YYH 2023 Work Sample @NYC

Page 1

YING-YU(Amber) HUANG

architecture | project management | collaborative

cell_(929) 338-9658 | email_qh0205@gmail.com

YINGYU HUANG. PRATT INSTITUTE . 2016 FALL

YING-YU(Amber) HUANG

architecture|management

architecture feasibility study hospitality mixed-use real eastate residential construction administration renovation academic

338-9658 | email_qh0205@gmail.com
cell_(929)

Far Rockaway Community Church

Construction Admin

1414 Central Ave, Queens, NY

Lot area: 30,000 sf

Area of work: 10,850 sf, Two stories

Year: 2020-2023

Responsibilities: W

• Construction Administration

• DD to CD development and bidding set production

• Coordinaitng and communicating with the complex teams involved in manifesting ideas into built realities

Interior Design: WQB Architecture PLLC

Architect: MAP, Magnusson Architecture and Planning

Construction: Pillar Property Management

architecture interior design hospitality

corporate real estate dev. residential construction administration renovation academic

Far Rockaway Church of Nazarene co-developed an affordable housing project for 180 apartments which included retaining the first and second floor of the building for use as a new church and community facilities. The sanctuary can host 700 people and has extensive audio-visual facilities with a 13 by 25 ft LED video screens available for use by community and community performance, wedding banquets and events. In close collaboration with contractor, engineer, and consultants, WQB has been working on the project since late 2019, seeing the project through from concept to construction. FRCC opened to the public on the 2nd of Auguest 2022.

137 West 14th St

Renovation

Change of use and 4th fl addition

137 West 14th St, New York, NY

Area: 13,200 sf, Cellar + 4 stories

Year: 2022-2023

Responsibilities:

• Analyze code and zoining regulations, produce planning and occupancy studies.

• SD, design layouts and options, to CD development and thorough knowledge of assembling CD, DOB set.

• NYC Department of Buildings coordination, assisting filing, review and solve plan review issues.

Structural Engineer: XU Consulting Engineering P.C.

MEP Engineer: CNY Engineering P.C.

DOB Consulting: YONA LOVE CONSULTING SERVICES, INC.

Workingwith Peen Sought Capital Management to convert the existing 3-story commercial building to a mixed-use building, including retail spaces, 9 luxury rental apartments, and 4th-floor addition.

The project includes analyzing ZLDA documents, zoning, and code regulation for the proposed 4th-floor addition, which parcel of the new building component will be underneath the adjacent building cantilever massing.

architecture interior
hospitality
design
corporate real estate dev. residential construction administration renovation academic
architecture

1098 & 1111 Utica Avenue

Rezoning, Mixed-use Building

1098 Utica Ave, Brooklyn, NY

Lot: 24,000 sf

Year: 2022-2023

Responsibilities:

• Analyze code and zoining regulations, produce planning and occupancy studies.

• Preliminary and schematic design development, design layouts and options, massing design, and modeling.

• Prearing and assembling meeting materils. Planning and Zoning Consultancy: Urban Cartographics

Clinet: Church of Nazarene

TWWhedesgine team assisted the Church of Nazarene for the proposed rezoning and development at 1098 Utica Avenue hopes to bring many of the aforementioned services more, in one central location, anchored by a neighborhood-based house of worship. Working with Urban Cartographics, WQB Architecture designed a new 14 story building with 190 affordable apartments and community facility sapces.

architecture interior design hospitality corporate real estate dev. residential construction administration renovation academic
architecture

Project Management

Central New York, NY

6 Avenue B, New York, NY

Lot: 1,817 sf

Year: 2023

Responsibilities:

• Conduct on site walkthrough and provide RFP

• PD and SD development, assemblyDOB filing set

• Communication and direction of architectural team to complete project tasks within design, schedule and budget requirements

Plymouth Tower | 340 East 93rd St, NY, NY

Lot Area: 25,176 sf, 30 stories

Year: 2017-2023

Responsibilities:

• Review and approve proposed alteration work per unit’s submission

• Assisted condo board to file Alt1 set to obatin building new C/O

• Provide consultation for building issues.

Plymouth Tower | 305 2nd Avenue, NY, NY

Lot: 21,431 sf, 10 stories

Year: 2019-2020

Responsibilities:

• Assembly DOB filing set, obtained permit and closed off

• Apt 901, 902, 801.

• Conducting Apt 902 for outdoor terrace addition amendment

414 Brightwater Court,Brooklyn, NY

Area of Work: 1,773

Year: 2018-2022

Responsibilities:

• Assembly DOB filing Alt1 set, legalization of two medical offices in the cellar, and obtaining new building C/O

•Report and coordinate with the management office, HPD, filing consultant, and project teams

Workingwith Peen Sought Capital Management to renovate the existing cellar+6-story mixed-use building to luxury rental apartments, and remove violations. The scope of works includes analyzing propertydocuments, BIS records, zoning, and searching code regulation for the proposed DOBNOW BUILD Alt2 filing.

architecture interior design hospitality corporate real estate dev. residential construction administration renovation academic
NOTES PROPOSED FLOOR PLAN A-500.00 NEW YORK, 10003 WQB Architecture PLLC 305 2ND AVE APT 801/902 NEW YORK, NY 10003 PROPOSED APT 902 ADDITION TERRACE SECTION LICENSED CONTRACTOR ALL WORK SHALL PERFORMED DONE IN ACCORDANCE OTHER TENANTS WITHOUT HOURS NOTICE STAIR DETAILS STAIR DETAILS RAILING DETAILS SITE SITE SITE

Hudson Mews

Mixed-use | 2018 July

485-505 9th Ave, New York, NY

Lot Area: 38,990 sqft

Responsibilities: Massing design

Elevation design development

Rendering

architecture interior design hospitality

corporate real estate dev. residential construction administration renovation academic

Thisnew 227-unit condominium building plus retail space on the 1st floor in midtown Manhattan. Located in proximity to the Lincoln Tunnel, the design evokes the vibe of the neighborhood. The clean and seamless curtain wall and irregularly arranged terrace create a primary grid, while metal spandrels and floor to floor window create modern, tactile layers which delineate the scale of the façade.

schematic section and setback WEST 37TH STREET WEST 38TH STREET 9TH AVENUE

Dyer Avenue

Mixed-use | 2018 August

485-505 9th Ave, New York, NY

Lot area: 80,675 sqft

Responsibilities:

Massing design

Elevation design development

Rendering

interior design hospitality corporate real estate dev. residential construction administration renovation academic

Thismixed-use 18-story tower in the heart of midtown Manhattan, Dyer Ave is a residential mass above Lincoln tunnel driveway and provides an accessible green public park on the ground level. The podium and residential towers portions of the building are demarcated by complementary white curtain walls in horizontal bulk. Double height lobbies of the respective spaces open up to the West 38 street through curtain glass walls. These are mirrored on the façade and the random terrace arranged around the building. There is two levels of the sky green park proposed on the 9th floor and the top floor has mezzanine apartments with their own double-height living spaces, and a roof deck contains numerous amenities.

architecture
Hudson Mews, New York, NY WQB Architecture PLLC Meyerson LLC 212 995 5600 F212 675 4228 w w. w q b a e s. m 8/9/2018 AIR RIGHT & MASTER PLAN DIAGRAM SCALE: 1/64"=1'-0" Dyer Avenue Scheme
schematic site planning proposal schematic site plan

The Corner Bethel

Lamdscaping development | 2018 September Bethel, New York, NY

Lot area: 12 acre

Responsibilities: Zoning research, Master planning Design Developmnet, Programing analysis

Drafting, 3d model, Rendering Co/op Rockwell groups, Interior design team

architecture interior design hospitality

corporate real estate dev. residential construction administration renovation academic

High-end hotel in the work for Bethel, a 100 keys hotel and 75,000square feet of retail and professional office space are planned for the intersection of routes 17B and 55 in the hamlet of White Lake in Sullivan County.

Plans for the Unscripted hotel include a large outdoor pool house and fitness center; expansive meetings and event space; and two food and beverage outlets, including a 2,000-square-foot restaurant and a graband-go eatery.

architecture interior hospitality

corporate multifamily residential

Birr Castle Orchard Retreat

Preservation of Culture & Environment | 2019 Feburary

Offly County, Ireland

Key: 66key

Responsibilities:

Schematic Design

Massing Study

3D Modeling

The 66 key Spa Hotel and 19 Cottage units offer meditative gardens of different characters and opportunities for rejuvenation and relaxation. It consists of two gardens, a formal courtyard and a natural park which complement the existing adjacent gardens of the Demesne.

The Birr Castle Orchard Retreat will be a destination resort within the grounds of the Castle Demesne. As a “living heritage”, Birr Castle offers visitors unparalleled opportunities for cultural preservation in the form of learning and education in history and science

The Upper Orchard Upper Orchard Garden Upper Orchard Aerial view Hotel Entrance Schematic Site Plan The Lower Orchard

Spring Valley Chirch if The Nazarene

Affordable Housing | 2019 October

103 N Main St Spring Valley, New York

Lot area: 38,990 sqft

Propject responsibility: Massing development

Developing ideas of Facade design

Rendering

Drafting

Preparer presentation set

Status: Ongoing

spring Valley is a new, multifamily building comprising 20,960 square feet in the Spring Valley neighborhood of suburb of New York City. The five-story building will house 67 residential affordable housing units. This project converts the existing church of the Nazarene property to five-story building and development with a local contractor and real estate agency. Also, the project combines three lots into one large scale lot area to enlarge zoning benefits and a green rooftop that will be accessible to all residents.pace to provide privacy while offering a comfortable outdoor activity space for families.

architecture interior design hospitality corporate multifamily residential
scheme 1 scheme 2
545 West 45th Street, 4th Floor New York, New York 10036 USA 212 995 5600 917 517 2330 Spring Valley Church of the Nazarene, Spring Valley, NY 10/08/2019 545 West 45th Street, 4th Floor New York, New York 10036 USA 212 995 5600 917 517 2330 Spring Valley Church of the Nazarene, Spring Valley, NY 10/08/2019 Proposed Floor Plan 545 West 45th Street, 4th Floor New York, New York 10036 USA 212 995 5600 917 517 2330 Spring Valley Church of the Nazarene, Spring Valley, NY 10/08/2019 545 West 45th Street, 4th Floor New York, New York 10036 USA 212 995 5600 917 517 2330 Spring Valley Church of the Nazarene, Spring Valley, NY 10/08/2019 Apartment Floor Plans

Rutherford Place

Renovation| 2019 July

305 2nd Avenue, New York, NY

Work area: Apt 702, 801, 901, 902

Status: PAA, ZD1, On going

Responsibilities:

Manage projects

Interior space planning

Involving SD, DD phase

Construction administration

Contact with consultants, vendors and clients

Drafting DOB filing set and conmunicate with expeditor team for filing PA, PAA

Tracking filing schdule on BIS online system

40 Water Street

Feasibility study | 2019 March 40 Water Street, New York, NY

Lot area: 1,462sft

Propject Responsibility:

Zoning analysis-Mixed-use Building

Design Developmnet

Massing analysis

Zoning diagram, sky exposure plane

Progaming proposal

architecture interior hospitality corporate multifamily residential
THK. FROSTED GLASS PROPOSED FLOOR PLAN A-500.00 NEW YORK, 10003 WQB Architecture PLLC 545 WEST 45TH STREET, 4TH FLOOR NEW YORK, 10036 Tel 212 995 5600 305 2ND AVE APT 801/902 305 2ND AVE APT 801/902 PROPOSED APT 902 ADDITION TERRACE ELEVATION PROPOSED APT 902 ADDITION TERRACE SECTION NOTES: LICENSED CONTRACTOR ALL WORK SHALL PERFORMED DONE IN ACCORDANCE WITH NEW YORK CITY BUILDING CODE OTHER TENANTS WITHOUT HOURS NOTICE STAIR DETAILS STAIR DETAILS RAILING DETAILS Apt 901 additional MBR Apt 901 additional MBR Apt 902 additional terrace, details, section Apt 901 additional MBR

Holiday Inn Express & Suites

Hotel | 2017 March

64-06 Queens Blvd, Woodside, NY

Lot area: 16,050sf

Status: Built

Responsibilities:

Co/op with in house architect execute interior bid set

Understanding franchise brand guidelines

Complete interior biding set includes guest rooms and public space, millwrok, Specs FF&E

Coordinating design layout with MEP, HVAC engineers

This new 227-unit condominium building plus retail space on the 1st floor in midtown Manhattan. Located in proximity to the Lincoln Tunnel, the design evokes the vibe of the neighborhood. The clean and seamless curtain wall and irregularly arranged terrace create a primary grid, while metal spandrels and floor to floor window create modern, tactile layers which delineate the scale of the façade.

architecture interior design hospitality corporate multifamily residential
interior

Parsons Boulevard

Residential Interior design | 2017 Decmber

42-23 Parsons Blvd, Flushing, NY

Lot area: 20,175sf

Status: Built

Responsibilities:

Co/op with in house architect execute interior bid set

Completed building interior bid set

Complete interior biding set includes public, common space and residentail unit, millwrok, Specs FF&E

Coordinating design layout with MEP, HVAC engineers

Boutique Hotel

Schematic Design | 2017 March

529 President Street, Brooklyn, NY

Lot area: 15.564sft

Status: Under construction

Propject Responsibility:

Schematic design Design Developmnet

Prepare DOB filing set

Coordinate with MEP and HVACengineers

architecture interior hospitality corporate multifamily residential
1-A 1-B 1-C 1-E (718) 445-2345 (718) 359-8809 Web: www.raymondchanarchitect.com 42-23 PARSONS BLVD, FLUSHING, PARSONS DEVELOPMENT BY NYC DEPT. BLDGS ON ZONING AND COMPASS CODE/ LOU BSA CALENDAR 259-07-A A102.00 FIRST FLOOR PLAN ADJ. BUILDING UNDER CONSTRUCTION 1 FIRST FLOOR FINISH PLAN Email: info@raymondchanarchitect.com 42-23 PARSONS BLVD, FLUSHING, PARSONS DEVELOPMENT BUILDING CODES. ALL CITY ENGINEERING. PC BSA CALENDAR 259-07-A A402.00 FIRST FLOOR FINISH PLAN 1-B 1-D DW.3 DW.3 DW.3 J.BOX DW.3 UT.2 UT.2 (718) 445-2345 Fax: (718) 359-8809 PARSONS DEVELOPMENT NOTE: ALL CITY ENGINEERING. COMPASS CODE/ LOU A302.00 FIRST FLOOR CEILING PLAN TYPE BATHROOM 4W/S.F LED(2700K) CT.1 S.S ELEVATOR SCALE: 1/2 1'-0" ELEVATOR CORRIDOR 6" 3'-9" 3'-9" 4W/S.F LED(2700K) 6" SCALE: 1/2 1'-0" LOBBY INTERIOR OPEN TO BEYOND LAMINATED GLASS 4W/S.F LED(2700K) EQ. EQ. 4'-6" 9'-10" 136-40 39TH AVENUE FLUSHING, NEW YORK 11354 42-23 PARSONS BLVD, FLUSHING, NOTE: ALL CITY ENGINEERING. PC BSA CALENDAR 259-07-A A-702.00 SCALE: 3/16" 1'-0" 1st FLOOR PLAN

Floating Campus

A cultural / Institutional Mixed Use Extension of CUNY| 2016 Fall Studio Brooklyn Navy Yard, New York, NY

Lot area: 6,429,961 sq ft

Program: Waterside Campus

Instructor: Henry Smith Miller

Archieved: Gragudation Inprosess 22

site plan

In the Fall studio project, we proposed “A cultural / institutional mixed use extension of CUNY, the City College of New York, a waterside Campus plan for the development of the BNY including but not limited to a core structure (or set of structures) with a total of some 50,000 square feet to 100,000 square feet, dedicated to the physical sciences; oceanic,atmospheric, ecological and environmental.

My idea is to generate space comes from two continuity surface which in between the space can develop and transform the room into a library, laboratory, classrooms, and café, etc. Indeed, my proposal was to make exterior tand interior space has no boundary and makes the campus could be a sculpture inside the Brooklyn Navy Yard.

architecture parametric design academic
skylight rotunda lecture hall student lounge lecture hall section

Dynamic Radical City

Central Park, New York, NY

Lot area: 843 acres

Program: Parametric Design Methodology

Instructor: Jason Vigneri-Beane and Thomas Leeser

Thisis a project explores radical changes transforming the surface of the existing city beyond cities. Conceived how to provide a new urban space in an existing high-density city. The idea comes from what is a space and how space defines by function and form. Original research that addresses a compact urban environment and socioeconomic issues.

Space can be generated by two simple lines also space could form by three-point. Indeed, space could be a single unit or as a cluster has organized composition.

By defined the connection between space relation of the interior to exterior, I found an interesting phenomenon which is the unceasing space sequence. The phase makes me have an idea that I could design space and space would rise by a continuity surface topology. This is the first step to develop a space condition by previous research. What’s the next approaching of the infinity dimension.

I apply the unceasing connection in an urban space attempt to reform a city landscape. The basic function in the city’s ground level is for commute or to link point by point. Yet if the ground level has altered landscape form what the city will be? What’s the novel prototype of continuous urban architectural type?

architecture parametric design academic
Existing city Analysis city data Regenerate budilng network Symbiotic surface of existing city
distribution
Radical city
Program
diagram

House s

Single Family Housing| 2011 September Hiunchu City, Taiwan

Lot area: 55,370 sqft

Status: Built

Responsibilities: Space planning Design Developmnet

Drafting, 3d model, Rendering, Physical model

Theproject is designed for single family and private use. In this case, I cooperated with an architect for assisting the 2D, 3D and design development which strengthen my professional skill also increase my professional acknowledges.

The project suspended for 3 threes long until July 2017 is completed. Built on a hillside, House S intentionally elevates the living space to provide privacy while offering a comfortable outdoor activity

space for families. An undulating wall running through the building defines the exterior and interior, separating the public space from the private. Within the building, the wall encircles the master bedroom and children’s room, forming the two main spaces, private and secure. Between the public and private spaces on each floor, three staggered terraces provide three different lifestyles and settings, enabling the owner and their children to retain their private spaces but also enjoy enriching interactions.

architecture parametric design academic residential
395.0 1630.0 225.0 495.0 940.0 515.0 DN STUDY/ TEA ROOM OPEN LIVING ROOM ENTRANCE D KITCHEN STORAGE C DINING ROOM E F1 DN A B UP 1730.0 十拓 開發設計有限公司 十拓開發設計有限公司 YARC Design architecutral misalinged practise 新竹林宅 B1F 1F G.L-325 2F 3F 地界線 G.L±0 地界線 FIX W1 W2 FIX W7 FIX FIX W8 W18 FIX FIX FIX FIX FIX FIX 1630.0 495.0 395.0 225.0 515.0 C D E BEDROOM MASTER BEDROOM B A LAUNDRY 109875 BEDROOM DN UP F2 十拓開發設計有限公司 YARC Design 新竹林宅 十拓 開發設計有限公司 B1F 1F G.L-325 2F 3F G.L±0 DW4 DW4 FIX W5 FIX FIX FIX FIX W10 W10 FIX FIX W11 W14 FIX W12 D2 W6 395.0 1630.0 495.0 515.0 225.0 BEDROOM BEDROOM F3 DN A B C D E 十拓開發設計有限公司 YARC Design 新竹林宅 台北市長安東路一段42號1樓 十拓 開發設計有限公司 FIX FIX W7 W18 FIX 320 320 159

cell_(929) 338-9658 | email_qh0205@gmail.com

YING-YU(AMBER) HUANG@2023 cell_(929) 338-9658 | email_qh0205@gmail.com

Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.