BIM Coordination Portfolio - Abeer Khalid

Page 1


Portfolio

2019 - 2024

Abeer Khalid

An experienced BIM Coordinator with a strong background in US, Indian, and Dubai projects. 5 years of expertise in optimizing BIM processes, fostering collaboration, and delivering efficient construction outcomes.

Abeer Khalid BIM Coordinator

December 2023

- Ongoing

Nationality: Indian

Living in: Dubai, UAE

D.O.B: 16/07/1996

Studio International Engineering Consultant, Dubai

BIM Coordinator

• Implementing a proper BIM setup for BIM coordination processes including model’s setup and clash detection and mitigation processes using internal CDE and engaging BIM and design teams from different stakeholders.

• Managing and supervising 3D design coordination process and clash analysis.Conducting workshops for critical issues/clashes.

• Providing training and support for project team members on BIM tools and Processes.

July 2023

- December 2023

Ecoxax, Dubai

BIM Coordinator

• Testing and installing add-ins for project team members. Frequently using add-ins are DiRoots One, pyRevit, BIM Interoperability, Property Enhancer etc.

• Creating Revit initial setups ; Project browser, Loading BIM contents with naming standards as per BEP, Loading

• Shared/Project parameters as per LOI, Creating view templates, Filters etc.

• Setting up Quality Assurance and Quality Control Procedures inclusive of optimized review, checklists, QC Schedules etc.

October 2022

- Ongoing

Novatr,India

Industry Guide

• As an IG at Novatr, I provide expert guidance and support to learners, addressing their BIM-related queries and facilitating their proficiency in software tools such as Revit, Navisworks, and Twinmotion.

August 2021

- May 2022

RÀ, Texas, USA

BIM Architect

• Worked on a single & double story villa which is located in Lockhart, Texas.

• Created Revit families to make the design process smooth.

• Performed quality checks at each stage of submissions.

November 2020

- July 2021 .efficiently, Seattle, USA

Junior BIM Architect

• Created a BIM Model according to project requirements

September 2019

- March 2020

July 2018

- November 2018

Bim Srv, Noida, India

Junior Architect

• Worked on a US-based scan to BIM projects.

Arcop Associates Pvt. Ltd., New Delhi, India

Intern

• Actively worked on detailing the design of IICC Dwarka.

• Worked on the RCP of IICC along with flooring.

December 2017

- May 2018

June 2016

- July 2016

SAK Consultant, Jeddah, Saudi Arabia

Intern

• Worked on a room layout of a 5-star Hotel. Also worked on the interiors and exteriors.

TYA & Associates, Jeddah, Saudi Arabia

Intern

• Delivered two variations of mosque, modern & classic style.

Education

Integral University, Lucknow, India

Bachelors of Architecture (2015 -2020)

DPS Jeddah, Jeddah, Saudi Arabia

Senior Secondary School (2014)

Certification

Techno Struct Academy

BIM Ready Complete (2021)

Software skills

Revit - Advance

Autocad - Advance

Naviswork - Advance

Photoshop - Intermediate

Sketchup - Advance

Lumin - Advance

Twinmotion - Intermediate

Major Projects

YAS Waterworld

GHAF Woods

IICC Dwarka, India

AL Dar Mosque Project, UAE

Dubai Uptown Tower, UAE

G+2 Khawaneej School, UAE

ADEK AL Riyad School, UAE

Major Projects

YAS Waterworld Abu Dhabi

Miral Experiences - Ongoing

Ghaf Woods

Majid Al Futtaim - 2023

Hudayriyat Island

MODON - 2023

Lockhart

RA Sanctuary - 2021

Revit Modelling

2021

YAS Waterworld Abu Dhabi

Spread over 37 acres, the UAE’s mega water park offers the ultimate water adventure where guests can enjoy more than 40 rip-roaring rides, slithering slides, and amazing experiences at different thrill levels catering for the whole family.

Elements of the existing facility have been designed with the future expansion in mind. The total plot size including Expansion Phases 3 and 4 is 138,864.41 sqm. The current Expansion area scope is approximately 18,000 sqm.

As a BIM Coordinator, I was responsible for multi-disciplinary coordination to maintain quality of Geometry and Information, from concept to current 100% DD Stage from March 2023 to present.

Multi-D co-ordination with all the consultants involved in the project, Using Navisworks, Revizto etc.

Developed custom clash matrix for Navisworks and standardization of clash matrix for organization.

Highlighting & resolving major co-ordination issues through BIM 360/ACC Issue Management

Creating & developing smart workflows using Autodesk software and Dynamo scripts and other add ins & plug ins. E.g., Automated Revit Audit checklist which Complies of ISO 19652, B.S 1192 and BEP

Creating interactive dashboard in Power BI to present weekly progress to PMC & Client. E.g., Mode! health, Model Progress, Issue Management, Navisworks clash detection

Setting up CDE in cloud platforms such as ACC/BIM360 complaint with ISO 19650

Presenting weekly & milestone progress to PMC & Client.

Ghaf Woods

Set amidst the expansive landscape of Dubailand, Ghaf Woods boasts a remarkable ratio of trees to residents, creating an environment where nature thrives. Here, the outdoors offer a refreshing coolness and pristine air quality. Interconnected by forest pathways, the neighborhood offers an immersive experience, with every unit enjoying direct views of nature. Farm-to-table cuisine is at the heart of the community, enhancing the connection between residents and their environment.

My role in the project was to conduct weekly clash test and highlight clashes to the respective teams. I also managed documents on BIM360, consuming and sharing packages. and maintained and update BIM documents like MIDP and BEP.

Project Goals

Improve project efficiency

Improve Apartment layouts

Adjust Powder Room,, Living/Dining

Shared bathroom in 3 bedrooms

Basement layouts

Improve circulation

Improve entrance experience

Better visitor parking distribution

Building Architecture

Simplify the Architecture

Resolve Façade landscaping

Condense the roof MEP plant

Revise Landscape, Combine pool

MEP / HVAC

Natural ventilation to the basement

Air Cooled Tower

Centralized irrigation tank, Optimization of MEP Space

Digital Delivery

1. WIP Daily work on our central Revit filles, each speciality with its own folders. Only task team can access the work in progress data 2. SHARED Approved Data is shared with other task teams and delivery teams or appointing party after check/review approval

3. PUBLISHED

Official project data according to EIR & BEP or milestones in different formats as per EIR & BEP to be used for detailed design or construction

4. ARCHIVED Journal

Published in Docs

Packaged Consumed Packaged not Consumed

Developed BIM documents like Master information delivery plan at all delivery stages

HUDAYRIYAT ISLAND

For beachfront vibes, catch-ups with friends and fun-filled family days out, Hudayriyat Island is your one-stop destination. Just across the water from Al Bateen you’ll find everything you need for a great day or night, from sports facilities to restaurants, glamping to play parks and more.

For this specific project, I was ensuring all the models are following BIM requirements from using correct parameters, coordinate and grids setup and overall model health.

I also conducted bi weekly model health, highlighting the concerns to the respective teams. and working on coordination with Naviswork.

Setting up 3D federated view for BIM 360 reviews.
Checking the model health
Checking the model health

Making sure the parameters are as per standards and all the details are filled correctly.

Digital Delivery

Lockhart

One of my initial projects, Lockhart showcases my modelling skills. In Texas, USA, the project focuses on aesthetic, geographical and technological elements necessary to nurture their inhabitants.

Revit Modelling

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
BIM Coordination Portfolio - Abeer Khalid by abeer khalid - Issuu