

The adoption of BIM services extends beyond planning and design phase of a project, extending throughout the building life cycle, supporting processes, including cost management, construction management, project management and facility operation.
Bimologie has a team of BIM professionals who have executed various projects in residential, commercial, institutional, hospitality spaces in various trades (architecture, structure, civil, mechanical, electrical) and has developed a reputation for being an excellent service provider with a team of well trained and experienced staff.
The BIM team mission at our office is to assist organizations in maximizing the value throughout the entire building lifecycle, from design phase to construction stage to operation management. We provide services namely BIM standard and documentation establishment, professional BIM training, construction BIM specifications establishment, project BIM model authoring, design rendering and animation production, interior design visualization, digital mock-up and virtual reality, spatial coordination and clash analysis, BIM based quantity take-off and cash flow simulations, drawings production, 4D construction sequence simulations, construction method statement simulations, asbuilt BIM models, BIM based digital asset registration, and software customization.
Our goal is to provide imaginative construction solutions within the economic and developmental constraints of all clients with the innovative use of today’s most advanced technologies.
The firm believes that all projects benefit from an integrated process involving client, architects, engineers, builder and other specialists in an informative collaboration and those successful projects are made possible through the management of all participants involved. We strongly encourage this collaboration and act as a guide through a process of design and construction so that each project benefits from the participation and strengths of each team member.
Via the central building model (BIM coordination model), the BIM working method permits the crossdisciplinary planning, construction, and operation of buildings.
With BIM software, all relevant information is merged and then analysed. Inconsistencies and errors are identified immediately and can be eliminated in the planning phase. This increases planning quality, which pays off in the building process and in the operational phase.
We strongly encourage the “3D to 2D” to become our new way in Malaysia construction industries. Our team has gone through several projects and have learned that BIM or 3D modelling, technology is enabling the construction industry to achieve more in lesser time with reduced cost. 3D modelling is changing the presentation world of architectural designs. 3D modelling is enabling architects and designers to be more creative and experimental.
With technologies like reality modelling getting intrinsically weaved into the construction lifecycle, the construction process no longer involves rolling out blueprints of building designs. Construction has largely gone digital. Architectural presentations have moved from draft tables to desktops and tablets.
Each of our team member possesses a great understanding in BIM workflow. We have the capability in preparing a BIM workflow to suit with the project’s requirement or client’s EIR (Exchange Information requirement).
We provide a BIM Protocol for a specific project or for the client’s general protocols. This protocol shall become a guideline in preparing a project’s BIM Execution Plan (BEP).
Our team have a vast experience in JKR BIM projects and JKR BIM requirements from the JKR BIM Guideline to the JKR specific Naming Convention to suit with JKR’s MySPATA (Sistem Pengurusan Aset Tak Alih) requirements.
We provide a 3D modelling services, by working closely with consultants. The 3D modelling services have been crucial to the BIM projects as this will become a base model and a single data resource for the entire BIM workflow Our BIM Modelling team have the capability in producing the models by taking into consideration of the specifications and requirements as below:
• Specific model elements including specific dimensions and features.
• Specific model data.
• Models’ family with parameters.
• Model naming conventions proposal.
• Data management at every stage and milestone.
• Model management to suit with project’s deliverable milestone.
• Model management to suit with project’s construction sequence.
• Model management to suit the BIM Clash analysis sequence.
Our team have a vast experience in producing the 2D deliverables in most of the local authority submissions as well as JKR 2D standards requirement.
One of the benefits of BIM is the possibility to extract 2D documentation from the 3D BIM model. Cutting through sections of the building in the 3D model to reveal required information that can be used as part of the 2D documentation either for planning permission or for construction work has proven useful across the industry. Some major benefits are:
• 2D cross-sections, elevations and floor plans can be extracted directly from the BIM model eliminating rework in CAD software
• Changes made on the 3D model will be automatically applied in every extracted 2D drawings ensuring consistency in the project as a whole.
However, whilst the benefits mentioned above have been appraised, the process of producing meaningful 2D documentation from the 3D model may be time-consuming if not thought through before and during the modelling process. Depending on the complexity of the project, it may require some significant manipulation in the 3D model in order to achieve the desired results.
The time spent on producing 2D documentation from the BIM model also depends on the phase of the project and the suitability of the information. Inevitably, the time increases as the project progresses towards construction. The time spent on manipulation also distinguishes between a good and a bad 3D model
Currently, 2D documentation is still required throughout the built processes. Government and local authority also require the projects’ deliverables have to be in 2D format.
Clash detection helps in effective identification, inspection and reporting of interferences in a project model. It is used for checking completed/ongoing work and reduces the risk of human error during model inspections. Clash detection is necessary because several models (structural, MEP, etc) are integrated into one main BIM model. With clash detection, mistakes which normally would have been discovered on the site (with high cost and schedule implications when corrected at that stage) can now be seen in the office even before anyone sets foot on the site. BIM even makes clash detection possible for objects within objects (a steel rod completely immersed inside a concrete wall). There are 3 main types of clashes that clash detection seeks out:
• Hard Clash: when two objects pass through each other. Most BIM modelling software eliminate the likelihood for this using clash detection rules based on embedded object data (like the image above).
• Soft Clash: work to detect clashes which occur when objects encroach into geometric tolerances for other objects (for example, a building being modelled too close to a hightension wire).
• 4D/Workflow Clash: clash resolves scheduling clashes and abnormalities as well as delivery clashes (for example, work crews arriving when there is no equipment on site).
The project timeline simulation is the most recognizable and common 4D service, it is also the primary way 4D “fiction” is spread. To date, we have seen limited examples of overall project simulation as a planning tool or as something the actual schedule could be measured against. Real value can be driven from this type of visualization if you consider the other types of 4D we have listed above (site logistics and equipment routing) in addition to adding geometry to visually track tasks or site readiness requirements that cannot be easily communicated in a 3D building model.
For this we apply model text that we call a key milestone indicator. These key milestone indicators can be colour coded by the construction planner to clarify responsible parties.
Sector : Healthcare
Location : Kota Samarahan, Sarawak, MY
Project Cost : RM 480 million / USD 110 million
Scope : BIM Full Scope to LOD 500
Status : Phase 1 LOD 300 Completed, Phase 2 LOD 300 On-Going
Our client, Perbena Emas is one of the biggest contractors in Sarawak and through this project, we are delivering the full A-Z BIM services including BIM Execution Plan Authoring, Digital and Information Modelling up to LOD 500, Common Data Collaboration, Clash Detections and Analysis, as well as 4D simulations. This project is expected to be completed in March 2025.
Sector : Healthcare
Location : Pulau Pinang, Malaysia
Project Cost : RM 104 million / USD 24 million
Scope : BIM LOD 350 (Construction Stage) & Coordination
Status : Completed LOD 350 Model & Coordination on-going
Our client, Builtech Project Management Sdn Bhd (BPM) is a company specializes in construction and project management and a prominent contractor based in Pulau Pinang, Malaysia We were hired to assist the contractor for this hospital project and were given the scope of BIM Modelling up to LOD 350 (Construction Stage) and BIM coordination. Within 6 months - we have completed the LOD 350 model based on the consultant drawings and shop drawings by NSC.
Sector : Healthcare
Location : Pulau Pinang, Malaysia
Project Cost : RM 110 million / USD 25 million
Scope : BIM LOD 350 (Construction Stage) & Coordination
Status : Completed LOD 350 Model & Coordination on-going
Again, our client, Builtech Project Management Sdn Bhd (BPM) have trusted us with another Hospital Project where our scope given were the same as the previous hospital i.e., to produce LOD 350 (Construction Stage) and conduct BIM coordination exercise. Currently we have completed the LOD 350 model based on the consultant drawings and shop drawings by NSC.
Sector : Commercial
Location : Batu Kawan, Pulau Pinang, MY
Project Cost : RM 86 million / USD 20 million
Scope : BIM LOD 400
Status : On going
Sector : Education (School)
Location : Kota Kinabalu, Sabah, MY
Project Cost : RM 80 million / USD 19 million
Scope : BIM Full Scope to LOD 500
Status : On going
Sector : Commercial
Location : Johor Bahru, MY
Project Cost : RM 40 million / USD 10 million
Scope : BIM Architecture Scope to LOD 300
Status : Completed LOD 300
Sector : Transportation
Location : Kuching, Sarawak, MY
Project Cost : RM 80 million / USD 19 million
Scope : BIM Architecture Scope to LOD 200
Status : Completed LOD 200
Sector : Education (School)
Location : Kangar, Perlis
Project Cost : RM 104 million / USD 23 million
Scope : BIM Coordination
Status : Completed LOD 300 – BIM Coordination
LOD 300 BLOK PENTADBIRAN & AKADEMIK BIM Coordination. Part of 8 other blocks that made up the school complex. BIM Coordination were done with consultants involved.
Sector : Education (School)
Location : Sepang, Selangor, MY
Project Cost : RM 97 million / USD 22 million
Scope : BIM Coordination
Status : Completed LOD 300 – BIM Coordination
LOD 300 BLOK AKADEMIK BIM Coordination. Part of 12 other blocks that made up the school complex. BIM Coordination were done with consultants involved.
Sector : Education (School)
Location : Belaga, Sabah, MY
Project Cost : RM 70 million / USD 22 million
Scope : Tender Stage BIM Modelling
Status : Completed LOD 300 Tender Stage
Sector : Healthcare
Location : Nilai, Negeri Sembilan, MY
Project Cost : RM 100 million / USD 24 million
Scope : BIM Architecture Modelling and 2D Documentations
Status : Completed LOD 300
This project is a collaboration between our team and the design team at Malaysian Public Works Department (JKR). We were engaged by JKR to work on this dental hospital following recommendations - and we have delivered outstanding Revit modelling and documentations work within a short time frame.
Sector : Commercial
Location : Generic Design for All McD Outlets
Project Cost : RM 1 million per Outlet / USD 240k per Outlet
Scope : MEP Modelling and Coordination
Status : Completed LOD 300
Sector : Education (School)
Location : Dungun, Terengganu, MY
Project Cost : RM 108 million / USD 26 million
Scope : BIM Tender Bidding
Status : Completed for Tender Stage
Clients often approach Bimologie with a general idea of what they need, and this project was no different. We were able to jump right in with our expertise and helped the tendering Contractor and their consultants to comply with BIM requirements during their tender submissions. We delivered the full BIM tender scope up to LOD 300 within one month.
At Bimologie, our team strive to provide outstanding services to our clients. On every project we undertake, our most important objective is to relate with them and understand their core necessities, needs and goals. Together, we will align our skillsets with clients' ideals to consistently delivering exceptional work and exceeds all expectations
Our professionals comprising of Architects & Engineers, Modelers, Drafters, 3D Multimedia Artists and Project Management Professionals across Architectural, Civil and Mechanical fields with national, international experience and have relentlessly striven for customer satisfaction and delight who are testimonies to our time, cost, and quality effective services since 2008.
BA (Hons) Architecture Liverpool John Moores University,UK Diploma of Architecture Universiti Teknologi Malaysia,MY
E: azizul@bimologie.com
Azizul has extensive experience in architecture, design, and BIM. He graduated from Liverpool John Moores University and has worked in Liverpool for a few years as an Architect before coming back to Malaysia to pursue his other ideals. Azizul quickly rose to become one the top BIM Managers in the industry and has worked on and delivered various BIM projects. His exceptional skills and vast experience have led him to establish Bimologie in 2021
BA (Hons) Architecture, University of Sheffield,UK Master of Architecture, University of Plymouth,UK
E: afif@bimologie.com
Afif obtained his bachelor’s degree from the University of Sheffield and master’s from the University of Plymouth. He subsequently joined a UK based architectural practice and worked for 3 years on hospitals, schools, and residential projects - all delivered at BIM Level 2. Afif then returned to Malaysia and joined an architecture firm as a Project Architect before partnering up with Azizul to form Bimologie.
Muhammad Siddiq Bin Mohd Hatta
Bachelor of Science (Architectural Studies) (Honours)
International Islamic University Malaysia
Siti Nurdiana Binti Jamil
B.Eng (Hons.) Civil Engineering
Universiti Malaysia Pahang, MY
Muhammad Zakwan Zainuddin
Diploma in Architecture Technology
Kolej Komuniti sabak Bernam
Mohammad Muaz Mohd Asri
Diploma in Civil Engineering (BIM) Kolej Kemahiran Tinggi MARA, MY
Certificate in Architecture, Institut Kemahiran MARA, MY
Nurul Saidah Binti Sulaiman
Diploma in Construction Technology (BIM)
Kolej Kemahiran Tinggi MARA, MY
Amirul Azim bin Adzman
Diploma in Architecture Technology
Kolej Komuniti Sabak Bernam, MY
Muhammad Farhan Harris Bin Tugiman
Diploma in Civil Engineering (BIM)
Kolej Kemahiran Tinggi Mara,MY
Akmal Bin Ahmad
Diploma in Civil Engineering (BIM)
Kolej Kemahiran Tinggi Mara,MY