ARCHITECTURE DESIGN PORTFOLIO |ADITYA BHAVE|SELECTED WORKS-2019-2022

Page 1

ADITYA .M. BHAVE

Vivekanand Education Society's College of Architecture (VESCOA)

R T F O L

P O
I O
SELECTED WORKS| 2019-2022

PERSONAL DETAILS : Address

Vidyalaya ,Hanumuan Cross Road 2

Vile Parle [E],Mumbai - 400057 Maharashtra

Nationality : Indian

Date Of Birth : 12.10.2001

Contact Number : +91 8369783638

email id - aditya.bhave@ves.ac.in

Instagram : @wandering_der_vish

Languages: English ,Marathi ,Hindi

ADITYA.M.BHAVE

“I am a undergraduate architecture student currently studying in 4th year at V.E.S College of Architecture , seeking a position as an Architectural Intern in a rm that provides an engaging and challenging work environment. I have developed my interests and abilities in various architectural dimensions throughout my journey. “

EDUCATIONAL QUALIFICATION :

UNIVERSITY - Vivekanand Education (2019-2024) Society's College of Architecture (VESCOA) ,Chembur

JUNIOR COLLEGE - V.P.M’s B. N. Bandodkar (2017-2019) College of Science,Thane (W)

SCHOOL - A.K. Joshi High School,Thane(W)

Multitasking | Communication |Decision making Time management | Team work

2020 Best Design (sem 3)

2021 2nd Rank (sem 5)

ACHIEVEMENTS : ELECTIVES :

Autocad 2d |Corel draw | Sketchup

Adobe Photoshop |Archicad (basic)|EDGE Software

Revit (basic)| rhinoceros |Light Room|M.S Ofce

Rendering: Enscape |twinmotion| lumion (basic)

SOFT SKILLS : Technical Skills : Manual|Machine Skills :

Hand drafting | Sketching | Laser cutting |Model Making

Green campus| 21st ICHH conference Mastering Kitchen Design|EDS - Climate Responsive Architecture| EDGE |QGIS| Urban design- livability index| Mahila Baug Jhalra and Precient (sem 2)

DOCUMENTATION :

Sketching|Painting|Graphic Design| Wildlife Photography|Travelling|Food 3D Modelling|Criicket|

Talent,Skills and Hobbies: PARTICIPATION :

2019 | COVID-19 Makeshift Quarantine Centre

2021 |ANDC TROPHY (Labour camp Design)

CONTENTS 01 02 03 04 05 06 07 08 09 10 11 CITY LIBRARY DESIGN | SEM 6 SCHOOL DESIGN | SEM 5 ATELIER|VILLA| SEM 3 COMMUNITY CENTRE| SEM 4 RETHINKING LIVES OF ARTISANS| ANDC TROPHY 2021 PYAU AT JODHPUR| A PLACE FOR SOCIAL EXCHANGE |SEM 2 URBAN DESIGN| |LIVABILITY INDEX SEM 6 EXHIBIT POD FOR PHOTOGRAPHER|ALLIED DESIGN |SEM 3 FURNITURE DESIGN|SEM 4 WORKING DRAWINGS|SEM 6 |PHOTOGRAPHY|SKETCHING 12 DIGITAL RENDERING|PHYSICAL MODEL
01) CITY LIBRARY DESIGN| KHARGHAR |SEM 6

MASSING

MASSING ON SITE WITH OFFSETS WITHIN GRID GEOMETRY

CENTRAL CIRCULATION WITH COURTYARD AND SETTING SPACES INTO AREA PROGRAM

SPINWHEEL FORM WITH SLEEK GEOMETRY CREATING TRANSITION OF EACH SPACE OPENING INTO LANDSCAPE

MASSING DIAGRAMS

CIRCULATION

ALL READING AND SHELVING AREA WITH NORTH

ATRIUM AND SKYLIGHT BRINGING IN DAYLIGHT

ROOF TO PREVENT HEATING OF ROOF

BASIC FORM IN PLAN HAVING SPINWHEEL GEOMETRY

TERRACES GIVING PANORAMIC VIEWS TOWARDS CITY

DEVELOPEMENT

CREATION OF

DOUBLE HEIGHT SPACES MAINTAINING THE LINEARITY AND SLEEKNESS

DEVELOPMENT OF ACTIVITY PROGRAM W.R.T FORM

VERTICAL
OF CONNECTION THROUGH PLAZA AROUND BUILDING
MODELS EXPLORING THE FORM
VOIDS
NAME :ADITYABHAVE
ORIENTATION
GREEN
FIRST FLOOR GROUND FLOOR SECOND FLOOR N ES W VERTICAL CIRCULATION VERTICAL CIRCULATION SERVICE BLOCK READING AND SHELVING PEDESTRAIN ENTRANCE 1 2 3 4 SUNKEN AUDITORIUM READING AND SHELVING OPEN TERRACES GIVING OPPORTUNITY FOR VIEWS BASEMENT PARKING PLAZA AREA WITH ACTIVITY SPACES AROUND LIBRARY INTERACTIVE SPACE AT ENTRANCE PERGOLA SHADING ENTRANCE WITH SEMI OPEN LANDSCAPE DOUBLE HEIGHT ATRIUM PROVIDING STACK VENTILATION GREEN ROOF COOLING THE SLAB SYSTEM SOLAR PANELS USABLE GREEN ROOF WITH TURF CITY LIBRARY |KHARGHAR |SEM6 PROCESS|FORM EVOLUTION

NORTH

EVAPORATIVE COOLING CAN BE DONE THROUGH WALL POROUS MATERIAL INSIDE THE WALL FILLED WITH WATER SUPPLY FROM STORED RAINWATER WALLS FACING SOUTH AND SOME ON WEST CAN BE USED

WALLS WITH INBUILD SHELVING AREA ROTATED AT AN ANGLE TO BRING IN NORTH LIGHT AND BLOCK THE HARSH RADITAION ON SOUTH AND WEST

SOUTH

CAVITY WALLS

USE OF GREEN ROOF SINCE FLAT ROOF IS MAXIUMUM PART EXPOSED TO SUNLIGHT ,GREEN ROOF HELPS IN ABSORBING GRASS LAYER AND KEEPING COOL INDOORS

PLANTING TREE ON SOUTH SIDE AND WEST SIDE TO KEEP IT SHADED FROM SUMMER SUN MAXIUMUM SHELVING AREA ON SOUTH AND SOUTH WEST AND CENTRAL READING SPACE LIT BY SKYLIGHT

PLAN IS ORIENTED WITH RESPECT TO NORTH AND ROTATED AT AN ANGLE OF 45 DEGREE

SINCE MAXIMUM

CONCEPT|PASSIVE STRATEGIES NAME :ADITYABHAVE YEAR : 3RD SEM: 6 ROLLNO:AR19005 CITYLIBRARYDESIGN KHARGHAR
CENTRAL COURTYARD HELPING IN STACK VENTILATION
LIGHT FALLING AT CERTAIN ANGLE INTO LIBRARY SPACE IN MORNING
WALLS TO BE
TO PREVENT FROM HEAT AND RADIATION COURTYARD GIVING OPPORTUNITIES FOR INTERACTION ALL SPACES CONNECTING A LANDSCAPE AREA CONCEPT VIEW REPRESENTING SUNKEN AUDITORIUM ROOF OF AUDITORIUM USED AS SITTING AREA AND LANDSCAPE SPACE SOLAR PANELS CAN BE USED
ROOF AREA EXPOSED N ATTEMPT TO MAINTAIN OPENESS THROUGH USE OF GLAZINGS GIVING SENSE OF TRANSPERENCY VISUAL CONNECT BETWEEN INDOOR AND OUTDOOR MINIMALIST AND REPETATION ON FACADE CONCEPTAND PASSIVE STRATEGIES RCC SLAB ISOLATED LAYER GRASS LAYER CITY LIBRARY |KHARGHAR |SEM6

230 MM BRICK WALL

GREEN ROOF

12 MM FROSTED GLASS GLAZING WITH ALUMINIUM LOUVERS

SPACE FRAME GLASS WITH STEEL SECTIONS

SKYLIGHT

ONE WAY RIBBED SLAB

WAFFLE SLAB AT LARGE SPANS

BEAM NETWORK ALUMINIUM FRAME LOUVERS

150 MM RCC SLAB

600 X600 MM COLOUMN

RCC 300 MM

SHEAR WALL

BASEMENT WITH RAFT FOUNDATION

GREEN ROOF

230 MM PARAPET WALL

CONCRETE COPING 12 MM EXTERNAL PLASTER

500 MM VENTILATOR

GLAZINGS

WAFFLE SLAB

150 MM RCC SLAB

(Exterior polished Venetian Plaster)

500 MM VENTILATOR 12 mm frosted glass with louvered opening 950x3500x200

SPRINKLER SYSTEM 25 MM DISTRIBUTION PIPE WET RISER SYSTEM IN CAFETERIA ALUMINIUM FINS 4000 X 600 MM

1000 m raised plinth for basement ventilation

900 MM SLAB DROP

12 mm frosted glass with louvered opening 950x3500x200 brickbat coba lling WAFFLE SLAB

UPSTAND BEAM RAFT FOUNDATION

BRICK BAT COBA FILLING

MM RAFT FOUNDATION BASE

MM GEO FABRIC LAYER WATERPROOFING

MM GEO FABRIC LAYER WATERPROOFING

150 MM PCC BED

25
20
EARTH
350
4000mm 4000mm 3280mm3750mm 2850mm
CITY LIBRARY |KHARGHAR |SEM6 EXPLODED VIEW|STRIP SECTION
CITY LIBRARY |KHARGHAR |SEM6 FLOOR PLANS A +0.45M ±0.9M ±0.0M ±0.0M +0.45M +0.45M ±0.0M ±0.0M ±0.0M ±0.0M +2.1M +0.15M+2.1M ±0.0M +1.05M +0.45M +0.45M +2.1M +2.1M ±0.0M OILETGENTS OILETLADIESPHYSICALL COUR READING SHELVING RESEARCH TIONS SHELACADEMIC VING PRIV READING ACES VIEWINGGALLER SEMIOPEN READING LIFT +5.05M SUNKEN SUNKEN +5.05M +5.05M +5.05M +5.05M +5.05M VIEWING +5.05MGALLERY READING AND SHELVING AREA RESEARCH STATIONS CIRCULATION SERVICES SEMI OPEN SPACE/TERRACE PASSIVE COOLING WALLS READING AND SHELVING AREA RESEARCH STATIONS CIRCULATION SERVICES PASSIVE COOLING WALLS ACADEMICSHELVING READINGAREAS RESEARCHLAB 9.2MSECONDFLOOR PLAN 1.85M ±0.9M ±0.0M +2.1M+2.1M +0.45M +0.45M ±0.0M ±0.0M ±0.0M ±0.0M +2.1M +0.15M+2.1M +1.05M +0.45M MIDLANDINGVL+2110mm SECTION AA’ SUNKEN AUDITORIUM READING AND SHELVING AREA SEMIOPEN SPACES [COURTYARD] CIRCULATION SERVICES ADMIN, COPY ROOM KIDS READING ZONE VERTICAL CIRCULATION CANTEEN AND KITCHEN SPACE SEGREGATION ±0.0Mshelvingreadingand area STKITCHENAND ORAGE CAFETERIA/CANTEEN COURTYARDKIDS SECTION ADMIN AREA/STAFF CABINCHAIRMEN ROOMCOPY +FFLOILETADMIN 0.9MVL-0.2MSUNKENSLAB GENTS OILETSUNKEN+FFL0.9M SLABVL-0.2M SUNKEN+FFL0.9M SLABVL-0.2MLADIESTOILET VL+FFL0.9M TER TION VL+0.9M MIDLANDINGVL+2110mm MIDLANDINGVL+2110mm VL+0.9M +0.9M MIDLANDINGVL+2110mm +0.9M basementtowards LVL±0.0M +0.9M +0.45M ±0.9M ±0.0M -0.15M +0.9M +0.9M +0.9M+0.9M +0.9M +0.9M ±0.0M +0.9M shelvingreadingand area+0.9M +0.9M ±0.0M +0.45M +0.45M ±0.0M ±0.0M ±0.0M ±0.0M +2.1M +0.15M+2.1M ±0.0M +1.05M +0.45M +0.45M +2.1M +2.1M ±0.0M T OW ARDS KHARGHAR ST A TION TOWARDSMETROSTATION EVENING SPOT STAGE AMPHITHEATRE OPEN PLAZA SITTINGAREA TOWARDS AUDITORIUM AUDITORIUM WAITINGAREA ACTIVITY SPACE SERVICE ENTRY LIBRARY ENTRANCE FOUNTAINAREA PEDISTRAIN ENTRY PEDISTRAIN ENTRY VEHICULAR ENTRY BASEMENT PARKING ENTRANCE BASEMENT EXIT SECOND FLOOR PLAN BASEMENT PLAN FIRST FLOOR PLAN GROUND FLOOR PLAN
VIEW
READINGAREA READINGAREA LIFTS ENTRANCE LIFTS BASEMENT 3500 2240 +2.24M FIRSTFLOOR +5.05M 2240 VL+6.39M GROUND FLOOR +0.9M BASEMENT -3.0 ±0.0 M +0.9M +5.05M +9.2M +13.35M +14.35M -3.0 M SECTION BB’ ±0.0 M +0.9 M +5.05 M +9.2 M +13.35M +15.35M 3500 4000 2000 4000 4000,04 1050 1335013850 3500 -0.3M 21 200010 2000 4450 5050 9500 +17.8M LIFTBEAM DRIVING SHEAVE 17800 4450 4690 2500 2040 8600 SECTIONAA’ ±0.9M +13.35M 1.85M ±0.9M ±0.0M +2.1M+2.1M +0.45M +0.45M ±0.0M ±0.0M ±0.0M ±0.0M +2.1M +0.15M+2.1M +1.05M +0.45M MIDLANDING A A’ B’ B KEYPLAN GENTS TOILET GENTS TOILET COURTYARD SEMIOPEN PASSAGE RESEARCH LAB READINGAREA SPACE FRAME GREEN ROOF SUNKEN SLAB SUNKEN SLAB BASEMENT PARKING BASEMENT PARKING WAFFLE SLAB SITTING SPACES OPEN PLAZA ENTRANCE PERGOLA EXPERIENCE OF SPACE INSIDE LIBRARY ATRIUM
FROM INTERNAL COURTYARD LANDSCAPE PLAZA CITY LIBRARY |KHARGHAR |SEM6 SECTIONS
CITY LIBRARY |KHARGHAR |SEM6 ELEVATIONS ±0.0 +0.9M +5.05M +9.2M +13.35M +14.35M +2.15M +3.15M 8050 2100 4000 D2 D4 D4 ±0.0 +0.9M +5.05M +9.2M +13.35M +14.35M +2.0M +3.15M ENTRANCE PERGOLA FOUNTAINAND SITTING SPACE SUNKENAUDITORIUM FOOTPATH LVL+2.1M ACTIVITYSPACE AUDITORIUM ROOF RAMPGOING TO BASEMENT PLAZAAND WAITINGAREA ACTIVITYSPACE AUDITORIUM ROOF RECREATIONALSPACE/ OPENAREAFORACTIVITIES AMPHITHEATRE OPEN TERRACES EAST ELEVATION NORTH ELEVATION FOUNTAINAT ENTRANCE AUDITORIUM ROOF VIEW FROM FIRST FLOOR TOWARDS UTSAV CHOWK
CITY LIBRARY |KHARGHAR |SEM6 RENDERS
02) SCHOOL DESIGN|SEM 5
PROCESS|FORM EVOLUTION|AREA DIAGRAMSCHOOL DESIGN|SEM 5
DESIGN STRATEGIES|SARVODAYA shade is provided by the cantilever projection courtyard bringing daylight into passage and open areas SCHOOL DESIGN|SEM 5
MUSIC ROOM SPORTS ROOM COURTYARD CLASSROOM CLASSROOMINTERACTIVE SPACES basketball ground 28x14m football ground 70x40m running trackfarming area experimentalground greenhousenursery water body garden andchildren playarea parking cycle parking mainroad entryserviceschool parking playchildren area playgroundentry school entry towards blockresidential towards blockresidential groundfootballtowards farming area residential block 6MWIDEROAD VL1.0M + VL1.0M VL+2.0M VL+3.0M VL+4.0M VL+5.0M VL-2.0M LVL+0.0MLVL 1.0MLVL-2.0M LVL 3.0M LVL-3.0M LVL-3.0M LVL -3.0M LVL+3.0M LVL+3.0M LVL 3.0M LVL 3.0M LVL 4.0M LVL 3.0M LVL 4.0M LVL 5.0M LVL-2.0M LVL-2.0M LVL-1.0M LVL-1.0M LVL+0.0M VL 2.0M LVL 3.0M LVL 4.0M LVL 5.0M LVL 5.0M LVL 5.0M LVL 5.0M LVL 6.0M residential block A A’ GROUND FLOOR PLAN FIRST FLOOR PLAN MASTER PLAN |MASTER SECTION|LAYOUTSSCHOOL DESIGN|SEM 5 school block classroom surrounded by courtyard amphitheatre space football ground experimental ground farming activities SECTIONAA’

SOUTH WEST ELEVATION

NORTH EAST ELEVATION

SECTION BB’
SECTION|ELEVATIONSCHOOL DESIGN|SEM 5
LANDSCAPE DETAILINGSCHOOL DESIGN|SEM 5
VIEWSSCHOOL DESIGN|SEM 5
03)A |VTELIER ILLA FOR PHOTOGRAPHER |SEM 3

SIDE FACING NORTH EAST MEANT FOR ENTRANCE

FOR EXHIBIT

COURTYARD FOR STACK VENTILATION

GROUND

FRAMES ON FACADE INTRODUCED IN ACCORDANCE WITH CONCEPT OF

USED FOR

CARVED OUT SPACES ACCORDING TO DAY LIGHT ANALYSIS

EXTRUDED SPACE FOR TERRACE AND OHT

AREA PROGRAM

TOILETS [FIRST FLOOR]

Ÿ

4 TOILETS EACH CONNECTED TO MASTER BEDROOM KIDS BEDROOM BEDROOM GYM AREA Ÿ [UPPER GROUND FLOOR]

UTILITY AREA TOILET CONNECTED TO GUEST BEDROOM Ÿ [LOWER GROUND FLOOR]

POWDER ROOM BENEATH STAIRCASE

PRIVATE SPACES

2 BEDROOMS AND 1 MASTER BEDROOM [FIRST FLOOR]

GUEST BEDROOM AND SWIMMING POOL DECK AREA [UPPER GROUND FLOOR]

SEMI PRIVATE SPACES

GYM AREA [FIRST FLOOR]

KITCHEN ,DINING AREA ,STORE AREA, LIVING ROOM [UPPER GROUND FLOOR]

HOME THEATRE

DRAWING ROOM [LOWER GROUND FLOOR]

LANDSCAPE AREA

CIRCULATION SPACES DECK AREA PASSAGE AREA STAIRCASE

SOUTH FACADE ADORED WITH FRAMES AROUND OPENINGS TO BRING IN LIGHT

Atelier

EXPOSED FACADE PLANNED WITH JALI BRINGING IN LIGHT AND BLOCKING HARSH RADIATIONS

planning

VOIDS AND OFFSETS BRING IN LIGHT IN SPACE AND FRAMES ACT AS A SHADING DEVICE

NORTH FACADE

DECK AREA

BALCONY

OPEN TERRACES

SEMI PRIVATE SPACES ON LOWER GROUND FLOOR

CENTRAL SPACE CIRCULATION ENTRANCE AT CONTOUR LEVEL +724

YELLOW PORTION FOR EXTRUDED FOR VERTICAL CIRCULATION

LEVEL

SMALL COURTYARD IN STAIRCASE WELL

CREATED FOR SWIMMING POOL

UPPER GROUND FLOOR ON CONTOUR LEVEL +727

FIRSTFLOOR EXTRUDING ON EDGES CREATING H -SHAPED

EVAPORATIVE COOLING EFFECT TO ALL SURROUNDED SPACES

SPACE

HOT

VOLUME

EVAPORATIVE COOLING MAINTAINS INNERTEMPERATUREAND

CREATED

SENSE OF

PROCESS|FORM EVOLUTION|AREA DIAGRAMATELIER|VILLA|SEM 3 lower ground oor  upper ground oor rst oor HOUSE PLAN AT CONTOUR LEVEL +724m RETAINING WALL PLAN AT CONTOUR LEVEL +727m SWIMMING POOL ENTRANCE FOYER WITH LANDSCAPE PORTION
DIFFERENCE FOR SEPERATING SEMI PRIVATE AND PUBLIC SPACES Ÿ
floor
+1 STRUCTURE
AND VOID
POD SPACE
PHOTOFRAME
PHOTO DISPLAY
FOR SOLAR PANELS
AIR TRAVEL UP THROUGH ATRIUM
VOID
CREATION OF CLOSED GREEN TERRACE REAR VIEW OF BUNGLOW SIDE OPENING TO NATURE CREATING SENSE OF PRIVATE PLACE OPENING INTO NATURE EQUAL
DISTRIBUTION ON BOTH SIDES ALLSPACES CONNECTED BY PASSAGE
PLAN
A
COURTIS
GROUND FLOOR ATELIER FIRSTFLOOR exhibit pod semi private spaces Ÿ cabin [rst oor] Ÿ discussuion room [rst oor] Ÿ photo studio [ground oor] Ÿ editing room [ground oor] Ÿ public spaces waiting room Ÿ exhibit pod pantry Ÿ reception Ÿ courtyard Ÿ circulation staicase Ÿ passage Ÿ landscape Ÿ toilet south facing portion of atelier
Ÿ
Ÿ
Ÿ
Ÿ
Ÿ
Ÿ
Ÿ
Ÿ
LIFT Ÿ
Ÿ
Ÿ
Ÿ
WAITING ROOM EXHIBIT POD DIAGONAL SECTION THROUGH ATELIER STUDIO EDITINGROOM SOUTH ELEVATION SHADOW ON 21 JUNE 3PM SUMMER SOLSTICE contour lvl +722m brick cladding on projections jali creates play of light into space BLACK COTTON SOIL ROCKY LAYER SECTION BB’ 7.1M 0.45M PLINTH DOUBLE HEIGHT CEILING BRICK CLADDINGTO PARAPETWALLSAND WINDOW PROJECTIONS STACK VENTILATION 2600x 2000mm A A GROUND FLOOR JALLI ON SOUTHAND SOUTH WESTFACADETO BLOCK HARSH RADIATIONS toilet under 2nd mid landing lvl 2250mm A PLANATPLINTHLEVEL+450mm A FIRST FLOOR PHOTOGRAPHER CABIN 6000x 6000mm CONFERENCE ROOM 4000x 8000mm first floor at height 3.45m FEATURES OF DESIGN: Ÿ CENTRALLY PLACED COURTYARD Ÿ DARK SPACES FOR STUDIO Ÿ JALI IN SOUTH AND WEST SIDES Ÿ ATRIUM AT ROOF BRINGING IN NATURAL LIGHT Ÿ GREEN TERRACE Ÿ EXHIBIT POD MATERIALPALLETE SECTIONAA’ 3M FRAME LIKE PROJECTIONS ACTAS SHADING DEVICES GRILLAGE FOUNDATION STEELFRAME STRUCTURE lvl +724m contour lvl +722m SOLAR PANELS FITTEDATTOPOF ROOF FACING SOUTH SIDE ATELIER STUDIOATELIER|VILLA|SEM 3

SECOND FLOOR PLAN

FIRST FLOOR PLAN

GROUND FLOOR PLAN

VILLAATELIER|VILLA|SEM 3
ATELIER STUDIO|VIEWSATELIER|VILLA|SEM 3
%('5220 *<0$5($ VILLA|VIEWSATELIER|VILLA|SEM 3
04)PYAU AT JODHPUR- A PLACE FOR |JODHPUR|SEM 2 SOCIAL EXCHANGE

THE PYAO IS SITUATED AT A CHAURAHA (FOUR ROADS MEET AT A POINT).

THE AREA HAS LARGE SPACE WHERE PEOPLE STAND OR SIT AND CHAT.

EXTREME HEAT IN SUMMER AND COLD IN WINTERS.

VERY NARROW PATHWAYS WHICH MAKES THE CIRCULATION DIFFICULT.

SAGARLAKE

GULABSAGARLAKE

ETC.

UNIQUE ELEMENTS -

NAALIS, PLINTHS, OUTSIDE HOUSES, BALCONIES, WALL PAINTINGS, JHALIS, CHHAJAS, JHAROKHAS, ARCHES, DOUBLE COLUMNS, DOMES

LOCAL MATERIALS AVAILABLE -

LIMESTONE, SANDSTONE, RED SANDSTONE, GOLDEN SANDSTONE, BUILDING STONE, CHHITAR STONE, CLAY, DOLOMITE, PINK SANDSTONE, WHITE MARBLE.

ARCHITECTONIC -

WALLS ARE CONSTRUCTED FROM SANDSTONE AND GOLDEN SANDSTONE. NO MORTAR USED, ONLY NAILS OR BONDED BY SCISSORS. HOUSES HAVE ARCHITECTURAL PATTERNS WHICH SHOWS VERNACULAR INDIAN ARCHITECTURE INDO-SARACENIC ARCHITECTURE STRUCTURES HAVE BALCONY, COURTYARDS AND STATELY ROOMS. HOUSES MAINLY ARE UP TO G+2 AND RARELY ARE OF G+3 LEVEL.

THE STREETS ARE VERY NARROW.

ONLY ONE VEHICLE CAN PASS AT A TIME.

EVEN STREET VENDORS HAVE THEIR SHOPS NEAR THE FOOT PATHS.

CONCEPT AND FORM EVOLUTION

SITE PLAN

NETWORK

TOWARDS

SITE IS SITUATED AT CENTRAL POINT ADJOINING THE CROSS ROADS HAVING LARGE AMOUNT OF VEHICULAR MOVEMENT AND HUMAN INTERACTIONS. MANY ACTIVITIES TAKE PLACE AROUND THE SITE

INTERACTIVE SPACES

LOCAL ACTIVITIES AROUND IT ARE SHOPS, STREET VENDORS, RELIGIOUS ACTIVITIES, PEOPLE GATHERING.

VEGETATION

SHOPS ARE PLACED ON GROUND FLOOR AND PEOPLE LIVE ON ABOVE FLOORS

SUN PATH

BUILDINGS WERE VERY CLOSE TO EACH OTHER HENCE SELF SHADING TAKES PLACE

MARBLE

WATER STATIONS

HIGHLY TENSILE MATERIAL RESISTANT TO FIRE AND ELECTRICITY WORKS AS A INSULATOR IN ROOFING SYSTEMS CAN BE CONVERTED INTO ANY FORM AS PER NEEDS AND EASILY STANDS IN BAD WEATHER CONDITIONS

BRINGS AN ESSENCE OF MODERNISM OVER THE CONTEMPARARY ROOFING STYLES

MAHILA GULAB LAL
TENT USE OF MARBLEAS MATERIALFOR FOUNTAINAS ITADDSTOASTHETICS OF DESIGNANDAS MARBLE IS EASILY AVAILABLE MATERIALIN RAJASTHAN
ROOF
WATER FOUNTAIN
SARDAR MARKET
ROAD
N
Ÿ
Ÿ
BACCHA
SITE : JODHPUR
BAUG KA JHALRA SARDAR MARKET
SAGAR LAKE AND MEHERANGARH FORT
BABA MANDIR AND MAIN ENTRANCE MANOHAR PUSTAK BHANDAR
BASIC FORM OF ROOF IN PLAN GLASS USED TO JOIN FOUR ENDS OF FABRIC STRUCTURE GROIN VAULTCOMBINATION OF TENT AND VAULT HEXAGON FORM INSPIRED FROM PETALS WATER FOUNTAIN AND WATER STATION PROPOSED IN WHITE MARBLE STEPS AND PLITH MADE OUT OF SANDSTONE SANDSTONE BLOCKS STEP WELLS BEING CONTEMPRARY FORM OF RAJASTHANI ARCHITECTURE EDGES AND SITTING SPACES INSPIRED FROM STEPWELLS USE OF PVDF FABRIC IN ROOFING STRETCHING ROOF AS ARCH SUSPENDED FROM 2 CORNERS GIVING SENSE OF ENCLOSURE STRUCTURAL ENVELOPE FOR ROOFING AND FABRICATION SITE ANALYSIS |CONECPT |FORM EVOLUTIONPYAU AT JODHPUR | A PLACE FOR SOCIAL EXCHANGE|SEM 2
Flowerbeds Marble jali
frame work for fabric roof Site could become as a landmark as it is situated at central position adjoining crossroad Site accessible from all sides 6 water stations Place to sit an relax Fabric roof laminated / wired thick glass
Marble dome water fountain Hexagonal style jali6 water stations accessible from all sides Cross road junction Multi functional pyau Facilitator Tree is retained and coexists with structure Water station given maximum importance in community spacesgiven equal importance Water and good sanitation considered as religious aspect Led lights for pyau to function at night time Light weight solar panels taps with sensors 5000.0mm 300.0mm600.0mm 1500.0mm 150.0mm 1000.0mm 2000.0mm ROAD TOWARDS MAHILA BAUG HOSPITAL 5000mm branches of the tree emerging out of the roof Jallis being an important element used in architecture in Rajasthan Jallis are set on all 4 sides of pyau to create sense of undened entry points to structure. LIBRARY SECTIONAA 10000 9000 2500 300 400700 300 2500 40006200 1400 300 A A’ 10 m x10 m square plinth yellow portion demarks the built area green portion demarcates the flower bed at 4 edges as portion of landscaping blue portion is the unbuilt space the gradation or shades of blue depicts the stairs or steps which are at different level going downwards the dark blue shades represent steps climbing up at different levels area for development of step wells and allocation of boundaries at edges to give sense of entrances to site landscaping with flower beds at edges to maintain asthetics and restriction of movement at the edges steps created at four edges for sake of creating a community spaces for people water station and water fountain analyzation of placement of form in terms of site 1 2 3 4 • USE OF GLASSATCENTRE JOINING/HOLDING • ALLFOUR PARTS OF ROOF • GLASS IF MOVABLE CONSIDERING FUTURE GROWTH OFTREE • USE OFTHICK GLASSTO CUT RADIATIONAND BRING LIGHT PLAN DESIGN DEVELOPEMENT SECTION AA’SECTION BB’ B B’ PYAU AT JODHPUR | A PLACE FOR SOCIAL EXCHANGE|SEM 2 DESIGN DRAWINGS|EXPLODED AXONOMETRIC
64ANDC-97 RETHINKINGTHELIVES REOFLABOURSARTISANS THINKINGTHELIVES OFLABOURSARTISANS 05)RETHINKING THE LIVES OF ARTISANS |ANDC 2021-2022
COMMUNAL GATHERING AT TEA STALL. WOODEN DAILY SCHEDULE INCLUDES COOKING FOOD ON CHULLAH AS NO OF USAGE OF ONSITE WOOD AND BAMBOO SCAFFOLDING AS VERTICAL IMPROPER SANITARY SYSTEM
KURLA STATION = 2.8KM = 20MINS MANKHURD STATION = 5.5KM = 27MINS MONORAIL STATION = 500M = 6MINS KURLA BUS STAND = 2.2KM = 15MINS ROAD NETWORK CHEMBUR FLYOVER PLOT PRIMARY ROADS TERTIARY ROADSRAMAKRISHNA CHEMBURKAR MARG CLIMATE ANALYSIS NEARBY AMENITIES AND ACCESSIBILITIES W A T E R R E Q U I R E M E N T S DRINKING WATER FOR W.C AND GENERAL SANITATION KITCHEN USAGE ENERGY REQUIREMENTS NATURAL VENTILATION ELECTRICAL CONNECTIONS CHARGING POINTS
FORM WORK USED AS DOOR PANELS AND LOCKED TEMPORARILY BY A THIN WIRE. NO SECURITY PROVIDED TO THE ARTISAN COMMUNITY.
AVAILABILITY
STOVE.
POLES SIT-OUT SPACE BUILD WITH ONSITE FORM WORK AND BUILDING BLOCKS.
COMMON WATER SUPPLY STORED IN SINTEX TANK. NAME OF THE PROJECT : HUB-TOWN SEASONS YEAR OF CONSTRUCTION UNDER CONSTRUCTION - PHASE ONE COMPLETE LOCATION OF PROJECT : NEXT TO FINE ARTS SOCIETY, RAMAKRISHNA CHEMBURKAR MARG, CHEMBUR, MUMBAI, MAHARASHTRA 400071 CO-ORDINATES : 19.05 DEGREES , 72.89 DEGREES AREA OF SITE : 10 ACRES APPROX RETHINKING THE LIVES OF ARTISANS| |ANDC TROPHY 2021-2022

• CONSTRUCTION SITE PROCEEDS FOR DEVELOPMENT AND MIGRANT WORKERS SETTLE WITH THEIR FAMILIES ON SITE.

• THE SPACE IDENTIFIED FOR SETTLEMENT -THE PARKING LOT.

C O N C E P T

• DESIGNING OF MODULE WITH A PERSPECTIVE OF NOT ONLY RECONSTRUCTING THROUGH AVAILABLE INFRASTRUCTURE, BUT ALSO RESPONDING TO THE NEED FOR COMFORT AND SAFETY OF THE USER GROUP.

• STRUCTURE BEING FOLDABLE, CONVERTIBLE, DETACHABLE, PACKING MODULE WHICH CAN BE EASILY TRANSPORTED AND REINSTALLED WITH DIFFERENT POSSIBILITIES AND PROBABILITIES ON ANY GIVEN SITE.

•ADDRESSING THE CORNERED PROBLEMS AND USING THEM AS THE STRENGTH OF THE MODULE.

• CONSTRUCTION MOVES FORWARDS , MORE ARTISANS SETTLE UP ON SITE.

• THUS MORE MODULAR PIECES ARE ATTACHED WITH NUT AND BOLT JOINERY.

• AS ARTISAN COMMUNITY EXPANDS WITH THE CONSTRUCTION, MORE AMENITIES ARE PROVIDED TO THEM FOR SAFETY AND NECESSITY.

• TRUCKS BRING IN WATER SUPPLY AND OTHER REMOVES SEWAGE DISPOSAL.

• AFTER THE PROJECT IS COMPLETED THE MODULAR PIECES ARE DETACHED AND TRANSPORTED TO OTHER LOCATION TO RE INSTALL.

• DESIGNED IN ACCORDANCE TO THE TRANSPORT TRUCK SIZE FOR EASY MOVABILITY.

RETHINKING THE LIVES OF ARTISANS| |ANDC TROPHY 2021-2022

RAINWATER HARVESTING TANK

TRAPULIN SHEET

BED

THE SPECIALTY OF THE PROTOTYPE IS ITS FLEXIBILITY WHERE STRUCTURAL FRAMEWORK IS CONSTANT AND WALLING PANELS ARE VARIABLES. AS PER THE AVAILABILITY OF MATERIALS, FUNDS, CLIMATIC ZONES AND OTHER BARRIERS,THE USERS CAN CHANGE THE WALLING MATERIAL.

GUTTER

THE WALLING PANELS ARE OF BAMBOO AS THEY ARE LIGHTWEIGHT, DURABLE, ENVIRONMENTAL FRIENDLY AND KEEPS INTERNAL TEMPERATURE COOLER THAN ALUMINIUM SHEETS.

BAMBOO SURFACE (EXTERIOR)

SURFACE (INTERIOR)

PLYWOOD

SLOTTED ANGLES

ELEVATED FROM THE GROUND BY 150 MM TO PREVENT RAINWATER AND INSECTS ENTERING IN.

PVC
PIPE
BAMBOO
FORMWORK
BAMBOO MAT CONCRETE BLOCK
2500mm 2500mm 3600mm 1000mm 1000 mm STRUCTURALGRID PLAN INTERIOR PLAN BUNK BED 1900x700 MM ST ORAGE AND KITCHEN BUNK BED 1900x700 MM EXPL ODED VI EW
BUNK
RETHINKING THE LIVES OF ARTISANS| |ANDC TROPHY 2021-2022
06) COMMUNITY CENTRE|FOR WOODEN HANDICRAFTS|SEM 4

40 x 25 m

SITE REPRESENTING SUNPATH AND WIND DIRECTIONS

plot given is 40 x 25 m area of plot is 1000 sqm

site development starts with 3m offset from all sides red portion shows the site for parking

Ÿ site has many good views towards south ,north east and north side Ÿ south side is blessed with lush green vegetation Ÿ On the north hotels and lodges are located with hills in background Ÿ on south there is view of bus stand with mahabaleshwar market

Ÿ pre existing vegetation Ÿ site and its surroundings is provided with quite good amount of vegetation Ÿ site has many trees located around Ÿ major portion is towards south giving good view

major trafc area around site are highlighted in orange bus /taxi stand is close to site at junction of 3 roads

LARGE OPENINGS WILL HELP TO BRING MORE LIGHT IN COLD AND CLOUDY CLIMATE

THICK AND RADIATION SHIELDING GLASS BE USED

VERTICAL LOUVERS COULD BE USED TO CUT RADIATIONS AND COULD ACT AS AESTHETIC ELEMENT

THERMAL COMFORT COULD BE ACHIEVED BY USING THE HEAT FROM EARTH

WINTERS IN MAHABLESHWAR ARE VERY COLD SO THICK WALLS COULD BE USED FOR THERMAL COMFORT

LARGE OVERHANGS TO PREVENT RAINS

OPENINGS ABOVE WINDOW FOR VENTILATION

VIEWS CAN BE ACHIEVED BY LARGE GLAZINGS ON SOUTH

LARGE BUFFERS WITH LANDSCAPE CAN BE DESIGNED ON SOUTH FOR CREATING MICRO CLIMATE

OPENESS

TREES ON SITE ACT AS WIND BREAKERS

SLOPING ROOFS WITH FALL CEILING FOR HEAVY RAINS IN MAHABLESHWAR

SUMMER SUN HARSH RADIATIONS CAN BE BLOCKED

SLOPING ROOF WOULD ALLOW RAIN WATER TO DRAIN OUT

BUFFER SPACES COMPACTNESS

LARGE OPENINGS

DELIGHT

CIRCULATION

SPACES

LOUVERS CAN BE USED TO CUT HARSH RADIATIONS

WINTER SUN CAN BE BROUGHT INSIDE

BUFFER SPACES OR LOUNGES CAN BE CREATED FOR GOOD AIR CIRCULATION AND CREATION OF SENSE OF OPENESS IN SPACE

HIGH PLINTH COULD PROTECT FROM RAINS

LANDSCAPING COULD BE DONE IN LOUNGE AREA FOR CREATION OF MICROCLIMATE

ROOMS COULD BE COMPACT DUE TO COLD CLIMATE

SITE ANALYSIS |DESIGN DECISIONSCOMMUNITY CENTRE |FOR WOODEN HANDICRAFTS|SEM 4
12 PM 8AM 4 PM MAXIMUM RAINFALL IS OBSERVED ON SOUTH AND SOUTH WEST HIGH INTENSITY WINTER WINDS WINTER SUN SOUTH WEST MONSOON WINDS LOW INTENSITY SUMMER WINDS
MONSOON WINDS HIGH INTENSITY SUMMER WINDS LOW INTENSITY SUMMER WINDS HIGH INTENSITY WINTER WINDS
DESIGN MATERIAL PALLETE DESIGN PROGRAM ADJACENCIES
LOCALCRAFT EXTERIOR VIEWS MULITIFUNCTIONAL
LOCAL INTERACTIONS VISUALCONNECT
PLAYOF LEVELS
TEXTURE PLAYOF LIGHT DAYLIT SPACES USE OF LOCAL MATERIAL SITE HOTELS AND RESTAURENT ON NORTH FACE OF SITE PLAYGROUND BUS DEPOT/ TAXI STAND RESIDENTIAL HOUSING TRAFFIC ZONES 1 2 3 4 5

SECOND FLOOR PLAN

EAST ELEVATION

FIRST FLOOR PLAN

GROUND FLOOR PLAN

FLOOR PLANS|ELEVATION|SECTIONCOMMUNITY CENTRE |FOR WOODEN HANDICRAFTS|SEM 4
SECTION AA’

DESIGN POSSES SLOPING ROOF RESPONDING TO CLIMATE ROOF HAS LIGHT WELL PLACED AT CENTRE FACING SOUTH SIDE TO BRING IN DIFUESD LIGHT IN AFTERNOON SOLAR PANELS ARE PLACED ON FLAT PROFILE SLABS FACING SOUTH ,WITH AIM TO USE SOLAR ENERGY FOR ELECTRICITY PURPOSE AND SOLAR WATER HEATER PROVIDES HOT WATER TO KITCHEN AND CANTEEN AREAS.

Ÿ

Ÿ

2nd FLOOR BECOMES A COMPACT SPACE HAVING ACADEMIC BLOCKS

LIBRARY FACING NORTH AND NORTH EAST WITH DIFFUSED LIGHT IN MORNING

FACADE BRINGS IN PATTERN OF SHADOW INTO SPACE BRINGING A VISUAL DELIGHT

GREEN NURSERY HAVING FULL HEIGHT GLAZINGS AND WALLS REPLACED BY GLASS DOORS BRINGS IN MAX LIGHT INTO IT

FIRST FLOOR

A DOUBLE HEIGHTMEZZANINE CANTEEN IS CARVED OUT VOID CREATING PLAYOF LEVELS.

Ÿ CANTEEN ON FIRSTFLOOR IS CONNECTED BY MEZZANINE CANTEEN

Ÿ INDOOR LANDSCAPE PATCHESAND LOUNGE SPACES ARE PROVIDEDTOWARDS SOUTH CREATINGAMICRO CLIMATE INSIDE

Ÿ VOID IS CREATEDATCENTRALAREAALLOWING VISUAL CONNECTON BELOW FLOORS

CONTROLLED OPENINGSARE PLACED ON NORTHAND NORTH EASTFOR MORNING LIGHT

Ÿ CULTURALBLOCK IS PLACED ON FIRSTAND GROUND FLOOR

THE FACADE CREATES A WAVE LIKE FORM ON ELEVATIONS

IT CREATES A SENSE OF VISUAL DELIGHT GROUND FLOOR CONSIST OF SHOPS WHICH SITS BELOW MEZZANINE SERVICES SUCH AS TOILETS AND UTILITY AND KITCHEN ARE PLACED ON GROUND FLOOR ITSELF NEAR WEST AND SOUTH WEST WITH SMALL OPENINGS

THERE IS AN CENTRAL OPEN SPACE WHICH GIVES FLEXIBLITY FOR COMMUNITY TO INTERACT WITHIN MICROCLIMATE IS CREATED AT BOTH , ENTRANCE AND TOWARDS END , WHICH BECOMES AN INTERCATION POINT HAVING SITTING SPACES AND LANDSCAPE WITH SMALL TREE .

STRIP SECTION |EXPLODED AXOCOMMUNITY CENTRE |FOR WOODEN HANDICRAFTS|SEM 4
VIEWSCOMMUNITY CENTRE |FOR WOODEN HANDICRAFTS|SEM 4

Ÿ KEEPING OFFSET FOR PLYWOOD

/MDF

Ÿ FITTING WHAT DESIGN COULD BE CUT WITH DETAILS OF JOINERY

Ÿ SYMMETRY AND REPETATION BEING IMPORTANT DESIGN PRINCIPLES

Ÿ MIRROR ALL THE DRAWINGS

Ÿ AND DRAWINGS ARE READY TO BE CUT

Ÿ STEP 2 INVOLVES THE FIXTURE OF ALL SEPARATE MODULES

Ÿ CROSS CONNECTED MODULES ARE JOINED TOGETHER BY A MEMBER CONNECTING THROUGH EACH PART OF MODULES

Ÿ EVERYTHING TO BE ARRANGED WITH PROPER OFFSETS

Ÿ

ASSEMBLY OF EVERYTHING BECOMES AN IMPORTANT STEP

EVERYTHING TO BE ARRANGED WITH PROPER OFFSETS

Ÿ FOR JOINERY TO WORKOUT

JOINERY CAN BE GLUED FOR MORE STRENGTH

REPEATING IT FOR EACH OF THE ELEMENT

MATERIAL PALLETE

Ÿ SPRAY PAINT TO BE APPLIED FOR GOOD FINISH EFFECT TO PLY BEFORE FITTING GLASS

Ÿ WHEN ALL 4 MODULES ARE READY

CROSS CONNECT THEM

SYMMETRY TO BE MAINTAINED

GLASS WILL BE FIXED AT ALL TOP FOUR POINTS

CENTER TABLE

15 MM THICK TOUGHENED GLASS

RUBBER

JOINT

CONNECTING

JOINT

ALL THE CUTOUTS ALLIGNED CONSIDERING CENTRAL AXIS

Ÿ MODEL MADE IN SUN BOARD SCALE 1:4 [5mm thick]

Ÿ CUTTING ALL THE MODULES

Ÿ ALLIGNING ALL FOUR MODULES WITH PLAN [CENTRAL ALLIGNMENT ] TO ACHIEVE SYMMETRY

Ÿ JOINING TOGETHER THE ADJOINING SIDES BY NOTCHES

Ÿ FINALLY JOINING ALL 4 BY VERTICAL MEMBERS AT AN ANGLE OF 45 DEGREE

Ÿ ATTACHING GLASS [OHP SHEET USED IN MODEL]

SECTION
A AND
B
4 MODULES
IN PLAN
Ÿ
Ÿ
Ÿ
Ÿ SAMPLE OF FINAL MODULE
Ÿ
Ÿ
Ÿ
Ÿ LASER CUTTING TO BE USED
7] |FURNITURE DESIGN SEM 4
PROCESS|DESIGN |ESTIMATION

ELEVATION SCALE 1 :10

7] |FURNITURE DESIGN SEM 4 FURNITURE DRAWINGS|AXO VIEWS
B B’

Ÿ

Criteria considered by me

/Requirements / points focused : Space for roaming Atleast for 6 to 8 people .

Form prevailing or concept from photographer or from works of photographer or equipments

Foldable parts OR STABLE STRUCTURE Exhibition panel

Ÿ

ACTUAL GEOMETRY OF FORM

PROJECTED ROOF

Ÿ WITH LIGHT WEIGHT GLASS OPENINGS FOR NATURAL LIGHT

Ÿ LARGE OPENING FOR VENTILATION AND EASY MOVEMENT

Ÿ OPEN SLIT ON REAR SIDE FOR CROSS VENTILATION

SECTION DEPICTING HEIGHTS CONSIDERING HUMAN ANTHROPOMETRY

PANEL FOLDING INSIDE WHILE EXHIBITION TIME AND PANEL FOLDS OUTSIDE CREATING A CLOSURE

PANELS FOR PHOTOGRAPHY EXHIBITION

SPACES WITH PLACED PANEL FOR VIEWING PHOTOGRAPHS

GLASS PANELS ON PROJECTED ROOF BRINGING IN NATURAL LIGHT SET AT PARTICULAR ANGLE

SOME VOIDS ON REAR PORTION FOR CROSS VENTILATION AND ANGLED SURFACE CREATED FOR NOT LETTING RAIN WATER IN

SOME SITTING SPACES PROVIDED

MORE 150mm raised level for area around panels

STORAGE SPACES 300 mm RAISED PLINTH

DIAGONAL SECTION

GLASSES PLACED ON PROJECTED ROOF FOR PLAYOF LIGHTINTO POD

USE OF PVDF FABRIC WITH STEELBARS

LARGE OPENING ON FRONT SIDE FOR GOOD AIR CIRCULATION AND LIGHT

ELEVATION

8]EXHIBIT POD |ALLIED DESIGN| SEM 3
FRONT
SIDE ELEVATION
ACTIVITY MAPPING9]URBAN DESIGN |LIVABILITY INDEX| SEM 5
10]WORKING DRAWINGS| SEM 6|CITY LIBRARY DESIGN SETTING OUT PLAN

DESIGN

WORKING DRAWINGS| SEM 6|CITY LIBRARY
CENTRELINE PLAN
WORKING DRAWINGS| SEM 6|CITY LIBRARY DESIGN FLOOR PLAN WD
WORKING DRAWINGS| SEM 6|CITY LIBRARY DESIGN SECTION WD

DESIGN

WORKING DRAWINGS| SEM 6|CITY LIBRARY
TOILET DETAIL
WORKING DRAWINGS| SEM 6|CITY LIBRARY DESIGN STAIRCASE DETAIL
11]HOBBIES|ACTIVITIES SKETCHES
WILDLIFE PHOTOGRAHYHOBBIES|ACTIVITIES
12]R PENDERING| HYSICAL MODEL

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.