AASHEER BHATIA
PORTFOLIO
SELECTED WORKS
FREELANCE_WORK
BASEMENT AT R70 GK-1
INTERIOR TURNKEY
BEDROOM AT CHATTARPUR
INTERIOR TURNKEY
BEDROOM DESIGN - CHATTARPUR
INTERIOR DESIGN
BEDROOM DESIGN - MAGNOLIAS
INTERIOR DESIGN
INTERIOR LAYOUT AND MEP 2400 MM WIDE + 5700 MM FIRE STAIRCASE T = 300 mm R = 153.85 mm W = 2000 mm No. of Risers = 26 G.TOILET (MALL) UP 2400 MM WIDE CORRIDOR + 5700 MM LVL. 2400 MM WIDE CORRIDOR + 5700 MM LVL. EXPANSION JOINT UP ToiletShaft Fire Shaft L.TOILET PROPOSED PASSAGE PROPOSED PASSAGE MAIN STAIRCASE T = 300 mm R = 152.08 mm W = 2000 mm No. of Risers = 24 58'-4" 1'-51 2 " 28'-9" WD WD WD Female Toi 11'4"X10'8" Male Toi 10'7"X10'10" Staff Toilet 7'8"X5'6" Pantry 12'1"X8'0" Center Head 9'3"X13'6" Sales 14'5"X9'10" Classrooms 14'3"X24'10" Reception 12'6"X22'-10" Council Cabins 7'11"X8'2" 4'10" Wide Passage Classrooms 14'0"X21'10" Classrooms 14'3"X24'10" Classrooms 14'3"X24'10" Classrooms 14'3"X24'10" Council Cabins 8'1"X8'2" Store 13'11"X8'2" 3'6" Wide Passage 26'-6" 3'-3" 23'-0" Teachers Cabin 11'0"X9'8" Council Cabins 6'9"X9'8" Council Cabins 6'9"X9'8" BLT 10'1"X11'8" Printer Electrical room 10'1"X8'5" Server 10'1"X7'8" 3'6" Wide Passage Printer Printer PROJECT CODE DWG. NO. © THIS DRAWING AND DESIGN REMAINS THE PROPERTY OF FALCON CONTRACTS AND MAY NOT BE COPIED WITHOUT PRIOR WRITTEN APPROVAL FROM THE COMPANY. CHECKED BY DATE OF EDIT DRAWN BY 25.07.2022 L(00)01 BYJUS GAZIABAD LAYOUT OPTION 2FOR APPROVAL 25.07.2022 FIRE STAIRCASE STAIRS PLUS LIFT CORE LIFT Reception Feature wall with logo Stage Stage Center Head 9'-6.5"X11'-11" WD WD WD Electrical room 6'0"X6'-5" Sales/BLT 23'5"X11'-10" Teacher Cabins 10'-3"X11'-10" Classrooms 20'11"X11'-10" Classrooms 22'2"X14'5" Classrooms 21'11"X14'5" Classrooms 22'2"X14'4" Classrooms 21'11"X14'4" Stage Stage Stage Server/UPS 10'-9"X6'0" Council Cabins 10'-10"X7'-3" Council Cabins 10'-10"X7'-3" Council Cabins 9'-0.5"X7'-4" Female Toi 9'-7"X7'-3" Male Toi 8'-1.5"X10'-7" Reception 18'-4"X25'-9" 4'-0" Wide Passage 4'-0" Wide Passage (from column edge) 3'-0" Wide Passage Thermal Scanner & Automatic Sanitizer Staff/Handicapped Toilet 8'-6.5"X7'-3" Council Cabins 8'-10.5"X7'-4" Pantry 7'11"X10'-7" Store 9'5.5"X7'-3" PRINTER Store 4'-0"X7'0" 4'-0" Wide Passage 4' 3'-0" Wide Passage PRINTER
BYJU’s (2 TUITION CENTRES)
BYJU’s (2 TUITION CENTRES)
INTERIOR LAYOUT AND MEP
4' FIRE STAIRCASE STAIRS PLUS LIFT CORE LIFT Reception Feature wall with logo Stage Stage Center Head 9'-6.5"X11'-11" WD WD Server room 6'3"X7'-10" Sales/BLT 23'5"X11'-10" Teacher Cabins 9'-8"X11'-10" Classrooms 21'6"X11'-10" Classrooms 22'2"X14'5" Classrooms 21'11"X14'5" Classrooms 22'2"X14'4" Classrooms 21'11"X14'4" Stage Stage Stage Electrical/UPS 10'-7"X5'11" Council Cabins 10'-10"X7'-3" Council Cabins 10'-10"X7'-3" Council Cabins 9'-0.5"X7'-4" Female Toi 10'-7"X7'-3" Male Toi 10'-1.5"X10'-7" Reception 18'-4"X25'-9" 4'-0" Wide Passage 4'-0" Wide Passage (from column edge) 3'-0" Wide Passage Thermal Scanner & Automatic Sanitizer Staff Toilet 5'-6.5"X7'-3" Council Cabins 8'-10.5"X7'-4" Pantry 7'11"X10'-7" Store 9'5.5"X7'-3" PRINTER Store 4'-0"X7'0" 4'-0" Wide Passage 3'-0" Wide Passage PRINTER 4' Ckt-7 TO LDB F13-F14 L15,E5 L15 F13 F14 E5 E5 E9 F18 L21,F18 L21 L21 L21 E9 F17 L20,F17 L20 L20 L20 E7 L9 L9 L9 L8 L8 L8 F2 F3 E8 LDB UPSDB RPDB Battery VTPNDB L16 L16 L16 L17 L17 L5 L17 L11 F6 F5 E1 E1 Ckt-4 TO LDB F5-F5 L11,E1 Ckt-5 TO LDB F4-F5 F7-F8 L12,E2 L13 F10 F9 E3 E3 F9-F10 L13,E3 L12 F8 F7 E2 E2 Ckt-6 TO LDB Ckt-8 TO LDB F11-F12 L14,E4 L14 F11 F12 E4 E4 E9 F16 L19 L19 L19 E8 E8 E8 L4 E8 E8 L4A L4A E8 E8 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 L2 Ckt-1 TO LDB L1-L4A E7 L19,F16 E7 L6 L6 L6 E9 F15 L18 L18 L18 L18,F15 E8 L7 L7 L7 F1 L7,F1 E8 TO MCB Ctrl E7 L10 L10 L10 F4 F4,L10 Ckt-2 TO LDB L24-L25 L24 L24 L24 L24 L24 E8 E8 L25 L25 E8 L26 L26 L26 L26 L27-L28 L28 L28 L27 L27 L27 E8 E8 E9 E8 L23 L23 L23 L23 E9 L22 L22 L22 L22 Battery L3 L4 L4 L4 L4 L4 L4 L4 L4 L4 L5 L5 E8 E7 L5-7 Ckt-3 TO LDB Ckt-9 TO LDB E9 E9 TO MCB Ctrl E7 TO MCB Ctrl F2-F3 L8-L9 L11 L11 L11 L12 L12 L12 L13 L13 L13 L14 L14 L14 L15 L15 L15 L16 L17 F19 F19 L1 Square fabric hanging light Circular Recessed lights 2'x2' LED LIGHT FIXTURE LEGEND Cylinderical Lights Circular Surface mounted lights 6A Emergency Switch 6A/10A Raw Power Switch 6A Switch for exhaust fan LINEAR LIGHT 2000X400 1No.s of 10A Switch 2M 1No.s of 10A Switch, 1No.s of 10A Switch No.s of fan regulators 4M 2No.s of 10A Switch 2M R a w P o w e UPS Power SWITCH BOX DETAILS FROM THIS CONSTRUCTION DRAWINGS, THE CONTRACTOR R0 REV NO: R1 R2 APPROVED BY: CLIENT : DRAWN BY: GENERAL CONTRACTORS : CHECKED BY: SCALE: DRAWING TITLE: DATE: PROJECT : BYJU: MATHURA CENTER Lighting LAYOUT 3. ALL DIMENSIONS ARE IN FEET INCHES AND LEVELS ARE IN 6. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON SITE GENERAL NOTES: R3 R4 CENTRE CODE: DAV00221 Sri Raghavendra #1&2, 4th Main Road, P.J Extension, Davangere, Karnataka-577002 R0 28-04-22 AASHEER NTS 28-4-22 -4' FIRE STAIRCASE STAIRS PLUS LIFT CORE LIFT Reception Feature wall with logo Stage Stage Center Head 9'-6.5"X11'-11" WD WD Server room 6'3"X7'-10" Sales/BLT 23'5"X11'-10" Teacher Cabins 9'-8"X11'-10" Classrooms 21'6"X11'-10" Classrooms 22'2"X14'5" Classrooms 21'11"X14'5" Classrooms 22'2"X14'4" Classrooms 21'11"X14'4" Stage Stage Stage Electrical/UPS 10'-7"X5'11" Council Cabins 10'-10"X7'-3" Council Cabins 10'-10"X7'-3" Council Cabins 9'-0.5"X7'-4" Female Toi 10'-7"X7'-3" Male Toi 10'-1.5"X10'-7" Reception 18'-4"X25'-9" 4'-0" Wide Passage 4'-0" Wide Passage (from column edge) 3'-0" Wide Passage Thermal Scanner & Automatic Sanitizer Staff Toilet 5'-6.5"X7'-3" Council Cabins 8'-10.5"X7'-4" Pantry 7'11"X10'-7" Store 9'5.5"X7'-3" Store 4'-0"X7'0" 4'-0" Wide Passage 3'-0" Wide Passage 4' 2Hr Fire rated partitions LDB UPSDB RPDB Battery Battery VTPNDB C.D C.D SPK SPK R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 U2 U2 U2 U2 U10 U10 R12 C.D C.D SPK SPK R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 U2 U2 U2 U2 U10 U10 R12 R12 R12 R12 Battery C.D C.D SPK SPK R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 U2 U2 U2 U2 U10 U10 C.D C.D SPK SPK R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 U2 U2 U2 U2 U10 U10 R12 C.D C.D U6 U14 U6 U8 U12 U12 U12 U8 U8 U12 U8 C.D C.D R12 U8 U9 U9 U12 U12 C.D C.D U6 U6 U6 U14 U6 U6 C.D C.D U5 U14 U5 U5 U5 C.D U5 U14 U5 U5 U14C.D R12 C.D R12 R12 U15 U16 U15 U15 U15 U15 C.D C.D SPK SPK R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 U2 U2 U2 U2 U10 U10 R8 R9 R9 R10 R9 R11 R11 R11 LEGEND Controlled by 10 Switch 6A Socket with Switch for SVM UPS @ 1200MM FROM FFL R0 REV NO: R1 R2 APPROVED BY: CLIENT : DRAWN BY: GENERAL CONTRACTORS : CHECKED BY: SCALE: DRAWING TITLE: DATE: PROJECT : BYJU: MATHURA CENTER Power LAYOUT ARCHITECT'S ENGINEER'S APPROVAL PRIOR TO SFL REPRESENTS STRUCTURAL FLOOR LEVEL FFL No. Description Date R3 R4 CENTRE CODE: DAV00221 Sri Raghavendra #1&2, 4th Main Road, P.J Extension, Davangere, Karnataka-577002 R0 28-04-22 AASHEER NTS 28-04-22 SIBIN -
4' FIRE STAIRCASE STAIRS PLUS LIFT CORE LIFT Reception Feature wall with logo Stage Stage Center Head 9'-6.5"X11'-11" WD WD Server room 6'3"X7'-10" Sales/BLT 23'5"X11'-10" Teacher Cabins 9'-8"X11'-10" Classrooms 21'6"X11'-10" Classrooms 22'2"X14'5" Classrooms 21'11"X14'5" Classrooms 22'2"X14'4" Classrooms 21'11"X14'4" Stage Stage Stage Electrical/UPS 10'-7"X5'11" Council Cabins 10'-10"X7'-3" Council Cabins 10'-10"X7'-3" Council Cabins 9'-0.5"X7'-4" Female Toi 10'-7"X7'-3" Male Toi 10'-1.5"X10'-7" Reception 18'-4"X25'-9" 4'-0" Wide Passage 4'-0" Wide Passage (from column edge) 3'-0" Wide Passage Thermal Scanner & Automatic Sanitizer Staff Toilet 5'-6.5"X7'-3" Council Cabins 8'-10.5"X7'-4" Pantry 7'11"X10'-7" Store 9'5.5"X7'-3" PRINTER Store 4'-0"X7'0" 4'-0" Wide Passage 3'-0" Wide Passage PRINTER 4' 2Hr Fire rated partitions LDB UPSDB RPDB Battery Battery VTPNDB Battery HVAC CABLE TRAY 300X150 POWER CABLE TRAY LEGEND DATA CABLE TRAY 100X50 FROM THIS CONSTRUCTION DRAWINGS, THE CONTRACTOR R0 REV NO: R1 R2 APPROVED BY: CLIENT : DRAWN BY: GENERAL CONTRACTORS : CHECKED BY: SCALE: DRAWING TITLE: DATE: PROJECT : BYJU: MATHURA CENTER Cable tray LAYOUT 3. ALL DIMENSIONS ARE IN FEET INCHES AND LEVELS ARE IN 6. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON SITE GENERAL NOTES: No. Description Date COMMENTS : R3 R4 CENTRE CODE: DAV00221 Sri Raghavendra #1&2, 4th Main Road, P.J Extension, Davangere, Karnataka-577002 R0 28-04-22 AASHEER NTS 28-04-22 -4' FIRE STAIRCASE STAIRS PLUS LIFT CORE LIFT Reception Feature wall with logo Stage Stage Center Head 9'-6.5"X11'-11" WD WD Server room 6'3"X7'-10" Sales/BLT 23'5"X11'-10" Teacher Cabins 9'-8"X11'-10" Classrooms 21'6"X11'-10" Classrooms 22'2"X14'5" Classrooms 21'11"X14'5" Classrooms 22'2"X14'4" Classrooms 21'11"X14'4" Stage Stage Stage Electrical/UPS 10'-7"X5'11" Council Cabins 10'-10"X7'-3" Council Cabins 10'-10"X7'-3" Council Cabins 9'-0.5"X7'-4" Female Toi 10'-7"X7'-3" Male Toi 10'-1.5"X10'-7" Reception 18'-4"X25'-9" 4'-0" Wide Passage 4'-0" Wide Passage (from column edge) 3'-0" Wide Passage Thermal Scanner & Automatic Sanitizer Staff Toilet 5'-6.5"X7'-3" Council Cabins 8'-10.5"X7'-4" Pantry 7'11"X10'-7" Store 9'5.5"X7'-3" PRINTER Store 4'-0"X7'0" 4'-0" Wide Passage 3'-0" Wide Passage PRINTER 4' 2Hr Fire rated partitions LDB UPSDB RPDB Battery Battery VTPNDB Battery A/D SVM DATA point for CCTV 2500mm From FFL DATA point for CCTV On Ceiling DATA point for WIFI On Ceiling DATA point Height To be referred in the Interior Layout. POE DATA point for SVM DATA point for Access Above Door LEGEND On Wall @ 1200 From FFL accordiing to furniture 1200mm From FFL/ accordiing to furniture FEETS UNLESS STATED OTHERWISE. R0 REV NO: R1 R2 APPROVED BY: CLIENT : DRAWN BY: GENERAL CONTRACTORS : CHECKED BY: SCALE: DRAWING TITLE: DATE: PROJECT : BYJU: MATHURA CENTER Data LAYOUT SHOWN IN THE DRAWINGS ARE STRUCTURAL MASONARY GENERAL NOTES: No. Description Date R3 R4 CENTRE CODE: DAV00221 Sri Raghavendra #1&2, 4th Main Road, P.J Extension, Davangere, Karnataka-577002 R0 28-04-22 AASHEER NTS 28-04-22 -
BYJU’s (2 TUITION CENTRES)
G.TOILET (MALL)
INTERIOR LAYOUT AND MEP
MAIN STAIRCASE T = 300 mm R = 152.08 mm W = 2000 mm No. of Risers = 24 2400 MM WIDE CORRIDOR + 5700 MM LVL. 2400 MM WIDE CORRIDOR UP 58'-3" 1'-51 2 28'-9" ToiletShaft Fire Shaft PROPOSED PASSAGE 56'-21 2 " WD WD WD Female Toi 11'4"X10'8" Male Toi 10'7"X10'10" Staff Toilet 7'8"X5'6" Pantry 12'1"X8'0" Center Head 9'3"X13'6" Sales 14'5"X9'10" Classrooms 14'3"X24'10" Reception 12'6"X22'-10" Council Cabins 7'11"X8'2" 4'10" Wide Passage Classrooms 14'0"X21'10" Classrooms 14'3"X24'10" Classrooms 14'3"X24'10" Classrooms 14'3"X24'10" Council Cabins 8'1"X8'2" Store 13'11"X8'2" 3'6" Wide Passage 26'-6" 3'-3" 23'-0" Teachers Cabin 11'0"X9'8" Council Cabins 6'9"X9'8" Council Cabins 6'9"X9'8" BLT 10'1"X11'8" Printer Electrical room 10'1"X8'5" Server 10'1"X7'8" 3'6" Wide Passage Printer Printer E1 F2 L6,F2 L6 L6 L6 E1 F1 L5,F1 L5 L5 E3 F7 L11,F7 L11 L11 E1 L7 L7 L7 E3 L10 L10 L10 F6 L10,F6 L10 L10 F3 F3-F4 E3 L13 L13 L12 F9 F8 E3 F8 L12 F14-F16 L20,E5 E5 L20 Ckt-8 TO LDB F17-F19 L21,E6 E6 L21 Ckt-9 TO LDB F11-F13 L19,E4 E4 L19 Ckt-7 TO LDB F20-F22 L22,E7 E7 L22 Ckt-10 TO LDB F23-F24 L23,E8 F24 E8 Ckt-11 TO LDB E1 LDB UPSDB RPDB Battery Battery VTPNDB E3 E3 E3 E3 E3 E3 E3 E3 E2 E2 E2 E2 E2 E2 E3 E3 E1 E1 E2 L7 L7 L3 L3 L3 L3 L3 L3 L12 L14 L14 L14 L14 L14 L14 L14 L15 L15 L15 L16 L16 L16 L16 L17 L17 L17 L17 L17 L18 L18 L18 L18 L18 L1 L2 L19 L19 L19 L19 L19 L20 L20 L20 L20 L20 L21 L21 L21 L21 L22 L22 L22 L22 L23 L23 L23 L23 L8 L8 L25 L26 E4 E5 E6 E7 E8 F12 F13 F15 F16 F18 F19 F21 F22 F23 L1-L3 L16,F10 E1 TO MCB Ctrl E3 TO MCB Ctrl TO MCB Ctrl Ckt-1 TO LDB Ckt-6 TO LDB Ckt-4 TO LDB Ckt-5 TO LDB Ckt-2 TO LDB L9 L9 L9 E1 F9 L13 L26 L26 L26 L26 E2 L25 L25 L25 L25 E2 F5 F4 F5 L26 L4 L4 L12 L13 L18 L25 L3 L3 L13 L13 Square fabric hanging light Circular Recessed lights LEGEND Cylinderical Lights Circular Surface mounted lights 6A Emergency Switch 6A/10A Raw Power Switch 6A Switch for exhaust fan LINEAR LIGHT 2000X400 1No.s of 10A Switch 2M 1No.s of 10A Switch, 1No.s of 10A Switch No.s of fan regulators 4M 2No.s of 10A Switch 2M R a w P o w e UPS Power SWITCH BOX DETAILS FROM THIS CONSTRUCTION DRAWINGS, THE CONTRACTOR R0 REV NO: R1 R2 APPROVED BY: CLIENT : DRAWN BY: GENERAL CONTRACTORS CHECKED BY: SCALE: DRAWING TITLE: DATE: PROJECT : BYJU: GAZIABAD RAJNAGAR CENTER Lighting LAYOUT 3. ALL DIMENSIONS ARE IN FEET INCHES AND LEVELS ARE IN ANY DOUBT DISCREPANCY. 6. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON SITE GENERAL NOTES: OF ANY WORK. R3 R4 CENTRE CODE:- R0 23-08-22 AASHEER NTS 21-08-22 -FALCON-CONTRACTS 31-08-22 LEGEND Near the ODU Out Door Type 6A Socket with Switch for Speaker 6/16A Socket controlled by 10A switch below the Counter for Crusher G.TOILET (MALL) MAIN STAIRCASE T = 300 mm R = 152.08 mm W = 2000 mm No. of Risers = 24 2400 MM WIDE CORRIDOR + 5700 MM LVL. 2400 MM WIDE CORRIDOR UP 58'-3" 1'-51 2 28'-9" ToiletShaft Fire Shaft PROPOSED PASSAGE 56'-21 2 " WD WD WD Female Toi 11'4"X10'8" Male Toi 10'7"X10'10" Staff Toilet 7'8"X5'6" Pantry 12'1"X8'0" Center Head 9'3"X13'6" Sales 14'5"X9'10" Classrooms 14'3"X24'10" Reception 12'6"X22'-10" Council Cabins 7'11"X8'2" 4'10" Wide Passage Classrooms 14'0"X21'10" Classrooms 14'3"X24'10" Classrooms 14'3"X24'10" Classrooms 14'3"X24'10" Council Cabins 8'1"X8'2" Store 13'11"X8'2" 3'6" Wide Passage 26'-6" 3'-3" 23'-0" Teachers Cabin 11'0"X9'8" Council Cabins 6'9"X9'8" Council Cabins 6'9"X9'8" BLT 10'1"X11'8" Printer Electrical room 10'1"X8'5" Server 10'1"X7'8" 3'6" Wide Passage Printer Printer LDB UPSDB RPDB Battery Battery VTPNDB C.D C.D SPK SPK U1 U15 R1 R1 C.D C.D SPK SPK U1 U15 R2 R2 C.D C.D SPK SPK U2 U16 R3 R3 C.D C.D SPK SPK U16 R4 R4 C.D C.D U3 U17 R5 U13 U19 U19 U13 U13 U19 C.D U8 C.D U8 U14 R11 C.D C.D R9 R9 R9 R9 R9 R10 R12 R12 R11 R10 R14 U10 U9 C.D U4 U5 U5 U18 U12 C.D UPS U4 U12 U4 R6 R7 R7 R6 R11 C.D U9 U9 U14 U9 U10 U10 U1 U1 U1 U1 U1 U1 U2 U2 U2 U2 U2 U2 U2 U3 U3 U3 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R2 R2 R2 R2 R2 R2 R2 R2 R2 R2 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R4 R4 R4 R4 R4 R4 R4 R4 R4 R4 R5 R5 R5 R5 R5 R5 R5 R5 U6 U6 U6 U7 U7 U11 U11 U12 U12 U12 U12 U14 U14 U17 U15 U15 U16 U16 U11 U11 U11 U12 U12 U12 U8 R13 R13 U20 C.D U20 C.D U18 R10 U18 U20 U7 R8 R8 R14 U4 U7 FROM THIS CONSTRUCTION DRAWINGS, THE CONTRACTOR APPROVED BY: CLIENT : DRAWN BY: CHECKED BY: SCALE: DRAWING TITLE: DATE: Power LAYOUT 3. ALL DIMENSIONS ARE IN FEET INCHES AND LEVELS ARE IN ANY DOUBT DISCREPANCY. 6. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON SITE GENERAL NOTES: OF ANY WORK. No. Description Date AASHEER NTS 05-05-22 -R0 REV NO: R1 R2 GENERAL CONTRACTORS PROJECT : BYJU: GAZIABAD CENTER R3 R4 CENTRE CODE:FALCON-CONTRACTS R0 23-08-22 31-08-22
DATA point for CCTV On Ceiling DATA point for WIFI On Ceiling HDMI point USB point DATA point NA Height To be referred in the Interior Layout. POE DATA point for SVM LEGEND On Wall @ 1200 From FFL accordiing to furniture 1200mm From FFL/ accordiing to furniture G.TOILET (MALL) MAIN STAIRCASE T = 300 mm R = 152.08 mm W = 2000 mm No. of Risers = 24 2400 MM WIDE CORRIDOR + 5700 MM LVL. 2400 MM WIDE CORRIDOR UP 58'-3" 1'-51 2 28'-9" ToiletShaft Fire Shaft PROPOSED PASSAGE 56'-21 2 " WD WD WD Female Toi 11'4"X10'8" Male Toi 10'7"X10'10" Staff Toilet 7'8"X5'6" Pantry 12'1"X8'0" Center Head 9'3"X13'6" Sales 14'5"X9'10" Classrooms 14'3"X24'10" Reception 12'6"X22'-10" Council Cabins 7'11"X8'2" 4'10" Wide Passage Classrooms 14'0"X21'10" Classrooms 14'3"X24'10" Classrooms 14'3"X24'10" Classrooms 14'3"X24'10" Council Cabins 8'1"X8'2" Store 13'11"X8'2" 3'6" Wide Passage 26'-6" 3'-3" 23'-0" Teachers Cabin 11'0"X9'8" Council Cabins 6'9"X9'8" Council Cabins 6'9"X9'8" BLT 10'1"X11'8" Printer Electrical room 10'1"X8'5" Server 10'1"X7'8" 3'6" Wide Passage Printer Printer LDB UPSDB RPDB Battery Battery VTPNDB A/D SVM A/D FROM THIS CONSTRUCTION DRAWINGS, THE CONTRACTOR APPROVED BY: CLIENT DRAWN BY: CHECKED BY: SCALE: DRAWING TITLE: DATE: Data LAYOUT 3. ALL DIMENSIONS ARE IN FEET & INCHES AND LEVELS ARE IN ANY DOUBT DISCREPANCY. 6. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON SITE GENERAL NOTES: OF ANY WORK. No. Description Date AASHEER NTS 28-04-22R0 REV NO: R1 R2 GENERAL CONTRACTORS : PROJECT BYJU: GAZIABAD CENTER R3 R4 CENTRE CODE:FALCON-CONTRACTS R0 23-08-22 31-08-22 G.TOILET (MALL) MAIN STAIRCASE T = 300 mm R = 152.08 mm W = 2000 mm No. of Risers = 24 2400 MM WIDE CORRIDOR + 5700 MM LVL. 2400 MM WIDE CORRIDOR UP 58'-3" 1'-51 2 " 28'-9" ToiletShaft Fire Shaft PROPOSED PASSAGE 56'-21 2 WD WD WD Female Toi 11'4"X10'8" Male Toi 10'7"X10'10" Staff Toilet 7'8"X5'6" Pantry 12'1"X8'0" Center Head 9'3"X13'6" Sales 14'5"X9'10" Classrooms 14'3"X24'10" Reception 12'6"X22'-10" Council Cabins 7'11"X8'2" 4'10" Wide Passage Classrooms 14'0"X21'10" Classrooms 14'3"X24'10" Classrooms 14'3"X24'10" Classrooms 14'3"X24'10" Council Cabins 8'1"X8'2" Store 13'11"X8'2" 3'6" Wide Passage 26'-6" 3'-3" 23'-0" Teachers Cabin 11'0"X9'8" Council Cabins 6'9"X9'8" Council Cabins 6'9"X9'8" BLT 10'1"X11'8" Printer Electrical room 10'1"X8'5" Server 10'1"X7'8" 3'6" Wide Passage Printer Printer FEETS UNLESS STATED OTHERWISE. APPROVED BY: CLIENT : DRAWN BY: CHECKED BY: SCALE: DRAWING TITLE: DATE: FAS LAYOUT SHOWN IN THE DRAWINGS ARE STRUCTURAL MASONARY BEFORE COMMENCING ANY WORK OR SHOP DRAWING. ANY GENERAL NOTES: No. Description Date SUHAIB NTS 05-05-22 R0 REV NO: R1 R2 GENERAL CONTRACTORS : PROJECT BYJU: GAZIABAD CENTER R3 R4 CENTRE CODE:FALCON-CONTRACTS R0 23-08-22
INTERNSHIP_WORK
INTERNSHIP DRAWINGS
STUDIO JN x WDI STUDIOS
INTERNSHIP DRAWINGS
TOILET 3Ds
INTERNSHIP DRAWINGS
STUDIO JN x WDI STUDIOS
℄WALL 150 150 150 600 400MM STONE SEAT ℄WALL SLOPE 2% SLOPE 4% SLOPE4% 100 100 NICHE AS PER ELEVATION +12MM threshold 500 ℄SPACE 100 935 815 330 660 © THIS DRAWING AND DESIGN REMAINS THE PROPERTY OF JEYANTHI NADESALINGAM AND MAY NOT BE COPIED WITHOUT PRIOR WRITTEN APPROVAL FROM THE COMPANY. DATE OF EDIT DRAWN BY RESIDENCE FOR Mr & Mrs Syal and Family 615A DLF CAMELLIAS GOLF COURSE RD., GURGAON TOILET 1 PLUMBING PART 1/2 SD JN 01.01.2022 JN134 A(74)11 FOR APPROVAL DATE:.............. 1:30 0 0.5 MTS CIVIL SCHEDULE OF FIXTURES 10. Bottle Trap @550mm FFL @ 1000MM FFL @400mm FFL 13. Angle Valve @400mm FFL 13. Angle Valve @550mm FFL © THIS DRAWING AND DESIGN REMAINS THE PROPERTY OF JEYANTHI NADESALINGAM AND MAY NOT BE COPIED WITHOUT PRIOR WRITTEN APPROVAL FROM THE COMPANY. CHECKED BY XREF RESIDENCE FOR Mr & Mrs Syal and Family 615A DLF CAMELLIAS GOLF COURSE RD., GURGAON TOILET 1 JN 29.03.2022 JN134 A(74)12 1:30 0 0.5 1 MTS DRAINAGE WATER SUPPLY lvl +2400 BOFC lvl +900 Sink top lvl +00 FFL lvl +3000 BOFC lvl +550 Bottle trap & angle valve lvl +760 Counter top 200 lvl +2400 BOFC lvl +900 Sink top lvl +00 FFL lvl +3000 lvl +1800 WC back-wall lvl +300 Lower ledge lvl +550 Bottle trap & angle valve lvl +760 Counter top lvl +1800 WC back-wall lvl +300 Lower ledge 620 820 400 SOUTH ELEVATION NORTH ELEVATION EAST ELEVATION WEST ELEVATION 300 250 400 TOILET 1 ELEVATIONS A(74)13 RESIDENCE FOR Mr & Mrs Syal and Family 615A, DLF CAMELIAS GOLF COURSE RD. GURGAON NORTH SCALE STATUS FORMAT CHECKED BY DATE OF EDIT PROJECT CODE DWG NO. REV. A3 SD April 22, 2022 JN134 jeyanthi@jeyanthinadesalingam.com
TOILET SECTION AND LAYOUT
FALSE CEILING SECTIONS
125 250 R150 250 125 325 R150 250 PROJECT CODE DWG. NO. © THIS DRAWING AND DESIGN REMAINS THE PROPERTY OF JEYANTHI NADESALINGAM AND MAY NOT BE COPIED WITHOUT PRIOR WRITTEN APPROVAL FROM THE COMPANY. REV. FORMAT CHECKED BY DATE OF EDIT DRAWN BY A3 XREF REV. DATE BY RESIDENCE FOR Mr & Mrs Syal and Family 615A , DLF CAMELLIAS GOLF COURSE RD., GURGAON CEILING SECTIONS TYPICAL DETAILS 5-6 SD JN 21.05.2022 JN134 A(35)03 LVL BOS. +3375 FROM FFL LVL BOFC. +2850 FROM FFL +3450 FROM FS Linear LED Light. SECTION 5 125 mm Opening for AC Grille LVL BOS. +3375 FROM FFL LVL BOFC. +2850 FROM FFL Linear LED Light. SECTION 6 125 mm Opening for AC Grille ASSUME FLOOR FINISH TO BE 75MM FROM RAW FLOOR SLAB. 8 x 8mm Groove b/w POP ceiling and AAC Block work 8 x 8mm Groove b/w POP ceiling and AAC Block work 0.05 0 0.2 0.15 0.1 0.25 MTS 1:5 GOOD FOR CONSTRUCTION 150 125 125 50 25 25 200 400 125 400 125 200 125 125 75 25 25 50 400 125 400 125 PROJECT CODE DWG. NO. © THIS DRAWING AND DESIGN REMAINS THE PROPERTY OF JEYANTHI NADESALINGAM AND MAY NOT BE COPIED WITHOUT PRIOR WRITTEN APPROVAL FROM THE COMPANY. REV. FORMAT A3 XREF REV. DATE RESIDENCE FOR Mr & Mrs Syal and Family 615A , DLF CAMELLIAS GOLF COURSE RD., GURGAON CEILING SECTIONS TYPICAL DETAILS 9-10 21.05.2022 JN134 A(35)05 LVL BOS. +3375 FROM FFL LVL BOFC. +2925 FROM FFL Linear LED Light. SECTION 9 150 mm Opening for AC Grille LVL BOS. +3375 FROM FFL LVL BOFC. +3175 FROM FFL Linear LED Light. SECTION 10 ASSUME FLOOR FINISH TO BE 75MM FROM RAW FLOOR SLAB. LVL BOFC. +3050 FROM FFL LVL BOFC. +2925 FROM FFL LVL BOFC. +3050 FROM FFL LVL BOFC. +3175 FROM FFL Linear LED Light. LVL BOFC. +2850 FROM FFL 0.05 0 0.2 0.15 0.1 0.25 MTS 1:5 GOOD FOR CONSTRUCTION DATE:..............
FIRE STAIRCASE VRF DN FHC presu. VOID DUCT PRESU. UP MASTER BEDROOM 1 5470 X 7010 DRESS 2770 4630 TOILET 4580 2100 POWDER TOILET 2320 1590 DRESS 1900 X 2500 buffet counter BEDROOM 3800 X 5520 FHC STUDIO 3350 X 3210 TOILET 4 3800 X 2000 LIVING DINING ROOM 11510 X 6410 BALCONY Washing machine/ dryer / extra sink KITCHEN 3760 X 6800 TOILET 2 1850 3750 SERVICE ALLY FOYER 5450 X 3260 GUEST BEDROOM 4300 X 5900 GUEST BEDROOM 3750 X 5900 TOILET 2950 1600 DRESSER 3 3500 X 2550 LOUNGE 6910 3450 sliding door STAFF ROOM 2630 X 2900 STAFF ROOM 2 2970 2750 LOBBY 2250 X 5650 BALCONY BALCONY SECTION 02 SECTION 01 SECTION 01 SECTION 02 location for CCTV DVR FIRE PANEL DATA LINE EPABX CALL POINT PROJECT CODE © THIS DRAWING AND DESIGN REMAINS THE PROPERTY OF JEYANTHI NADESALINGAM AND MAY NOT BE COPIED WITHOUT PRIOR WRITTEN APPROVAL FROM THE COMPANY. CHECKED BY DRAWN BY XREF REV. DATE BY RESIDENCE FOR Mrs & Mr NAGRATH 414A DLF CAMELLIAS GOLF COURSE RD., GURGAON ELECTRICAL LIGHTING CIRCUIT SD JN 20.01.2019 JN124 L04 FOR APPROVAL DATE:.............. 1:100 0 1 2 3 4 5 MTS GENERAL NOTES 1. ALL DIMENSIONS ARE IN MM 2. VERTCAL DROP COUNDUITS ALONG SHEAR WALLS COLUMN NOT TO CHAISED. 3. GC TO USE MATERIAL AS DLF GUIDELINES. © THIS DRAWING AND DESIGN REMAINS THE PROPERTY OF JEYANTHI NADESALINGAM AND MAY NOT BE COPIED WITHOUT PRIOR WRITTEN APPROVAL FORMAT CHECKED BY DATE OF EDIT A3 RESIDENCE FOR MRS & MR NAGRATH 414A DLF CAMELLIAS GOLF COURSE RD., GURGAON PLUMBING FIXTURE DIMENSION JN 20.01.2019 JN124 L08 FOR APPROVAL 1:100 0 1 2 3 4 5 MTS FIRE STAIRCASE VRF DN FHC presu. VOID DUCT PRESU. UP MASTER BEDROOM 1 5470 X 7010 DRESS 2770 4630 TOILET 4580 2100 POWDER TOILET 2320 X 1590 DRESS 1900 X 2500 buffet counter BEDROOM 3800 X 5520 FHC STUDIO 3350 X 3210 TOILET 3800 2000 LIVING DINING ROOM 11510 X 6410 BALCONY Washing machine/ dryer / extra sink KITCHEN 3760 X 6800 TOILET 2 1850 3750 FOYER 5450 X 3260 GUEST BEDROOM 4300 X 5900 GUEST BEDROOM 3750 X 5900 TOILET 2950 1600 DRESSER 3 3500 X 2550 LOUNGE 6910 X 3450 Lockable sliding door STAFF ROOM 2630 X 2900 STAFF ROOM 2 2970 2750 LOBBY 2250 X 5650 BALCONY BALCONY SECTION 02 SECTION 01 SECTION 01 SECTION 02 location for CCTV DVR FIRE PANEL DATA LINE EPABX CALL POINT PROJECT CODE © THIS DRAWING AND DESIGN REMAINS THE PROPERTY OF JEYANTHI NADESALINGAM AND MAY NOT BE COPIED WITHOUT PRIOR WRITTEN APPROVAL FROM THE COMPANY. CHECKED BY DRAWN BY XREF REV. DATE RESIDENCE FOR Mrs & Mr NAGRATH 414A DLF CAMELLIAS GOLF COURSE RD., GURGAON RCP SETTING OUT SD JN 05.12.2018 JN124 L35 FOR APPROVAL DATE:.............. 1:100 0 1 2 3 4 5 MTS GENERAL NOTES 1. ALL DIMENSIONS ARE IN MM 2. REFER TO INDIVISUAL SHEETS FOR LEGEND.
INTERNSHIP DRAWINGS
COWORKING SPACE LAYOUT OFFICE LAYOUT AND LIGHTING
18
Reception Conf-1 WS Area - 44+12 seats SEATING CAPACITY- GF · OFFICE-1 : 56 · OFFICE-2 : 45 · OFFICE-3 : 46 · HOTDESKS : 40 TOTAL : 187 Cabin-1 M.Room-1 M.Room-2 M.Room-4 WS Area 37 + 8 seats Cabin-1 M.Room-1 M.Room-2 WS Area - 38 + 8 seats OFFICE-1 OFFICE-2 OFFICE-3 M.Room-3 CAFE Open area Cabin-1 M.Room-2 Pantry/ Store M.Room - 1 PROJECT CODE DWG. © THIS DRAWING AND DESIGN REMAINS THE PROPERTY OF WDI STUDIOS PVT. LTD. AND MAY NOT BE COPIED WITHOUT PRIOR WRITTEN APPROVAL FROM THE COMPANY. FORMAT CHECKED BY DATE OF EDIT DRAWN BY A1 XREF WDI STUDIOS ARCHITECTURE DATE REV. GROUND FLOOR ENTERPRISE GROUND FLOOR, TOWER SECTOR 62, NOIDA, LOCATION AB 21.03.2022 L(00)01 ELEC. ROOM LIFT LOBBY SERVICE LIFT LIFT ELEC. ROOM JA L. TOI. G. TOI. H/C LIFT LIFT SHAFT 1500 MM WIDE BALCONY LIFT LOBBY 1050 MM HIGH RAILING 1050 MM HIGH RAILING FIRST FLOOR PLAN CAFE PANTRY CORRIDOR MEET. RM 5 TRAINING RM. CONF. RM. MD CABIN-(ALAKH) MEET. RM MEET. RM 2 MEET. RM 1 GAMES ROOM MD CABIN-(PRATEEK) SEATING CAPACITY WORKSTATIONS : 218 MD CABIN : 2 CONF. ROOM : 20 TRAINING : 24 MEETING ROOMS : 5 CAFETERIA : 40 GAMES ROOM SERVER TERRACE MEET. RM 4 MEET. RM 5 (TORQUE) TRAINING RM. (FORCE) CONF. RM. (GRAVITY) CABIN-(ENERGY) MEET. RM 3 (MOMENTUM) MEET. RM 2 (INFINITY) (OHMS) CABIN-(LIGHT) MEET. RM 4 (POTASSIUM) AVOID DUCT OVER MOVE TO ONE 900 765 1000 3790 1000 900 750 3790 1800 900 900 2345 1800 3790 1035 750 600 600 600 900 900 900 600 600 600 600 600 600 600 1800 1800 600 600 600 600 provision for fairy lights on pergola suspended track ceiling inset track 750 750 600 600 600 2645 2315 2585 600 600 600 600 1445 2345 Pendant Light 15 W warm white recessed light Gypsum false ceiling Emergency light E Cove light Pendant Light type-2 Fairy lights Track lighting 600 Helmet Light 2100 1375 2335 1005 250 900 1800 align edge SCHEDULE OF LIGHTS 450 450 450 450 900 450 900 450 1485 1215 900 545 545 450 450 900 1200 1200 600 600 1895 600 600 1100 695 2200 1000
INTERNSHIP DRAWINGS
42MM ARCHITECTURE
RCP PLAN
SECOND FLOOR TERRACE FLOOR FIRST FLOOR GROUND FLOOR BASEMENT FLOOR UP DN LVL +3'6" LVL +3'6" 1 3 5 7 9 11 -1 -3 -5 -7 -9 -11 R- 6" T- 11" W- 3'6" L3 L4 CUT OUT 9'-2" X 4'-7" D3 (7'-0" X 5'-4") LIFT 00-08 00-08-A (7'-0" X 5'-4") LIFT TOILET (8'0" x 6'1") UP D.B3 D.B4 R- 6" T- 11" W- 3'6" -1 -3 -5 -7 -9 -11 -13 -15 -17 -19 -21 -23 -25 L1 L2 CUT OUT 9'-2" X 4'-7" B-03 B-04 (7'-0" X 5'-4") LIFT UP DN 26 28 30 32 34 36 13 15 17 25 R- 6" T- 11" W- 3'6" L5 L6 CUT OUT 9'-2" X 4'-7" 19 21 23 D13 01-05 01-05-A UP DN 51 53 55 57 59 61 38 40 44 42 46 48 50 R- 6" T- 11" W- 3'6" L7 L8 CUT OUT 9'-2" X 4'-7" (7'-0" X 5'-4") LIFT D25 02-02 02-02-A 02-02-B DN 51 53 55 57 59 61 63 65 69 67 71 73 75 R- 6" T- 11" W- 3'6" L7 L8 CUT OUT 9'-2" X 4'-7" D36 (7'-0" X 5'-4") LIFT 03-02 03-02-A 03-02-B S S' S S' S S' S S' S S' T T' T T' T T' T T' T T' GFC 1. THIS DRAWING IS THE PROPERTY OF THE DESIGNERS. NO PORTION MAY BE USED OR REPRODUCED WITHOUT THEIR WRITTEN PERMISSION. 2. ALL DIMENSIONS ARE TO BE VERIFIED ON THE SITE BY THE CONTRACTOR. ANY DISCREPANCIES ARE TO BE REPORTED TO THE DESIGNERS IMMEDIATELY. 3.THIS DRAWING IS TO BE READ IN CONJUGATION WITH THE DESIGNERS SPECIFICATIONS AND CONDITIONS OF CONTRACT. 4. DRAWINGS NOT SHOWING THE LATEST REVISIONS TO BE CANCELED. 5. ALL DIMENSIONS ARE TO BE READ, NOT SCALED. 6. ALL INDICATED LEVELS ARE FINISHED LEVELS. A.S.01 DRWG. NO. R3 R2 R1 R0 13.02.20 ISSUE No SHEET TITLE STAIRCASE DETAIL PROJECT Jeevan choudhary's residence PROJECTCODE NOTES TITLE1 TITLE2 TITLE3 TITLE4 TITLE5 TITLE6 TITLE7 Architect FOR INFORMATION TOILET 5'-9" X 11'-1 1 2 " 1'-0" 1'-0" 1'-0" 7 1 " 1'-11 1 2 4'-31 2 " 2'-8" 2" 1'-11" 1'-11" B A PLAN Grey stone flooring Grey stone Off white tile 1'-11" 1'-11" 2'-31 2 " 2'-31 2 " 2'-31 2 " 1'-10" 3'-6 1 2 " 2'-9" 2'-9" Lvl 8'0" FC
8'-0" False ceiling, 8'0" above floor level 50X50mm Groove W/C Window A/S Schedule Off white tile Framed mirror Sink 1'-6" 4'-0" 4'-0" 11 1 2 " Vanity in wood laminate Grey stone flooring SECTION A 1'-6" 4'-0" 4'-0" 8'-0" False ceiling, 8'0" above floor level 50X50mm Groove W/C Shower head Grey stone Framed mirror Sink Window A/S Schedule 11 1 2 1'-0 1 2 " 3'-6" Grey stone flooring Vanity in wood laminate Off white tile SECTION B THIS DRAWING IS THE PROPERTY OF THE DESIGNERS. ALL DIMENSIONS ARE TO BE VERIFIED ON THE SITE BY THE CONTRACTOR. ANY DISCREPANCIES ARE TO BE REPORTED TO THE DESIGNERS IMMEDIATELY. 3.THIS DRAWING IS TO BE READ CONJUGATION WITH THE DRAWINGS NOT SHOWING THE LATEST REVISIONS TO BE CANCELED. ALL DIMENSIONS ARE TO BE READ, NOT SCALED. PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION /Users/Aasheer/Desktop/D-190 toilet details 20200720.dwg, Mon Jul 27 16:02:27 2020, DWG To PDF.pc3
-25 -23 -21 -19 -17 -15 -13 -11 -9 -7 -5 -3 -1 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 SECTION TT' SECTION SS' NOTE: RISER 6" TREAD - 11" WIDTH - 3'6" NO. - 75 L1 L2 L3 L4 L5 L6 L7 L8 1 3 5 7 9 11 13 15 19 17 21 23 25 27 29 31 33 35 38 39 41 45 43 47 50 52 54 56 58 60 62 64 66 70 68 72 75 -19 -21 -23 -25 -7 -9 -11 -13 -15 -17 -3 -5 NOSING DETAIL SKIRTING DETAIL GFC 1. THIS DRAWING IS THE PROPERTY OF THE DESIGNERS. NO PORTION MAY BE USED OR REPRODUCED WITHOUT THEIR WRITTEN PERMISSION. 2. ALL DIMENSIONS ARE TO BE VERIFIED ON THE SITE BY THE CONTRACTOR. ANY DISCREPANCIES ARE TO BE REPORTED TO THE DESIGNERS IMMEDIATELY. 3.THIS DRAWING IS TO BE READ IN CONJUGATION WITH THE DESIGNERS SPECIFICATIONS AND CONDITIONS OF CONTRACT. 4. DRAWINGS NOT SHOWING THE LATEST REVISIONS TO BE CANCELED. 5. ALL DIMENSIONS ARE TO BE READ, NOT SCALED. 6. ALL INDICATED LEVELS ARE FINISHED LEVELS. A.S.02 DRWG. NO. R3 R2 R1 R0 13.02.20 ISSUE No SHEET TITLE STAIRCASE DETAIL PROJECT Jeevan choudhary's residence PROJECTCODE NOTES TITLE1 TITLE2 TITLE3 TITLE4 TITLE5 TITLE6 TITLE7 Architect FOR INFORMATION
INTERNSHIP DRAWINGS
PREM NATH AND ASSOCIATES (2019)
A' B' B' B'B' A'A' D' D' D'D'
INTERNSHIP DRAWINGS
PREM NATH AND ASSOCIATES (2019)
1.20 1.20 2.86 4.35 1.20 3.78 39.95 1.20 PLOT AREA DIAGRAM RG AREA DIAGRAM 1:500(A1) 1:800(A1) 8.66 20.65 6.30 4.001.35 1.95 1.20 0.40 3 5.05 6.50 0.75 0.75 21.00 14.71 18.56 26.51 3.30 16.00 9.16 26.15 67.79 6.95 0.75 6.00 20.85 38.76 67.45 5.04 6.00 ESS
COLLEGE_WORK
THESIS WORK
PANCHSILA CLUB REDEVOPMENT - A WELLNESS CLUB
SOL-PIE RESEARCH CENTER AND OFFICE, MANGAR INTRODUCTION
3RD YEAR, 1ST SEMESTER
This solar-piezo research center/office is placed in the Mangar Bani Forest reserve area of Faridabad. It brings a whole new perspective to a part semi-public work place where the entire roof structure is available for use for a select general public.
The aim of this project was to tackle the challenging landscape of the site with appropriate and efficient design that fosters maximum user movement and interaction.
This concept has been made possible by the Piezoelectric Pathway installed on the roof, as well as the Solar pavillion which is also being a major attraction point.
INTRODUCTION N
SOL-PIE RESEARCH CENTER AND OFFICE, MANGAR
SECTIONS AND VIEWS
LAKE-SIDE AREAS
SECTION BB’
SECTION CC’
INTERIOR COURTYARD
SECTION BB’
SECTION CC’
SECTIONS AND VIEWS
PIEZO-ROOF/PATH
STEPPED CORRIDORS, INDORE
HOUSING, 4TH YEAR, SITE PLAN
MAIN ROAD SIDE
N
PARK SIDE
STEPPED CORRIDORS, INDORE
CLUSTER PLAN WITH GRID
UP DN EXPLANATORY SECTION BB’ N
REFERENCE PLAN
DETAILED SECTION AA’
EXPLANATORY SECTION CC’
SECTIONS
MISCELLENIOUS/ART
FINE ARTS
Fine arts class assignements on playing with paper, helped in developing sense of design out of simple and scrap material and later fostered into a passion. Images are of 2nd year of college.
Developing understanding of different ways of moulding a simple and plain object like paper, understanding and studying texture, colour forms etc.
Created the center dress for 2019 ZONASA Convention, for which we recieved first place in Fashion, as well as for the overall convention
Lighting Installation and Wall design done as college fest and miscellenious projects. Some videography as well.
INSTALLATIONS/WALL/FASHION
MISCELLENIOUS/ART
DIGITAL ART
POLITICAL SATIRE: AMERICAN DEMOCRACY IN RUSSIA
REIMAGINGING SCALE: BURJ KHALIFA AS CIGGY AND CHANDELIER
Expressing situations by looking at prominent architectural works around the world and portraying them in a way that the graphics themselves tell a story. Art and architectural quality through digital media.
QUTUB MINAR IN DISTOPIAN SETTING
GEOMETRIC
SIMPILICITY?
DISTOPIAN AND UTOPIAN KUMBHALGARH
FINISH