Asian Architecture Seminar Presentation

Page 32

Stage 1: Documentation i. Historical research

Ii. Measured drawing

Stage 2: Dilapidation Survey and Building Investigation gather and record information of the finished surfaces and exposed structure.

i. Site testing

ii. Laboratory test.

Prepare a proposal (renovation work can proceed only after a written approval)

Stage 3: Conservation Works

Top down process

i. Preservation:

Ii. Restoration :

iii) Adaptation :

(retains highest value or authenticity and historical fabric)

(emphasizes the retention and repair of historic materials, replace worn out materials to today’s new materials.)

giving a new purpose to the shophouse, turned into hotels, cafes, shops

(source: Preservation and Recycling of Heritage Buildings in Malacca, Wan Hashimah Wan Ismail, 2013)


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.