coat, render or painting

15


16

NSW

Alpha & Omega, 43–47 Greek Street, Glebe


PVC PERMANENT FORMWORK

5+1

23

LOGICWALL®

HEIGHT

UNITS

REDIWALL®

AFS AFS AFS AFS AFS AFS AFS AFS AFS AFS AFS AFS AFS AFS AFS

LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L®

4,630m2 643 m2

1 2 0 M M INT/EXT WALLS 1 2 0 M M PA R A P E T WA L LS 1 2 0 M M L I F T & STA I R C O R E 1 5 0 M M E X T E R N A L WA L LS 1 5 0 M M PA R A P E T WA L LS 1 6 2 M M B L A D E WA L LS 1 6 2 M M C O R R I D O R WA L LS 1 6 2 M M PA RT Y WA L LS 1 6 2 M M B A LU ST R A D E WA L LS 1 6 2 M M E X T E R N A L WA L LS 1 6 2 M M L I F T & STA I R C O R E 2 0 0 M M E X T E R N A L WA L LS 2 0 0 M M B L A D E WA L LS 2 0 0 M M PA RT Y WA L LS 2 0 0 M M B A LU ST R A D E WA L LS

AFS REDIWALL® 200MM BASEMENT RETAINING WALLS

17


4

144

4,855m2

HEIGHT

UNITS

INSTALLED

A F S LO G I C WA L L® 1 2 0 M M PA RT Y WA L LS A F S LO G I C WA L L® 1 2 0 M M E X T E R N A L WA L LS A F S LO G I C WA L L® 2 0 0 M M L I F T & STA I R C O R E

18

NSW

BUPA Aged Care, 2 Alfred Street, Clemton Park


19

RAPID INSTALLATION

AS3600 AND MORE

SOLID CONCRETE

3 men can install 100m2 in just one day

Acoustic and fire ratings exceed BCA demands

Corefilled to satisfy structural, security and quality demands


‘‘

An unbreakable bond

AFS LOGICWALL® have created an unbreakable bond with Henley Constructions and have provided the building industry with an alternative, more efficient way of constructing walls. The teamwork and professionalism demonstrated by AFS LOGICWALL® during the construction of ‘Camperdown 2050’, a modern 21 unit block, designed by Architects Becerra and proudly built by Henley Constructions, had set a standard that will be hard to match. We highly recommend AFS LOGICWALL® for your next project and assure you that they’ll be doing ours.

’’

PATRICK SARKIS, PROJECT MANAGER, HENLEY CONSTRUCTIONS PTY LTD

NSW

20

Camperdown 2050, 69–71 Parramatta Road, Camperdown


6

21

3,131m2

HEIGHT

UNITS

INSTALLED

A F S LO G I C WA L L® 1 5 0 M M E X T E R N A L WA L LS A F S LO G I C WA L L® 1 6 2 M M PA RT Y WA L LS A F S LO G I C WA L L® 2 0 0 M M L I F T & STA I R C O R E

NSW

Camperdown HQ, 72–76 Parramatta Road, Camperdown


5

16

1,552m2

HEIGHT

UNITS

INSTALLED

A F S LO G I C WA L L® 1 6 2 M M PA RT Y WA L LS A F S LO G I C WA L L® 2 0 0 M M E X T E R N A L WA L LS A F S LO G I C WA L L® 2 0 0 M M L I F T & STA I R C O R E

NSW

22

82–89 Gould Street, Bondi Beach


‘‘

The solution for tight situations

Using AFS LOGICWALL® on this project helped greatly in terms of buildability as it was a very tight the site. We were building to the boundary on all 4 sides—hard up against buildings on two sides and two very narrow street frontages on the others. We needed a system that was easy to handle on a site where there was very little room to move. Also the AFS wall thicknesses gave us a little more net internal area than more conventional brick construction which was originally proposed. ALEX SMITH, DIRECTOR, CSA ARCHITECTS PTY LTD

’’

We needed a system that was easy to handle


TIGHT SITES Easier materials handling on even the most difficult sites

PVC PERMANENT FORMWORK

5 + 2 25 HEIGHT

AFS AFS AFS AFS

UNITS

LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L®

LOGICWALL® REDIWALL®

3,212m2 63 m2

1 5 0 M M EXTERNAL WALLS 1 5 0 M M CORRIDOR WALLS 1 6 2 M M PARTY WALLS 2 0 0 M M LIFT & STAIR CORE

A F S R E D I WA L L® 2 0 0 M M B A S E M E N T WA L LS

AVOID EXTRA EXPENSE Hardwearing substrate ready for skim coat, render or painting

LESS WALL, MORE FLOORSPACE Increase floor area for each unit by up to 10%

NSW

24

Lords Manor 50, 48–50 Lords Avenue, Asquith


25


Certified resistant to fire and water Ideal for basements, columns, party walls, retention tanks, foundation and retaining walls, service and stormwater pits, stair and lift walls.

26


AFS can help you design and build your next project, contact us at: PVC PERMANENT FORMWORK

1300 727 237 or visit: afswall.com.au

3 men + 1 day = 100m

This information is copyright protected and may not be copied, rebroadcast or redistributed in any way, in whole or in part without the written permission of AFS Systems Pty Ltd. This newsletter is copyright© of AFS Systems Pty Ltd ABN 455 760 727 88.

A three-man team can erect one hundred square metres of LOGICWALL® in just one day

Document No: COR 00011 NOV16

2


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.