Facility Condition Assessment – December 20, 2021

Page 10

MOUNT VERNON COMMUNITY SCHOOL

BUREAU VERITAS PROJECT: 148303.21R000-011.354

2. Building and Site Information

Systems Summary Condition

System

Description

Structure

Concrete beams and columns with cast-in-place floors

Façade

Primary Wall Finish: Brick Windows: Aluminum

Roof

Primary: Flat construction with single-ply TPO/PVC membrane Secondary: Hip construction with metal finish

Interiors

Walls: Painted CMU, glazed brick Floors: Carpet, VCT, quarry tile Ceilings: ACT

Fair

Elevators

Passenger: One hydraulic car serving all three floors

Fair

Plumbing

Distribution: Copper distribution and PVC waste and venting Hot Water: Gas domestic boilers with storage tanks Fixtures: Toilets, urinals, and sinks in some restrooms

Fair

HVAC

Central System: Boilers, chillers, and cooling tower feeding ventilators Non-Central System: Packaged units and Split-system heat pumps

Fair

Fire Suppression

Fire extinguishers only

Fair

Electrical

Source and Distribution: Main switchboard with copper wiring Interior Lighting: linear fluorescent

Fair

Fire Alarm

Alarm panel with smoke detectors, heat detectors, alarms, strobes, pull stations, back-up emergency lights, and exit signs

Fair

Equipment/Special

Commercial kitchen equipment

Fair

Site Pavement

Asphalt lots with limited areas of concrete aprons and pavement and adjacent concrete sidewalks, curbs, ramps, and stairs

Fair

Good Fair

8 www.us.bureauveritas.com | p 800.733.0660

Good


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Facility Condition Assessment – December 20, 2021 by ACPSk12 - Issuu