6
62/$5 3$1(/6
5 522)
6 '$
Project Description
/289(5(' :,1'2:
3,7&+,1* 32,17
The project brief was to design an eco-pod for a semi-rural site in the Clare Valley. The clients wanted a small upmarket off grid self-sufficient pod to house guests wanting a retreat from the city and engage with the local Aboriginal culture, the Nagadjuri people. The overall concept is to touch the ground lightly and provide a comfortable space for guests to enjoy the peacefulness of the site, no matter the weather, and engage with the local aboriginal culture through a sense of place while providing oppurtunities for them to enjoy food cooked with indidengious ingredients.
3,7&+,1* 32,17
5 :$//
/$5*( ),;(' :,1'2: 1. 2. 3. 4. 5. 6. 7. 8. 9.
))/
)/225 '5$,1
Wardu Pod
/2* 6($7
685()227 6<67(0
),5( 3,7
10. 11. 12. 13. 14. 15.
52&. :$//
16. 17. 18. 19. 20.
5 6863(1'(' )/225
(Wombat pod)
SECTION 01 0
1:50
Solar Panel Bracket for solar panels Galvanised Corugated Roofing 76mm Steel Purlins 125x60x6mm RHS 310mm Box Gutter Folded galvanised top flashing 50mmØ Downpipe 19x122mm Spotted Gum Timber Cladding left to grey Folded Galvanised bottom flashing Fly Screen to BAL29 Spec. Glass Louvered Window 76mm Light Gauge Steel Framing 75mm R2.0 Earth Wool Insulation 50mm Durapanel Wall Panel with plywood finish Quartz Stone wall cladding 300x300x18mm packer panel Metal section furring channel 125mm R3.0 Earth Wool ceiling insulation Sisalation
SECTION 01 - DETAIL A
2.5m
0
1:10
500mm
6
3
62/$5 3$1(/6 2
1
6 '$
&$6(0(17 3,927 :,1'2:
6/,',1* '225 5
3,7&+,1* 32,17
:$7(57$1.
%$* $1' &/27+(6 6725$*(
1. 2. 3. 4. 5.
4
0
))/
100m
MASTER PLAN 1:5000 SITE BOUNDRY
QUARTZ SPINE
WARDU SITE ACCESS
PROPOSED LOCATION FOR VIEWING PLATFORM
SITE 1 - WARDU
PROPOSED LOCATION FOR CARPARK
SITE PATHS
PROPOSED SITE LOCATIONS 1. WARDU (WOMBAT) 2. WURDLU (KANGAROO) 3. BINDI-GARU (MAGPIE) 4. BARDNA (GECKO) 5. GURRAGI (WHITE COCKATOO)
WATER WALKING PATHS EXISTING ROAD WAY
*5281' /(9(/
PROPOSED LOCATOIN FOR SERVICES BUILDING
6 '%
EXISTING BUILDINGS 1. COTTAGE 2. SHED 3. HOUSE
%,2*$6 ',*(6725
PROPOSED EVAC SITE
1,&+( )25 1,&.1$&.6
EXISITING VEGETATION PROPOSED GARDEN AREA PROPOSED GATHERING LOCATION
)/2$7,1* 48((1 6,=( %('
6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.
Galvanizved corrugated roofing 75mm Steel Flange Galvanized barge trim Folded Galvanised top flashing 19x122mm Spotted Gum Shiplapped Timber Cladding left to grey Blocking for timber cladding Sisalation 145mm R3.5 Insulation 120x60x6mm RHS BEAM 300x300x18mm Durapanel Packing Panel 50mm Durapanel Wall Panel with plywood finish 76mm Light Gauge Steel Framing 75mm R2.0 Earth Wool Insulation 300x300x18mm Durapanel Lintel Double Glazed Casement/Pivot Window Folded Galvanised bottom flashing Fly Screen Compatible with BAL29
3,7&+,1* 32,17
SECTION 02 0
1:50
2.5m
SECTION 02 DETAIL A
0
1:10
500mm
12pm
3pm
9am
515pm
730am
Summer Solstice
3pm
12pm
))/
9am
6pm
Equinox
6am 830pm
Winter Solstice
SOLAR ANALYSIS
1. 2.
PASSIVE COOLING DESIGN
Casement /Pivot Window 19x122mm Spotted Gum Timber Cladding 3. 50mm Durapanel Wall Panel with plywood finish 4. 76mm Light Gauge Steel Framing 5. 20mm Air Gap 6. 75mm R2.0 Earth Wool Insulation 7. 75x75x2mm SHS Coloumn 8. 20mm Hardwood Timber Floor 9. 150mm Insulation 10. 150mm Light Guage Steel Joists 11. Moisture Barrier 12. Surefoot Footing System
*5281' /(9(/
SECTION 02 DETAIL B
0
SUMMER SOLSTICE - DECEMBER 22nd
1:10
500mm
WINTER SOLSTICE - JUNE 22nd
Adam Hingston (A1712776)
Plan Detail A 0
1:10
500mm
DESIGN STUDIO 3 - ASSINGMENT 3 - FINAL DESIGN PG.3
19x122mm Spotted Gum Timber Cladding left to grey 2. 20mm Air Gap 3. 76mm Light Gauge Steel Framing 4. 75mm R2.0 Earth Wool Insulation 5. 75x75x2mm SHS Column 6. Corner Piece 7. Water Heater 8. 50mm Durapanel Wall Panel with Plywood finish 9. Plywood Sheething 10. Cement Screed 11. Quartz Stone Cladding Wall 12. Copper Shower
1.