Adegunwa Odulana architecture portfolio

Page 1

+971 (0)507190923

hamzatgunwa@gmail.com

PORTFOLIO

ADEGUNWA ODULANA 08/10/2020


2

Contents


4

Curriculum Vitae

6

Selected Works

6

AB farm house

18

Crazy Gardens

22

khovsgol Lake

28

CIMC

30

LIV Tower

32

Media Frame

36

Dubai Maritime Museum

40

Muweilah Community Center

44

Design Build


4

RESUME Thursday October 8, 2020

Adegunwa Odulana 2 years experience

Specialty •

Residential

Hospitality

Family Homes

Retail & Entertainment

Summary Adegunwa is a junior architect with up to 2 years experience in residential hospitality , Family homes and Retail/Entertainment in the U.A.E. He has a very well developed understanding and knowledge of architecture and design. He has become an individual with knowledge in all the different stages of design from the conceptual phase to construction and documentation.

Education 2012- 2018

American University Of Sharjah Bachelor of Architecture, 5 year Bachelor’s degree (NAAB accredited)

Languages •

English

Yo r u b a ( N a t i v e )

Experience 2020

Software •

Revit

AutoCAD

Rhino

Vray

Sketch-up

InDesign

Photoshop

Illustrator

Lumion

Enscape

AO Design | Freelance Architect | Dubai, UAE Produced preconcept designs,studies and sketches for residential and sports hall. Worked on various parts all design and production phases. designed all projects individually from pre-concept to schematic design. produces interior and exterior visuals for projects. Main Projects: • AB Farm house, Ogun, Nigeria. • DA Arena, Kwara, Nigera

2019-2020

H+A | Junior Architect | Dubai, UAE Produced preconcept designs,studies and sketches for residential, mixed use and retail/entertainment projects. Worked on various parts all design and production phases. Incorporated 3D model viewing into virtual reality. Coordinated between consultants and subconsultants. Main Projects: • LIV Residential tower Concept, Dubai, UAE. • Crazy Gardens, Dubai, UAE. • Marriot hotel, Ras al-khaimah, UAE. • Khovsgol Lake Resort, Khovgol, Mongolia.


2018

CallisonRTKL | Intern-Architect | Dubai, UAE Participated various reviews and workshops during internship period, produced sketches and diagrams for various design reviews. Produced inhouse renders and studies. Main Projects: • CIMC QINDAO, Qindao, China.

2017

Dubai hills mall, Dubai, UAE.

AVR, Riyadh, Saudi.

BMA Studio | Intern-Architect | Dubai, UAE Photoshop tasks and transformational modelling. Conducted grasshopper and dynamo studies on revit and rhino. Observed meetings and acquired knowledge on client contact.

2017

Killa Design | Intern-Architect | Dubai, UAE Participated various conceptual design phases during internship period. Produced sketches and diagrams in the predesign phase. Conducted massing studies for project proposal. Communicated directly with clients and assimilated their requests. Created a team based project proposal. Main Projects: • Museum of the future, Dubai UAE. •

Dubai wave park concept.


6

AB Farm House Firm: AO Design Location: Ogun, Nigeria. Description: Family home Status: Construction


Designed project individually from start to finish; Preconcept to Schematic phase with specific details as was required. All design ,drafting and visualizing done by me.


AR-300-003 1

B

G

BA

7050

BB

13675

4200

4500

SETBACK LINE

FARM

+0.15 m FF

1 AR-100-009

250

12

2800 250

UP

D14

5350

5350

Gazebo G042 45 m²

4000

200

2000

4850

GRAVEL

1750

1500 11150

250

4000

1000

250

200 1200 200

2350

concrete Bench BDRM 1 G029 15 m²

2600

Bathroom G030 5 m²

250

UP 250

5000

+0.15 m FFL

1

PLANTER (GRAVEL)

1950

Laundry G031 3 m²

GRASS LAWN

SETBACK LINE

250 200

UP 8375

3000 2175

2000

1250 500

5700

BDRM 2 G032 15 m²

Bathroom G033 Corridor 5 m² G036 12 m²

Concrete Bench

500

4700

CARPET G

2825

GRAVEL 500

2000

1000

GRAVEL

+0.15 m FFL

INBUILT JACUZZI

BDRM 3 G034 15 m²

2% SLOPE TO DRAIN 4550

UP

3

250

4000

UP

12500

TABLE TENNIS AREA

3500

4500

100 100 500 500

1000

250

250

8450 +0.90 m FFL

1350

3025

4000

UP

250

4275

250

1000 250

250

3150

4000

200

3400

200

2300

250

2000

PLANTER

Bathroom G035 5 m²

2% SLOPE TO DRAIN

+0.75 m FFL

Refer to CGI

1950 250 1150

1500

Refer to CGI

UP

375

Toilet G037 3 m²

Refer to CGI

BDRM 4 G041 15 m²

3150

6850

2175

4

6800

4900

6000

250

+0.90 m FFL

Bathroom G040 5 m²

1750

2025

3000

400

1950

GRAVEL

6

+0.90 m FFL

1325 150

250

1200 250

PLANTER

3050

UP

ENTRANCE LOBBY G038 7 m²

4875

34550

4500

7

2600

250

2% SLOPE TO DRAIN 250 2350 250

200 250

4000

+0.90 m FFL 9900

250

8

6650

100 100 500 500

2% SLOPE TO DRAIN

250

250

5150

4150

250

6100

UP

1

4200

23

GRAVEL

3000

3000

16515

6300

100 100 500 500 2000

AR-300-004

2

200

+0.45 m FFL

+0.45 m FFL

1

LAUNDRY G021 3 m²

GAZEBO GARDEN G044 109 m²

GRASS LAWN

GRASS LAWN

AR-300-005

Kitchen G022 23 m²

5700

450

450

1450

2950

9

5

23

M

2000

1950

10

2950

200

Storage G020 3 m²

2550

6250

+0.90 m FFL

11

1800

600

2950

250

7400

250

250

13

1750

200

3150

250

2500

250

3775

A

FLOOR PLAN

1

GROUND FLOOR PLAN @ A2 1 : 150

425

B

C

2250

3300

D

E

1075

F

5725

G

2600

H

+0.60 m FFL

600

500 500 100

100

PLANTER

1215 600

2250

i

1400

J

PLANTER 4405

600

4405

5325

K

L

M

600


AR-300-003

AR-300-003

2

BC

BD

3

BE

BF

BG

AH

AK

AJ

65575 3400

3900

4200

4600

16550

1000

2500

COPYRIGHTS

All design, ideas and arrangements as indicated are the copyright and legal property of A+O De and specific project for which they were prepar the project title block. Reproduction, publication method, in whole or part, without the express w A+O Design, Incorporated is prohi There shall be no changes, substitutions, m deviations from these drawings or accompany without the consent of A+O Design, or electron of these drawings and attached specifications s acceptance of all these restrictio 1 AR-100-005

KEY

3275

2200

1000

4857

GENERAL NOTES

- THIS DRAWING IS THE COPYRIGHT OF A+O DESIGN USE OR REPRODUCTION IS PERMITTED WITHOUT TH PRIOR PERMISSION

250 1500

+0.30 m FFL

Kitchen Bathroom G001 G003 4 m² 4 m²

3000

200

4050

3800

12

250 2650

250

2700

PLANTER 6100

2700

1500

550

+0.30 m FFL

UP

750

+0.15 m FFL

800

3150

3000

3450

A4

4825

10800

PLANTER

ARCHITECT OF RECORD

2700

11925

+0.60 m FFL

2% SLOPE TO DRAIN

A5

A6

3150

250 6150

250

3100

250

3850

1000 2000

SETBACK LINE

GARRAGE G007 59 m²

851 Generator Room G005 15 m²

A8

A9

°

Fuel Storage G006 9 m²

66 .4

PLOT No.

IGBOMOKU, IJEBU IFE EAST LOCAL GOVERN AREA, OGUN STATE

2.27°

5175

DRAWING

GROUND FLOOR PLAN

23.51

PLANTER

0

+0.30 m FFL

6240

+0.60 m FFL

+0.15 m FFL

A7

3400

+0.00 m FFL

1500

4000

1500

GRASS LAWN

3149

PLANTER 1 AR-100-008

250

2150

250

250

250

1850

250

UP

1700

1725

250

250

250

+0.15 m FFL

2700

BDRM 2 G028 10 m²

Bathroom G027 5 m²

3425

250

1150

www.tayoodulana.com Dubai, UAE

2700

3200

+0.00 m FFL +0.60 m FFL

+0.60 m FFL

Toilet G026 2 m²

GOLF SAND

3475

DESIGN C O N S U L T A N T

825 200

700

3200

1500

2600

1775

250

3200

+0.60 m FFL

1700

A3

750

PLANTER

Living space G025 20 m²

200 1250 200

4500

4975

2000 750

550

2700

concrete Bench

1400

0

4500

5050

3200

BDRM 1 G023 10 m²

200 8800

3500

1300

250

concrete Bench

GRASS

BATHROOM G024 5 m²

2600

0

+0.60 m FFL

250

AR-100-006 30050

250

ENTRY YARD G043 478 m²

concrete Bench

AB FARM HOUSE, PRO GROUND LEVEL FARM

1

7750

1500

1000

1700

250

250

1500

PLANTER

+0.00 m FFL

8800

2000

PROJECT

44551

1975

500

500

4550 2000

9000

CLIENT

AB Odulana

1300

UP

100% ADVANCED CONCEPT 100% ADVANCED CONCEPT Description

1550

2000

UP

3900

3900

+0.45 m FFL

06/09/2020 30/08/2020 Date

2700 12900 1000

8950

2 1 Rev.

PLANTER

250

2650

8600

700

UP +0.15 m FFL

250

4300

NOT FOR CONSTRUCTION

1500 2000

Prayer RM G009 10 m²

1150

UP

-COLUMN LAYOUT ARE INDICATIVE AND SHOULD BE CONSTRUCTION AND SHOULD BE AS PER STRUCTUR

200 Storage G011 4 m²

+0.60 m FFL

+0.60 m FFL

- ALL DIMENSIONS INDICATED # ARE MEASURED ON OR BUILDING EDGE - COORDINATE WITH ARCHITECT

2000

1500

PLANTER

- ALL DIMENSIONS INDICATED * TO BE ADJUSTED ON OF THE ARCHITECT.

3000

Ablution RM G008 6 m²

2100

Toilet G010 2 m²

Gym G012 23 m²

F.Toilet G014 2 m²

2300 200

A2

16725

200

+0.30 m FFL

250

- THIS DRAWING IS TO BE READ IN CONJUNCTION WI ARCHITECTURAL, STRUCTURAL, MECHANICAL + ELE + ALL RELEVANT SECTIONS OF SPECIFICATION.

8750

3200

3000

5550

200

200 1200 200

M.Toilet G013 2 m²

F.BathroomM.Bathroom G018 G017 4 m² Maids RM Maids RM 4 m² G019 G015 9 m² 9 m² Corridor G016 4 m²

300

4000

Watchman LR G004 8 m²

3800

200 1200 200

2100

2300

3400

200 1500 200 1500 200

5950

300

5975

BDRM G002 10 m²

250

1 AR-100-004

- ANY DESCREPANCY IN THE DRAWING IS TO BE BRO IMMEDIATE ATTENTION OF THE ARCHITECT.

3050

200 +0.15 m FFL

- ALL DIMENSIONS ARE TO BE VERIFIED ON SITE. - ALL LEVELS IN MM UNLESS OTHERWISE STATED.

200

UP

FL

A1

2500

2500

M

- THIS DRAWING IS NOT TO BE SCALED.

3200 250

250

A10

1 AR-100-007

10475

1925

3400

8275

6400

3400

3850

200

SCALE

800

DATE

1 : 150 @A1

2500

69350

Drawn by :

AA

AB

AC

AD

AO

S

9/6/2020 6:27:47 PM

Checked by :

AO

Ap

JOB NO. AE

AF

AG

AH Ai

AJ

0003

AK

Drawing No

Revision

AR-100-001 STATUS

Preliminary Design




AR-300-001

AR-300-001

3

AR-300-001

5

A

2

B C

3775

D

425

E

2250

AR-300-004

F

3300

1075

UP W2

1

G

W2

2% SLOPE TO DRAIN

1 250

700

700

700

4800

250

+0.45 m FFL

450

8

1750

2800

1200

BDRM 4 G041 15 m²

4250

6325

785

2700

1200

3400

W2

2300

8450

D01

1100

250

2000

500

1

2% SLOPE TO DRAIN

+0.90 m FF

GRAV

W2

1200

+0.60 m FFL

UP

AR-300-005 3 2175

2

8700

+0.90 m FFL

250

4500

1200

+0.45 m FFL

250 0 700

700

GRAVEL

D02

D04

4275

250

19350

AR-200-001 AR-600-013

1 2

W7

700 375

1850

Bathroom G040 5 m²

4 W2

GRAVEL 250

1200

3250

W2

2175

5

5600

6

1750

1

700 200

2025

1750

2600

AR-300-001

5125

5125 1200

1250

250

7

200 350

3275

4500 2250

UP

250

700

W2

W3

1700

4500

W2

700

700

1075

9900

Conc

2

4200

GRAVEL

1

MAIN VILLA FLOOR PLAN


AR-300-001 4

2 7 AR-200-001 AR-600-013

H

i

J

K

L

M

28125 2600

2250

1400

3900

1425

UP

5725

PLANTER +0.90 m FFL

250 250

2400

700 400 150 700

2400

W2

W3

PLANTER

1950 W3

1650

350

1750

700

PLANTER 250

1200 700 700

W2

2425 250

600 700 700 700

4000 1950

250

600

2800

BDRM 1 G029 15 m²

0 W2

GRAVEL

1400

W2

700 1750

700

5600 W2

250 W2

4500

700 1300

200 700

250

2600

350

W2

TOILET VENTILATION SHOULD BE PASSED THROUGH FALSE CEILING IN LAUNDRY AND EXAUSTED OUT VIA LAUNDRY EXTERIOR WALL

700

1200

3250

1750

UP

W2

250

200 2600

Bathroom G030 5 m²

W2

1300 2000

D04

250

+0.15 m FFL

PLANTER (GRAVEL)

D02

1850

AR-200-001

AR-200-001

6

+0.60 m FFL 3400

250

1200

700

W2

Laundry G031 3 m² 1700

1950

700 700

12825

crete Bench

AR-200-001 AR-600-013

BDRM 2 G032 15 m²

Bathroom G033 5 m² 1750

D02

700

W2

2600

Corridor G036 12 m²

+0.15 m FFL

3150

D04

2225

1200

W2

1950

9775

D02

1200

+0.90 m FFL

W2

+0.60 m FFL

concrete Bench

AR-200-001 AR-600-013

3150

700

W2

D02

concrete Bench

200

1950

W2

W2

8700

925

D04

UP

VEL

+0.00 m FFL

700

BDRM 3 G034 15 m²

4000

2600

1200

Bathroom G035 5 m²

700

2% SLOPE TO DRAIN

D02

3450 700

W6

FL

625

1100

700

250

700

1750

2175

1450

16900

1550

00

1600

W2

W7

4800

D01

W2

1200

1725

2400 Toilet G037 3 m²

1375

+0.90 m FFL

+0.75 m FFL

250

3000

3400 5125

ENTRANCE LOBBY G038 7 m²

D03

UP W2

1600

650

D05

50

+0.90 m FFL

2% SLOPE TO DRAIN

700

2800

W2

700

5125

700

1325

W2

13000

3 9




AR-100-003

AR-300-00

3

1

12 12250

150

150

Grass Lawn

150

Farm

1

SITE SECTION 3 1 : 100

AR-300-005

AR-300-002

1

A6

AR-300-001

1

AR-300-004

1

A5

A4

2

A3 5

3425

28425

4825

3450

10775

250

Pitched roof by Contractor

2450

False ceiling

False ceiling

2800

BDRM 2 G028 10 m²

False ceiling

Living space G025 20 m²

BDRM 1 G023 10 m²

900

Planter

Planter

2

SITE SECTION 4 1 : 100 AR-100-005

AR-300-005

3

1

A9

A8

A7

A6

AR-300-002

AR

1

A5

A4

A3 34526

851

2525

625 450

3400

3

SITE SECTIONS

SITE SECTION 5 1 : 100

1850

3425

4825

3450

107


04

AR-300-001

AR-300-005

1

8

7

2

6

4

3

2

1

5 31600 4500

2025

2175

4275

2175

COPYRIGHTS

4200

1550

TOP OF ROOF LVL 6050 +4.500 ROOF LVL 4500 +4.200 ROOF LVL 4200

550

300

250

Pitched roof by Contractor

900

False ceiling

2800

2450

6050

WATCHMAN ROOF LEVEL 3300

2400

Living Space G039 76 m²

900

+0.900 GROUND LVL 900

All design, ideas and arrangements as indicated on these dr are the copyright and legal property of A+O Design, Incorpo and specific project for which they were prepared as indicat the project title block. Reproduction, publication or re-use b method, in whole or part, without the express written conse A+O Design, Incorporated is prohibited. There shall be no changes, substitutions, modifications deviations from these drawings or accompanying specifica without the consent of A+O Design, or electronic contact o of these drawings and attached specifications shall constitu acceptance of all these restrictions.

KEY

150450 300

+0.600 GROUND LVL 600 +0.15 GATE LEVEL 150 +0.00 ROAD LVL 0

GENERAL NOTES

- THIS DRAWING IS THE COPYRIGHT OF A+O DESIGN. NO UNAUTHO USE OR REPRODUCTION IS PERMITTED WITHOUT THE ARCHITECT PRIOR PERMISSION - THIS DRAWING IS NOT TO BE SCALED. - ALL DIMENSIONS ARE TO BE VERIFIED ON SITE. - ALL LEVELS IN MM UNLESS OTHERWISE STATED.

- ANY DESCREPANCY IN THE DRAWING IS TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT.

- THIS DRAWING IS TO BE READ IN CONJUNCTION WITH OTHER RE ARCHITECTURAL, STRUCTURAL, MECHANICAL + ELECTRICAL DRA + ALL RELEVANT SECTIONS OF SPECIFICATION.

AR-100-003

- ALL DIMENSIONS INDICATED * TO BE ADJUSTED ON SITE TO APR OF THE ARCHITECT.

3

9

10

- ALL DIMENSIONS INDICATED # ARE MEASURED ON RELATIVE PLO OR BUILDING EDGE - COORDINATE WITH ARCHITECT.

12

-COLUMN LAYOUT ARE INDICATIVE AND SHOULD BE REVIEWED BE CONSTRUCTION AND SHOULD BE AS PER STRUCTURAL ENG. DRA 1950

NOT FOR CONSTRUCTION

4000

TOP OF ROOF LVL 6050 1550 6050

450

Planter

WATCHMAN ROOF LEVEL 3300

2 1 Rev.

06/09/2020 30/08/2020 Date

100% ADVANCED CONCEPT 100% ADVANCED CONCEPT Description

CLIENT

AB Odulana

+0.900 GROUND LVL 900 +0.600 GROUND LVL 600

150450 300

900

Farm

2400

2450

Gym G012 23 m²

+4.200 ROOF LVL 4200

900

250 550

False ceiling

2800

+4.500 ROOF LVL 4500

300

Pitched roof by Contractor

+0.15 GATE LEVEL 150 +0.00 ROAD LVL 0

PROJECT

AB FARM HOUSE, PROPOSE GROUND LEVEL FARM HOUS DESIGN C O N S U L T A N T

R-300-004

ARCHITECT OF RECORD

3

10

4000

1550

+4.200 ROOF LVL 4200 5900

900

+4.500 ROOF LVL 4500

300

TOP OF ROOF LVL 6050

DRAWING

SITE SECTION

WATCHMAN ROOF LEVEL 3300

PLOT No. 2400

1950

12

+0.900 GROUND LVL 900

450 300

9

+0.600 GROUND LVL 600

150

2

775

www.tayoodulana.com Dubai, UAE

AR-100-003

+0.15 GATE LEVEL 150 +0.00 ROAD LVL 0

IGBOMOKU, IJEBU IFE, IJEBU EAST LOCAL GOVERNMENT AREA, OGUN STATE SCALE

DATE

1 : 100 @A1

Drawn by :

AO

SHEET ISSU

9/6/2020 6:52:57 PM

Checked by :

AO

03/01/16

Approved by : A

JOB NO.

0003 Drawing No

Revision No

AR-300-003 STATUS

Preliminary Design

2


18

Crazy Gardens Firm: H+A Location: Dubai Description: Retail/Entertainment


Produced preconcept designs,studies and sketches. Worked on various parts of concept, pre- concept and production phases. Incorporated 3D model viewing into virtual reality. Coordinated between sub-consultants.




22

Khovsgol Lake resort Firm: H+A Location: Khovsgol, Mongolia. Description: Hospitality


Produced preconcept designs,studies and sketches. Worked along side the team to plan and allocate spaces and areas . Created a complete concept report. phases. Incorporated 3D model viewing into virtual reality.


SITE


Building positioning and planning explored best possible location for the project by testing for best views to the lake topography and pedestrian and vehicular access




28

CIMC QINDAO

Firm: CallisonRTKL Location: Qindao, China Description: -Participated in the design of various office buildings, retail shops, malls and residential projects. -I worked along side the director of the team I worked with to produce the concept stage for this specific project . The brief was to design two iconic towers that defines a style for the rest of the buildings in the project plan.

ION DO1

OPTION DO2

Massing options

OPTION DO3



30

Liv Tower

Firm: H+A Location: Dubai, Marina Description: Residential/ Hotel apartments.



32

Sharjah Media Center

University project Location: Sharjah Description: This project is a mixed-use development that will accommodate retail facilities as well as offices , media spaces, and an auditorium. The project is a multi-storey, mixed use development. The project acts as a link between two very distinct areas in sharjah with a site that is a physical threshold between the industrial area and a residential and mixed use area. The building fulfills its purpose by pulling an audience from both sides into its central plaza while at the same time accommodating for other programs.

Virtical circulation

Site plan

Entry/Access

Contextual link


Offices

Media spaces

Retail

Program

Site plan



View from retail loop


36

Dubai Maritime Museum

University project Location: Dubai Description: With reference to local dhows, topologies of construction, materials and functional dynamics were harnessed into the museum. The overall procession in and out of the site relates to the narrative of both engulfing and beaching an entity. Corten, zinc and steel panels represent the life-cycle of a dhow boat while the undulating roof magnifies its subtle curvature. The project is a museum designed to accommodate and preserve the UAE maritime history as well as creating sufficient opportunity for extracurricular activities.


A1 C102

L.O.W SET BACK

L.O.W

L.O.W

SET BACK

SET BACK

SERVICE ACCESS

52

51

50

49

53

54

55

56

57

48

47

46

PARKING ENTRY

PROPOSED BUILDING

45

WATER DUBAI CREEK

44

VEHICLE DROP OFF 43

14 42

13 41

15

31

12

40

UP

16 11

30

PROPOSED PARKING

39

17

UP

10

29 38

18 9

28 37

19

5

8 27 36

20

4

7 26 35

21

3

6 25 34

22

2

PROPOSED LANDSCAPE

24 33

23

1

32

PARKING EXIT

SET BACK

SET BACK

SET BACK

L.O.W

L.O.W

L.O.W

AL JADAF MARINE

Site plan A1

A

B

C

E

D

I

H

G

F

J

K

L

79.0m

SITE PLAN

32.4m

SCALE 1:500

46.5m

23.5m 4.0m

8.9m

13.5m

6.0m

4.5m

25.7m

8.9m 4.5m

4.7m

5.7m

10.3m

10.8m

8.1m

4.8m

PROJECT NORT A1 A202

SET BACK

SET BACK

SERVICE ACCESS

SET BACK

SERVICE ACCESS

SERVICE ACCESS A1 A301

SERVICE ENTRY

W1

SERVICE DOOR

W3

9.9m

12.4m

1

A1 A251

RESTROOM

OFFICES

50sq.m

100sq.m

RESTROOM

STORAGE

50sq.m

100sq.m

MAIN GALLERY 500sq.m

UP

EGRESS

2.5m

2 3

OFFICE ENTRY

PARKING ENTRY

MAIN STAIR LOBBY 100sq.m

41.3m

VEHICLE DROP OFF

IN

MA

UP

ENTR

UP

16.9m

EGRESS

Y

A1 A201

TICKET BOOTH 10sq.m

WATER DUBAI CREEK

CAFE

150sq.m

ADMINISTRATION

4 2.6m

20sq.m

E

AP

SC

ND

LA

Y

TR

EN

3

7 5 17

10

SOUVENIRS SHOP 50sq.m

9.5m

12.1m

5

A1 A303

W2

6 PROPOSED LANDSCAPE

C1 A251

A1 A203

C1 A252

A1 252

CONCRETE

FIRST FLO HANDICAP

Ground floor plan

A1

FIRST FLOOR PLAN SCALE 1:200

A 1


Wall section model

OF m

RAPET

NISHED ROOF

3

7-5-17

100% DD

AB

AB

WALL SECTION A

RENDERED WALL SECTION A

Section perspectives

A 303


Û± RIGID INSULATION

FOLDED ALUMINIUM ROOF FLASHING ROOF CONSTRUCTION:PLASTIC WATERPROOF SHEATHING 160 240mm RIGID FOAM ON SLOPE BITUMENOUS VAPOR BARRIER 10mm CHIPBOARD 50mm TRAPEZOIDAL SHEET BATT INSULATION STEEL ANGLE 2mm SHEET ALUMINIUM CASING WIRE MESH ACOUSTIC SUSPENDED CEILING RECESSED CAN LIGHTING

FACADE POST WITH FIXING GROOVE 10mm Corten Panels [1000mm * 2000mm]

GLAZING [10mm + 16mm CAVITY 10+m]

ALUMINIUM GLAZING STRIP, FLUSH

CURTAIN WALL

COMPOSITE LIGHTWEIGHT CONCRETE DECK SPRINKLER SYSTEM

STEEL GIRDER

COCNRETE PANELS

CORTEN LOUVRE

STEEL COLUMN

CONCRETE FLOOR BASE PLATE

WATER PROOFING

ISOLATION JOINT RETAINING WALL

3" MIN. COVER REINFORCING STEEL

ANCHOR ROD GRAVEL EARTH

Detailed wall section


40

Muweilah Community Center

University project Location: Sharjah Description: This project seeks to provide opportunities for cultural growth, social exchange and entertainment to individual in muweila the community district. In addition to generating the first units of the neighbourhood . These neighbourhood units will help foster a localized sense of identity which the emirates needs., And can provide a counterbalance on the neighbourhood scale. The muweila community center is a facility that will cater to the issues of multi cultural society. It can hold course workshops, promote exhibitions, host seminars and provide spaces and opportunities tailored for children, parents and families.

Vegetation

Program Blocks

Circulation and Egress

Functional exteriors

Landscape zones and circulation

Audience Dancers General public

Program circulation diagram

Exterior shading structures



Ground floor plan

Section B-B

Longitudinal section

Section c-c



44

Design build

Pulse Location: Sharjah (preserved areas) Description: Mixed-use shaded/functional pathway linking two campus buildings.



46

Side projects and sketches

Neonomads Location: Sharjah (preserved areas) Description: Desert camping shelter for environmental scientists working in the area


FORM AND LIGHT-

CONTOUR

ARC401 | ADEGUNWA ODULANA | 46793

A

FORM AND LIGHT-

CONTOUR

ARC401 | ADEGUNWA ODULANA | 46793 C

A

FORM AND LIGHT-

CONTOUR

ARC401 | ADEGUNWA ODULANA | 46793 C

A

C

B

B

C

PLAN 1

PLANS PLAN 1

PLANS PLAN 1

B

PLAN 2

A

B

PLAN 2

A

PLAN 2

A

B

PLAN 3

B

PLAN 3

SCALE 1:1

C

SCALE 1:1

C

PLAN 3

SCALE 1:1

PLANS

SECTION A-A

SECTIONS

SECTION A-A

SECTIONS

SECTION A-A

SECTIONS

IMAGES

IMAGES

IMAGES

INTERIOR RENDERS

INTERIOR RENDERS

INTERIOR RENDERS

SECTION B-B

SECTION C-C

SECTION B-B

SECTION C-C

SECTION B-B

SECTION C-C

SCALE 1:1

SCALE 1:1

SCALE 1:1


+971 (0)507190923

hamzatgunwa@gmail.com


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.