What is The General Plan of a Private House For? After agreeing on legal issues when purchasing a building plot, it is necessary to develop and approve technical documentation. It is required to obtain a building permit. The basis of the documentation package is the general plan of a private house and a plot. After the preparation of these official papers in accordance with the existing rules for planning decisions and coordination with the supervisory authorities of the local government, an official building permit is issued. The information in this article will be useful for every potential developer. You will find out what is included in the package of technical documentation, as well as how and where to properly arrange it. The master plan of the designed cottage is a passport of the object indicating the exact location with reference to the terrain, roads, surrounding buildings, and existing communications. The design of the master plan for individual housing construction in urban and rural areas is recommended to be carried out in accordance with the norms and rules. The rules provide for sanitary and fire zones for the location of objects on the site or in relation to neighbouring buildings, linking to the general development of the surrounding territory. Without an approved New Construction Plans, it is impossible to obtain a building permit, register and admit the building into operation, and conclude an agreement for connecting to communications. You cannot perform legal actions, including registering residents or selling a house. The collection of technical documentation for the facility under construction and its approval is a costly but necessary step before the start of construction and installation operations. Land Master Plan The design of the general plan of the site, as part of the technical documentation for the construction of the facility, is based on the data of geological and topographic surveys. In the breakdown of the territory defined for the cottage or individual housing construction, a cadastral number is assigned to each plot. This number determines the position of the site on the territory, its border. Situational plan Its drawing is recommended to be done on a scale of 1: 500. Situational plan - a map that includes territories adjacent to the site being prepared for development. The map indicates the location of the projected general layout of the site, adjacent roads, and district buildings. Reference plan Its drawing is performed on a scale of 1:200. The basic plan schematically depicts roads, neighbouring buildings, parks, recreational areas, landscaping, and existing communication networks are applied. The master plan of a building plot with a house The New Home Construction Plandrawing is the main one when drawing up a technical project for construction. It is attached to the application when drawing up a design assignment. It is carried out on a scale of 1:50 or 1:100, depending on the required detailing of the location of buildings and other objects on the site. The general plan indicates the location of the site and its size, development boundaries, the location of capital structures and auxiliary facilities for water supply, sewage according to the requirements. How much the design work costs?